CN109931501A - A kind of Segmented heating gas delivery system - Google Patents
A kind of Segmented heating gas delivery system Download PDFInfo
- Publication number
- CN109931501A CN109931501A CN201711362577.7A CN201711362577A CN109931501A CN 109931501 A CN109931501 A CN 109931501A CN 201711362577 A CN201711362577 A CN 201711362577A CN 109931501 A CN109931501 A CN 109931501A
- Authority
- CN
- China
- Prior art keywords
- heating
- gas
- pipe
- pressure regulator
- heater wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The present invention relates to a kind of Segmented heating gas delivery systems, including several gas transfer pipelines, gas transfer pipeline includes the preliminary preheating pipe of successively closed connection, enhancing heating pipe, heater wire heating pipe, preliminary preheating pipe is equipped with warm-up block, and the preheated module temperature after heating of gas is maintained at T1DEG C, enhancing heating pipe is equipped with multiple pressure regulator valves, is arranged with heating mantle on pressure regulator valve, the heated set temperature after heating of gas is maintained at T2DEG C, heater wire is arranged on heater wire heating pipe, the heated line temperature after heating of gas is maintained at T3DEG C, T1Less than T2, T2Greater than T3, T3Greater than T1, gas passes sequentially through warm-up block, regulating valve, heater wire heated transportation.The present invention has heating effect good, gas conveys unobstructed feature by the way of the subsection setup heating source on air shooter road.
Description
Technical field
The present invention relates to a kind of gas delivery system, in particular to a kind of Segmented heating gas delivery system belongs to gas
Source supplies field.
Background technique
Currently, being directed to the supply system of special gas, single heating mode is often taken, first from special gas equipment
Source is that heating is realized only by heater wire from the beginning to the end, heating reaches to distributor box, then in this supply chain of board
To temperature be also consistent, be typically set at 35 degree.Although such heating mode is certain to being supplied with for special gas
It helps, but is not optimal mode, and demand of the component due to installing in entire supply system to heating is different.Have
When will lead to some areas heating be not enough, thus affect supply gas pressure and flow.In addition, in winter gas
Temperature it is relatively low in the case where, heat the position being not enough leads to the problem of understand it is more obvious, cause to become by gas herein
The mixture of liquid and gas produces into serious influence entire transportation system.
Summary of the invention
Segmented heating gas delivery system of the present invention discloses new scheme, is set using being segmented on air shooter road
The mode for setting heating source solves transportation problem caused by otherness demand of the existing scheme because not being able to satisfy heating.
Segmented heating gas delivery system of the present invention includes several gas transfer pipelines, and gas transfer pipeline includes successively
Preliminary preheating pipe, the enhancing heating pipe, heater wire heating pipe of closed connection, preliminary preheating pipe are equipped with pre- hot-die
Block, the preheated module temperature after heating of gas are maintained at T1DEG C, enhancing heating pipe is equipped with multiple pressure regulator valves, covers on pressure regulator valve
Equipped with heating mantle, the heated set temperature after heating of gas is maintained at T2DEG C, heater wire, gas are arranged on heater wire heating pipe
Heated line temperature after heating is maintained at T3DEG C, T1Less than T2, T2Greater than T3, T3Greater than T1, gas pass sequentially through warm-up block, adjust
Save valve, heater wire heated transportation.
Further, the Segmented heating gas delivery system of this programme includes two gas transfer pipelines, above-mentioned two gas
The end of body transfer pipeline is connected to gas delivery main road, and gas delivery main road is equipped with pneumatic filter, heat gas
It is exported through pneumatic filter.
Further, the warm-up block of this programme includes module housing, is equipped with spiral pipe, helical coil in module housing
Electric heating circuit is equipped on the inside of road, electric heating loop heating flows through the gas of spiral pipe.
Further, it is successively arranged on the preliminary preheating pipe of the upstream of the warm-up block of this programme along gas conveying direction
Pressure transmitter, pneumatic control valve.
Further, the heating mantle internal layer of this programme is equipped with the heater strip that bending extends, and one end of heating mantle is equipped with multiple knobs
Button, the other end of heating mantle are equipped with multiple button holes, and button and button hole fastening cooperate, and heating mantle passes through above-mentioned fastening engagement sleeves
Tightly on pressure regulator valve.
Further, pressure regulator valve A, pressure regulator valve B, pressure regulator valve are equipped with along gas conveying direction on the enhancing heating pipe of this programme
Enhancing heating pipe between A and pressure regulator valve B is equipped with pressure gauge, is additionally provided with pressure transmitter on pressure regulator valve B.
Segmented heating gas delivery system of the present invention by the way of the subsection setup heating source on air shooter road,
Good with heating effect, gas conveys unobstructed feature.
Detailed description of the invention
Fig. 1 is the schematic diagram of Segmented heating gas delivery system of the present invention.
Fig. 2 is the schematic diagram of warm-up block.
Fig. 3 is the schematic diagram of warm-up block internal structure.
Fig. 4 is the schematic diagram of heating mantle expansion.
Fig. 5 is the schematic diagram that bending extends heater strip inside the heating mantle being unfolded in Fig. 4.
Fig. 6 is the schematic diagram after heating mantle fastening.
Fig. 7 is the schematic top plan view of the heating mantle fastened in Fig. 6.
Wherein, 100 be preliminary preheating pipe, and 110 be warm-up block, and 111 be spiral pipe, and 200 be enhancing heating tube
Road, 210 be heating mantle, and 211 be heater strip, and 212 be button, and 300 be heater wire heating pipe, and 400 be gas delivery main road.
Specific embodiment
As shown in Figure 1, the schematic diagram of Segmented heating gas delivery system of the present invention.Segmented heating gas delivery system
Including several gas transfer pipelines, gas transfer pipeline include successively closed connection preliminary preheating pipe, enhancing heating pipe,
Heater wire heating pipe, preliminary preheating pipe are equipped with warm-up block, and the preheated module temperature after heating of gas is maintained at T1DEG C,
Enhance heating pipe and be equipped with multiple pressure regulator valves, heating mantle is arranged on pressure regulator valve, the heated set temperature after heating of gas is kept
In T2DEG C, heater wire is arranged on heater wire heating pipe, the heated line temperature after heating of gas is maintained at T3DEG C, T1Less than T2,
T2Greater than T3, T3Greater than T1, gas passes sequentially through warm-up block, regulating valve, heater wire heated transportation.In order to guarantee that gas conveys
Efficiency, the scheme that this programme can be conveyed simultaneously using a plurality of pipeline, as shown in Figure 1, i.e. preferably segmented formula heat gas conveying
System includes two gas transfer pipelines, and the end of above-mentioned two gas transfer pipelines is connected to gas delivery main road, gas
Delivery main road is equipped with pneumatic filter, and heat gas is exported through pneumatic filter.Above scheme is used in air shooter
The mode of road subsection setup heating source improves heating power at the position for needing to reinforce heating, improves gas temperature, avoid
Gas delivery problem caused by low temperature.
As shown in Figure 2,3, the warm-up block of this programme includes module housing, is equipped with spiral pipe, spiral shell in module housing
It revolves shape insides of pipes and is equipped with electric heating circuit, electric heating loop heating flows through the gas of spiral pipe.In order to realize conveying control
It makes, is successively arranged pressure transmitter, gas along gas conveying direction on the preliminary preheating pipe of the upstream of the warm-up block of this programme
Dynamic control valve.
As also shown in e.g. figs. 4-7, the heating mantle internal layer of this programme is equipped with the heater strip that bending extends, and one end of heating mantle is equipped with
Multiple buttons, the other end of heating mantle are equipped with multiple button holes, and button and button hole fastening cooperate, and heating mantle passes through above-mentioned fastening
Cooperation is locked on pressure regulator valve.In order to improve the effect of pipeline pressure regulation, along gas conveying side on the enhancing heating pipe of this programme
To being equipped with pressure regulator valve A, pressure regulator valve B, enhancing heating pipe between pressure regulator valve A and pressure regulator valve B is equipped with pressure gauge, on pressure regulator valve B
It is additionally provided with pressure transmitter.
This programme discloses a kind of segmentally heating system of special gas supply, carries out to entire special gas heating system
Gradation study.First to gas source come out gas carry out unified heating, to the gas flowed through no matter the temperature for Chu Laiing how much,
30 degree, rated power 2400W all are previously heated to, is then entering subsequent equipment distributor box-board, this ensure that
The temperature of gas source is not very low.Secondly, the important pressure regulator valve flowed through to centre has carried out individually after the heating of (preheating) module
Heating.Heating mode originally is single, and the heating power to pressure regulator valve is also every meter of 30W, but actually pressure regulator valve is to need most
The component of heat compensation is heated and carried out, so this programme has individually carried out independent heating design to pressure regulator valve, devises one
Heating jacket (heating mantle) of a shape as pressure regulator valve, directly individually covers on pressure regulator valve, at the same heating power also from
30 W before greatly improve 600W till now, sufficiently meet the demand for heat of pressure regulator valve, while heating temperature is set as 37
Degree is set slightly higher than the temperature of front.Disk heating and pipeline heating, this programme after pressure regulator valve still use
Heater wire heating mode originally, temperature are set in 35 degree, every meter of 30W of power.In this way, the heating system of entire special gas supply
System, segmentally heating temperature is 30 degree, 37 degree, 35 degree respectively, and heating power is 2400W, 600W, 30w/m respectively.Such point
Section heating mode effectively avoids the heating " blind spot " in entire heating system, solves the difficulty in gas conveying, whole
A gas supply system becomes very unimpeded, effective, and flow is also sufficiently ensured.Gas first passes around heating by pipeline
Block (warm-up block) is tentatively heated, and is carried out pressure regulator valve local heating using pressure regulator valve, is protected pressure regulator valve, increases pressure regulator valve
Service life is finally heated by disk entirety heater wire, again to guarantee the temperature and flow velocity of gas.Meanwhile this programme
Heater wire can be divided into left and right disk, once single disk heat damage, another disk is unaffected can still to work.Heat small jacket
(heating mantle) heats main valve member, carries out local heating to main valve member, guarantees in this way when gas is by these valve members, gas
It can sufficiently be heated, it is also ensured that this part valve member will not cause to drip because of heating temperature unevenness and ice condition goes out
It is existing, valve is preferably protected, valve service life is increased.This programme uses the preliminary heat gas of heat block, enters master in gas
Heat block heating is first passed through before wanting pipeline, makes gas that there is certain temperature, can make subsequent heating more uniform in this way, it can also
To play the role of tentatively protecting the pipeline and valve member in disk below.This programme controls multiple heating modes using multilist,
It is controlled using multiple temp controlled meters, heating module is segmented, so that better heat gas, is that gas obtains sufficiently
Production equipment is entered back into after heating.
Existing scheme heating mode is heated pipeline and valve member by canoe using heater wire, and is led to outside
It crosses heat-preservation cotton package and carries out Heat preservation.This programme carries out Heat preservation by heater wire heat-preservation cotton in prior art basis
Outside, it increases HEATING BLOCK (heating module) and heats small jacket for pressure regulator valve customization and carry out segmentally heating, to make
Gas flowing is more stable, the icing phenomenon that drips caused by flow velocity is too fast is prevented, to increase using equipment life.This programme changes
Existing heating mode is become, has realized heating section, different heating temperatures is set, different heating powers, Lai Shixian are designed
Special gas supply is convenient, unimpeded.Based on the above feature, the Segmented heating gas delivery system of this programme compares existing scheme
With substantive distinguishing features outstanding and significant progress.
This programme Segmented heating gas delivery system is not limited to content disclosed in specific embodiment, in embodiment
The technical solution of appearance can the understanding based on those skilled in the art and extend, those skilled in the art combine according to this programme
The simple replacement scheme that common knowledge is made also belongs to the range of this programme.
Claims (6)
1. a kind of Segmented heating gas delivery system, it is characterized in that including several gas transfer pipelines, the air shooter
Road includes the preliminary preheating pipe of successively closed connection, enhancing heating pipe, heater wire heating pipe, the preliminary preheating pipe
It is equipped with warm-up block, gas is maintained at T through the warm-up block temperature after heating1DEG C, the enhancing heating pipe is equipped with
Multiple pressure regulator valves are arranged with heating mantle on the pressure regulator valve, and gas temperature after the heating mantle heats is maintained at T2DEG C, it is described
Heater wire is arranged on heater wire heating pipe, gas is maintained at T through the heater wire temperature after heating3DEG C, T1Less than T2, T2
Greater than T3, T3Greater than T1, gas passes sequentially through the warm-up block, regulating valve, heater wire heated transportation.
2. Segmented heating gas delivery system according to claim 1, which is characterized in that the Segmented heating gas
Transportation system includes two gas transfer pipelines, and the end of two gas transfer pipelines is connected to gas delivery main road,
The gas delivery main road is equipped with pneumatic filter, and heat gas is exported through the pneumatic filter.
3. Segmented heating gas delivery system according to claim 1, which is characterized in that the warm-up block includes mould
Block shell, the module housing is interior to be equipped with spiral pipe, electric heating circuit is equipped on the inside of the spiral pipe, the electricity adds
The gas for flowing through the spiral pipe is heated in hot loop.
4. Segmented heating gas delivery system according to claim 3, which is characterized in that the upstream of the warm-up block
Preliminary preheating pipe on along gas conveying direction be successively arranged pressure transmitter, pneumatic control valve.
5. Segmented heating gas delivery system according to claim 1, which is characterized in that the heating mantle internal layer is equipped with
It is bent the heater strip extended, one end of the heating mantle is equipped with multiple buttons, and the other end of the heating mantle is equipped with multiple buttons
Hole, the button and button hole fastening cooperate, and the heating mantle is locked on the pressure regulator valve by fastening cooperation.
6. Segmented heating gas delivery system according to claim 1, which is characterized in that on the enhancing heating pipe
Along gas conveying direction equipped with pressure regulator valve A, pressure regulator valve B, on the enhancing heating pipe between the pressure regulator valve A and the pressure regulator valve B
Equipped with pressure gauge, pressure transmitter is additionally provided on the pressure regulator valve B.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711362577.7A CN109931501B (en) | 2017-12-18 | 2017-12-18 | Sectional type heating gas conveying system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711362577.7A CN109931501B (en) | 2017-12-18 | 2017-12-18 | Sectional type heating gas conveying system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109931501A true CN109931501A (en) | 2019-06-25 |
CN109931501B CN109931501B (en) | 2021-04-06 |
Family
ID=66982297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711362577.7A Active CN109931501B (en) | 2017-12-18 | 2017-12-18 | Sectional type heating gas conveying system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109931501B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117366475A (en) * | 2023-11-13 | 2024-01-09 | 上海韩科建设工程有限公司 | Novel method for controlling temperature change of extra-gas high-low pressure regulating valve |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192655A (en) * | 1977-07-18 | 1980-03-11 | Caloric Gesellschaft Fur Apparatebau M.B.H. | Process and apparatus for the conveyance of real gases |
EP0976969A1 (en) * | 1998-07-29 | 2000-02-02 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Apparatus and process for the supply of helium to a plurality of production lines |
CN103486439A (en) * | 2013-10-11 | 2014-01-01 | 国家电网公司 | SF6 gas bottle heating jacket |
CN203525575U (en) * | 2013-09-30 | 2014-04-09 | 国家电网公司 | High-pressure mixed gas inflating device |
CN203585808U (en) * | 2013-11-11 | 2014-05-07 | 国家电网公司 | Sulfur hexafluoride gas bottle heating device |
CN203708518U (en) * | 2013-12-12 | 2014-07-09 | 冠礼控制科技(上海)有限公司 | Segmented-control heating blanket for gas supply system |
CN104165271A (en) * | 2014-08-04 | 2014-11-26 | 东北石油大学 | Buried oil-gas-water pipeline leakage diffusion experimental facility and working method thereof |
CN104896307A (en) * | 2015-06-09 | 2015-09-09 | 宁波高新区安立特电气科技有限公司 | Frequency conversion electromagnetic induction sectional heating oil-conveying pipe device |
CN204664877U (en) * | 2015-06-09 | 2015-09-23 | 宁波高新区安立特电气科技有限公司 | The oil transport pipeline device of conversion electromagnetic induction Segmented heating |
CN105465605A (en) * | 2015-11-16 | 2016-04-06 | 江苏中圣高科技产业有限公司 | Efficient and energy-saving extra-long-distance conveyance method and system for steam |
CN106545748A (en) * | 2016-11-10 | 2017-03-29 | 黑龙江省电力科学研究院 | For the device and its supplementing method for air of extremely frigid zones Mixed gas insulation electrical equipment gas QI invigorating |
-
2017
- 2017-12-18 CN CN201711362577.7A patent/CN109931501B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192655A (en) * | 1977-07-18 | 1980-03-11 | Caloric Gesellschaft Fur Apparatebau M.B.H. | Process and apparatus for the conveyance of real gases |
EP0976969A1 (en) * | 1998-07-29 | 2000-02-02 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Apparatus and process for the supply of helium to a plurality of production lines |
CN203525575U (en) * | 2013-09-30 | 2014-04-09 | 国家电网公司 | High-pressure mixed gas inflating device |
CN103486439A (en) * | 2013-10-11 | 2014-01-01 | 国家电网公司 | SF6 gas bottle heating jacket |
CN203585808U (en) * | 2013-11-11 | 2014-05-07 | 国家电网公司 | Sulfur hexafluoride gas bottle heating device |
CN203708518U (en) * | 2013-12-12 | 2014-07-09 | 冠礼控制科技(上海)有限公司 | Segmented-control heating blanket for gas supply system |
CN104165271A (en) * | 2014-08-04 | 2014-11-26 | 东北石油大学 | Buried oil-gas-water pipeline leakage diffusion experimental facility and working method thereof |
CN104896307A (en) * | 2015-06-09 | 2015-09-09 | 宁波高新区安立特电气科技有限公司 | Frequency conversion electromagnetic induction sectional heating oil-conveying pipe device |
CN204664877U (en) * | 2015-06-09 | 2015-09-23 | 宁波高新区安立特电气科技有限公司 | The oil transport pipeline device of conversion electromagnetic induction Segmented heating |
CN105465605A (en) * | 2015-11-16 | 2016-04-06 | 江苏中圣高科技产业有限公司 | Efficient and energy-saving extra-long-distance conveyance method and system for steam |
CN106545748A (en) * | 2016-11-10 | 2017-03-29 | 黑龙江省电力科学研究院 | For the device and its supplementing method for air of extremely frigid zones Mixed gas insulation electrical equipment gas QI invigorating |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117366475A (en) * | 2023-11-13 | 2024-01-09 | 上海韩科建设工程有限公司 | Novel method for controlling temperature change of extra-gas high-low pressure regulating valve |
Also Published As
Publication number | Publication date |
---|---|
CN109931501B (en) | 2021-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9057327B2 (en) | Method and apparatus for heating liquid fuel supplied to a gas turbine combustor | |
CN109931501A (en) | A kind of Segmented heating gas delivery system | |
BRPI0719168A2 (en) | OPTIMAL DEFROSTING REGULATION OF COOL AIR OUTLETS DISPOSED IN PARALLEL OF AIR CONDITIONERS | |
CN109084476A (en) | A kind of conduction oil heat-exchange system and its working method | |
CN210528999U (en) | Induction coil heating furnace | |
CN205448316U (en) | Conduction oil heat -cycle system of bituminous material production line | |
CN203814289U (en) | Greenhouse indoor temperature-regulating device | |
CN213454821U (en) | Medium-pressure hot air supplementing device | |
CN204373228U (en) | A kind of fire power regulator for gas heater of water | |
CN212567020U (en) | Temperature control pipeline for heating medium oil system | |
CN206037521U (en) | Pipeline anti -freezing device | |
CN206488336U (en) | Adjustable injection apparatus and heating system | |
CN206213263U (en) | Cooling system and tobacco machine equipment | |
CN208859876U (en) | A kind of conduction oil heat-exchange system | |
CN209428405U (en) | A kind of device of accurate control bushing cooler circulating water flow | |
CN207975475U (en) | A kind of natural gas lofty tone station | |
CN208850302U (en) | A kind of flower planting intelligent management system | |
CN105498019A (en) | Bicirculating system of water for injection | |
CN213021084U (en) | Cooling water temperature control device for polyurethane production | |
CN204554359U (en) | Mate the heat-conducting oil system of multiple conduction oil | |
CN204208109U (en) | Two-way Cycle water for injection system | |
CN219829520U (en) | Cooling circulating water system of multi-heating furnace | |
CN215174143U (en) | Vaporizer device for low-temperature storage tank | |
CN208458302U (en) | A kind of synthesis ammonia utilizing waste heat for refrigeration system | |
CN211204604U (en) | Wax oil cooling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |