CN109944272A CN201910294650.4A CN201910294650A CN109944272A CN 109944272 A CN109944272 A CN 109944272A CN 201910294650 A CN201910294650 A CN 201910294650A CN 109944272 A CN109944272 A CN 109944272A
Authority
CN
China
Prior art keywords
main body
pier
cushion cap
pier main
stair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910294650.4A
Other languages
Chinese (zh)
Inventor
李国强
潘云鹏
侯永东
王增华
贾阳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Seventh Group Co Ltd
Xian Railway Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
China Railway Seventh Group Co Ltd
Xian Railway Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Seventh Group Co Ltd, Xian Railway Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical China Railway Seventh Group Co Ltd
Priority to CN201910294650.4A priority Critical patent/CN109944272A/en
Publication of CN109944272A publication Critical patent/CN109944272A/en
Pending legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The present invention provides a kind of subway work multifunctional measuring architecture of base station, it include: cushion cap, the cushion cap is cast in the foundation pit of excavating earth surface, pier main body is equipped on the upside of the cushion cap, the pier main body and cushion cap are integrated founder's structure, plane survey point is equipped with above the pier main body, cushion cap on the outside of the pier main body is equipped with measurement of higher degree point, pier main body upper end is surrounded by densely covered net, the overstocked frame of arranging net of Netcom that gathers is mounted in pier main body, the pier body side is equipped with stair, stair one end is arranged in pier main body upper end, the other end is mounted in earth's surface, the stair are equipped with guard rail.The present invention uses a kind of simple machine, changes restricted single operation and security risk, improves the working efficiency and precision of measurement work, provides powerful guarantee for subsequent accurate construction.

Description

A kind of subway work multifunctional measuring architecture of base station
Technical field
The present invention relates to subway work technical field of measuring equipment, specially a kind of subway work multifunctional measuring base station Structure.
Background technique
During general subway civil construction, the measurement in construction and survey set task for convenience, in tunneling and open cut vehicle Stand construction, shield tunnel construction originate and tunneling process in must increase infilling control point, station main body axis is controlled with this The construction precision of line and tunnel excavation and driving.The Metrical Method of pass point generally use back traverse, echo connecting traverse into Row is subject to infilling control point composition close ring or echos to conform to line by the chopped-off head control point by cross-post as known point.By It is typically in city busiest section in subway work, people's vehicle flowrate is big, and surrounding enviroment are complicated, the high standard text that construction site requires Brightization construction, therefore generally closed using 2 meters of high enclosings.Universal pass point is performed in roof, causes using trouble, measurement The excessive influence measurement accuracy of pitch angle performs easily to be rolled by loaded vehicle on road and causes to settle, generally perform forced centering stake at For a kind of fixed height point, cause sighting condition limited, greatly reduce working efficiency, influence the construction of entire engineering into Degree.
Summary of the invention
Technical problem solved by the invention is to provide a kind of subway work multifunctional measuring architecture of base station, to solve The problems mentioned above in the background art.
Technical problem solved by the invention is realized using following technical scheme: a kind of subway work multifunctional measuring Architecture of base station, comprising: cushion cap, the cushion cap are cast in the foundation pit of excavating earth surface, and pier main body is equipped on the upside of the cushion cap, The pier main body and cushion cap are integrated founder's structure, are equipped with plane survey point, the pier master above the pier main body The cushion cap of external side is equipped with measurement of higher degree point, and pier main body upper end is surrounded by densely covered net, and Netcom of gathering is excessively densely covered Screen frame frame is mounted in pier main body, and the pier body side is equipped with stair, and stair one end is arranged in pier main body upper end, separately One end is mounted in earth's surface, and the stair are equipped with guard rail.
The plane survey point includes plane survey platform, and the plane survey stage+module is on rotary table, the circle Platform is mounted in pier main body by drilling plus bar planting, is vertically equipped with anti-settling resistance muscle in the middle part of the drilling plus bar planting.
Retaining wall is equipped on the outside of the pier main body, retaining wall is built on cushion cap.
It is equipped with steel reinforcement cage in the pier main body and cushion cap, steel reinforcement cage includes several main reinforcements and several stirrups, between stirrup It is arranged in parallel, is arranged in parallel between main reinforcement, stirrup and stirrup form cuboid steel reinforcement cage.Steel reinforcement cage is cast in concrete square.
The guard rail is fixed on pier body top using expansion bolt;The stair are welded on guard rail.
Compared with prior art, the beneficial effects of the present invention are: the present invention uses a kind of simple machine, changing is restricted Single operation and security risk, improve measurement work working efficiency and precision, for it is subsequent it is accurate construction provide effectively It ensures.Sighting condition progress instrument antenna height can be measured according to site operation freely to adjust;Plane survey point periphery uses The small-sized rotary table of concrete system effectively avoids ponding that point is caused to corrode;Plane survey point welds lateral anti-settling resistance muscle, prevents Point is subjected to displacement variation;Guard rail and stair ensure that the safety of survey crew and instrument and equipment, thus before changing Restricted fixation measuring height of sighting line prevents machinery etc. from blocking sight and causes not working asynchronously.With very high safety, Practicability and economy.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is plane survey point structural schematic diagram of the invention.
Fig. 3 is stirrup distribution schematic diagram of the invention.
Specific embodiment
In order to make implement technical means of the invention, creation characteristic, reach purpose and effect is easy to understand, tie below Conjunction is specifically illustrating, and the present invention is further explained, in the description of the present invention, it should be noted that unless otherwise specific regulation And restriction, term " installation ", " company ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, be also possible to detachable Connection, or be integrally connected and can be mechanical connection, it is also possible to be electrically connected;It can be directly connected, centre can also be passed through Medium is indirectly connected, can connection inside two elements.
As shown in Figures 1 to 3, a kind of subway work multifunctional measuring architecture of base station, comprising: cushion cap 7, the cushion cap 7 pour It builds in the foundation pit of excavating earth surface 9, pier main body 2 is equipped on the upside of the cushion cap 7, the pier main body 2 is integrated with cushion cap 7 Founder's structure, plane survey point 3 is equipped with above the pier main body 2, and the cushion cap 7 in 2 outside of pier main body is equipped with height Journey measurement point position 4,2 upper end of pier main body are surrounded by densely covered net 5, and the net 5 that gathers is mounted on pier by the screen frame frame that gathers In main body 2,2 side of pier main body is equipped with stair 6, and the setting of 6 one end of stair is mounted in 2 upper end of pier main body, the other end In earth's surface 9, the stair 6 are equipped with guard rail 5.
The plane survey point 3 includes plane survey platform 31, and the plane survey platform 31 is mounted on rotary table 32, The rotary table 32 is mounted in pier main body 2 by drilling plus bar planting 33, and it is anti-settling that the drilling adds 33 middle part of bar planting to be vertically equipped with Resistance muscle 34 drops.
Retaining wall 1 is equipped on the outside of the pier main body 2, retaining wall 1 is built on cushion cap 7.
The pier main body 2 is interior equipped with steel reinforcement cage with cushion cap 7, and steel reinforcement cage includes several main reinforcements 11 and several stirrups 10, hoop It is arranged in parallel between muscle 10, is arranged in parallel between main reinforcement 11, stirrup 10 and stirrup 10 form cuboid steel reinforcement cage.Steel reinforcement cage pours In concrete square.
The guard rail 5 is fixed on 2 top of pier main body using expansion bolt;The stair 6 are welded on guard rail 5 On.
The material of heretofore described retaining wall is 240mm × 115mm × 53mm standard solid brick.The pier master Body and the material on basis are reinforced concrete structure.Main reinforcement is Φ 28 (Φ 16) screw-thread steel, 4 (8) roots, long 2620mm.Stirrup is 10 round steel of Φ;The material of the stair is 5mm steel plate;The material of the guard rail is 4 section 1200*1500mm protection screen sheets; The material of the plane survey point is measurement control spot welding 16 screw-thread steel of Φ;It can be set up in the plane survey point 3 A variety of measuring devices, to make measurement sight adjustable.
Economic effect of the invention:
1, manufacturing cost is calculated: concrete, reinforcing bar, steel plate, protection screen sheet, brick add a total of about 1200 yuan of other auxiliary materials.
2, complex site factor and standardization civilized construction requirement, universal pass point often economic efficiency contrast: are limited to Position device production is too complicated, mode of operation fixed single, and it is restricted can only set up the equipment such as fixed pedestal, from manpower Material resources cause to waste.Part planar measurement point position cannot merge completely with pass point measuring device, cause point displacement, drop significantly Low working efficiency and measurement precision, influence the construction speed of entire engineering.
After multi-functional subway work measurement point position device, random setting station can be carried out according to construction survey environment, without dead Angle intervisibility sight, can meet live any position measurement and survey sets work;Anti-skidding railing and stair have effectively ensured measurement people The safety of member;It is multiple effectively to control the frequent conducting wire of point displacement bring using lateral anti-settling resistance muscle for plane survey point It surveys.The work safety, measurement working efficiency and precision of survey crew is substantially increased, has provided and has tried hard to keep for subsequent accurate construction Barrier.With very high safety, practicability and economy.
The present invention can measure sighting condition according to site operation and carry out instrument antenna height freedom when subway work measures It adjusts;Plane survey point periphery effectively avoids ponding that point is caused to corrode using the small-sized rotary table of concrete system;Plane survey point Lateral anti-settling resistance muscle is welded, point is prevented to be subjected to displacement variation;Guard rail and stair ensure that survey crew and instrument The safety of equipment, thus restricted fixation measuring height of sighting line before changing, preventing machinery etc. from blocking that sight causes can not Synchronous working.It meets measurement and survey in different construction environments and sets work, improve measurement working efficiency and precision, be subsequent accurate Construction provides powerful guarantee.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.Claimed range of the invention by appended claims and Its equivalent thereof.

Claims (5)

1. a kind of subway work multifunctional measuring architecture of base station, comprising: cushion cap, it is characterised in that: the cushion cap is cast in out It digs in the foundation pit of earth's surface, pier main body is equipped on the upside of the cushion cap, the pier main body and cushion cap are integrated founder's structure, institute It states and is equipped with plane survey point above pier main body, the cushion cap on the outside of the pier main body is equipped with measurement of higher degree point, described Pier main body upper end is surrounded by densely covered net, and the overstocked frame of arranging net of Netcom that gathers is mounted in pier main body, the pier main body Side is equipped with stair, and the setting of stair one end is mounted in earth's surface in pier main body upper end, the other end, and the stair are equipped with protection Railing.
2. a kind of subway work multifunctional measuring architecture of base station according to claim 1, it is characterised in that: the plane Measurement point position includes plane survey platform, and for the plane survey stage+module on rotary table, the rotary table passes through drilling plus bar planting It is mounted in pier main body, is vertically equipped with anti-settling resistance muscle in the middle part of the drilling plus bar planting.
3. a kind of subway work multifunctional measuring architecture of base station according to claim 1, it is characterised in that: the pier Retaining wall is equipped on the outside of main body, retaining wall is built on cushion cap.
4. a kind of subway work multifunctional measuring architecture of base station according to claim 1, it is characterised in that: the pier Steel reinforcement cage is equipped in main body and cushion cap, steel reinforcement cage includes several main reinforcements and several stirrups, is arranged in parallel between stirrup, between main reinforcement It is arranged in parallel, stirrup and stirrup form cuboid steel reinforcement cage.Steel reinforcement cage is cast in concrete square.
5. a kind of subway work multifunctional measuring architecture of base station according to claim 1, it is characterised in that: the protection Railing is fixed on pier body top using expansion bolt;The stair are welded on guard rail.
CN201910294650.4A 2019-04-12 2019-04-12 A kind of subway work multifunctional measuring architecture of base station Pending CN109944272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910294650.4A CN109944272A (en) 2019-04-12 2019-04-12 A kind of subway work multifunctional measuring architecture of base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910294650.4A CN109944272A (en) 2019-04-12 2019-04-12 A kind of subway work multifunctional measuring architecture of base station

Publications (1)

Publication Number Publication Date
CN109944272A true CN109944272A (en) 2019-06-28

Family

ID=67014918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910294650.4A Pending CN109944272A (en) 2019-04-12 2019-04-12 A kind of subway work multifunctional measuring architecture of base station

Country Status (1)

Country Link
CN (1) CN109944272A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101010333B1 (en) * 2010-03-31 2011-01-25 주식회사 대한지오매틱스 Level surveying using a assembly level point device
CN103076010A (en) * 2013-01-25 2013-05-01 天津二十冶建设有限公司 Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN104121895A (en) * 2013-04-28 2014-10-29 上海勘测设计研究院 Soft soil area plane height measurement control point and embedding method thereof
CN106760872A (en) * 2017-01-17 2017-05-31 中交公局第二工程有限公司 A kind of segment girder precast measurement formula of consolidating superelevation observation tower
CN206736881U (en) * 2017-05-11 2017-12-12 中交第二航务工程局有限公司 Shallow sea region measurement control point platform
CN107504962A (en) * 2017-06-29 2017-12-22 中交航局第四工程有限公司 A kind of method using laser plummet apparatus control bridge deck-molding pier stud perpendicularity
CN208219683U (en) * 2018-04-12 2018-12-11 中国建筑一局(集团)有限公司 A kind of mini-valve tube soil body pressure releasing structure
CN210216495U (en) * 2019-04-12 2020-03-31 中铁七局集团有限公司 Multifunctional measuring base station structure for subway construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101010333B1 (en) * 2010-03-31 2011-01-25 주식회사 대한지오매틱스 Level surveying using a assembly level point device
CN103076010A (en) * 2013-01-25 2013-05-01 天津二十冶建设有限公司 Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN104121895A (en) * 2013-04-28 2014-10-29 上海勘测设计研究院 Soft soil area plane height measurement control point and embedding method thereof
CN106760872A (en) * 2017-01-17 2017-05-31 中交公局第二工程有限公司 A kind of segment girder precast measurement formula of consolidating superelevation observation tower
CN206736881U (en) * 2017-05-11 2017-12-12 中交第二航务工程局有限公司 Shallow sea region measurement control point platform
CN107504962A (en) * 2017-06-29 2017-12-22 中交航局第四工程有限公司 A kind of method using laser plummet apparatus control bridge deck-molding pier stud perpendicularity
CN208219683U (en) * 2018-04-12 2018-12-11 中国建筑一局(集团)有限公司 A kind of mini-valve tube soil body pressure releasing structure
CN210216495U (en) * 2019-04-12 2020-03-31 中铁七局集团有限公司 Multifunctional measuring base station structure for subway construction

Similar Documents

Publication Publication Date Title
CN102268871B (en) Construction method of turnover platform for underwater pile foundation of bridge
CN108330835A (en) The construction method of setting bracket
CN105839475B (en) A kind of Monolithic Track Bed Construction method
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN105544587B (en) The construction method of tower crane is fixed using combined type foundation for tower crane
CN108049393A (en) For the attached building enclosure construction technology in subway station under the conditions of rich water thick sand bed
CN110685277A (en) Guide positioning device and method for permanent steel casing of large onshore pile foundation
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN101684632B (en) Settlement test method for embankment filling construction
CN105297731B (en) Reverse construction method steel stand column positioning device and positioning method
CN111485573A (en) Transmission project prefabricated foundation installation and iron tower assembly coherent construction method
CN109944272A (en) A kind of subway work multifunctional measuring architecture of base station
CN211773827U (en) Pile foundation anti-settling device
CN210216495U (en) Multifunctional measuring base station structure for subway construction
CN116517012A (en) Pile wall foundation structure suitable for soft soil site and construction method
CN105040598A (en) Prepressing construction device of cantilever box beam No.0 block and prepressing construction method thereof
CN108797607A (en) A kind of construction method of two-tube diagonal brace deep basal pit
CN107476327A (en) Narrow base list column step foundation construction method
CN212642146U (en) Movable type one-column one-pile stone filling platform
CN205975615U (en) Structure of rectifying of stress tube stake in advance inclines
CN209703493U (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN207646621U (en) The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage
CN208965580U (en) A kind of non-console mode tower crane
CN105887688B (en) Drop in beam formwork elevation measuring adjusting means, mobile formwork and absolute altitude adjusting method
CN111636439A (en) Soil body protective structure between foundation ditch supporting construction bored concrete pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination