CN109958463A - A kind of tunnel double-lining waterstop positioning installation apparatus - Google Patents
A kind of tunnel double-lining waterstop positioning installation apparatus Download PDFInfo
- Publication number
- CN109958463A CN109958463A CN201910393506.6A CN201910393506A CN109958463A CN 109958463 A CN109958463 A CN 109958463A CN 201910393506 A CN201910393506 A CN 201910393506A CN 109958463 A CN109958463 A CN 109958463A
- Authority
- CN
- China
- Prior art keywords
- waterstop
- ring
- connecting rod
- pipe fitting
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 20
- 238000009415 formwork Methods 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000007769 metal material Substances 0.000 claims description 3
- 238000007363 ring formation reaction Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000012423 maintenance Methods 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 238000000034 method Methods 0.000 description 6
- 229910052742 iron Inorganic materials 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/381—Setting apparatus or devices
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention provides a kind of tunnel double-lining waterstop positioning installation apparatus, including waterstop, device noumenon, trolley formwork, bolt, pipe fitting, trolley formwork is equipped with fixed ring, fixed ring is equipped with bolt hole, device noumenon is fixedly connected by bolt passing through bolt hole with trolley formwork, device noumenon circumferential direction is uniformly set in qually spaced on trolley formwork, device noumenon includes connecting rod, locating rod, positioning ring, connecting rod and locating rod, which vertically connect, forms right angle corner, positioning ring is arranged at right angle corner, connecting rod passes through fixed ring and connect with trolley formwork, pipe fitting is formed through the ring that a radius is greater than trolley location radii in the middle part of the positioning ring of multiple device noumenons, waterstop is by steel wire lashing on pipe fitting.Connecting rod dimension adjustable of the present invention, structure is simple, easy access and replacement, reduces cost of equipment maintenance, and waterstop position can be effectively ensured waterstop construction quality with flexible modulation, the ring that pipe fitting is formed, carry out subsequent waterstop installation convenient for operative employee.
Description
Technical field
The invention belongs to lining construction technical fields, and in particular to a kind of tunnel double-lining waterstop location and installation dress
It sets.
Background technique
In constructing tunnel quality, tunnel water handling is the key points and difficulties of construction quality, and waterstop installation in tunnel is
An important link in tunnel waterproof and water drainage system needs in process of construction to the two lining waterstop installations in built tunnel
Quality is monitored.
The method being often used at present is manually to be fixed with iron wire, i.e., uses before installed plug template after two lining trolleys are had good positioning
Iron wire is simply fixed the position of waterstop, and this method is bigger to the loss of iron wire, the random ratio of worker's construction
It is larger, and the flexibility of iron wire is bigger it is difficult to ensure that the position of waterstop immobilizes, to be difficult to protect during construction
The accuracy and fastness for demonstrate,proving fixed position, cause tunnel double-lining waterstop installation quality to be affected, to can serve as a contrast to two
Draining impacts.
Summary of the invention
In order to solve the problems in above-mentioned background technique, the present invention provides a kind of tunnel double-lining waterstop location and installation dress
It sets.
The technical scheme is that a kind of tunnel double-lining waterstop positioning installation apparatus, including waterstop, device sheet
Body, trolley formwork, bolt, pipe fitting, the trolley formwork are equipped with fixed ring, and the fixed ring is equipped with bolt hole, the spiral shell
Bolt passes through bolt hole and is fixedly connected with device noumenon with trolley formwork, and described device ontology is circumferential to be uniformly set in qually spaced in trolley
In template, described device ontology includes connecting rod, locating rod, positioning ring, and it is straight that the connecting rod and locating rod vertically connect formation
Angle turning, the positioning ring are arranged at right angle corner, and the connecting rod passes through fixed ring and connect with trolley formwork, the pipe fitting
The ring that a radius is greater than trolley location radii is formed through in the middle part of the positioning ring of multiple device noumenons, the waterstop passes through
Steel wire lashing is on pipe fitting.
Further, the connecting rod is equipped with scale to scheme.
Further, the connecting rod includes casing, extension tubing, fastening nut to scheme, and the extension tubing is set in casing
Inside, described sleeve pipe are equipped with screw hole, and fastening nut passes through screw hole and fixes casing and extension tubing.
Further, the connecting rod, locating rod, positioning ring are welded as a whole scheme, by the metal material system of hard
At.
Further, the spacing of described device ontology is 1m to scheme.
Further, the pipe fitting is pvc pipe to scheme.
Further, the radius that the pipe fitting passes through the ring that positioning ring is formed is that trolley location radii adds two liner thickness degree to scheme
Half.
The invention has the advantages that the present invention is in use, device noumenon is fixed on two lining trolleys by bolt
Face adjusts the size for being suitble to needs by the scale in connecting rod, is then equidistantly evenly arranged according to circumferential direction, pipe fitting is worn
It crosses positioning ring and forms ring, the position of waterstop is fixed according to the ring of pipe fitting formation, the waterstop for pouring side is bound in connecting rod
At the right angle corner formed with locating rod, guarantee that the waterstop for pouring side is vertical with two lining locking plug template holdings, it is ensured that fixed
The accuracy and fastness of position, connecting rod size of the invention can be adjusted at any time according to demand, and equipment, which can be repeated several times, to be made
With, reduce the amortization cost of equipment, structure is simple, by dismountable assembling mode, convenient for the present invention carry out maintenance and
Replacement, reduces the cost of plant maintenance, and waterstop position can form the position of a ring locating water-stopping band with flexible modulation, pipe fitting
It is set effective and ensure that waterstop construction quality, carry out subsequent waterstop installation convenient for operator.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the installation structure diagram of the invention;
Fig. 3 is connecting rod structural schematic diagram of the present invention;
Wherein: 1, waterstop, 2, device noumenon, 21, connecting rod, 211, casing, 212, extension tubing, 213, fastening nut, 22, mark
Ruler, 23, locating rod, 24, positioning ring, 3, trolley formwork, 4, fixed ring, 5, bolt, 6, pipe fitting.
Specific embodiment
Clear and complete description is done to the present invention with reference to the accompanying drawing, so that those skilled in the art is not needing to make
Under conditions of creative work, it can sufficiently implement the present invention.
A specific embodiment of the invention is: as shown in Figure 1-3, a kind of tunnel double-lining waterstop positioning installation apparatus, packet
Waterstop 1, device noumenon 2, trolley formwork 3, bolt 5, pipe fitting 6 are included, the trolley formwork 3 is equipped with fixed ring 4, the fixation
Ring 4 is equipped with bolt hole, and the bolt 5 passes through bolt hole and is fixedly connected with device noumenon 2 with trolley formwork 3, described device sheet
Body 2 is circumferential to be uniformly set in qually spaced on trolley formwork 3, and described device ontology 2 includes connecting rod 21, locating rod 23, positioning ring
24, vertically connection forms right angle corner for the connecting rod 21 and locating rod 23, and the positioning ring 24 is arranged at right angle corner, institute
It states connecting rod 21 to connect across fixed ring 4 with trolley formwork 3, the pipe fitting 6 is worn in the middle part of the positioning ring 24 of multiple device noumenons 2
It crosses and forms the ring that a radius is greater than trolley location radii, the waterstop 1 is by steel wire lashing on pipe fitting 6.
Further, the connecting rod 21 is equipped with scale.
Further, the connecting rod 21 includes casing 211, extension tubing 212, fastening nut 213, the extension tubing 212
It is set in inside casing 211, described sleeve pipe 211 is equipped with screw hole, and fastening nut 213 passes through screw hole for casing 211 and extension tubing
212 is fixed, can be adjusted according to the needs 21 size of connecting rod.
Further, the connecting rod 21, locating rod 23, positioning ring 24 are welded as a whole, by the metal material of hard
It is made.
Further, the spacing of described device ontology 2 is 1m.
Further, the pipe fitting 6 is pvc pipe.
Further, it is that trolley location radii adds two liner thickness degree that the pipe fitting 6, which passes through the radius for the ring that positioning ring 24 is formed,
Half.
Use process of the invention is: connecting rod 21 passes through fixed ring 4, suitable to adjust by the scale 22 in connecting rod 21
The size needed is closed, then bolt 5 passes through bolt hole and tightens fixed connecting rod 21, and device noumenon 2 is fixed on two lining trolleys
Face is equidistantly evenly arranged multiple device noumenons 2 according to above-mentioned steps circumferential direction, and pipe fitting 6 is passed through positioning ring 24 and forms ring, will only
Water band 1 is bound on pipe fitting 3, and the position of waterstop 1 is fixed according to the ring of the formation of pipe fitting 6, and the binding of waterstop 1 for pouring side exists
At the right angle corner that connecting rod 21 and locating rod 23 are formed, guarantee that the waterstop 1 for pouring side is vertical with two lining locking plug template holdings,
Subsequent handling is carried out later, ensure that the stability of waterstop 1.
Presently preferred embodiments of the present invention is described above, it should be pointed out that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, technology according to the present invention
Essence any simple modifications, equivalents, and modifications made to the above embodiment still fall within technical solution of the present invention protection
In the range of.
Claims (7)
1. a kind of tunnel double-lining waterstop positioning installation apparatus, which is characterized in that including waterstop, device noumenon, trolley formwork,
Bolt, pipe fitting, the trolley formwork are equipped with fixed ring, and the fixed ring is equipped with bolt hole, the bolt passing through bolt hole
Device noumenon is fixedly connected with trolley formwork, described device ontology is circumferential to be uniformly set in qually spaced on trolley formwork, described
Device noumenon includes connecting rod, locating rod, positioning ring, and the connecting rod and locating rod, which vertically connect, forms right angle corner, described
Positioning ring is arranged at right angle corner, and the connecting rod passes through fixed ring and connect with trolley formwork, and the pipe fitting is from multiple devices
The ring that a radius is greater than trolley location radii is formed through in the middle part of the positioning ring of ontology, the waterstop is existed by steel wire lashing
On pipe fitting.
2. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that the connecting rod
It is equipped with scale.
3. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that the connecting rod
Including casing, extension tubing, fastening nut, the extension tubing is set in inside pipe casing, and described sleeve pipe is equipped with screw hole, fastening nut
Casing and extension tubing are fixed across screw hole.
4. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that the connection
Bar, locating rod, positioning ring are welded as a whole, and are made of the metal material of hard.
5. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that described device sheet
The spacing of body is 1m.
6. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that the pipe fitting is
Pvc pipe.
7. a kind of tunnel double-lining waterstop positioning installation apparatus according to claim 1, which is characterized in that the pipe fitting is worn
The radius for crossing the ring of positioning ring formation is that trolley location radii adds two liner thickness degree half.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910393506.6A CN109958463A (en) | 2019-05-13 | 2019-05-13 | A kind of tunnel double-lining waterstop positioning installation apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910393506.6A CN109958463A (en) | 2019-05-13 | 2019-05-13 | A kind of tunnel double-lining waterstop positioning installation apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109958463A true CN109958463A (en) | 2019-07-02 |
Family
ID=67027191
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910393506.6A Pending CN109958463A (en) | 2019-05-13 | 2019-05-13 | A kind of tunnel double-lining waterstop positioning installation apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109958463A (en) |
-
2019
- 2019-05-13 CN CN201910393506.6A patent/CN109958463A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203991788U (en) | Simple steel pipe straightening machine | |
CN107503473A (en) | A kind of tool-type rectangular column steel bar positioning fixture | |
WO2021232479A1 (en) | Underwater repairing method for large-diameter hdpe pipeline | |
CN207193985U (en) | Supporting construction and foundation pit support system | |
CN206992626U (en) | A kind of assembled cable protecting sleeve | |
CN109958463A (en) | A kind of tunnel double-lining waterstop positioning installation apparatus | |
CN207110466U (en) | Pulling-on piece formula aluminum alloy mould plate reinforcing member and pulling-on piece formula template system | |
CN202064646U (en) | Special appliance used for arranging steel truss folding line | |
CN103994277B (en) | Circular top pipe deviation correcting regulation pipe | |
CN202265801U (en) | Exhaust system for joint grouting of induced joints of rolled concrete dam | |
CN212641205U (en) | Bridge pipeline carrying system | |
CN204720098U (en) | The experiment body support of tilt adjustable | |
CN106759523A (en) | A kind of installation auxiliary device of underground pipe gallery waterstop | |
CN210397943U (en) | Through floor pipe sleeve positioning device | |
CN105135147A (en) | PCCP accident treating device and installation method thereof | |
CN205917715U (en) | A positioner that is used for high -pressure superhigh pressure pipe pier bolt | |
CN208089322U (en) | A kind of tunnel longitudinal direction waterstop positioning device | |
CN210164486U (en) | Two lining waterstop location installation device in tunnel | |
CN207392234U (en) | A kind of pipe gallery deformation joint ruggedized construction for passing through ground fissure | |
CN208072929U (en) | Scaffold wall connecting piece | |
CN206554526U (en) | A kind of built-in fitting fixing device | |
CN203022346U (en) | Three-section-head type water stop threaded rod | |
CN206448169U (en) | A kind of fastening clip of joint steel pipe Bailey beam stent helix tube column | |
CN206888136U (en) | A kind of construction drainage pipeline | |
CN210597028U (en) | Accurate control device for high-speed railway bridge pier column steel bar protection layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |