CN109976715A - A kind of software project development method and apparatus - Google Patents
A kind of software project development method and apparatus Download PDFInfo
- Publication number
- CN109976715A CN109976715A CN201711464852.6A CN201711464852A CN109976715A CN 109976715 A CN109976715 A CN 109976715A CN 201711464852 A CN201711464852 A CN 201711464852A CN 109976715 A CN109976715 A CN 109976715A
- Authority
- CN
- China
- Prior art keywords
- project
- software
- configuration file
- management tool
- developing instrument
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The present embodiments relate to technical field of software development more particularly to a kind of software project development method and apparatus, comprising: the dependence according to the project structure of software project, between each sub-project for establishing the software project in the first software management tool;For every sub-project, the required developing instrument of the sub-project is determined, and the developing instrument in the second software management tool is introduced into first software management tool;In first software management tool, the exploitation of the software project is carried out according to the developing instrument of the dependence and each sub-project.Due to during developing to software project, while by the first software management tool and the second software management tool, so as to reduce development cycle, cost of labor, and then software development efficiency is promoted.
Description
Technical field
The present embodiments relate to technical field of software development more particularly to a kind of software project development method and apparatus.
Background technique
Currently, customization software application project is due to the features such as its business function is more, demand is changeable, it is desirable that software project
Development cycle is shorter than common software project, so that the development task of customization software project is more nervous.It is opened implementing software project
When hair, if project team will certainly cause the delayed development period, increase cost of labor not by existing Software Development Tools
And the problems such as reducing software development efficiency.
Summary of the invention
The embodiment of the present invention provides a kind of software project development method and apparatus, to reduce by Software Development Tools
Development cycle, cost of labor are to promote software development efficiency.
The embodiment of the present invention provides a kind of software project development method, comprising:
According to the project structure of software project, each sub-project of the software project is established in the first software management tool
Between dependence;
For every sub-project, the required developing instrument of the sub-project is determined, and by the second software management tool
In developing instrument be introduced into first software management tool;
In first software management tool, according to the progress of the developing instrument of the dependence and each sub-project
The exploitation of software project.
Preferably, further include:
It is soft that the corresponding initial configuration file of the developing instrument in second software management tool is introduced into described first
In part management tool;
The exploitation of the software project is carried out according to the developing instrument of the dependence and projects, comprising:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument
The exploitation of the software project.
Preferably, further include:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file
Item is identical as the configuration item in the initial configuration file but configuration content is different;
In compiling, according to current use environment, revision configuration file corresponding with the use environment is called.
Preferably, after creating the revision configuration file, further includes:
Different revision configuration files is stored in same file, and determines the path letter of each revision configuration file
Breath;
It is described to call revision configuration file corresponding with the use environment, comprising:
The revision configuration file is called according to the routing information of each revision configuration file.
The embodiment of the present invention also provides a kind of software project development device, comprising:
Creation module establishes the software for the project structure according to software project in the first software management tool
Dependence between each sub-project of project;
Determining module determines the required developing instrument of the sub-project for being directed to every sub-project, and by second
Developing instrument in software management tool is introduced into first software management tool;
Development module, in first software management tool, according to opening for the dependence and each sub-project
Hair tool carries out the exploitation of the software project.
Preferably, further include: introduce module;
The introducing module, for by the corresponding initial configuration file of the developing instrument in the second software management tool
It is introduced into first software management tool;
The development module, is specifically used for:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument
The exploitation of the software project.
Preferably, further include: calling module;
The creation module, is also used to:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file
Item is identical as the configuration item in the initial configuration file but configuration content is different;
The calling module, for according to current use environment, calling corresponding with the use environment in compiling
Revise configuration file.
Preferably, the creation module, is also used to: after creating the revision configuration file, different revisions being matched
It sets file to be stored in same file, and determines the routing information of each revision configuration file;
The calling module, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
Another embodiment of the present invention provides a kind of calculating equipment comprising memory and processor, wherein the storage
Device is for storing program instruction, and the processor is for calling the program instruction stored in the memory, according to the journey of acquisition
Sequence executes any of the above-described kind of method.
Another embodiment of the present invention provides a kind of computer storage medium, the computer-readable recording medium storage has
Computer executable instructions, the computer executable instructions are for making the computer execute any of the above-described kind of method.
Software project development method and apparatus provided by the above embodiment, comprising: according to the project structure of software project,
The dependence between each sub-project of the software project is established in first software management tool;For every sub-project, really
The fixed required developing instrument of the sub-project, and the developing instrument in the second software management tool is introduced into described first
In software management tool;In first software management tool, according to the developing instrument of the dependence and each sub-project
Carry out the exploitation of the software project.As can be seen that managing work by the first software first during software project development
Tool establishes the dependence between each sub-project of software project, then determines the required exploitation work of every sub-project
Tool, and be introduced into the first software management tool by the developing instrument in the second software management tool, finally in the first software
In management tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to software item
During mesh is developed, while by the first software management tool and the second software management tool, so as to reduce out
Period, cost of labor are sent out, and then promotes software development efficiency.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment
Attached drawing is briefly introduced.
Fig. 1 is a kind of flow diagram of software project development method provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the project structure relationship of software project provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of software project development device provided in an embodiment of the present invention.
Specific embodiment
In order to which the purpose of the present invention, technical solution and beneficial effect is more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used to explain this hair
It is bright, it is not intended to limit the present invention.
Fig. 1 illustrates a kind of flow diagram of software project development method provided in an embodiment of the present invention, such as
Shown in Fig. 1, this method can include:
S101, the project structure according to software project establish the software project projects in the first software management tool
Between dependence.
S102, it is directed to each project, determines the required developing instrument of the project, and by the second software management tool
In developing instrument be introduced into the first software management tool.
S103, in the first software project management tool, according to the developing instrument of dependence and projects carry out software
The exploitation of project.
The project structure of software project in above-mentioned steps S101 may include three project structure relationships secondary layer by layer, these three
Level is respectively: top layer operation system, middle layer logical capability and underlying basis tool.Wherein, top layer operation system, for pair
It is outer that the system of business function is provided;Middle layer logical capability supports top layer industry for the realization layer of main business logic and subsystem
Business system;Underlying basis tool does not include service logic, only provides corresponding for providing the tool and ability module on basis
Software capability.
In the specific implementation, including three levels of top layer operation system, middle layer logical capability and underlying basis tool
Project structure relationship software project, reference can be made to Fig. 2.
From figure 2 it can be seen that the software project includes five sub-projects, this five sons in this layer of top layer operation system
Project is respectively: group customer portal, affiliate's portal, operation management system, third-party product access, polling service mould
Block;This layer of logical capability includes three sub-projects to the software project in middle level, these three sub-projects are respectively: short message sends son
System, service logic realize module, login authentication subsystem;The software project includes four sons in this layer of underlying basis tool
Project, this four sub-project is respectively: master tool module, asynchronous message Queue module, data model objects module, business are slow
Storing module.
From in Fig. 2 it can also be seen that each software sub-project between dependence,
(1) three of middle layer logical capability layer are directly relied on positioned at the sub-project " group customer portal " of top layer operation system
Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(2) three of middle layer logical capability layer are directly relied on positioned at the sub-project " affiliate's portal " of top layer operation system
Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(3) three of middle layer logical capability layer are directly relied on positioned at the sub-project " operation management system " of top layer operation system
Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(4) the three of middle layer logical capability layer is directly relied on positioned at the sub-project " third-party product access " of top layer operation system
Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(5) three of middle layer logical capability layer are directly relied on positioned at the sub-project " polling service module " of top layer operation system
Sub-project " short message transmission subsystem ", " service logic realization module ", " login authentication subsystem ".
(6) subitem in underlying basis tool is directly relied on positioned at the sub-project " short message transmission subsystem " of middle layer logical capability
Mesh " master tool module " and " service buffer module ".
(7) underlying basis tool neutron is directly relied on positioned at the sub-project " service logic realization module " of middle layer logical capability
Project " master tool module ", " asynchronous message Queue module ", " data model objects module " and " service buffer module ".
(8) subitem in underlying basis tool is directly relied on positioned at the sub-project " login authentication subsystem " of middle layer logical capability
Mesh " data model objects module " and " service buffer module ".
After determining the project structure of software project, software project and each can be established by the first software management tool
Dependence between project.Wherein, the first software management tool may include but be not limited to Maven.When the first software manages work
When tool is Maven, then software project and the software item as shown in Figure 2 can be established by the multimode constructing technology of Maven
Dependence between each sub-project of purpose.
After establishing the dependence between software project and projects by the first software management tool, it can be directed to
Every sub-project determines the required developing instrument of the sub-project.For example, it is directed to sub-project " short message transmission subsystem ",
It can determine that the sub-project is needed using " timed task " and " caching component " in Spring boot.
It, can be by the exploitation work of the second software management tool after determining the required developing instrument of every sub-project
Tool is introduced into the first software management tool, then in the first software management tool, according to dependence and each sub-project
The exploitation of developing instrument progress software project.Wherein, the second software management tool may include but be not limited to Spring boot.
When the developing instrument of the second software management tool is introduced into the first software management tool, if the exploitation
Tool further includes corresponding initial configuration file, then the developing instrument of the second software management tool is being introduced into the first software pipe
While in science and engineering tool, the is also introduced into together with initial configuration file corresponding to the developing instrument in the second software management tool
In one software management tool.Then, according to dependence, projects developing instrument and developing instrument corresponding to initially match
Set the exploitation that file carries out software project.
It is different according to the function of each software project, it usually needs to soft from second in the development process of software project
Configuration file corresponding to developing instrument is modified accordingly in part management tool, therefore, can also create developing instrument not
With the revision configuration file of use environment, the configuration item in the revision configuration file is identical as the configuration item in initial configuration file
But configuration content is different.
Specifically, being directed to same initial configuration file, in the development process of software project, one revision of configuration can customize
Configuration file, the compilation process for software project;Also it can customize the test that another revision configuration file is used for software project
Process.
Optionally, in order to simplify the maintenance cost of configuration, also different revision configuration files can be stored in same file
In, and determine the routing information of each revision configuration file, then repaired according to the routing information calling of each revision configuration file
Order configuration file.
" determine for example, the sub-project " short message subsystem " in above-mentioned Fig. 2 needs to use the developing instrument in Spring boot
When task " this developing instrument, and the corresponding original configuration file of developing instrument " timed task " in Spring boot is interior
Hold for " configuration 1=minute ", indicate only to allow to send short message on the time point of minute, without permission second, millisecond, microsecond
Time point on send short message.In the development process of above-mentioned software project shown in Fig. 2, for sub-project " short message subsystem "
" 1=points of configuration of the content of the corresponding original configuration file of developing instrument " timed task " in the Spring boot for needing to use
Clock " can customize configuration revision configuration file 1 " configuration 1=seconds ", indicate to allow second time point on send short message,
For being used in the environment of compiling;It also can customize another revision configuration file 2 " 1=milliseconds of configuration " of configuration, indicate to allow
Short message is sent on the time point of millisecond, for using in the environment of test.
In order to simplify the maintenance cost of configuration, above-mentioned revision configuration file 1 and revision configuration file 2 can be also placed into together
In one file, and the routing information of revision configuration file 1 and revision configuration file 2 respectively, with the root in different uses is changed commanders
Corresponding revision configuration file is called according to the routing information of each revision configuration file.
According to the above as can be seen that during software project development, first by the first software management tool
The dependence between each sub-project of software project is established, then determines the required developing instrument of every sub-project,
And be introduced into the first software management tool by the developing instrument in the second software management tool, finally in the first software management
In tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to software project into
During row exploitation, while by the first software management tool and the second software management tool, so as to reduce exploitation week
Phase, cost of labor, and then promote software development efficiency.In addition, when the original configuration file configuration difference for developing instrument is changed
By revision configuration file when, the revision configuration file of these varying environments can also be managed concentratedly, with simplify configuration dimension
Protect cost.
Based on the same technical idea, the embodiment of the present invention also provides a kind of software development apparatus, as shown in figure 3, the dress
It sets can include:
Creation module 301 is established described soft for the project structure according to software project in the first software management tool
Dependence between each sub-project of part project;
Determining module 302 determines the required developing instrument of the sub-project, and will for being directed to every sub-project
Developing instrument in second software management tool is introduced into first software management tool;
Development module 305, in first software management tool, according to the dependence and each sub-project
Developing instrument carries out the exploitation of the software project.
Preferably, further include: introduce module 303;
Module 303 is introduced, for by the corresponding initial configuration file of the developing instrument in the second software management tool
It is introduced into first software management tool;
Development module 305, is specifically used for:
It is carried out according to the dependence, the developing instrument of described projects and the corresponding initial configuration file of developing instrument
The exploitation of the software project.
Preferably, further include: calling module 304;
Creation module 301, is also used to:
Create configuration of the developing instrument in the revision configuration file of different use environments, the revision configuration file
Item is identical as the configuration item in the initial configuration file but configuration content is different;
Calling module 304, for according to current use environment, calling corresponding with the use environment in compiling
Revise configuration file.
Preferably, creation module 301, is also used to: after creating the revision configuration file, different revisions being configured
File is stored in same file, and determines the routing information of each revision configuration file;
Calling module 304, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
The embodiment of the invention provides a kind of calculating equipment, which is specifically as follows desktop computer, portable
Computer, smart phone, tablet computer, personal digital assistant (Personal Digital Assistant, PDA) etc..The meter
Calculating equipment may include central processing unit (Center Processing Unit, CPU), memory, input-output apparatus etc.,
Input equipment may include keyboard, mouse, touch screen etc., and output equipment may include display equipment, such as liquid crystal display
(Liquid Crystal Display, LCD), cathode-ray tube (Cathode Ray Tube, CRT) etc..
Memory may include read-only memory (ROM) and random access memory (RAM), and provide storage to processor
The program instruction and data stored in device.In embodiments of the present invention, memory can be used for storing software project development method
Program.
Processor is by the program instruction for calling memory to store, and processor according to the program instruction of acquisition for executing
State the program of software project development method.
The embodiment of the invention provides a kind of computer storage mediums, for being stored as calculating used in above-mentioned calculating equipment
Machine program instruction, it includes the programs for executing above-mentioned software project development method.
The computer storage medium can be any usable medium or data storage device that computer can access, packet
Include but be not limited to magnetic storage (such as floppy disk, hard disk, tape, magneto-optic disk (MO) etc.), optical memory (such as CD, DVD,
BD, HVD etc.) and semiconductor memory (such as it is ROM, EPROM, EEPROM, nonvolatile memory (NAND FLASH), solid
State hard disk (SSD)) etc..
To sum up, software project development method and apparatus provided by the above embodiment, comprising: according to the project knot of software project
Structure, the dependence between each sub-project for establishing the software project in the first software management tool;For each subitem
Mesh determines the required developing instrument of the sub-project, and the developing instrument in the second software management tool is introduced into institute
It states in the first software management tool;In first software management tool, according to opening for the dependence and each sub-project
Hair tool carries out the exploitation of the software project.As can be seen that during software project development, first by the first software
Management tool establishes the dependence between each sub-project of software project, then determines that every sub-project is required and opens
Hair tool, and be introduced into the first software management tool by the developing instrument in the second software management tool, finally first
In software management tool, the exploitation of software project is carried out according to the developing instrument of dependence and each sub-project.Due to soft
During part project is developed, while by the first software management tool and the second software management tool, so as to drop
Low development cycle, cost of labor, and then promote software development efficiency.In addition, when the original configuration file for developing instrument is matched
When setting the different revision configuration files changed commanders, the revision configuration file of these varying environments can also be managed concentratedly, with simplification
The maintenance cost of configuration.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method or computer program product.
Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the present invention
Form.It is deposited moreover, the present invention can be used to can be used in the computer that one or more wherein includes computer usable program code
The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic
Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as
It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (10)
1. a kind of software project development method characterized by comprising
According to the project structure of software project, between each sub-project for establishing the software project in the first software management tool
Dependence;
For every sub-project, the required developing instrument of the sub-project is determined, and will be in the second software management tool
Developing instrument is introduced into first software management tool;
In first software management tool, the software is carried out according to the developing instrument of the dependence and each sub-project
The exploitation of project.
2. the method as described in claim 1, which is characterized in that further include:
The corresponding initial configuration file of the developing instrument in second software management tool is introduced into the first software pipe
In science and engineering tool;
The exploitation of the software project is carried out according to the developing instrument of the dependence and projects, comprising:
According to the dependence, the developing instrument of described projects and the corresponding initial configuration file progress of developing instrument
The exploitation of software project.
3. method according to claim 2, which is characterized in that further include:
The developing instrument is created in the revision configuration file of different use environments, the configuration item in the revision configuration file with
Configuration item in the initial configuration file is identical but configuration content is different;
In compiling, according to current use environment, revision configuration file corresponding with the use environment is called.
4. method as claimed in claim 3, which is characterized in that after creating the revision configuration file, further includes:
Different revision configuration files is stored in same file, and determines the routing information of each revision configuration file;
It is described to call revision configuration file corresponding with the use environment, comprising:
The revision configuration file is called according to the routing information of each revision configuration file.
5. a kind of software project development device characterized by comprising
Creation module establishes the software project for the project structure according to software project in the first software management tool
Each sub-project between dependence;
Determining module determines the required developing instrument of the sub-project for being directed to every sub-project, and by the second software
Developing instrument in management tool is introduced into first software management tool;
Development module is used in first software management tool, according to the exploitation work of the dependence and each sub-project
Tool carries out the exploitation of the software project.
6. device as claimed in claim 5, which is characterized in that further include: introduce module;
The introducing module, for introducing the corresponding initial configuration file of the developing instrument in the second software management tool
Into first software management tool;
The development module, is specifically used for:
According to the dependence, the developing instrument of described projects and the corresponding initial configuration file progress of developing instrument
The exploitation of software project.
7. device as claimed in claim 6, which is characterized in that further include: calling module;
The creation module, is also used to:
The developing instrument is created in the revision configuration file of different use environments, the configuration item in the revision configuration file with
Configuration item in the initial configuration file is identical but configuration content is different;
The calling module, for according to current use environment, calling revision corresponding with the use environment in compiling
Configuration file.
8. device as claimed in claim 7, which is characterized in that the creation module is also used to: creating the revision configuration
After file, different revision configuration files is stored in same file, and determines the path letter of each revision configuration file
Breath;
The calling module, is specifically used for:
The revision configuration file is called according to the routing information of each revision configuration file.
9. a kind of calculating equipment characterized by comprising
Memory, for storing program instruction;
Processor requires 1 to 4 according to the program execution benefit of acquisition for calling the program instruction stored in the memory
Described in any item methods.
10. a kind of computer storage medium, which is characterized in that the computer storage medium is stored with the executable finger of computer
It enables, the computer executable instructions are for making the computer perform claim require 1 to 4 described in any item methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711464852.6A CN109976715A (en) | 2017-12-28 | 2017-12-28 | A kind of software project development method and apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711464852.6A CN109976715A (en) | 2017-12-28 | 2017-12-28 | A kind of software project development method and apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109976715A true CN109976715A (en) | 2019-07-05 |
Family
ID=67075239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711464852.6A Pending CN109976715A (en) | 2017-12-28 | 2017-12-28 | A kind of software project development method and apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109976715A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112068806A (en) * | 2020-09-09 | 2020-12-11 | 上海万向区块链股份公司 | Method and system for optimizing project management in software development |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102135885A (en) * | 2011-03-22 | 2011-07-27 | 曙光信息产业(北京)有限公司 | Modularized software development architecture |
CN104142825A (en) * | 2014-07-08 | 2014-11-12 | 北京彩云动力教育科技有限公司 | Method and system for modularization development of products |
CN107291448A (en) * | 2017-05-19 | 2017-10-24 | 上海瀚乾信息技术服务有限公司 | A kind of Software Develop Project Management system |
-
2017
- 2017-12-28 CN CN201711464852.6A patent/CN109976715A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102135885A (en) * | 2011-03-22 | 2011-07-27 | 曙光信息产业(北京)有限公司 | Modularized software development architecture |
CN104142825A (en) * | 2014-07-08 | 2014-11-12 | 北京彩云动力教育科技有限公司 | Method and system for modularization development of products |
CN107291448A (en) * | 2017-05-19 | 2017-10-24 | 上海瀚乾信息技术服务有限公司 | A kind of Software Develop Project Management system |
Non-Patent Citations (6)
Title |
---|
ALIPANDA: "使用Maven构建多模块项目", 《HTTPS://BLOG.CSDN.NET/QQ_34767910/ARTICLE/DETAILS/78810972》 * |
CODECRAFT: "springboot集成内存cache", 《HTTPS://SEGMENTFAULT.COM/A/1190000006621340》 * |
SPRING: "SpringBoot系列 - 缓存", 《HTTPS://WWW.XNCODING.COM/2017/07/28/SPRING/SB-CACHE.HTML》 * |
一只袜子: "SpringBoot 多模块项目实践(附打包方法)", 《HTTPS://WWW.JIANSHU.COM/P/59CEEA4F029D》 * |
胡配祥: "《ASP.NET程序设计项目教程》", 31 July 2016 * |
阿刚ABC: "SpringBoot 多模块项目搭建", 《HTTPS://MY.OSCHINA.NET/SDLVZG/BLOG/1573616》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112068806A (en) * | 2020-09-09 | 2020-12-11 | 上海万向区块链股份公司 | Method and system for optimizing project management in software development |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9021440B1 (en) | System and method for automated test script generation | |
US11379943B2 (en) | Optimizing compilation of shaders | |
TW201828220A (en) | Service processing method and apparatus | |
CN110674047B (en) | Software testing method and device and electronic equipment | |
CN107644286A (en) | Workflow processing method and device | |
WO2015130755A1 (en) | Diagnosis and optimization of cloud release pipelines | |
CN109299222A (en) | Verification of data method and device | |
CN111045932B (en) | Business system simulation processing method and device, electronic equipment and storage medium | |
CN110532044A (en) | A kind of big data batch processing method, device, electronic equipment and storage medium | |
CN109491646B (en) | Message entry method and device, electronic equipment and readable medium | |
CN113505520A (en) | Method, device and system for supporting heterogeneous federated learning | |
CN111597686A (en) | Loosely-coupled visual simulation resource integration and encapsulation method and system | |
JPWO2014061229A1 (en) | Information system construction support apparatus, information system construction support method, and information system construction support program | |
CN111475137A (en) | Method, system and equipment for predicting software development requirements | |
CN110020333A (en) | Data analysing method and device, electronic equipment, storage medium | |
CN109976715A (en) | A kind of software project development method and apparatus | |
US20180150786A1 (en) | Efficient task planning using past performance | |
JPWO2014054231A1 (en) | Information system construction support apparatus, information system construction support method, and information system construction support program | |
CN109582384A (en) | The update method and device of configuration information | |
CN110032750A (en) | A kind of model construction, data life period prediction technique, device and equipment | |
CN110381150B (en) | Data processing method and device on block chain, electronic equipment and storage medium | |
CN110351104A (en) | A kind of VIM selection method and device | |
CN112130962B (en) | Continuous delivery platform and method for deploying application system by using same | |
US20220036304A1 (en) | Computer methods and systems for identifying parts and inventory | |
US9158536B2 (en) | Program code library consolidation in an integrated development environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190705 |