CN109972647A - A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method - Google Patents
A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method Download PDFInfo
- Publication number
- CN109972647A CN109972647A CN201910183849.XA CN201910183849A CN109972647A CN 109972647 A CN109972647 A CN 109972647A CN 201910183849 A CN201910183849 A CN 201910183849A CN 109972647 A CN109972647 A CN 109972647A
- Authority
- CN
- China
- Prior art keywords
- connection structure
- pile foundation
- binder
- concrete
- steel connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011230 binding agent Substances 0.000 title claims abstract description 54
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 84
- 239000010959 steel Substances 0.000 claims abstract description 84
- 230000001681 protective effect Effects 0.000 claims abstract description 14
- 230000015271 coagulation Effects 0.000 claims description 5
- 238000005345 coagulation Methods 0.000 claims description 5
- 238000007596 consolidation process Methods 0.000 claims description 5
- 230000010412 perfusion Effects 0.000 claims description 4
- 239000002775 capsule Substances 0.000 claims description 3
- 125000004122 cyclic group Chemical group 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 12
- 238000005516 engineering process Methods 0.000 abstract description 10
- 230000008901 benefit Effects 0.000 description 4
- UZVHFVZFNXBMQJ-UHFFFAOYSA-N butalbital Chemical compound CC(C)CC1(CC=C)C(=O)NC(=O)NC1=O UZVHFVZFNXBMQJ-UHFFFAOYSA-N 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0084—Production methods for working underwater using pneumatical means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
The invention discloses the connection structures of a kind of pile foundation and underwater binder, comprising: passes through binder between multiple jointings and two jointings;Jointing includes: that the first shear connector is connect with the first steel connection structure;Second shear connector is connect with the second steel connection structure, and the size of the second steel connection structure is greater than the first steel connection structure, and binder is connect with the second steel connection structure;Protective cover is arranged in horn-like, second end in the first end of second steel connection structure, and plugging air bag protected cover in inflation stops to extend to the first steel connection structure direction;The first concrete region, the second concrete region are formed between first steel connection structure and the second steel connection structure;The present invention improves the holistic resistant behavior on high bearing platform supported on piles in deep water basis, reduces the project cost on entire basis;It is higher to the construction errors tolerance such as positioning accuracy of pile foundation using air bag plugging technology;Marine environment small by the active force of water flow under water, suitable for hydrologic condition complexity.
Description
Technical field
The present invention relates to technical field of buildings more particularly to a kind of pile foundations and the connection structure of underwater binder, pile foundation construction
Connection method.
Background technique
The engineering constructions such as domestic bridge, wind-powered electricity generation, harbour in recent years are further sent out to profundal zones such as ocean, rivers and reservoirs
Exhibition.Deep water foundation cost is high, and Selection of engineering projects has very important influence to the total cost of entire engineering.In 30m
Within within the scope of the depth of water, under no special hydrogeologic condition, elevated pile cap grouped pile foundation is in engineering economy, convenience for construction etc.
Aspect has certain advantage relative to other base forms such as caisson, open caisson, jacket, therefore is widely used.
In the elevated pile cap grouped pile foundation of profundal zone, pile foundation it is longer without lateral support length, in horizontal forces such as wind, waves and
Under the action of superstructure horizontal force, bending is larger with displacement at pile top, generally use increase stake diameter mode come meet by
Force request.It, can be big if increasing one or more layers submerged level consolidation coupled system between a clump of piles according to structural mechanics principle
Width reduces Internal forces and increases the whole thrust stiffness on basis, to reduce the demand to stake diameter, promotes a high-rise pile cap clump of piles
The engineering economy on basis.
Early stage, certain domestic Yangtze Bridge used the double-deck cushion cap technology, using underwater lower layer's cushion cap as between a clump of piles
Horizontal consolidation coupled system.But the temporary projects expense such as the technology cofferdam is higher, mature in great diameter and long pile foundation technology
Today, do not have technology economy advantage;While its bottomless steel cofferdam of large size used is larger by the active force of water flow,
It is difficult to adapt to the biggish marine environment of stormy waves.
For the further development for pushing profundal zone elevated pile cap grouped pile foundation technology, need to developing one kind, cost is relatively low, to evil
Bad construction environment adaptability is relatively strong, has the connection structure of the pile foundation and underwater binder of certain tolerance to pile foundation construction error.
Summary of the invention
The purpose of the present invention is to provide a kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method, solutions
Certainly existing high-rise pile cap deep water foundation technology cost is high, is difficult to adapt to the problems such as deeper depth condition, and difficulty of construction compared with
It is low.
To achieve the goals above, the present invention provides the connection structure of a kind of pile foundation and underwater binder, comprising:
Multiple jointings and multiple binders pass through binder between two jointings and connect;The jointing includes:
First shear connector is connect with the first steel connection structure;
Second shear connector is connect with the second steel connection structure, and the size of second steel connection structure is greater than described the
The size of one steel connection structure, the binder are connect with second steel connection structure;
The first end of second steel connection structure is in horn-like, the second end setting protection of second steel connection structure
Cover, is provided with plugging air bag in the protective cover, the plugging air bag in inflation by the protective cover stop and to described the
One steel connection structure direction extends;
The first concrete region, the second coagulation are formed between first steel connection structure and second steel connection structure
Tu Qu;First concrete region is located at the bottom of second concrete region, and the plugging air bag is located at first coagulation
The bottom of Tu Qu, and the height of first concrete region is less than the height of second concrete region.
Preferably, the protective cover includes: the first connecting plate, the second connecting plate, first connecting plate and described second
Connecting plate is in 90 degree of connections;
The first end of first connecting plate is connected in second steel connection structure, and the second of first connecting plate
End is connected to the first end of second connecting plate, and the of the second end of second connecting plate and second steel connection structure
Two end extending directions are identical;
The plugging air bag is stopped by second connecting plate in inflation and is prolonged to first steel connection structure direction
It stretches.
In a kind of implementation, the binder is steel pipe, and is perfused with slightly expanded concrete in the steel pipe.
In a kind of implementation, second shear connector and/or first shear connector are multiple cyclic annular steel plate strips compositions.
Preferably, the first concrete region encapsulating base concrete, perfusion consolidation concrete in second concrete region.
A kind of pile foundation construction connection method, which comprises
Pile foundation is poured, determines the pile foundation number, the pile foundation size and the pile foundation spacing;
According to the pile foundation size selection jointing, and determine according to the pile foundation number quantity of jointing, with
And the size of binder is determined according to the pile foundation spacing;
The binder and the jointing are subjected to the connection structure that welding forms pile foundation Yu underwater binder, and according to institute
The position for stating pile foundation carries out positioning and the lower section of the pile foundation and the connection structure of underwater binder;
After determining that height below the connection structure of the pile foundation and underwater binder is in place, to stifled in the jointing
Gas leakage capsule is inflated, to reach preset pressure value;
Concreting is carried out to the first concrete region in each jointing by root;And in first concrete region
Concrete strength reach the first preset strength after, in each jointing the second concrete region carry out concreting,
Concrete in the second concrete region, which reaches to construct after the second preset strength, to be finished.
Using pile foundation provided in an embodiment of the present invention and the connection structure of underwater binder, pile foundation construction connection method, have
Have the beneficial effect that:
(1) it is covered in pile foundation by jointing, two adjacent jointings are attached further through binder, thus shape
At entirety, the holistic resistant behavior on high bearing platform supported on piles in deep water basis is improved in this way, reduces the project cost on entire basis;?
Beneficial to the promotion of basic holistic resistant behavior, High-Rise Pile Cap Foundation is still feasible under 50m depth condition and has economic advantages.
(2) air bag plugging technology is used, it is higher to the construction errors tolerance such as positioning accuracy of pile foundation, it is provided simultaneously with adaptive
The ability of position should be adjusted;Air bag inflation can be used electric control solenoid valve remote control and implement, and default lead can be used in underwater concreting
Pipe is filled more than the water surface and is sent, therefore difficulty of construction is lower;Air bag plugging and the dual fixation of bottom concrete, fully ensure that
Consolidate the construction quality of concrete.
(3) pile foundation provided by the invention and the connection structure volume of underwater binder are small, small by the active force of water flow under water,
Marine environment suitable for hydrologic condition complexity.
Detailed description of the invention
Fig. 1 is one of binder provided in an embodiment of the present invention and pile base jointing construction sectional elevation.
Fig. 2 is one of binder provided in an embodiment of the present invention and pile base jointing construction flat sectional drawing.
Fig. 3 is that multiple tracks binder provided in an embodiment of the present invention and multi-column pier foundation jointing construct sectional elevation schematic diagram.
Fig. 4 is that multiple tracks binder provided in an embodiment of the present invention and multi-column pier foundation jointing construct flat cutting faces schematic diagram.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification
Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities
The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from
Various modifications or alterations are carried out under spirit of the invention.
Please refer to Fig. 1-4.It should be noted that only the invention is illustrated in a schematic way for diagram provided in the present embodiment
Basic conception, only shown in schema then with related component in the present invention rather than component count, shape when according to actual implementation
Shape and size are drawn, when actual implementation kenel, quantity and the ratio of each component can arbitrarily change for one kind, and its component cloth
Office's kenel may also be increasingly complex.
The present invention provides the connection structure of a kind of pile foundation and underwater binder picture 1-4, comprising: multiple jointings and multiple
Binder passes through binder between two jointings and connects;The jointing includes:
First shear connector 9 is connect with the first steel connection structure 10;
Second shear connector 8 is connect with the second steel connection structure 3, and the size of the second steel connection structure 3 connects greater than the first steel
The size of binding structure 10, binder 2 are connect with the second steel connection structure 3;
The first end of second steel connection structure 3 is in horn-like, the second end setting protective cover 5 of the second steel connection structure 3, guarantor
Plugging air bag 4 is provided in shield 5, plugging air bag 4 is stopped by the protective cover 5 in inflation and connects and tie to first steel
10 direction of structure extends;
The first concrete region 6, the second concrete region are formed between first steel connection structure 10 and the second steel connection structure 3
7;First concrete region 6 is located at the bottom of the second concrete region 7, and plugging air bag 4 is located at the bottom of the first concrete region 6, and first
Height of the height of concrete region 6 less than the second concrete region 7.
It is understood that the first shear connector 9 is connect with the first steel connection structure 10, the first shear connector 9 is multiple along the
One steel connection structure 10 circlewise steel plate strip, the second shear connector 8 is identical as 9 structure of the first shear connector, the first shear connector 9, and second
8 section configuration of shear connector is isosceles trapezoid and bottom is weld side.The size of second steel connection structure 3 connects greater than first steel
The size of binding structure 10 will form annular space region between the second steel connection structure 3, the first steel connection structure 10 in this way.
The first end of the second steel connection structure 3 of setting is in horn-like simultaneously, and such concreting can be from the second steel connection structure 3
First end, the filling of the first end of the first steel connection structure 10 are sent, and construction is facilitated.
The plugging air bag 4 being arranged in the embodiment of the present invention is located in protective cover 5, is played by 5 one side of protective cover to gas
The protection of capsule prevents plugging air bag 4 from damaging, on the other hand plays resistance to its gas replenishment process while protecting plugging air bag 4,
So that plugging air bag 4 extends to 10 direction of the first steel connection structure, increase between plugging air bag 4 and the first steel connection structure
Pressure, improve jointing and its internal pile foundation connective stability.
It should be noted that the annulus formed between the first steel connection structure 10 and the second steel connection structure 3 can be with
It is divided into the first concrete region 6, the second concrete region 7, the first concrete region 6 is located at the bottom of the second concrete region 7, and first
The height of concrete region 6 is less than the height of the second concrete region 7, and illustratively, the height of the first concrete region 6 is the second coagulation
The half of native 7 height of area, alternatively, the height of the first concrete region 6 is 1/3, etc. of 7 height of the second concrete region, the present invention
Embodiment is not specifically limited herein.
During specific implementation, after being attached connector connection, need in the first concrete region 6, the second concrete region 7
Perfusion is small particle aggregate and the concrete with quick solidifiability.First concrete region 6 is after plugging air bag 4 is inflated
It pours, it is therefore an objective to binder 2 and a clump of piles is tentatively fixed, reduce pile foundation 1 caused by flow action and the first steel connection structure 10, the
Shaking displacement between two steel connection structures 3, to guarantee the construction quality of the second concrete region 7;Therefore difficulty of construction is lower;?
When construction area is Lentic environment, the first concrete region 6 can not implement, and be adapted to different use environments.
Preferably, the protective cover 5 includes: the first connecting plate 51, the second connecting plate 52, and the first connecting plate 51 and second connects
Fishplate bar 52 is in 90 degree of connections;The first end of first connecting plate 51 is connected in the second steel connection structure 3, and the of the first connecting plate 51
Two ends are connected to the first end of the second connecting plate 52, the second end of the second end of the second connecting plate 52 and the second steel connection structure 3
Extending direction is identical;The plugging air bag 4 is stopped by second connecting plate 52 in inflation and connects and tie to first steel
10 direction of structure extends.
It should be noted that the plugging air bag 4 is hidden in protective cover 5 before inflating, it is located at first concrete region 6
Bottom, avoid damaging;First connecting plate 51, second connecting plate after the inflation of plugging air bag 4 in protective cover 5
Under the action of 52, downwards inwardly expansion and can be by the first steel connection structure 10, the bottom of the second steel connection structure 3 and pile foundation
Gap between 1 is completely enclosed.It is higher to the construction errors tolerance such as positioning accuracy of pile foundation 1 using air bag plugging technology.Specifically
In implementation, air bag inflation can be used electric control solenoid valve remote control and implement, strong operability.
It should be noted that in actual use, for the first steel connection structure, by taking the pile foundation of profundal zone as an example, in deep water
Usually there are two types of forms for area's pile foundation, first is that steel pipe driven pile, piling strtucture is exactly hollow steel pipe, connect and tie as the first steel
Structure, another kind are cast-in-situ bored piles, outside be pile foundation steel pile casting, i.e. the first steel connection structure, inside be it is solid, be reinforcing bar
Structure.
In a kind of implementation of the invention, the binder 2 is steel pipe, and microdilatancy coagulation is perfused in the steel pipe
Soil.
Preferably, second shear connector 8 and/or first shear connector 9 are multiple cyclic annular steel plate strip compositions.First cuts
Power key 9,8 section configuration of the second shear connector is isosceles trapezoid and bottom is weld side.
In another implementation of the invention, the 6 encapsulating base concrete of the first concrete region, second concrete
Perfusion consolidation concrete in area 7.It should be noted that first concrete region 6, second concrete region 7 are small particle
Aggregate and the concrete with quick solidifiability.
It the embodiment of the invention also discloses a kind of pile foundation construction connection method, carries out pouring pile foundation first, such as Fig. 3, Fig. 4 institute
Show, determines the pile foundation number, the pile foundation size and the pile foundation spacing;According to the pile foundation size selection jointing,
And the quantity of jointing is determined according to the pile foundation number, and the size of binder is determined according to the pile foundation spacing;By institute
It states binder and the jointing carries out the connection structure that welding forms attachment device pile foundation Yu underwater binder, weld together shape
At lattice system;Slightly expanded concrete is filled in binder steel pipe forms combination member of steel tube concrete;To binder and jointing
Carry out appropriate preservative treatment.
Positioning and the lower section of the connection structure of the pile foundation and underwater binder are carried out according to the position of the pile foundation;Using big
Type crane barge, integral hoisting binder and jointing lattice system;Using Pile Installation Platform, related auxiliary positioning facility is installed,
Binder and jointing lattice system is assisted to be accurately positioned and transfer.
Then after height below the connection structure for determining the pile foundation and underwater binder is in place, to the jointing
In plugging air bag be inflated, to reach preset pressure value;The first concrete region in each jointing is carried out by root
Concreting;And after the concrete strength of first concrete region reaches the first preset strength, to each jointing
In the second concrete region carry out concreting, constructed after the concrete of the second concrete region reaches the second preset strength
Finish.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe
The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause
This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as
At all equivalent modifications or change, should be covered by the claims of the present invention.
Claims (6)
1. the connection structure of a kind of pile foundation and underwater binder characterized by comprising multiple jointings and multiple binders, two
It is connected between a jointing by binder;The jointing includes:
First shear connector (9) is connect with the first steel connection structure (10);
Second shear connector (8) is connect with the second steel connection structure (3), and the size of second steel connection structure (3) is greater than institute
The size of the first steel connection structure (10) is stated, the binder (2) connect with second steel connection structure (3);
The first end of second steel connection structure (3) is in horn-like, the second end setting guarantor of second steel connection structure (3)
Shield (5), the protective cover (5) is interior to be provided with plugging air bag (4), and the plugging air bag (4) is in inflation by the protective cover
(5) stop and extend to the first steel connection structure (10) direction;
The first concrete region (6), are formed between first steel connection structure (10) and second steel connection structure (3)
Two concrete regions (7);First concrete region (6) is located at the bottom of second concrete region (7), the plugging air bag
(4) it is located at the bottom of first concrete region (6), and the height of first concrete region (6) is less than second coagulation
The height of Tu Qu (7).
2. the connection structure of pile foundation according to claim 1 and underwater binder, which is characterized in that protective cover (5) packet
Include: the first connecting plate (51), the second connecting plate (52), first connecting plate (51) and second connecting plate (52) are in 90 degree
Connection;
The first end of first connecting plate (51) is connected on second steel connection structure (3), first connecting plate
(51) second end is connected to the first end of second connecting plate (52), the second end of second connecting plate (52) with it is described
The second end extending direction of second steel connection structure (3) is identical;
The plugging air bag (4) in inflation by second connecting plate (52) stop and to first steel connection structure (10)
Direction extends.
3. the connection structure of pile foundation according to claim 1 and underwater binder, which is characterized in that the binder (2) is steel
Pipe, and slightly expanded concrete is perfused in the steel pipe.
4. the connection structure of pile foundation according to claim 1 to 3 and underwater binder, which is characterized in that described the
Two shear connectors (8) and/or first shear connector (9) are multiple cyclic annular steel plate strip compositions.
5. the connection structure of pile foundation according to claim 4 and underwater binder, which is characterized in that first concrete region
(6) encapsulating base concrete, the interior perfusion consolidation concrete in second concrete region (7).
6. a kind of pile foundation construction connection method, which is characterized in that the described method includes:
Pile foundation (1) is poured, determines the pile foundation (1) number, the pile foundation (1) size and the pile foundation (1) spacing;
According to the pile foundation (1) size selection jointing, and determine according to the pile foundation (1) number the quantity of jointing,
And the size of binder (2) is determined according to the pile foundation (1) spacing;
The binder (2) and the jointing are subjected to the connection structure that welding forms pile foundation Yu underwater binder, and according to institute
The position for stating pile foundation (1) carries out positioning and the lower section of the pile foundation and the connection structure of underwater binder;
After determining that height below the connection structure of the pile foundation and underwater binder is in place, to the leak stopping gas in the jointing
Capsule (4) is inflated, to reach preset pressure value;
Concreting is carried out to the first concrete region (6) in each jointing by root;And in first concrete region
(6) after concrete strength reaches the first preset strength, concrete is carried out to the second concrete region (7) in each jointing
It pours, the concrete in the second concrete region (7), which reaches to construct after the second preset strength, to be finished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910183849.XA CN109972647A (en) | 2019-03-12 | 2019-03-12 | A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910183849.XA CN109972647A (en) | 2019-03-12 | 2019-03-12 | A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109972647A true CN109972647A (en) | 2019-07-05 |
Family
ID=67078517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910183849.XA Pending CN109972647A (en) | 2019-03-12 | 2019-03-12 | A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109972647A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070261335A1 (en) * | 2006-05-08 | 2007-11-15 | Powell David W | Precast construction method and apparatus for variable size elevated platform |
CN103362136A (en) * | 2013-07-22 | 2013-10-23 | 中铁大桥局股份有限公司 | Water stopper arranged between prefabricated structure and pile foundation |
CN203701138U (en) * | 2014-01-24 | 2014-07-09 | 熊翱 | Shallow sea high pile strengthening hoop |
CN210127483U (en) * | 2019-03-12 | 2020-03-06 | 中交第三航务工程勘察设计院有限公司 | Connection structure of pile foundation and underwater tie beam |
-
2019
- 2019-03-12 CN CN201910183849.XA patent/CN109972647A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070261335A1 (en) * | 2006-05-08 | 2007-11-15 | Powell David W | Precast construction method and apparatus for variable size elevated platform |
CN103362136A (en) * | 2013-07-22 | 2013-10-23 | 中铁大桥局股份有限公司 | Water stopper arranged between prefabricated structure and pile foundation |
CN203701138U (en) * | 2014-01-24 | 2014-07-09 | 熊翱 | Shallow sea high pile strengthening hoop |
CN210127483U (en) * | 2019-03-12 | 2020-03-06 | 中交第三航务工程勘察设计院有限公司 | Connection structure of pile foundation and underwater tie beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212426780U (en) | Double-walled steel cofferdam and short pile casing crowd integrated positioning mounting structure | |
CN105951826B (en) | A kind of pile tube inner suction ground anchorage and its hydraulic pressure injection method | |
CN103225304B (en) | A kind of marine foundation supporting structure and construction method thereof | |
EP2837554A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN109339065A (en) | Method for deep water exposed bedrock close-packed pile supporting construction bearing platform | |
CN104805854A (en) | Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment | |
CN209636843U (en) | Offshore wind turbine suction bucket jacket large-diameter pile composite foundation | |
JP3230883U (en) | Combined single pile foundation structure for offshore wind power generation | |
CN106223355A (en) | A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box | |
CN108755731A (en) | A kind of well foundation and construction method | |
CN106088120B (en) | A kind of cofferdam decentralization construction method | |
CN113718820A (en) | Offshore wind power steel pipe pile combined reinforcing device and reinforcing method | |
JP6105044B2 (en) | Partially floating offshore platform for offshore wind power, bridges and offshore structures, and construction method | |
CN205894049U (en) | A first pitching pile formula jacket structure for marine booster station | |
CN201713827U (en) | Fan base structure of offshore wind power station | |
CN101876174A (en) | Foundation structure of marine wind electric field fan | |
CN102733407A (en) | Two-ring grouted single pile foundation | |
CN106049520A (en) | Method for combining concrete base of offshore supporting structure and steel pipe pile | |
CN110735394B (en) | Cable tower structure and construction method thereof | |
CN109162288B (en) | Lock catch type steel pipe pile cofferdam construction device and construction method | |
CN209162871U (en) | A kind of Analysis of Suspension Bridges ' Anchorage composite foundation suitable for deep water soft clay area | |
CN209194555U (en) | Earth cofferdam for deep water exposed bedrock close-packed pile supporting construction bearing platform | |
CN217517602U (en) | Nearly river dike underground structure | |
CN114215093B (en) | Construction method of bearing platform foundation | |
CN109972647A (en) | A kind of pile foundation and the connection structure of underwater binder, pile foundation construction connection method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |