CN109949916A CN201910225507.XA CN201910225507A CN109949916A CN 109949916 A CN109949916 A CN 109949916A CN 201910225507 A CN201910225507 A CN 201910225507A CN 109949916 A CN109949916 A CN 109949916A
Authority
CN
China
Prior art keywords
module
equipment
maintenance
information
hospital
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910225507.XA
Other languages
Chinese (zh)
Inventor
井庆福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juxian Peoples Hospital
Original Assignee
Juxian Peoples Hospital
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Juxian Peoples Hospital filed Critical Juxian Peoples Hospital
Priority to CN201910225507.XA priority Critical patent/CN109949916A/en
Publication of CN109949916A publication Critical patent/CN109949916A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of equipment Department of Our Hospital life period of an equipment management systems of hospital equipment asset management technical field, including guardian end and user's end, guardian end includes data input module, information receiving module and information updating module, user's end includes information uploading module, interactive module;Data input module is used to hospital equipment be classified to the corresponding model typing of hospital equipment, and sorted hospital equipment typing is needed to the project safeguarded;Information receiving module receives the information that user's end issues and the equipment more new information by network sink devices producer, then shows received information;The historgraphic data recording module of information updating module is used for recording equipment maintenance record and equipment more new record, then comparative apparatus maintenance record and special Maintenance Significant Items are uploaded, the present invention avoids maintenance chaotic, omitted caused by state is unclear etc., timely uploading device fault message, the time is saved, is improved efficiency.

Description

A kind of equipment Department of Our Hospital life period of an equipment management system
Technical field
The present invention relates to hospital equipment asset management technical field, specially a kind of equipment Department of Our Hospital life period of an equipment Management system.
Background technique
Plant life cycle refers to that since equipment coming into operation, should not continue to use and move back to being technically or economically Time experienced until use process out.The life cycle of equipment has following three kinds: the substance service life of equipment, also known as nature longevity Life.It refers to that since equipment coming into operation, reported to making equipment technically completely lose use value due to physical wear Time experienced until useless.The technical life of equipment, also known as useful life.It refer to equipment since coming into operation, to by In technological progress, the novel device that performance is more preferable, more efficient occurs, and loses existing equipment just before the not up to substance service life It loses use value and exits the use process time experienced.The economic life of equipment.Refer to since equipment investment use, arrive by In ageing equipment, cost of use is sharply increased, and is continued to use economically unreasonable and experienced until exiting use process Time.
Currently, equipment Department of Our Hospital staff is cured entirely using the network information system or desktop of hospital internal The equipment files and account management of institute.It, which does not have each participating user, can participate in the acquisition of management information, reports for repairment, repairs Submission and monitoring function with the processes such as maintenance, and all technical data is as record, the function for not being used and analyzing Can, it also needs to prepare a complete set of equipment of server, computer room, network and running environment in hospital for the prior art, and need One team carries out the Stability Maintenance of twenty four hours, wastes a large amount of manpower and resource.Additionally need make an inventory, inspection, The equipment such as periodic maintenance are more, safeguard and easily omit, entanglement, and cannot be passed to equipment division staff in time when equipment fault.
Based on this, the present invention devises a kind of equipment Department of Our Hospital life period of an equipment management system, to solve above-mentioned ask Topic.
Summary of the invention
The purpose of the present invention is to provide a kind of equipment Department of Our Hospital life period of an equipment management systems, to solve above-mentioned back Itd is proposed in scape technology make an inventory, inspection, the equipment such as periodic maintenance it is more, safeguard and easily omit, entanglement, and when equipment fault cannot and When the problem of being passed to equipment division staff.
To achieve the above object, the invention provides the following technical scheme: a kind of equipment Department of Our Hospital life period of an equipment pipe Reason system, including guardian end and user's end, the guardian end include data input module, information receiving module and information Update module, the user's end include information uploading module, interactive module;
The data input module includes device model recording module, taxonomic revision module, plant maintenance data input mould Block, the device model recording module are used for the corresponding model typing of hospital equipment, and the taxonomic revision module will be for that will cure Institute's equipment is classified, and the plant maintenance data input module is used for the item for needing to safeguard by sorted hospital equipment typing Mesh;
The information receiving module includes the first receiving module and display module, for receiving the information of user's end sending With the equipment more new information for passing through network sink devices producer, the display module is for showing received information;
The information updating module includes that module, the historgraphic data recording mould are rewritten in historgraphic data recording module and update Block is used for recording equipment maintenance record and equipment more new record, updates rewrite module be used for comparative apparatus maintenance record and Pass special Maintenance Significant Items;
The information uploading module includes repairing information recording module and the wireless hair that several are mounted on hospital equipment Emitter, the repairing information recording module select for user or fill in corresponding project of reporting for repairment, and the wireless transmitter is used for The information of repairing information recording module typing is uploaded to information receiving module;
The interactive module includes operation module and terminal presentation facility, and the operation module is arrived for uploading maintenance information Information receiving module, the terminal presentation facility is for showing plant maintenance state.
Preferably, the Maintenance Significant Items of the plant maintenance data input module typing include day Maintenance Significant Items, week maintenance item Mesh and moon Maintenance Significant Items, the day Maintenance Significant Items include hull clean, equipment trial operation or sundry item, the week Maintenance Significant Items Including equipment mechanism inspection, lubrication or sundry item, the moon Maintenance Significant Items include emphasis maintenance cleaning, equipment Alignment or its He.
Preferably, the information receiving module is set if the repairing information for receiving wireless transmitter sending in display module Standby model display mark is red, green in display device module device model display mark if the confirmation message for receiving operation module upload Otherwise mark is blue, shows that mark is yellow in display device module device model if the equipment more new information for receiving equipment manufacturer.
Preferably, the terminal presentation facility shows that plant maintenance state includes two kinds, and a kind of maintenance completion mark is green, other Situation mark is red.
Preferably, the update is rewritten module for regular comparative apparatus maintenance record and is identified according to equipment maintenance record The equipment or the higher component of the frequency that goes wrong often repaired out upload special Maintenance Significant Items according to problem component selection and add Into plant maintenance data input module.
Preferably, option is reported built in the repairing information recording module for repairment, the option that reports for repairment is provided by equipment manufacturer Experience reports option for repairment and is equipped with corresponding solution after reporting option for repairment, and user's end selection can see corresponding failure when reporting for repairment Solution.
Compared with prior art, categorized the beneficial effects of the present invention are: the present invention establishes equipment library by guardian end Maintenance Significant Items are uniformly established afterwards, the maintenance state of equipment is determined by user end and upload to guardian end, through display module And terminal presentation facility, intuitively find out plant maintenance state, avoids maintenance chaotic, omitted caused by state is unclear etc., pass through The repairing information recording module of user's end can prompt failure to help, and can voluntarily overhaul, the timely uploading device fault message of energy, The time is saved, is improved efficiency, special Maintenance Significant Items can be according to circumstances added according to history maintenance and more new data, reduce failure Incidence is conducive to equipment stable operation.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is guardian end of the present invention flow diagram;
Fig. 2 is user's end flow diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of equipment Department of Our Hospital life period of an equipment management system System, including guardian end and user's end, guardian end include data input module, information receiving module and information update mould Block, user's end include information uploading module, interactive module;
Data input module includes device model recording module, taxonomic revision module, plant maintenance data input module, if Standby model recording module is used for the corresponding model typing of hospital equipment, and taxonomic revision module is for being divided hospital equipment Class, plant maintenance data input module are used for the project for needing to safeguard by sorted hospital equipment typing;
Information receiving module includes the first receiving module and display module, for receiving the information of user's end sending and leading to The equipment more new information of network sink devices producer is crossed, display module is for showing received information;
Information updating module includes historgraphic data recording module and updates rewriting module, and historgraphic data recording module is for remembering Recording apparatus maintenance record and equipment more new record update and rewrite module for comparative apparatus maintenance record and upload especially maintenance item Mesh;
Information uploading module includes repairing information recording module and the wireless transmitter that several are mounted on hospital equipment, Repairing information recording module selects or fills in corresponding project of reporting for repairment for user, and wireless transmitter is used for repairing information typing The information of module typing is uploaded to information receiving module;
Interactive module includes operation module and terminal presentation facility, and operation module is received for uploading maintenance information to information Module, terminal presentation facility is for showing plant maintenance state.
Wherein, the Maintenance Significant Items of plant maintenance data input module typing include day Maintenance Significant Items, all Maintenance Significant Items and the moon Maintenance Significant Items, day Maintenance Significant Items include hull clean, equipment trial operation or sundry item, all Maintenance Significant Items include equipment mechanism inspection Look into, lubricate or sundry item, the moon Maintenance Significant Items include emphasis maintenance cleaning, equipment Alignment or other.
Information receiving module is shown if the repairing information for receiving wireless transmitter sending in display module device model Mark it is red, it is blue in the green otherwise mark of display device module device model display mark if the confirmation message for receiving operation module upload, Show that mark is yellow in display device module device model if the equipment more new information for receiving equipment manufacturer.
Terminal presentation facility shows that plant maintenance state includes two kinds, and a kind of maintenance completion mark is green, other situation marks are red.
It updates and rewrites module for regular comparative apparatus maintenance record and frequent maintenance is identified according to equipment maintenance record Equipment or the higher component of the frequency that goes wrong, special Maintenance Significant Items are uploaded according to problem component selection and are added to plant maintenance In data input module.
Option is reported for repairment built in repairing information recording module, is reported option for repairment and is provided experience by equipment manufacturer and reports option and report for repairment It is equipped with corresponding solution after repairing option, user's end selection can see the solution of corresponding failure when reporting for repairment.
One concrete application of the present embodiment are as follows: the present invention will be cured by the device model recording module of data input module The corresponding model typing of institute's equipment, establishes equipment library, and categorized sorting module classifies hospital equipment, then plant maintenance Sorted hospital equipment typing is needed the project safeguarded, the dimension of plant maintenance data input module typing by data input module Shield project include day Maintenance Significant Items, all Maintenance Significant Items and moon Maintenance Significant Items, day Maintenance Significant Items include hull clean, equipment trial operation Or sundry item, all Maintenance Significant Items include equipment mechanism inspection, lubrication or sundry item, the moon Maintenance Significant Items include that emphasis maintenance is clear Clean, equipment Alignment or other, maintenance is corresponded into each equipment, Maintenance Significant Items are refined, aging is slowed down, is conducive to extend and sets Standby substance service life and economic life.
Maintenance work is executed by maintenance personnel, determines whether that maintenance is completed by using end by user of service, maintenance personnel After the Maintenance Significant Items for completing the same day, maintenance completion is uploaded by the operation module of interactive module or what is do not completed receives mould to information Block, if blue in the green otherwise mark of display device module device model display mark if the confirmation message for receiving operation module upload, Terminal presentation facility shows that plant maintenance state-maintenance completion mark is green simultaneously, other situation marks are red, prevent maintenance and do not tie up It protects chaotic situation, and determines that maintenance state can avoid that maintenance personnel is lazy not to be safeguarded by user.
By the equipment for the receiving equipment manufacturer more new information of information receiving module, set through display module by what need to be updated Standby model display mark is yellow, after maintenance personnel sees more new information, can customize and chooses whether to update, finishes or do not update if updating Then device model is not shown normally, and mark is yellow always if being not processed, and can according to circumstances choose whether that equipment is updated or risen Grade, is conducive to extend the technical life of equipment.
It is selected by the repairing information recording module of information uploading module by user or fills in corresponding project of reporting for repairment, selected When, report option built in repairing information recording module for repairment, user's end selection can see the solution of corresponding failure when reporting for repairment, If not corresponding to failure problems or user can not solve, user is through wireless transmitter by repairing information recording module typing Information be uploaded to information receiving module, display module device model display mark it is red, found in time by guardian and organize to tie up It repairs, maintenance finishes, and shows that life is normal, minor issue occurs, and user can complete to overhaul according to prompt oneself, saving time and manpower Cost, what user can't resolve can report for repairment in time, repair equipment.
Equipment maintenance record and equipment more new record are recorded by the historgraphic data recording module of information updating module, is passed through It updates and rewrites the regular comparative apparatus maintenance record of module and identify the equipment or appearance often repaired according to equipment maintenance record The higher component of troublesome frequencies is selected to upload special Maintenance Significant Items and is added to plant maintenance letter according to problem component by guardian It ceases in recording module, according to historical data, the fragile part of customized judgement equipment is then added in maintenance item, is conducive to The stable operation of equipment.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (6)

1. a kind of equipment Department of Our Hospital life period of an equipment management system, it is characterised in that: including guardian end and user's end, The guardian end includes data input module, information receiving module and information updating module, and the user's end includes information Uploading module, interactive module;
The data input module includes device model recording module, taxonomic revision module, plant maintenance data input module, institute Device model recording module is stated for by the corresponding model typing of hospital equipment, the taxonomic revision module to be used for hospital equipment Classify, the plant maintenance data input module is used for the project for needing to safeguard by sorted hospital equipment typing;
The information receiving module includes the first receiving module and display module, for receiving the information of user's end sending and leading to The equipment more new information of network sink devices producer is crossed, the display module is for showing received information;
The information updating module includes historgraphic data recording module and updates rewriting module, and the historgraphic data recording module is used In recording equipment maintenance record and equipment more new record, the update rewrites module for comparative apparatus maintenance record and uploads spy Other Maintenance Significant Items;
The information uploading module includes repairing information recording module and the wireless transmitter that several are mounted on hospital equipment, The repairing information recording module selects or fills in corresponding project of reporting for repairment for user, and the wireless transmitter will be for that will report for repairment The information of data input module typing is uploaded to information receiving module;
The interactive module includes operation module and terminal presentation facility, and the operation module is for uploading maintenance information to information Receiving module, the terminal presentation facility is for showing plant maintenance state.
2. a kind of equipment Department of Our Hospital life period of an equipment management system according to claim 1, it is characterised in that: described The Maintenance Significant Items of plant maintenance data input module typing include day Maintenance Significant Items, all Maintenance Significant Items and moon Maintenance Significant Items, it is described Day, Maintenance Significant Items included hull clean, equipment trial operation or sundry item, and the week Maintenance Significant Items include equipment mechanism inspection, profit Sliding or sundry item, the moon Maintenance Significant Items include emphasis maintenance cleaning, equipment Alignment or other.
3. a kind of equipment Department of Our Hospital life period of an equipment management system according to claim 1, it is characterised in that: described Information receiving module is red in display module device model display mark if the repairing information for receiving wireless transmitter sending, if connecing The confirmation message for receiving operation module upload is then blue in the green otherwise mark of display device module device model display mark, sets if receiving The equipment more new information of standby producer then shows that mark is yellow in display device module device model.
4. a kind of equipment Department of Our Hospital life period of an equipment management system according to claim 1, it is characterised in that: described Terminal presentation facility shows that plant maintenance state includes two kinds, and a kind of maintenance completion mark is green, other situation marks are red.
5. a kind of equipment Department of Our Hospital life period of an equipment management system according to claim 1, it is characterised in that: described Update rewrite module for regular comparative apparatus maintenance record and identified according to equipment maintenance record the equipment often repaired or The higher component of the frequency that goes wrong uploads special Maintenance Significant Items according to problem component selection and is added to plant maintenance data input In module.
6. a kind of equipment Department of Our Hospital life period of an equipment management system according to claim 1, it is characterised in that: described Report option built in repairing information recording module for repairment, it is described report option for repairment and provide experience by equipment manufacturer report option for repairment and report choosing for repairment Corresponding solution is equipped with after, user's end selection can see the solution of corresponding failure when reporting for repairment.
CN201910225507.XA 2019-03-25 2019-03-25 A kind of equipment Department of Our Hospital life period of an equipment management system Pending CN109949916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910225507.XA CN109949916A (en) 2019-03-25 2019-03-25 A kind of equipment Department of Our Hospital life period of an equipment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910225507.XA CN109949916A (en) 2019-03-25 2019-03-25 A kind of equipment Department of Our Hospital life period of an equipment management system

Publications (1)

Publication Number Publication Date
CN109949916A true CN109949916A (en) 2019-06-28

Family

ID=67011554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910225507.XA Pending CN109949916A (en) 2019-03-25 2019-03-25 A kind of equipment Department of Our Hospital life period of an equipment management system

Country Status (1)

Country Link
CN (1) CN109949916A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110752022A (en) * 2019-10-16 2020-02-04 深圳市宝安区妇幼保健院 Electronic maintenance method of medical equipment, intelligent terminal and storage medium
CN111584058A (en) * 2020-03-27 2020-08-25 李宏儒 Full life cycle operation quality control system and control method for medical equipment
CN113539451A (en) * 2021-06-04 2021-10-22 贵州医科大学附属医院 Qt-based medical linear accelerator regular maintenance data recording system and maintenance method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107038346A (en) * 2017-06-05 2017-08-11 天津市联大医用设备有限公司 A kind of equipment Department of Our Hospital life period of an equipment management system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107038346A (en) * 2017-06-05 2017-08-11 天津市联大医用设备有限公司 A kind of equipment Department of Our Hospital life period of an equipment management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱伟 等: "基于HERP的医疗设备维修管理系统的设计与开发", 《中国医疗设备》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110752022A (en) * 2019-10-16 2020-02-04 深圳市宝安区妇幼保健院 Electronic maintenance method of medical equipment, intelligent terminal and storage medium
CN111584058A (en) * 2020-03-27 2020-08-25 李宏儒 Full life cycle operation quality control system and control method for medical equipment
CN113539451A (en) * 2021-06-04 2021-10-22 贵州医科大学附属医院 Qt-based medical linear accelerator regular maintenance data recording system and maintenance method

Similar Documents

Publication Publication Date Title
US11157519B2 (en) System and method for enterprise asset management and failure reporting
CN109949916A (en) A kind of equipment Department of Our Hospital life period of an equipment management system
WO2021258235A1 (en) Smart factory data collection platform and implementation method therefor
US9696698B2 (en) Method and system for handling batch production within ANSI/ISA/95 production scheduling extended with batch production parameter historian
CN101582812A (en) Monitoring and operation managing system
CN107656749A (en) A kind of device version management-control method and device
CN103530757A (en) Network based multi-mode intelligent order following management method and intelligent management system
CN107332722A (en) The method for removing and system of a kind of fault message
CN101763582A (en) Scheduled overhaul management module for EAM system of power plant
CN105915381A (en) System for realizing monitoring system business logic online modification
CN102857371A (en) Dynamic allocation management method for cluster system
CN101763581A (en) EAM system of power station and report forms management module thereof
CN102768511A (en) Searching methd and system for reasons of fault event in process industry
CN108021992A (en) A kind of multimedia teaching facility network complaint management system and method
CN101763580A (en) Equipment state overhaul management module for EAM system of power plant
Lewis et al. Maintenance of mobile mine equipment in the information age
CN105335401A (en) Data warehouse index management method, apparatus and system
CN201371834Y (en) Railway transportation multi-functional alarm display
JP6901840B2 (en) Guidance information presentation system, guidance information presentation method and program
CN106533788A (en) Network anomaly monitoring method and system
Burhanuddin et al. An application of decision making grid to improve maintenance strategies in small and medium industries
CN110008046A (en) A kind of IT operation management method based on Internet of Things
CN101763577B (en) EAM system for power plant
CN106296021A (en) A kind of dynamic managing and control system of capital construction aggregative indicator
CN105388875A (en) Maintenance and remanufacturing intelligent management system and control method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628