CN109960564A - A kind of method of virtual machine (vm) migration - Google Patents
A kind of method of virtual machine (vm) migration Download PDFInfo
- Publication number
- CN109960564A CN109960564A CN201711415858.4A CN201711415858A CN109960564A CN 109960564 A CN109960564 A CN 109960564A CN 201711415858 A CN201711415858 A CN 201711415858A CN 109960564 A CN109960564 A CN 109960564A
- Authority
- CN
- China
- Prior art keywords
- migration
- task
- numerical value
- agency
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
- G06F9/45558—Hypervisor-specific management and integration aspects
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
- G06F9/45533—Hypervisors; Virtual machine monitors
- G06F9/45558—Hypervisor-specific management and integration aspects
- G06F2009/4557—Distribution of virtual machine instances; Migration and load balancing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Hardware Redundancy (AREA)
Abstract
The present invention relates to a kind of methods of virtual machine (vm) migration, comprising: by migration task that all front ends send over, positive sequence sorts and is stored in database table A in chronological order, and migration task status is set as " waiting " state;According to the source IP of migration and destination IP searching database Table A, and judge whether current source IP or destination IP belong to the IP migrated;If belonging to the IP in migration, new migration task will not be handed down to virtual level order and execute agency's processing;If it is determined that it is no, then execute further operating.The present invention effectively manages virtual machine (vm) migration process, shortens the transit time of virtual machine, so that physical resource obtains efficient and rational utilization.
Description
Technical field
The present invention relates to a kind of method of Virtual Machine Manager more particularly to a kind of methods of virtual machine (vm) migration.
Background technique
Virtual machine technique is common computer memory technical, but the needs upgraded since physical machine is subsequent, that
First the virtual machine having existed in physical machine must move on other machines, then to corresponding physical machine into
Row upgrading.
Simultaneously as virtual machine (vm) migration belongs to time-consuming operation (system disk data volume is bigger, and time-consuming is longer), existing operation is all
Be separate unit physical machine is issued with CC (Central Controller, central controller) control, but AE (Agent Executor,
Virtual level order executes agency) it can only handle a virtual machine (vm) migration task, the migration task that other front ends are sent is always etc.
It stays in task queue, and front end is shown in migration.
Summary of the invention
In view of the above-mentioned problems, a kind of method that the present invention proposes virtual machine (vm) migration, comprising: send over all front ends
Positive sequence sorts and is stored in database table A migration task in chronological order, and migration task status is set as " waiting " state;Root
According to the source IP and destination IP searching database Table A of migration, and judge each IP of current source IP (Internet Protocol,
Internet protocol) or destination IP whether belong to the IP migrated;If belonging to the IP in migration, new migration
Task will not be handed down to AE processing;If it is determined that it is no, then it performs the following operations:
Whether the source machine and the current operand value of purpose machine for judging migration are greater than 0;If being not more than 0, then it is assumed that
Inadequate resource returns to operation;
If it is greater than 0, then source machine numerical value and target machine numerical value respectively subtract 1, then whether target machine numerical value is judged
Less than 1, if target machine numerical value, which less than 1, migrates task, will also come in task queue, AE processing will not be handed down to;Such as
Fruit target machine numerical value is not less than 1, and target machine numerical value subtracts 1, then issues task and gives AE processing;
Migration task can be with timeout treatment: migrating task by setting time poll;If (when current time-migration starts
Between)/1000 >=migration task migration duration, then migration task has timed, out;Otherwise continue poll.
Poll confirmation migration task has timed, out, and CC sends the inquiry of a current migration task status to AE, if worked as
Preceding migration task is also being handled, then CC is returned;Otherwise CC sends a termination order and terminates current migration task to AE, AE,
CC carries out corresponding rolling back action, terminates current migration task, and be set to failure handling.
Technical solution of the present invention realize the utility model has the advantages that
Effectively management virtual machine (vm) migration process, shorten the transit time of virtual machine so that physical resource obtain it is efficient and rational
Utilization.
Detailed description of the invention
Fig. 1 is a kind of flow chart of the method for virtual machine (vm) migration of the present invention.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the present invention is further explained, and the embodiment of the present invention is only to illustrate this hair
The protection scope that bright technical solution is not intended to limit the present invention.
A kind of method for proposing virtual machine (vm) migration such as Fig. 1, the present invention, comprising: the migration for sending over all front ends is appointed
Positive sequence sorts and is stored in database table A in chronological order for business, and migration task status is set as " waiting " state;According to migration
Source IP and destination IP searching database Table A, and judge whether current source IP or destination IP belong to the IP migrated;Such as
Fruit belongs to the IP in migration, then new migration task will not be handed down to AE processing;If it is determined that it is no, then execute following behaviour
Make:
Whether the source machine and the current operand value of purpose machine for judging migration are greater than 0;If being not more than 0, then it is assumed that
Inadequate resource returns to operation;
If it is greater than 0, then source machine numerical value and target machine numerical value respectively subtract 1, then whether target machine numerical value is judged
Less than 1, if target machine numerical value, which less than 1, migrates task, will also come in task queue, AE processing will not be handed down to;Such as
Fruit target machine numerical value is not less than 1, and target machine numerical value subtracts 1, then issues task and gives AE processing;
Migration task can be with timeout treatment: migrating task by setting time poll;If (when current time-migration starts
Between)/1000 >=migration task migration duration, then migration task has timed, out;Otherwise continue poll.
Poll confirmation migration task has timed, out, and CC sends the inquiry of a current migration task status to AE, if worked as
Preceding migration task is also being handled, then CC is returned;Otherwise CC sends a termination order and terminates current migration task to AE, AE,
CC carries out corresponding rolling back action, terminates current migration task, and be set to failure handling.
Claims (3)
1. a kind of method of virtual machine (vm) migration, characterized by comprising:
By migration task that all front ends send over, positive sequence sorts and is stored in database table A in chronological order, described to move
Task status is moved to be set as " waiting " state;
The database table A is retrieved according to the source IP of migration and destination IP, and judges whether are the source IP or the destination IP
Belong to the IP migrated;
Determine the IP belonged in migration, new migration task will not be handed down to virtual level order and execute agency's processing;
Determine no, then execute operation:
Whether the source machine and the current operand value of purpose machine for judging migration are greater than 0;
Determine to be not more than 0, returns to operation;
Determining to be greater than 0, source machine numerical value and target machine numerical value respectively subtract 1,
Whether continue to determine the target machine numerical value less than 1, determines the target machine numerical value less than 1, then the migration is appointed
Business will also come in task queue, will not be handed down to the virtual level order and execute agency's processing;The target machine numerical value is not
Less than 1, the target machine numerical value subtracts 1, issues task to the virtual level order and executes agency's processing.
2. the method for virtual machine (vm) migration according to claim 1, it is characterised in that the timeout treatment of the migration task are as follows:
Task is migrated by described in setting time poll;(current time-migration time started)/1000 >=migration task migration
Duration determines that the migration task has timed, out;Otherwise continue poll.
3. the method for virtual machine (vm) migration according to claim 2, it is characterised in that the poll confirms the migration task
It has timed, out, central controller executes the inquiry that agency sends a current migration task status to virtual level order, determines institute
It states current migration task also handling, the central controller returns;Otherwise the central controller sends a termination order
Agency is executed to the virtual level order, the virtual level order executes agency and terminates the current migration task, the center
Controller carries out corresponding rolling back action, terminates current migration task, and be set to failure handling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711415858.4A CN109960564B (en) | 2017-12-22 | 2017-12-22 | Virtual machine migration method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711415858.4A CN109960564B (en) | 2017-12-22 | 2017-12-22 | Virtual machine migration method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109960564A true CN109960564A (en) | 2019-07-02 |
CN109960564B CN109960564B (en) | 2023-04-11 |
Family
ID=67020487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711415858.4A Active CN109960564B (en) | 2017-12-22 | 2017-12-22 | Virtual machine migration method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109960564B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111104206A (en) * | 2019-12-25 | 2020-05-05 | 曙光信息产业(北京)有限公司 | Virtual machine storage migration method and device and computer equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446115A (en) * | 2012-01-09 | 2012-05-09 | 浙江大学 | Dynamic deployment method for virtual machines |
CN103631633A (en) * | 2012-08-20 | 2014-03-12 | 中国电信股份有限公司 | Virtual machine total-system online migration method, device and system |
CN103810016A (en) * | 2012-11-09 | 2014-05-21 | 北京华胜天成科技股份有限公司 | Method and device for realizing virtual machine migration and cluster system |
US20140245293A1 (en) * | 2013-02-25 | 2014-08-28 | Red Hat Israel, Ltd. | Migration of Virtual Machines with Shared Memory |
CN104750542A (en) * | 2015-04-22 | 2015-07-01 | 成都睿峰科技有限公司 | Data migration method based on cloud platform |
CN105430049A (en) * | 2015-10-29 | 2016-03-23 | 西安交通大学 | Virtual streaming cluster cooperative migration method based on DCN |
CN105677441A (en) * | 2014-11-21 | 2016-06-15 | 华为技术有限公司 | Migration method of virtual machines, manager of virtual facility and coordinator |
-
2017
- 2017-12-22 CN CN201711415858.4A patent/CN109960564B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102446115A (en) * | 2012-01-09 | 2012-05-09 | 浙江大学 | Dynamic deployment method for virtual machines |
CN103631633A (en) * | 2012-08-20 | 2014-03-12 | 中国电信股份有限公司 | Virtual machine total-system online migration method, device and system |
CN103810016A (en) * | 2012-11-09 | 2014-05-21 | 北京华胜天成科技股份有限公司 | Method and device for realizing virtual machine migration and cluster system |
US20140245293A1 (en) * | 2013-02-25 | 2014-08-28 | Red Hat Israel, Ltd. | Migration of Virtual Machines with Shared Memory |
CN105677441A (en) * | 2014-11-21 | 2016-06-15 | 华为技术有限公司 | Migration method of virtual machines, manager of virtual facility and coordinator |
CN104750542A (en) * | 2015-04-22 | 2015-07-01 | 成都睿峰科技有限公司 | Data migration method based on cloud platform |
CN105430049A (en) * | 2015-10-29 | 2016-03-23 | 西安交通大学 | Virtual streaming cluster cooperative migration method based on DCN |
Non-Patent Citations (2)
Title |
---|
KEJIANG YE: "Live Migration of Multiple Virtual Machines with Resource Reservation in Cloud Computing Environments", 《 2011 IEEE 4TH INTERNATIONAL CONFERENCE ON CLOUD COMPUTING》 * |
刘文洁等: "一种面向云资源调度的热点迁移策略", 《西北工业大学学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111104206A (en) * | 2019-12-25 | 2020-05-05 | 曙光信息产业(北京)有限公司 | Virtual machine storage migration method and device and computer equipment |
CN111104206B (en) * | 2019-12-25 | 2023-09-01 | 曙光信息产业(北京)有限公司 | Virtual machine storage migration method and device and computer equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109960564B (en) | 2023-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105429776B (en) | Method and system for managing functions of virtual network | |
CN107526645B (en) | A kind of communication optimization method and system | |
CN103294533A (en) | Task flow control method and task flow control system | |
CN105159768A (en) | Task management method and cloud data center management platform | |
CN103514038B (en) | A kind of smooth method for closing and system of virtual system | |
CN104461744A (en) | Resource allocation method and device | |
EP3537281B1 (en) | Storage controller and io request processing method | |
CN103605574A (en) | Virtual machine resource scheduling method and system for server clusters | |
CN103744808B (en) | A kind of method and apparatus for being used to control I/O to ask | |
CN112000441A (en) | Method for managing virtual machine life cycle based on kubernets acoustic arrangement | |
CN103780686A (en) | Method and system for customizing application approval procedure in cloud organization | |
CN107766160A (en) | Queue message processing method and terminal device | |
CN105302641A (en) | Node scheduling method and apparatus in virtual cluster | |
CN114661462A (en) | Resource allocation method, system, computer readable storage medium and electronic device | |
CN102999317A (en) | Multi-tenant oriented elastic multi-process service processing method | |
CN109144428A (en) | Garbage recycling method, device and medium applied to solid state disk | |
TWI414947B (en) | Method, computer-readable medium and parallel computing system of loading a program on the computing system including multiple processing nodes | |
CN106412088B (en) | Data synchronization method and terminal | |
CN104571931A (en) | I/O (input/output) request combination scheduling system and method based on system resources | |
CN109960564A (en) | A kind of method of virtual machine (vm) migration | |
CN110968410A (en) | Task failure retry method and device, computer equipment and storage medium | |
US20230216731A1 (en) | Method and system for monitoring switch on basis of bmc, and device and medium | |
WO2024119930A1 (en) | Scheduling method and apparatus, and computer device and storage medium | |
CN112860401A (en) | Task scheduling method and device, electronic equipment and storage medium | |
US20170235602A1 (en) | Resource Scheduling Method and Related Apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |