CN109976715A - A kind of software project development method and apparatus - Google Patents

A kind of software project development method and apparatus Download PDF

Info

Publication number
CN109976715A
CN109976715A CN201711464852.6A CN201711464852A CN109976715A CN 109976715 A CN109976715 A CN 109976715A CN 201711464852 A CN201711464852 A CN 201711464852A CN 109976715 A CN109976715 A CN 109976715A
Authority
CN
China
Prior art keywords
project
software
configuration file
management tool
developing instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711464852.6A
Other languages
Chinese (zh)
Inventor
李云
张鹏
施平
陈大庆
刘洋
侯兆森
王旭
谭朝丽
谷鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Beijing Co Ltd
China Mobile Hangzhou Information Technology Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Beijing Co Ltd
China Mobile Hangzhou Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Beijing Co Ltd, China Mobile Hangzhou Information Technology Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201711464852.6A priority Critical patent/CN109976715A/en
Publication of CN109976715A publication Critical patent/CN109976715A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/20Software design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The present embodiments relate to technical field of software development more particularly to a kind of software project development method and apparatus, comprising: the dependence according to the project structure of software project, between each sub-project for establishing the software project in the first software management tool;For every sub-project, the required developing instrument of the sub-project is determined, and the developing instrument in the second software management tool is introduced into first software management tool;In first software management tool, the exploitation of the software project is carried out according to the developing instrument of the dependence and each sub-project.Due to during developing to software project, while by the first software management tool and the second software management tool, so as to reduce development cycle, cost of labor, and then software development efficiency is promoted.

Description

A kind of software project development method and apparatus
Technical field
The present embodiments relate to technical field of software development more particularly to a kind of software project development method and apparatus.
Background technique
Currently, customization software application project is due to the features such as its business function is more, demand is changeable, it is desirable that software project Development cycle is shorter than common software project, so that the development task of customization software project is more nervous.It is opened implementing software project When hair, if project team will certainly cause the delayed development period, increase cost of labor not by existing Software Development Tools And the problems such as reducing software development efficiency.
Summary of the invention
The embodiment of the present invention provides a kind of software project development method and apparatus, to reduce by Software Development Tools Development cycle, cost of labor are to promote software development efficiency.
The embodiment of the present invention provides a kind of software project development method, comprising:
According to the project structure of software project, each sub-project of the software project is established in the first software management tool Between dependence;
For every sub-project, the required developing instrument of the sub-project is determined, and by the second software management tool In developing instrument be introduced into first software management tool;
In first software management tool, according to the progress of the developing instrument of the dependence and each sub-project The exploitation of software project.
Preferably, further include:
It is soft that the corresponding initial configuration file of the developing instrument in second software management tool is introduced into described first In part management tool;
The exploitation of the software project is carried out according to the developing instrument of the dependence and projects, comprising:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument The exploitation of the software project.
Preferably, further include:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file Item is identical as the configuration item in the initial configuration file but configuration content is different;
In compiling, according to current use environment, revision configuration file corresponding with the use environment is called.
Preferably, after creating the revision configuration file, further includes:
Different revision configuration files is stored in same file, and determines the path letter of each revision configuration file Breath;
It is described to call revision configuration file corresponding with the use environment, comprising:
The revision configuration file is called according to the routing information of each revision configuration file.
The embodiment of the present invention also provides a kind of software project development device, comprising:
Creation module establishes the software for the project structure according to software project in the first software management tool Dependence between each sub-project of project;
Determining module determines the required developing instrument of the sub-project for being directed to every sub-project, and by second Developing instrument in software management tool is introduced into first software management tool;
Development module, in first software management tool, according to opening for the dependence and each sub-project Hair tool carries out the exploitation of the software project.
Preferably, further include: introduce module;
The introducing module, for by the corresponding initial configuration file of the developing instrument in the second software management tool It is introduced into first software management tool;
The development module, is specifically used for:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument The exploitation of the software project.
Preferably, further include: calling module;
The creation module, is also used to:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file Item is identical as the configuration item in the initial configuration file but configuration content is different;
The calling module, for according to current use environment, calling corresponding with the use environment in compiling Revise configuration file.
Preferably, the creation module, is also used to: after creating the revision configuration file, different revisions being matched It sets file to be stored in same file, and determines the routing information of each revision configuration file;
The calling module, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
Another embodiment of the present invention provides a kind of calculating equipment comprising memory and processor, wherein the storage Device is for storing program instruction, and the processor is for calling the program instruction stored in the memory, according to the journey of acquisition Sequence executes any of the above-described kind of method.
Another embodiment of the present invention provides a kind of computer storage medium, the computer-readable recording medium storage has Computer executable instructions, the computer executable instructions are for making the computer execute any of the above-described kind of method.
Software project development method and apparatus provided by the above embodiment, comprising: according to the project structure of software project, The dependence between each sub-project of the software project is established in first software management tool;For every sub-project, really The fixed required developing instrument of the sub-project, and the developing instrument in the second software management tool is introduced into described first In software management tool;In first software management tool, according to the developing instrument of the dependence and each sub-project Carry out the exploitation of the software project.As can be seen that managing work by the first software first during software project development Tool establishes the dependence between each sub-project of software project, then determines the required exploitation work of every sub-project Tool, and be introduced into the first software management tool by the developing instrument in the second software management tool, finally in the first software In management tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to software item During mesh is developed, while by the first software management tool and the second software management tool, so as to reduce out Period, cost of labor are sent out, and then promotes software development efficiency.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly introduced.
Fig. 1 is a kind of flow diagram of software project development method provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the project structure relationship of software project provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of software project development device provided in an embodiment of the present invention.
Specific embodiment
In order to which the purpose of the present invention, technical solution and beneficial effect is more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used to explain this hair It is bright, it is not intended to limit the present invention.
Fig. 1 illustrates a kind of flow diagram of software project development method provided in an embodiment of the present invention, such as Shown in Fig. 1, this method can include:
S101, the project structure according to software project establish the software project projects in the first software management tool Between dependence.
S102, it is directed to each project, determines the required developing instrument of the project, and by the second software management tool In developing instrument be introduced into the first software management tool.
S103, in the first software project management tool, according to the developing instrument of dependence and projects carry out software The exploitation of project.
The project structure of software project in above-mentioned steps S101 may include three project structure relationships secondary layer by layer, these three Level is respectively: top layer operation system, middle layer logical capability and underlying basis tool.Wherein, top layer operation system, for pair It is outer that the system of business function is provided;Middle layer logical capability supports top layer industry for the realization layer of main business logic and subsystem Business system;Underlying basis tool does not include service logic, only provides corresponding for providing the tool and ability module on basis Software capability.
In the specific implementation, including three levels of top layer operation system, middle layer logical capability and underlying basis tool Project structure relationship software project, reference can be made to Fig. 2.
From figure 2 it can be seen that the software project includes five sub-projects, this five sons in this layer of top layer operation system Project is respectively: group customer portal, affiliate's portal, operation management system, third-party product access, polling service mould Block;This layer of logical capability includes three sub-projects to the software project in middle level, these three sub-projects are respectively: short message sends son System, service logic realize module, login authentication subsystem;The software project includes four sons in this layer of underlying basis tool Project, this four sub-project is respectively: master tool module, asynchronous message Queue module, data model objects module, business are slow Storing module.
From in Fig. 2 it can also be seen that each software sub-project between dependence,
(1) three of middle layer logical capability layer are directly relied on positioned at the sub-project " group customer portal " of top layer operation system Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(2) three of middle layer logical capability layer are directly relied on positioned at the sub-project " affiliate's portal " of top layer operation system Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(3) three of middle layer logical capability layer are directly relied on positioned at the sub-project " operation management system " of top layer operation system Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(4) the three of middle layer logical capability layer is directly relied on positioned at the sub-project " third-party product access " of top layer operation system Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(5) three of middle layer logical capability layer are directly relied on positioned at the sub-project " polling service module " of top layer operation system Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(6) subitem in underlying basis tool is directly relied on positioned at the sub-project " short message transmission subsystem " of middle layer logical capability Mesh " master tool module " and " service buffer module ".
(7) underlying basis tool neutron is directly relied on positioned at the sub-project " service logic realization module " of middle layer logical capability Project " master tool module ", " asynchronous message Queue module ", " data model objects module " and " service buffer module ".
(8) subitem in underlying basis tool is directly relied on positioned at the sub-project " login authentication subsystem " of middle layer logical capability Mesh " data model objects module " and " service buffer module ".
After determining the project structure of software project, software project and each can be established by the first software management tool Dependence between project.Wherein, the first software management tool may include but be not limited to Maven.When the first software manages work When tool is Maven, then software project and the software item as shown in Figure 2 can be established by the multimode constructing technology of Maven Dependence between each sub-project of purpose.
After establishing the dependence between software project and projects by the first software management tool, it can be directed to Every sub-project determines the required developing instrument of the sub-project.For example, it is directed to sub-project " short message transmission subsystem ", It can determine that the sub-project is needed using " timed task " and " caching component " in Spring boot.
It, can be by the exploitation work of the second software management tool after determining the required developing instrument of every sub-project Tool is introduced into the first software management tool, then in the first software management tool, according to dependence and each sub-project The exploitation of developing instrument progress software project.Wherein, the second software management tool may include but be not limited to Spring boot.
When the developing instrument of the second software management tool is introduced into the first software management tool, if the exploitation Tool further includes corresponding initial configuration file, then the developing instrument of the second software management tool is being introduced into the first software pipe While in science and engineering tool, the is also introduced into together with initial configuration file corresponding to the developing instrument in the second software management tool In one software management tool.Then, according to dependence, projects developing instrument and developing instrument corresponding to initially match Set the exploitation that file carries out software project.
It is different according to the function of each software project, it usually needs to soft from second in the development process of software project Configuration file corresponding to developing instrument is modified accordingly in part management tool, therefore, can also create developing instrument not With the revision configuration file of use environment, the configuration item in the revision configuration file is identical as the configuration item in initial configuration file But configuration content is different.
Specifically, being directed to same initial configuration file, in the development process of software project, one revision of configuration can customize Configuration file, the compilation process for software project;Also it can customize the test that another revision configuration file is used for software project Process.
Optionally, in order to simplify the maintenance cost of configuration, also different revision configuration files can be stored in same file In, and determine the routing information of each revision configuration file, then repaired according to the routing information calling of each revision configuration file Order configuration file.
" determine for example, the sub-project " short message subsystem " in above-mentioned Fig. 2 needs to use the developing instrument in Spring boot When task " this developing instrument, and the corresponding original configuration file of developing instrument " timed task " in Spring boot is interior Hold for " configuration 1=minute ", indicate only to allow to send short message on the time point of minute, without permission second, millisecond, microsecond Time point on send short message.In the development process of above-mentioned software project shown in Fig. 2, for sub-project " short message subsystem " " 1=points of configuration of the content of the corresponding original configuration file of developing instrument " timed task " in the Spring boot for needing to use Clock " can customize configuration revision configuration file 1 " configuration 1=seconds ", indicate to allow second time point on send short message, For being used in the environment of compiling;It also can customize another revision configuration file 2 " 1=milliseconds of configuration " of configuration, indicate to allow Short message is sent on the time point of millisecond, for using in the environment of test.
In order to simplify the maintenance cost of configuration, above-mentioned revision configuration file 1 and revision configuration file 2 can be also placed into together In one file, and the routing information of revision configuration file 1 and revision configuration file 2 respectively, with the root in different uses is changed commanders Corresponding revision configuration file is called according to the routing information of each revision configuration file.
According to the above as can be seen that during software project development, first by the first software management tool The dependence between each sub-project of software project is established, then determines the required developing instrument of every sub-project, And be introduced into the first software management tool by the developing instrument in the second software management tool, finally in the first software management In tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to software project into During row exploitation, while by the first software management tool and the second software management tool, so as to reduce exploitation week Phase, cost of labor, and then promote software development efficiency.In addition, when the original configuration file configuration difference for developing instrument is changed By revision configuration file when, the revision configuration file of these varying environments can also be managed concentratedly, with simplify configuration dimension Protect cost.
Based on the same technical idea, the embodiment of the present invention also provides a kind of software development apparatus, as shown in figure 3, the dress It sets can include:
Creation module 301 is established described soft for the project structure according to software project in the first software management tool Dependence between each sub-project of part project;
Determining module 302 determines the required developing instrument of the sub-project, and will for being directed to every sub-project Developing instrument in second software management tool is introduced into first software management tool;
Development module 305, in first software management tool, according to the dependence and each sub-project Developing instrument carries out the exploitation of the software project.
Preferably, further include: introduce module 303;
Module 303 is introduced, for by the corresponding initial configuration file of the developing instrument in the second software management tool It is introduced into first software management tool;
Development module 305, is specifically used for:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument The exploitation of the software project.
Preferably, further include: calling module 304;
Creation module 301, is also used to:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file Item is identical as the configuration item in the initial configuration file but configuration content is different;
Calling module 304, for according to current use environment, calling corresponding with the use environment in compiling Revise configuration file.
Preferably, creation module 301, is also used to: after creating the revision configuration file, different revisions being configured File is stored in same file, and determines the routing information of each revision configuration file;
Calling module 304, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
The embodiment of the invention provides a kind of calculating equipment, which is specifically as follows desktop computer, portable Computer, smart phone, tablet computer, personal digital assistant (Personal Digital Assistant, PDA) etc..The meter Calculating equipment may include central processing unit (Center Processing Unit, CPU), memory, input-output apparatus etc., Input equipment may include keyboard, mouse, touch screen etc., and output equipment may include display equipment, such as liquid crystal display (Liquid Crystal Display, LCD), cathode-ray tube (Cathode Ray Tube, CRT) etc..
Memory may include read-only memory (ROM) and random access memory (RAM), and provide storage to processor The program instruction and data stored in device.In embodiments of the present invention, memory can be used for storing software project development method Program.
Processor is by the program instruction for calling memory to store, and processor according to the program instruction of acquisition for executing State the program of software project development method.
The embodiment of the invention provides a kind of computer storage mediums, for being stored as calculating used in above-mentioned calculating equipment Machine program instruction, it includes the programs for executing above-mentioned software project development method.
The computer storage medium can be any usable medium or data storage device that computer can access, packet Include but be not limited to magnetic storage (such as floppy disk, hard disk, tape, magneto-optic disk (MO) etc.), optical memory (such as CD, DVD, BD, HVD etc.) and semiconductor memory (such as it is ROM, EPROM, EEPROM, nonvolatile memory (NAND FLASH), solid State hard disk (SSD)) etc..
To sum up, software project development method and apparatus provided by the above embodiment, comprising: according to the project knot of software project Structure, the dependence between each sub-project for establishing the software project in the first software management tool;For each subitem Mesh determines the required developing instrument of the sub-project, and the developing instrument in the second software management tool is introduced into institute It states in the first software management tool;In first software management tool, according to opening for the dependence and each sub-project Hair tool carries out the exploitation of the software project.As can be seen that during software project development, first by the first software Management tool establishes the dependence between each sub-project of software project, then determines that every sub-project is required and opens Hair tool, and be introduced into the first software management tool by the developing instrument in the second software management tool, finally first In software management tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to soft During part project is developed, while by the first software management tool and the second software management tool, so as to drop Low development cycle, cost of labor, and then promote software development efficiency.In addition, when the original configuration file for developing instrument is matched When setting the different revision configuration files changed commanders, the revision configuration file of these varying environments can also be managed concentratedly, with simplification The maintenance cost of configuration.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the present invention Form.It is deposited moreover, the present invention can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. a kind of software project development method characterized by comprising
According to the project structure of software project, between each sub-project for establishing the software project in the first software management tool Dependence;
For every sub-project, the required developing instrument of the sub-project is determined, and will be in the second software management tool Developing instrument is introduced into first software management tool;
In first software management tool, the software is carried out according to the developing instrument of the dependence and each sub-project The exploitation of project.
2. the method as described in claim 1, which is characterized in that further include:
The corresponding initial configuration file of the developing instrument in second software management tool is introduced into the first software pipe In science and engineering tool;
The exploitation of the software project is carried out according to the developing instrument of the dependence and projects, comprising:
According to the dependence, the developing instrument of described projects and the corresponding initial configuration file progress of developing instrument The exploitation of software project.
3. method according to claim 2, which is characterized in that further include:
The developing instrument is created in the revision configuration file of different use environments, the configuration item in the revision configuration file with Configuration item in the initial configuration file is identical but configuration content is different;
In compiling, according to current use environment, revision configuration file corresponding with the use environment is called.
4. method as claimed in claim 3, which is characterized in that after creating the revision configuration file, further includes:
Different revision configuration files is stored in same file, and determines the routing information of each revision configuration file;
It is described to call revision configuration file corresponding with the use environment, comprising:
The revision configuration file is called according to the routing information of each revision configuration file.
5. a kind of software project development device characterized by comprising
Creation module establishes the software project for the project structure according to software project in the first software management tool Each sub-project between dependence;
Determining module determines the required developing instrument of the sub-project for being directed to every sub-project, and by the second software Developing instrument in management tool is introduced into first software management tool;
Development module is used in first software management tool, according to the exploitation work of the dependence and each sub-project Tool carries out the exploitation of the software project.
6. device as claimed in claim 5, which is characterized in that further include: introduce module;
The introducing module, for introducing the corresponding initial configuration file of the developing instrument in the second software management tool Into first software management tool;
The development module, is specifically used for:
According to the dependence, the developing instrument of described projects and the corresponding initial configuration file progress of developing instrument The exploitation of software project.
7. device as claimed in claim 6, which is characterized in that further include: calling module;
The creation module, is also used to:
The developing instrument is created in the revision configuration file of different use environments, the configuration item in the revision configuration file with Configuration item in the initial configuration file is identical but configuration content is different;
The calling module, for according to current use environment, calling revision corresponding with the use environment in compiling Configuration file.
8. device as claimed in claim 7, which is characterized in that the creation module is also used to: creating the revision configuration After file, different revision configuration files is stored in same file, and determines the path letter of each revision configuration file Breath;
The calling module, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
9. a kind of calculating equipment characterized by comprising
Memory, for storing program instruction;
Processor requires 1 to 4 according to the program execution benefit of acquisition for calling the program instruction stored in the memory Described in any item methods.
10. a kind of computer storage medium, which is characterized in that the computer storage medium is stored with the executable finger of computer It enables, the computer executable instructions are for making the computer perform claim require 1 to 4 described in any item methods.
CN201711464852.6A 2017-12-28 2017-12-28 A kind of software project development method and apparatus Pending CN109976715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711464852.6A CN109976715A (en) 2017-12-28 2017-12-28 A kind of software project development method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711464852.6A CN109976715A (en) 2017-12-28 2017-12-28 A kind of software project development method and apparatus

Publications (1)

Publication Number Publication Date
CN109976715A true CN109976715A (en) 2019-07-05

Family

ID=67075239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711464852.6A Pending CN109976715A (en) 2017-12-28 2017-12-28 A kind of software project development method and apparatus

Country Status (1)

Country Link
CN (1) CN109976715A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112068806A (en) * 2020-09-09 2020-12-11 上海万向区块链股份公司 Method and system for optimizing project management in software development

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102135885A (en) * 2011-03-22 2011-07-27 曙光信息产业(北京)有限公司 Modularized software development architecture
CN104142825A (en) * 2014-07-08 2014-11-12 北京彩云动力教育科技有限公司 Method and system for modularization development of products
CN107291448A (en) * 2017-05-19 2017-10-24 上海瀚乾信息技术服务有限公司 A kind of Software Develop Project Management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102135885A (en) * 2011-03-22 2011-07-27 曙光信息产业(北京)有限公司 Modularized software development architecture
CN104142825A (en) * 2014-07-08 2014-11-12 北京彩云动力教育科技有限公司 Method and system for modularization development of products
CN107291448A (en) * 2017-05-19 2017-10-24 上海瀚乾信息技术服务有限公司 A kind of Software Develop Project Management system

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
ALIPANDA: "使用Maven构建多模块项目", 《HTTPS://BLOG.CSDN.NET/QQ_34767910/ARTICLE/DETAILS/78810972》 *
CODECRAFT: "springboot集成内存cache", 《HTTPS://SEGMENTFAULT.COM/A/1190000006621340》 *
SPRING: "SpringBoot系列 - 缓存", 《HTTPS://WWW.XNCODING.COM/2017/07/28/SPRING/SB-CACHE.HTML》 *
一只袜子: "SpringBoot 多模块项目实践(附打包方法)", 《HTTPS://WWW.JIANSHU.COM/P/59CEEA4F029D》 *
胡配祥: "《ASP.NET程序设计项目教程》", 31 July 2016 *
阿刚ABC: "SpringBoot 多模块项目搭建", 《HTTPS://MY.OSCHINA.NET/SDLVZG/BLOG/1573616》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112068806A (en) * 2020-09-09 2020-12-11 上海万向区块链股份公司 Method and system for optimizing project management in software development

Similar Documents

Publication Publication Date Title
US9021440B1 (en) System and method for automated test script generation
US11379943B2 (en) Optimizing compilation of shaders
TW201828220A (en) Service processing method and apparatus
CN110674047B (en) Software testing method and device and electronic equipment
CN107644286A (en) Workflow processing method and device
WO2015130755A1 (en) Diagnosis and optimization of cloud release pipelines
CN109299222A (en) Verification of data method and device
CN111045932B (en) Business system simulation processing method and device, electronic equipment and storage medium
CN110532044A (en) A kind of big data batch processing method, device, electronic equipment and storage medium
CN109491646B (en) Message entry method and device, electronic equipment and readable medium
CN113505520A (en) Method, device and system for supporting heterogeneous federated learning
CN111597686A (en) Loosely-coupled visual simulation resource integration and encapsulation method and system
JPWO2014061229A1 (en) Information system construction support apparatus, information system construction support method, and information system construction support program
CN111475137A (en) Method, system and equipment for predicting software development requirements
CN110020333A (en) Data analysing method and device, electronic equipment, storage medium
CN109976715A (en) A kind of software project development method and apparatus
US20180150786A1 (en) Efficient task planning using past performance
JPWO2014054231A1 (en) Information system construction support apparatus, information system construction support method, and information system construction support program
CN109582384A (en) The update method and device of configuration information
CN110032750A (en) A kind of model construction, data life period prediction technique, device and equipment
CN110381150B (en) Data processing method and device on block chain, electronic equipment and storage medium
CN110351104A (en) A kind of VIM selection method and device
CN112130962B (en) Continuous delivery platform and method for deploying application system by using same
US20220036304A1 (en) Computer methods and systems for identifying parts and inventory
US9158536B2 (en) Program code library consolidation in an integrated development environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190705