CN109922316A - Media resource scheduling and managing medium resource method, apparatus and electronic equipment - Google Patents

Media resource scheduling and managing medium resource method, apparatus and electronic equipment Download PDF

Info

Publication number
CN109922316A
CN109922316A CN201910163694.3A CN201910163694A CN109922316A CN 109922316 A CN109922316 A CN 109922316A CN 201910163694 A CN201910163694 A CN 201910163694A CN 109922316 A CN109922316 A CN 109922316A
Authority
CN
China
Prior art keywords
resource
node
module
added
mapping table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910163694.3A
Other languages
Chinese (zh)
Inventor
段小强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Megvii Technology Co Ltd
Original Assignee
Beijing Megvii Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Megvii Technology Co Ltd filed Critical Beijing Megvii Technology Co Ltd
Priority to CN201910163694.3A priority Critical patent/CN109922316A/en
Publication of CN109922316A publication Critical patent/CN109922316A/en
Pending legal-status Critical Current

Links

Abstract

The present invention provides media resource scheduling method, managing medium resource method and device, electronic equipment, computer readable storage mediums.Media resource scheduling method includes: to receive media resource scheduling request from client, and wherein media resource scheduling request includes the system banner and task type of resource node;According to the system banner of resource node and pre-stored resource mapping table, resource module is determined, wherein resource mapping table includes the system banner of resource node and the mapping relations of resource module;Resource module is called to execute scheduler task corresponding with task type to the media resource of resource node.The present invention can realize the quick access to different types of media resource by mapping table, simplify the scheduling and management of different types of media resource in systems, improve system development efficiency.

Description

Media resource scheduling and managing medium resource method, apparatus and electronic equipment
Technical field
This invention relates generally to information technology fields, more particularly, to media resource scheduling method and media resource Management method, device, electronic equipment and computer readable storage medium.
Background technique
Currently, carrying out media resource access in security system or video monitoring system and needing that platform will be come from advance Facility information to be exported or logged in corresponding equipment manually recorded in case use when logging in by facility information.
SDK (Software Development Kit, Software Development Kit) type of present video monitoring manufacturer is many More, ununified access standards.The SDK interface of different manufacturers differs greatly, and causes huge burden to system development.With The type of SDK increases, and maintenance cost is also very high.Addition branch is tested per newly adding a kind of SDK to require to modify to engineering It holds, development task is comparatively laborious.Compatibility is there is also certain problem between the SDK version of some producers, in access procedure It needs to carry out after ging wrong individually to debug positioning.
In addition, security system supports multiple resources to converge jointly at present, such as video, audio, picture, structuring resource pipe Reason and application etc..As the medium type that user is concerned about increases, it may appear that the more chaotic situation of management.
Summary of the invention
In order to solve the above-mentioned problems in the prior art, the present invention provides media resource scheduling method, media to provide Power supply management method and device, electronic equipment and computer readable storage medium.
In a first aspect, the embodiment of the present invention provides a kind of media resource scheduling method, this method comprises: receiving from client Media resource scheduling request, wherein media resource scheduling request includes the system banner and task type of resource node;According to money The system banner of source node and pre-stored resource mapping table, determine resource module, and wherein resource mapping table includes resource section The system banner of point and the mapping relations of resource module;Call resource module to the media resource execution of resource node and task class The corresponding scheduler task of type.
In one example, it calls resource module to execute scheduling corresponding with task type to the media resource of resource node to appoint Business includes: the system banner according to resource node, obtains the access relevant information of pre-stored resource node;According to access phase Information access resource node is closed, scheduler task is executed to resource node.
In one example, this method further include: generate scheduler task and operate handle, wherein scheduler task operates handle and includes The session identification of scheduler task;Scheduler task, which is sent, to client operates handle;And in response to receiving client transmission Resource turn-off request stops executing scheduler task corresponding with session identification, and discharges media resource, and wherein resource is closed Request includes that scheduler task operates handle.
In one example, it calls resource module to execute scheduling corresponding with task type to the media resource of resource node to appoint Business includes: that the scheduler task of the media resource for resource node is added in the task queue of resource module.
In one example, resource module includes that national standard module, video flow point forwarding module, Software Development Kit act on behalf of mould One of block, real time streaming transport protocol module are a variety of.
In one example, this method further include: receive resource node addition request from client, wherein resource node addition is asked Ask original mark and resource type relevant information including resource node to be added;According to original mark letter related to resource type Breath, judges whether there is resource node to be added in resource mapping table;If having had resource to be added in resource mapping table Node does not then execute addition operation to resource node to be added;If not having resource node to be added in resource mapping table, It executes following steps: resource node to be added is generated according to the original mark of resource node to be added and resource type relevant information System banner;Resource module associated with resource node to be added is determined according to resource type relevant information;It will be to be added The system banner of resource node and the mark of resource module are stored in association in resource mapping table.
In one example, resource module packet associated with resource node to be added is determined according to resource type relevant information It includes: resource module to be selected is determined according to resource type relevant information;According to the load and performance parameter of resource module to be selected, to It selects and determines resource module associated with resource node to be added in resource module, wherein the load of resource module to be selected includes Number through resource node associated with resource module to be selected.
In one example, according to original mark and resource type relevant information, judge whether to have had in resource mapping table to Adding resource node includes: to judge whether there is original mark in resource mapping table;If not having original in resource mapping table Begin mark, it is determined that does not have resource node to be added in resource mapping table;If having original mark in resource mapping table, Judge the corresponding system of the original mark having had in the resource type relevant information and resource mapping table of resource node to be added System identifies whether to match;If it does, then determining in resource mapping table that there is resource node to be added;If it does not match, Determine do not have resource node to be added in resource mapping table.
In one example, this method further include: receive resource node removal request from client, wherein resource node is deleted Request includes the system banner of resource node to be deleted;According to the system banner of resource node to be deleted, from resource mapping table Delete entry associated with resource node to be deleted.
In one example, this method further include: in system starting, read system configuration file information, start monitoring task Port, wherein profile information includes database login information, monitor task port for monitor media resource scheduling request, One or more of resource node addition request and resource node removal request;According to database login information registration data Library obtains resource mapping table from database;Storage resource mapping table.
Second aspect, the embodiment of the present invention provide a kind of managing medium resource method, this method comprises: receiving from client Resource node addition request, wherein resource node addition request includes the original mark and resource type phase of resource node to be added Close information;According to original mark and resource type relevant information, judge whether there is resource section to be added in resource mapping table Point;If having had resource node to be added in resource mapping table, addition operation is not executed to resource node to be added;If Do not have resource node to be added in resource mapping table, then executes following steps: according to the original mark of resource node to be added The system banner of resource node to be added is generated with resource type relevant information;According to resource type relevant information determine with wait add Add the associated resource module of resource node;In association by the mark of the system banner of resource node to be added and resource module It is stored in resource mapping table.
In one example, resource module packet associated with resource node to be added is determined according to resource type relevant information It includes: resource module to be selected is determined according to resource type relevant information;According to the load and performance parameter of resource module to be selected, to It selects and determines resource module associated with resource node to be added in resource module, wherein the load of resource module to be selected includes Number through resource node associated with resource module to be selected.
In one example, according to original mark and resource type relevant information, judge whether to have had in resource mapping table to Adding resource node includes: to judge whether there is original mark in resource mapping table;If not having original in resource mapping table Begin mark, it is determined that does not have resource node to be added in resource mapping table;If having original mark in resource mapping table, Judge the corresponding system of the original mark having had in the resource type relevant information and resource mapping table of resource node to be added System identifies whether to match;If it does, then determining in resource mapping table that there is resource node to be added;If it does not match, Determine do not have resource node to be added in resource mapping table.
In one example, this method further include: receive resource node removal request from client, wherein resource node is deleted Request includes the system banner of resource node to be deleted;According to the system banner of resource node to be deleted, from resource mapping table Delete entry associated with resource node to be deleted.
The third aspect, the embodiment of the present invention provide a kind of media resource scheduling device, which includes: media resource scheduling Request receiving module is configured to receive media resource scheduling request from client, and wherein media resource scheduling request includes money The system banner and task type of source node;Mapping block is configured to the system banner according to resource node and is stored in advance Resource mapping table, determine resource module, wherein resource mapping table includes the system banner of resource node and reflecting for resource module Penetrate relationship;Scheduler task execution module is configured to call resource module to the media resource execution of resource node and task class The corresponding scheduler task of type.
Fourth aspect, the embodiment of the present invention provide a kind of managing medium resource device, which includes: that addition request receives Module is configured to receive resource node addition request from client, and wherein resource node addition request includes resource to be added The original mark and resource type relevant information of node;Judgment module has been deposited, has been configured to according to original mark and resource type Relevant information judges whether there is resource node to be added in resource mapping table;Addition operation terminate module, be configured to as There is resource node to be added in fruit resource mapping table, then addition operation has not been executed to resource node to be added;Addition operation Execution module executes following operation: according to wait add if being configured to do not have resource node to be added in resource mapping table The original mark of resource node and resource type relevant information is added to generate the system banner of resource node to be added;According to resources-type Type relevant information determines resource module associated with resource node to be added;By the system banner and money of resource node to be added The mark of source module is stored in association in resource mapping table.
5th aspect, the embodiment of the present invention provide a kind of electronic equipment, wherein the electronic equipment includes: memory, is used for Store instruction;And processor, any of the above-described kind of method of instruction execution for calling memory to store.
6th aspect, the embodiment of the present invention provide a kind of computer readable storage medium, the computer readable storage medium Computer executable instructions are stored with, computer executable instructions when executed by the processor, execute any of the above-described kind of method.
Media resource scheduling method provided in an embodiment of the present invention, managing medium resource method and device, electronic equipment The quick access to different types of media resource can be realized by mapping table with computer readable storage medium, simplified not The scheduling and management of the media resource of same type in systems improve system development efficiency.
Detailed description of the invention
The following detailed description is read with reference to the accompanying drawings, above-mentioned and other purposes, the feature of embodiment of the present invention It will become prone to understand with advantage.In the accompanying drawings, several implementations of the invention are shown by way of example rather than limitation Mode, in which:
Fig. 1 shows the flow chart of media resource scheduling method according to embodiment of the present invention;
Fig. 2 shows the mistakes that scheduler task is executed in the media resource scheduling method of another embodiment according to the present invention The flow chart of journey;
Fig. 3 shows the flow chart of the media resource scheduling method of another embodiment according to the present invention;
Fig. 4 shows the flow chart of managing medium resource method according to embodiment of the present invention;
Fig. 5, which is shown, determines that resource node is related in the media resource scheduling method of another embodiment according to the present invention The flow chart of the process of the resource module of connection;
Fig. 6 shows the system starting process in media resource scheduling method according to embodiment of the present invention Flow chart;
Fig. 7 shows the information update process in the managing medium resource method of another embodiment according to the present invention Flow chart;
The resource node that Fig. 8 is shown in managing medium resource method according to embodiment of the present invention was deleted The flow chart of journey;
Fig. 9 shows the block diagram of media resource scheduling device according to embodiment of the present invention;
Figure 10 shows the block diagram of managing medium resource device according to embodiment of the present invention;
Figure 11 shows the block diagram of electronic equipment according to embodiment of the present invention.
In the accompanying drawings, identical or corresponding label indicates identical or corresponding part.
Specific embodiment
The principle and spirit of the invention are described below with reference to several illustrative embodiments.It should be appreciated that providing this A little embodiments are used for the purpose of making those skilled in the art can better understand that realizing the present invention in turn, and be not with any Mode limits the scope of the invention.
Although being noted that the statements such as " first " used herein, " second " to describe embodiments of the present invention not Same module, step and data etc., still the statement such as " first ", " second " is merely in different modules, step and data etc. Between distinguish, and be not offered as specific sequence or significance level.In fact, the statements such as " first ", " second " are complete It may be used interchangeably.
As shown in Figure 1, an embodiment of the invention provides a kind of media resource scheduling method 100.Method 100 is wrapped Include step S101-S103.In some embodiments, media resource scheduling method 100 can be in security system, video monitoring system System etc., which needs to access in the system of multimedia resource, to be realized.Specifically, method 100 can be transported by the server of above system Row.Alternatively, method 100 can be run in any equipment for having computing capability.
In step s101, media resource scheduling request is received from client, wherein media resource scheduling request includes money The system banner and task type of source node.
In some embodiments, media resource may include image, video, audio, structural data etc..For example, knot Structure data can be the data generated and carrying out feature extraction and processing to resources such as image, videos.
In some embodiments, resource node may include media resource acquisition equipment.Only as an example, media resource Acquiring equipment may include SDK general camera, DVR (Digital Video Recorder, digital video recorder), NVR (Network Video Recorder, network video recorder), national standard platform camera, RTSP (Real Time Streaming Protocol, real time streaming transport protocol) camera, capture machine, RTSP video resource equipment etc..
Optionally, other than entity device, resource node is also possible to more device resource nodes, such as can be to more The platform that a acquisition equipment is summarized and managed, for example, video monitoring platform.
Optionally, resource node is also possible to resource node, module in system etc..
In some embodiments, system banner can uniquely identify a resource node in system.For example, system Mark can be from the sequence number increased.Optionally, system banner may include one or more fields.For example, working as resource node When being SDK camera, system banner may include the device identification (ID) of the SDK camera.In addition to this, system banner also can wrap Other information is included, for example, Internet protocol (Intemet Protocol, IP) port address of resource node, resource node Title, login username etc..In addition, in some embodiments, system banner may include the type information of resource node.
In some embodiments, task type may include scheduler task or scheduler task of the user to resource node Combination.Only as an example, task type may include unlatching, closing, query resource node, the candid photograph for obtaining resource node Figure, the video for obtaining resource node etc..For example, task type can be the RTSP camera for requiring to open specific ID.
In step s 102, according to the system banner of resource node and pre-stored resource mapping table, resource mould is determined Block.Wherein resource mapping table includes the system banner of resource node and the mapping relations of resource module.
In some embodiments, resource mapping table can store in the memory of system, and also can store can in system In the database of access.
In some embodiments, resource module is referred to as the Logic of Tasks or scheduling logic, is a kind of implementation procedure.
In some embodiments, resource module may include national standard module, video flow point forwarding (streamer) module, Software Development Kit (SDK) acts on behalf of one of (proxy) module, real time streaming transport protocol (RTSP) module or a variety of.When So, above-mentioned not exhaustive property, according to the resource type of resource node, resource module can be executed for any type of resource The media resource scheduling that node carries out.For example, RTSP module can carry out media resource scheduling to RTSP camera.
As an example, national standard module can be responsible for interaction related to national standard platform, for example, waiting junior as platform higher level Platform registration, facility inventory inquiry, in real time, playback, downloading, school when, information inquiry, state reporting etc..Video flow point forwards mould Block can be responsible for video flowing, picture stream point forwarding etc. service logics.SDK proxy module can be divided into disparate modules again, such as Different proxy modules is each responsible for interacting with the SDK equipment of different vendor.RTSP module can be responsible for linking RTSP view Frequency camera.
In step s 103, resource module is called to execute tune corresponding with task type to the media resource of resource node Degree task.
In some embodiments, only as an example, being held when task type is to require to open the RTSP camera of specific ID Row scheduler task is exactly to open the RTSP camera of the ID.
In some embodiments, scheduler task may include being docked with the interface of resource node, or and resource The proxy module of node is docked.
In the method 100, system can determine to notify corresponding resource module come complete according to the mapping table established before It is requested at different resource types.Different from being normally applied occasion, to need to provide complete facility information and resource type etc. a variety of Information aggregate, user is without providing specific device resource type in this process, it is only necessary to provide the system banner letter of equipment Breath reduces the operation of user.The quick access to different types of media resource is realized by resource mapping table, letter The scheduling and management of different types of media resource in systems are changed.Needing to access different resource sections in addition, avoiding When the different SDK interfaces of point, the exploitation program to system is needed to modify or develop again, improves system development effect Rate.
As shown in Fig. 2, an embodiment of the invention, which provides, executes scheduler task in media resource scheduling method Process 200.Process 200 includes step S201-S202.
In step s 201, according to the system banner of resource node, the access for obtaining pre-stored resource node is related Information.
In some embodiments, the access relevant information of resource node may include the port address of resource node, step on Record information.For example, log-on message may include user name, password etc..
In some embodiments, access relevant information can store in system memory, and also can store can in system In the database of access.
In step S202, according to access relevant information access-in resource node, scheduler task is executed to resource node.
By the way that the access relevant information of resource node is stored in advance, system be may not need when executing scheduler task by user It is manually entered log-on message and carrys out logging resource node, but can automatically log in, improve dispatching efficiency, reduce user's Operation sequence improves convenience.When scheduling especially being needed to summarize the media resource platform of multiple collection of resources equipment, meeting Time needed for saving scheduling very significantly, and bringing great advantage to the user property.
As shown in figure 3, an embodiment of the invention provides a kind of media resource scheduling method 300.Method 300 is wrapped Include step S301-S306.
In step S301, media resource scheduling request is received from client, wherein media resource scheduling request includes money The system banner and task type of source node.
In step s 302, according to the system banner of resource node and pre-stored resource mapping table, resource mould is determined Block.Wherein resource mapping table includes the system banner of resource node and the mapping relations of resource module.
In step S303, resource module is called to execute tune corresponding with task type to the media resource of resource node Degree task.
Step S301-S303 is identical as the step S101-S103 in method 100, relevant explanation and description and beneficial Effect please participate in the description above for method 100, and details are not described herein.
In step s 304, it generates scheduler task and operates handle, wherein it includes scheduler task that scheduler task, which operates handle, Session identification (SessionID).
In step S305, scheduler task is sent to client and operates handle.
In step S306, in response to receiving the resource turn-off request of client transmission, stop execution and session identification Corresponding scheduler task, and media resource is discharged, wherein resource turn-off request includes scheduler task operation handle.
By transmitting the session identification of currently performed scheduler task in operation handle, pass through operation handle convenient for user Close resource, release resource, resource is deleted and destroys operation etc..
In some embodiments, resource module is called to execute the media resource of resource node corresponding with task type Scheduler task may include: that will be added to the task queue of resource module for the scheduler task of the media resource of resource node In.
It in this case, can be by corresponding scheduler task from the task team of resource module when user closes resource It is deleted in column.
As shown in figure 4, an embodiment of the invention provides a kind of managing medium resource method 400.It should be noted that , in some embodiments, above-described media resource scheduling method may include the step of managing medium resource method Suddenly.It is alternatively possible to which managing medium resource method is first carried out before executing media resource scheduling method.It is alternatively possible to Managing medium resource method is executed during executing media resource scheduling method.In some embodiments, media resource The step in step and managing medium resource method in dispatching method can execute in any sequence, can also intersect and hold Row.
In step S401, resource node addition request is received from client.Wherein, resource node addition request include to Add the original mark and resource type relevant information of resource node.
In some embodiments, the original mark of resource node may include the network port of resource node, user name, Uniform resource locator (Uniform Resource Locator, URL) etc., as long as the resource node can be uniquely identified ?.
In some embodiments, if the resource node is capable of providing a plurality of types of media resources, for example, can be same When video resource and image resource are provided, then being directed to different resource types, the key parameter of resource type relevant information is not Equally.For example, the corresponding parameter of video resource is URL, the corresponding parameter of image resource includes vendor types, the network port, use Name in an account book, password, channel information etc..According to resource type relevant information, it can be determined that the resource node currently added will be What kind of media resource is provided in system.
In step S402, according to original mark and resource type relevant information, judge whether had in resource mapping table There is resource node to be added.
If having had resource node to be added in resource mapping table, addition behaviour is not executed to resource node to be added Make, EP (end of program).
If not having resource node to be added in resource mapping table, S403-S405 is thened follow the steps.
In step S403, generated according to the original mark of resource node to be added and resource type relevant information to be added The system banner of resource node.
In some embodiments, the digit of system banner can be different from the original mark digit of equipment, to carry out area Point.For example, 18 system banners can be generated, to be different from 20 device identifications of target device.
In some embodiments, it can use the different resource type of different coded representations, be embedded into system banner Character string in.For example, system banner can be internal start coding+resource type coding+from increasing number.
In step s 404, resource mould associated with resource node to be added is determined according to resource type relevant information Block.
In step S405, the mark of the system banner of resource node to be added and resource module is stored in association with In resource mapping table.
In some embodiments, the system banner of resource node to be added can be sent to client by system.
Alternatively, the resource mapping table that client can store in reading system, to obtain resource node to be added System banner.For example, client can resource mapping table by way of poll to store in reading system.
When adding resource node, it is compared by the data information deposited in elder generation and mapping table, it can be to avoid repetition Addition improves the efficiency of management to resource node.
By generating associated with resource type system banner, can by the Patterns of Information Resources of Current resource node into Row is distinguished well, convenient for the maintenance to resource.
After client learns system banner, user is when request scheduling resource, so that it may which directlying adopt this is System mark, rather than the original mark of resource node.
As shown in figure 5, an embodiment of the invention, which provides, determines resource node phase in managing medium resource method The process 500 of associated resource module.Process 500 includes step S501-S502.
In step S501, resource module to be selected is determined according to resource type relevant information.
In step S502, according to the load and performance parameter of resource module to be selected, determined in resource module to be selected with The associated resource module of resource node to be added.Wherein, the load of resource module to be selected include with resource module to be selected The number of associated resource node.
In some embodiments, it is understood that there may be for multiple resource modules of same task type.For example, it may be possible in the presence of Multiple RTSP resource modules.It in this case, can be according to negative when to current RTSP resource node distribution RTSP resource module It carries balance policy and selects one from multiple RTSP resource modules.Load balancing considers the performance ginseng of Current resource module Number and load.For example, having corresponded to 10 RTSP cameras below a RTSP resource module, another has corresponded to 2, then Current RTSP camera, which will be assigned to, has corresponded to 2 RTSP resource modules.In another example an if RTSP resource module energy More scheduler task is enough handled, then RTSP camera is preferentially distributed into the module.
By carrying out load balancing, computing resource, the load of balanced modules, when reducing waiting can be reasonably utilized Between, improve execution efficiency.Loading lesser resource module can be the less resource module of the resource node bound before.
As shown in fig. 6, an embodiment of the invention provides the system starting in a kind of media resource scheduling method Process 600.Process 600 includes step S601-S603.
In step s 601, when system starts, system configuration file information is read, task port is monitored in starting.Wherein, Profile information includes database login information.Task port is monitored for monitoring media resource scheduling request, resource node One or more of addition request and resource node removal request.
In step S602, according to database login information registration database, resource mapping table is obtained from database.
In some embodiments, system can also preload resource mapping table and some other dictionary table information, module Information table, field list, system configuration information, session list etc..For example, dictionary table, which can be, indicates resources-type in system banner The coding of type and the corresponding relationship of resource type.
In step S603, storage resource mapping table.
In some embodiments, resource mapping table can be stored into Installed System Memory.
On startup, by the way that by the information configuration in database, into Installed System Memory, the system of can be improved reads these letters The speed of breath, to improve the speed and efficiency of task schedule.
In some embodiments, according to original mark and resource type relevant information, judge in resource mapping table whether It include: to judge whether there is original mark in resource mapping table with resource node to be added;If in resource mapping table Without original mark, it is determined that do not have the resource node to be added in resource mapping table;If had in resource mapping table Original mark then judges the original mark having had in the resource type relevant information and resource mapping table of resource node to be added Whether corresponding system banner matches;If it does, then determining in resource mapping table that there is the resource node to be added;Such as Fruit mismatches, it is determined that does not have the resource node to be added in resource mapping table.
In some embodiments, a resource node can correspond to multiple resources type, for example, a RTSP camera can To correspond to video resource and picture resource, then when the RSTP camera to be added in resource mapping table, according to different money Different system banners can be generated in Source Type, to bind different resource modules.
In some embodiments, when resource node to be added in resource mapping table, for different resource types, The key parameter of resource type relevant information is different.For example, the corresponding parameter of video resource is URL, image resource is corresponding Parameter includes vendor types, the network port, user name, password, channel information etc..According to resource type relevant information, can sentence The disconnected resource node currently added will provide what kind of media resource in systems.It may include in system banner and provide A relevant coding of Source Type, by carrying out the resource type code field in resource type relevant information and system banner Match, so that it may learn whether this medium type of the resource node is added in resource mapping table.
It, can be with needle by being added to the same asset node for providing different media types corresponding to different system banners To the different media resources that the resource node provides, different resource modules is called to execute different scheduler tasks respectively.For example, For video resource, the relevant scheduler task of video is executed by video resource module, it is related to execute picture by picture resource module Scheduler task.The processing respectively for being conducive to different media types, improves the execution efficiency of scheduler task.
As shown in fig. 7, another embodiment of the invention provides the information updates in a kind of managing medium resource method Process 700.
In step s 701, map information is received from client update request.Wherein map information updates request packet Include the system banner and resource type relevant information of resource node.
In some embodiments, resource type relevant information may include the resource for the media resource that resource node provides Type.Optionally, for different resource types, the key parameter of resource type relevant information is different.For example, video resource Corresponding parameter is URL, and the corresponding parameter of image resource includes vendor types, the network port, user name, password, channel information Deng.
In step S702, resource type relevant information and information associated with resource node in resource mapping table are judged Whether match.
If it does not match, execute step S703, updated according to resource type relevant information in resource mapping table with money The associated information of source node.
If it does, then not being updated to resource mapping table, EP (end of program).
It is updated by being done to resource mapping table, consistency on messaging can be kept, be conducive to the management service of resource node.
In some embodiments, managing medium resource method can also include resource node data information renewal process. The process may include: to receive data information from client to update request, wherein it includes resource section in request that data information, which updates, The system banner and resource node data information of point;Judge that data information updates resource node data information and data in request Whether the resource node data information in library matches;If it does not match, updating the resource node in request according to data information Data information carrys out the resource node data information in more new database;If it does, then not being updated to database, program knot Beam.
In some embodiments, resource node data information may include the letter such as the title of resource node, registion time Breath.
In some embodiments, it can store resource node data information in database.It is alternatively possible to by resource section In the specific table of point data information storage in the database, also it can store as the specific fields in database.
By being updated to the resource node data information stored in database, it is able to maintain resource node data information Consistency, be conducive to the management service of resource node.
As shown in figure 8, an embodiment of the invention provides the resource node in a kind of managing medium resource method Deletion process 800.Process 800 includes step S801-S802.
In step S801, resource node removal request is received from client.Wherein, resource node removal request include to Delete the system banner of resource node.
In step S802, according to the system banner of resource node to be deleted, deleted from resource mapping table with it is to be deleted The associated entry of resource node.
When resource node is no longer available or is replaced, it is deleted from mapping table, mapping table can be removed In useless information, convenient for the management service of mapping table, while improving the speed of task schedule.
As shown in figure 9, an embodiment of the invention provides a kind of media resource scheduling device 900.Device 900 wraps Include: media resource scheduling request receiving module 901 is configured to receive media resource scheduling request from client, wherein media Resource scheduling request includes the system banner and task type of resource node;Mapping block 902, is configured to according to resource node System banner and pre-stored resource mapping table, determine resource module, wherein resource mapping table includes that resource node is The mapping relations of system mark and resource module;Scheduler task execution module 903 is configured to call resource module to resource node Media resource execute corresponding with task type scheduler task.
In some embodiments, scheduler task execution module 903 can also be configured to: according to the system of resource node Mark, obtains the access relevant information of pre-stored resource node;According to access relevant information access-in resource node, to resource Node executes scheduler task.
In some embodiments, device 900 can also include: handle generation module, be configured to generate scheduler task Operate handle, wherein scheduler task operation handle includes the session identification of scheduler task;Handle sending module, be configured to Client sends scheduler task and operates handle;Resource closedown module is configured to the resource in response to receiving client transmission Turn-off request stops executing scheduler task corresponding with session identification, and discharges media resource, wherein resource turn-off request Handle is operated including scheduler task.
In some embodiments, scheduler task execution module 903 can also be configured to: will be directed to the matchmaker of resource node The scheduler task of body resource is added in the task queue of resource module.
In some embodiments, resource module includes national standard module, video flow point forwarding module, Software Development Kit One of proxy module, real time streaming transport protocol module are a variety of.
In some embodiments, device 900 can also include: addition request receiving module, be configured to from client Resource node addition request is received, wherein resource node addition request includes the original mark of resource node to be added and resources-type Type relevant information;Judgment module has been deposited, has been configured to judge resource mapping table according to original mark and resource type relevant information In whether there is resource node to be added;Addition operation terminates module, if be configured to have had in resource mapping table to Resource node is added, then addition operation is not executed to resource node to be added;Operation executing module is added, if being configured to money Do not have resource node to be added in the mapping table of source, then execute following operation: according to the original mark of resource node to be added and Resource type relevant information generates the system banner of resource node to be added;According to resource type relevant information it is determining with it is to be added The associated resource module of resource node;The mark of the system banner of resource node to be added and resource module is deposited in association Storage is in resource mapping table.
In some embodiments, addition operation executing module can also be configured to: according to resource type relevant information Determine resource module to be selected;According to the load and performance parameter of resource module to be selected, determined in resource module to be selected with wait add Add the associated resource module of resource node, wherein the load of resource module to be selected includes associated with resource module to be selected Resource node number.
In some embodiments, device 900 can also include starting configuration module, be configured to: in system starting, System configuration file information is read, task port is monitored in starting, and wherein profile information includes database login information, is monitored Task port be used for monitor media resource scheduling request, resource node addition request and resource node removal request in one or It is multiple;According to database login information registration database, resource mapping table is obtained from database;Storage resource mapping table.
In some embodiments, having deposited judgment module can also be configured to: judge whether had in resource mapping table There is original mark;If not having original mark in resource mapping table, it is determined that do not have resource to be added in resource mapping table Node;If having original mark in resource mapping table, the resource type relevant information and money of resource node to be added are judged Whether the corresponding system banner of original mark having had in the mapping table of source matches;If it does, then determining resource mapping table In there is resource node to be added;Do not have resource node to be added in resource mapping table if it does not match, determining.
In some embodiments, device 900 can also include resource node removing module, be configured to: from client Receive resource node removal request, wherein resource node removal request includes the system banner of resource node to be deleted;According to The system banner for deleting resource node deletes entry associated with resource node to be deleted from resource mapping table.
As shown in Figure 10, an embodiment of the invention provides a kind of managing medium resource device 1000.Device 1000 include addition request receiving module 1001, deposited judgment module 1002, addition operation terminate module 1003, addition operation hold Row module 1004.
Request receiving module 1001 is added, is configured to receive resource node addition request from client, wherein resource section Point addition request includes the original mark and resource type relevant information of resource node to be added.
Judgment module 1002 has been deposited, has been configured to judge resource impact according to original mark and resource type relevant information Whether there is resource node to be added in table.
Addition operation terminates module 1003, if being configured to that there is resource node to be added in resource mapping table, Addition operation is not executed to resource node to be added.
Operation executing module 1004 is added, if being configured to do not have resource node to be added in resource mapping table, It executes following operation: resource node to be added is generated according to the original mark of resource node to be added and resource type relevant information System banner;Resource module associated with resource node to be added is determined according to resource type relevant information;It will be to be added The system banner of resource node and the mark of resource module are stored in association in resource mapping table.
In some embodiments, addition operation executing module 1004 can also be configured to: according to resource type correlation Information determines resource module to be selected;According to the load and performance parameter of resource module to be selected, determined in resource module to be selected with The associated resource module of resource node to be added, wherein the load of resource module to be selected include with resource module phase to be selected The number of associated resource node.
In some embodiments, having deposited judgment module 1002 can also be configured to: judge in resource mapping table whether There is original mark;If not having original mark in resource mapping table, it is determined that do not have in resource mapping table to be added Resource node;If having original mark in resource mapping table, the resource type relevant information of resource node to be added is judged Whether system banner corresponding with the original mark having had in resource mapping table matches;If it does, then determining that resource is reflected There is resource node to be added in firing table;Do not have resource node to be added in resource mapping table if it does not match, determining.
In some embodiments, device 1000 can also include resource node removing module, be configured to: from client Receive resource node removal request, wherein resource node removal request includes the system banner of resource node to be deleted;According to The system banner for deleting resource node deletes entry associated with resource node to be deleted from resource mapping table.
The function that modules in device are realized is corresponding with the step in method as described above, specific implementation The description for method and step above is referred to technical effect, details are not described herein.
As shown in figure 11, an embodiment of the invention provides a kind of electronic equipment 1100.Wherein, the electronic equipment 1100 include memory 1101, processor 1102, input/output (Input/Output, I/O) interface 1103.Wherein, memory 1101, for storing instruction.Processor 1102, the matchmaker of the instruction execution embodiment of the present invention for calling memory 1101 to store Body scheduling of resource, the method for managing medium resource.Wherein, processor 1102 connects with memory 1101, I/O interface 1103 respectively It connects, such as can be attached by bindiny mechanism's (not shown) of bus system and/or other forms.Memory 1101 can be used for Program and data are stored, including media resource scheduling program involved in the embodiment of the present invention and managing medium resource program, place Reason device 1102 by operation be stored in the program of memory 1100 thereby executing the various function application of electronic equipment 1100 and Data processing.
Processor 1102 can use digital signal processor (Digital Signal in the embodiment of the present invention Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), programmable patrol At least one of volume array (Programmable Logic Array, PLA) example, in hardware realizes, the processor 1102 It can be central processing unit (Central Processing Unit, CPU) or there is data-handling capacity and/or instruction The combination of one or more of the processing unit of other forms of executive capability.
Memory 1101 in the embodiment of the present invention may include one or more computer program products, the computer Program product may include various forms of computer readable storage mediums, such as volatile memory and/or non-volatile deposit Reservoir.The volatile memory for example may include random access memory (Random Access Memory, RAM) and/ Or cache memory (cache) etc..The nonvolatile memory for example may include read-only memory (Read-Only Memory, ROM), flash memory (Flash Memory), hard disk (Hard Disk Drive, HDD) or solid state hard disk (Solid-State Drive, SSD) etc..
In the embodiment of the present invention, I/O interface 1103 can be used for receiving input instruction (such as number or character information, with And generate key signals input related with the user setting of electronic equipment 1100 and function control etc.), it can also be output to the outside Various information (for example, image or sound etc.).I/O interface 1103 may include physical keyboard, function button in the embodiment of the present invention In (such as volume control button, switch key etc.), mouse, operating stick, trace ball, microphone, loudspeaker and touch panel etc. One or more.
In some embodiments, the present invention provides a kind of computer readable storage medium, the computer-readable storages Media storage has computer executable instructions, and computer executable instructions when executed by the processor, execute described above appoint Where method.
In some embodiments, the present invention provides a kind of computer readable storage medium, the computer-readable storages Media storage has computer executable instructions, and computer executable instructions when executed by the processor, execute described above appoint Where method.
Although description operation in a particular order in the accompanying drawings should not be construed as requiring specific shown in Sequence or serial order operate to execute these operations, or shown in requirement execution whole to obtain desired result.? In specific environment, multitask and parallel processing be may be advantageous.
Methods and apparatus of the present invention can be completed using standard programming technology, using rule-based logic or its His logic realizes various method and steps.It should also be noted that herein and the terms used in the claims " device " " module " is intended to include using the realization of a line or multirow software code and/or hardware realization and/or for receiving input Equipment.
One or more combined individually or with other equipment can be used in any step, operation or program described herein A hardware or software module are executed or are realized.In one embodiment, software module use includes comprising computer program The computer program product of the computer-readable medium of code is realized, can be executed by computer processor any for executing Or whole described step, operation or programs.
For the purpose of example and description, the preceding description that the present invention is implemented is had been presented for.Preceding description is not poor Also not the really wanting of act property limits the invention to exact form disclosed, according to the above instruction there is likely to be various modifications and Modification, or various changes and modifications may be obtained from the practice of the present invention.Select and describe these embodiments and be in order to Illustrate the principle of the present invention and its practical application, so that those skilled in the art can be to be suitable for the special-purpose conceived Come in a variety of embodiments with various modifications and utilize the present invention.

Claims (18)

1. a kind of media resource scheduling method, which comprises
Media resource scheduling request is received from client, wherein media resource scheduling request includes the system mark of resource node Knowledge and task type;
According to the system banner of the resource node and pre-stored resource mapping table, resource module is determined, wherein the money Source mapping table includes the system banner of the resource node and the mapping relations of the resource module;
It calls the resource module to execute scheduling corresponding with the task type to the media resource of the resource node to appoint Business.
2. according to the method described in claim 1, wherein, the resource module is called to hold the media resource of the resource node Corresponding with the task type scheduler task of row includes:
According to the system banner of the resource node, the access relevant information of the pre-stored resource node is obtained;
The resource node is accessed according to the access relevant information, the scheduler task is executed to the resource node.
3. according to the method described in claim 1, further include:
It generates scheduler task and operates handle, wherein the scheduler task operation handle includes the session identification of the scheduler task;
The scheduler task, which is sent, to the client operates handle;And
The resource turn-off request sent in response to receiving the client stops executing institute corresponding with the session identification Scheduler task is stated, and discharges the media resource, wherein the resource turn-off request includes the scheduler task operation handle.
4. according to the method described in claim 1, wherein, the resource module is called to hold the media resource of the resource node Corresponding with the task type scheduler task of row includes:
The scheduler task of media resource for the resource node is added in the task queue of the resource module.
5. according to the method described in claim 1, wherein, the resource module include national standard module, video flow point forwarding module, One of Software Development Kit proxy module, real time streaming transport protocol module are a variety of.
6. according to the method described in claim 1, further include:
Resource node addition request is received from the client, wherein resource node addition request includes resource section to be added The original mark and resource type relevant information of point;
According to the original mark and the resource type relevant information, judge whether to have had in the resource mapping table described Resource node to be added;
If having had the resource node to be added in the resource mapping table, the resource node to be added is not executed Addition operation;
If not having the resource node to be added in the resource mapping table, following steps are executed:
It is generated according to the original mark of the resource node to be added and the resource type relevant information described to be added The system banner of resource node;
According to the determining resource module associated with the resource node to be added of the resource type relevant information;
The mark of the system banner of the resource node to be added and the resource module is stored in association with described In resource mapping table.
7. according to the method described in claim 6, wherein, being determined and the money to be added according to the resource type relevant information The associated resource module of source node includes:
Resource module to be selected is determined according to the resource type relevant information;
According to the load and performance parameter of the resource module to be selected, determined in the resource module to be selected with it is described to be added The associated resource module of resource node, wherein the load of the resource module to be selected include with the resource to be selected The number of the associated resource node of module.
8. according to the method described in claim 6, wherein, according to the original mark and the resource type relevant information, sentencing Whether breaking in the resource mapping table, there is the resource node to be added to include:
Judge whether there is the original mark in the resource mapping table;
If not having the original mark in the resource mapping table, it is determined that do not have in the resource mapping table it is described to Add resource node;
If having the original mark in the resource mapping table, the described resources-type of the resource node to be added is judged Whether the corresponding system banner of the original mark having had in type relevant information and the resource mapping table matches;
If it does, then determining in the resource mapping table that there is the resource node to be added;
Do not have the resource node to be added in the resource mapping table if it does not match, determining.
9. according to the method described in claim 6, the method also includes:
Resource node removal request is received from the client, wherein the resource node removal request includes resource to be deleted The system banner of node;
According to the system banner of the resource node to be deleted, deleted and the resource section to be deleted from the resource mapping table The associated entry of point.
10. according to claim 1, method described in any one of 6 or 9, further includes:
In system starting, system configuration file information is read, task port is monitored in starting, wherein the profile information packet Database login information is included, the monitoring task port is requested for monitoring the media resource scheduling, resource node addition is asked One or more of resource node removal request of summing;
According to database described in the database login information registration, the resource mapping table is obtained from the database;
Store the resource mapping table.
11. a kind of managing medium resource method, which comprises
Resource node addition request is received from client, wherein resource node addition request includes resource node to be added Original mark and resource type relevant information;
According to the original mark and the resource type relevant information, judge whether to have had in resource mapping table described wait add Add resource node;
If having had the resource node to be added in the resource mapping table, the resource node to be added is not executed Addition operation;
If not having the resource node to be added in the resource mapping table, following steps are executed:
It is generated according to the original mark of the resource node to be added and the resource type relevant information described to be added The system banner of resource node;
According to the determining resource module associated with the resource node to be added of the resource type relevant information;
The mark of the system banner of the resource node to be added and the resource module is stored in association with described In resource mapping table.
12. according to the method for claim 11, wherein according to the resource type relevant information it is determining with it is described to be added The associated resource module of resource node includes:
Resource module to be selected is determined according to the resource type relevant information;
According to the load and performance parameter of the resource module to be selected, determined in the resource module to be selected with it is described to be added The associated resource module of resource node, wherein the load of the resource module to be selected include with the resource to be selected The number of the associated resource node of module.
13. according to the method for claim 11, wherein according to it is described it is original mark and the resource type relevant information, Judge whether to have had in resource mapping table the resource node to be added include:
Judge whether there is the original mark in the resource mapping table;
If not having the original mark in the resource mapping table, it is determined that do not have in the resource mapping table it is described to Add resource node;
If having the original mark in the resource mapping table, the described resources-type of the resource node to be added is judged Whether the corresponding system banner of the original mark having had in type relevant information and the resource mapping table matches;
If it does, then determining in the resource mapping table that there is the resource node to be added;
Do not have the resource node to be added in the resource mapping table if it does not match, determining.
14. the method according to claim 11, the method also includes:
Resource node removal request is received from the client, wherein the resource node removal request includes resource to be deleted The system banner of node;
According to the system banner of the resource node to be deleted, deleted and the resource section to be deleted from the resource mapping table The associated entry of point.
15. a kind of media resource scheduling device, described device include:
Media resource scheduling request receiving module is configured to receive media resource scheduling request from client, wherein the matchmaker Body resource scheduling request includes the system banner and task type of resource node;
Mapping block is configured to system banner and pre-stored resource mapping table according to the resource node, determines money Source module, wherein the resource mapping table includes the system banner of the resource node and the mapping relations of the resource module;
Scheduler task execution module is configured to call the resource module to the media resource execution of the resource node and institute State the corresponding scheduler task of task type.
16. a kind of managing medium resource device, described device include:
Request receiving module is added, is configured to receive resource node addition request from client, wherein the resource node adds Adding request includes the original mark and resource type relevant information of resource node to be added;
Judgment module has been deposited, has been configured to judge resource impact according to the original mark and the resource type relevant information Whether there is the resource node to be added in table;
Addition operation terminates module, if being configured to that there is the resource node to be added in the resource mapping table, Addition operation is not executed to the resource node to be added;
Operation executing module is added, if being configured to do not have the resource node to be added in the resource mapping table, It executes following operation: institute is generated according to the original mark of the resource node to be added and the resource type relevant information State the system banner of resource node to be added;According to resource type relevant information determination and the resource node phase to be added Associated resource module;In association by the mark of the system banner of the resource node to be added and the resource module It is stored in the resource mapping table.
17. a kind of electronic equipment, the electronic equipment include:
Memory, for storing instruction;And
Processor, for calling method of the instruction execution of the memory storage as described in any one of claim 1-14.
18. a kind of computer readable storage medium, the computer-readable recording medium storage has computer executable instructions, institute It states computer executable instructions when executed by the processor, executes the method as described in any one of claim 1-14.
CN201910163694.3A 2019-03-04 2019-03-04 Media resource scheduling and managing medium resource method, apparatus and electronic equipment Pending CN109922316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910163694.3A CN109922316A (en) 2019-03-04 2019-03-04 Media resource scheduling and managing medium resource method, apparatus and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910163694.3A CN109922316A (en) 2019-03-04 2019-03-04 Media resource scheduling and managing medium resource method, apparatus and electronic equipment

Publications (1)

Publication Number Publication Date
CN109922316A true CN109922316A (en) 2019-06-21

Family

ID=66963361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910163694.3A Pending CN109922316A (en) 2019-03-04 2019-03-04 Media resource scheduling and managing medium resource method, apparatus and electronic equipment

Country Status (1)

Country Link
CN (1) CN109922316A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110795244A (en) * 2019-10-24 2020-02-14 浙江大华技术股份有限公司 Task allocation method, device, equipment and medium
CN115357400A (en) * 2022-10-17 2022-11-18 成都华栖云科技有限公司 Resource warehousing method and system based on Kubernetes recording and broadcasting manufacturers

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090187536A1 (en) * 2004-03-13 2009-07-23 Cluster Resources, Inc. System and Method Providing Object Messages in a Compute Environment
CN102740466A (en) * 2011-04-01 2012-10-17 中兴通讯股份有限公司 Method for carrying out operation on resource in Internet of things and apparatus thereof
CN104584659A (en) * 2012-08-24 2015-04-29 富士通株式会社 Radio communication method, radio communication system, radio base station, and radio terminal
CN107168788A (en) * 2016-03-07 2017-09-15 阿里巴巴集团控股有限公司 The dispatching method and device of resource in distributed system
CN108093206A (en) * 2016-11-21 2018-05-29 北京视联动力国际信息技术有限公司 A kind of resource monitoring method and system
CN108701132A (en) * 2015-11-27 2018-10-23 华为技术有限公司 Resource management system and method
CN109375992A (en) * 2018-08-17 2019-02-22 华为技术有限公司 A kind of resource regulating method and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090187536A1 (en) * 2004-03-13 2009-07-23 Cluster Resources, Inc. System and Method Providing Object Messages in a Compute Environment
CN102740466A (en) * 2011-04-01 2012-10-17 中兴通讯股份有限公司 Method for carrying out operation on resource in Internet of things and apparatus thereof
CN104584659A (en) * 2012-08-24 2015-04-29 富士通株式会社 Radio communication method, radio communication system, radio base station, and radio terminal
CN108701132A (en) * 2015-11-27 2018-10-23 华为技术有限公司 Resource management system and method
CN107168788A (en) * 2016-03-07 2017-09-15 阿里巴巴集团控股有限公司 The dispatching method and device of resource in distributed system
CN108093206A (en) * 2016-11-21 2018-05-29 北京视联动力国际信息技术有限公司 A kind of resource monitoring method and system
CN109375992A (en) * 2018-08-17 2019-02-22 华为技术有限公司 A kind of resource regulating method and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110795244A (en) * 2019-10-24 2020-02-14 浙江大华技术股份有限公司 Task allocation method, device, equipment and medium
CN110795244B (en) * 2019-10-24 2022-07-08 浙江大华技术股份有限公司 Task allocation method, device, equipment and medium
CN115357400A (en) * 2022-10-17 2022-11-18 成都华栖云科技有限公司 Resource warehousing method and system based on Kubernetes recording and broadcasting manufacturers
CN115357400B (en) * 2022-10-17 2023-02-03 成都华栖云科技有限公司 Resource warehousing method and system based on Kubernetes recording and broadcasting manufacturers

Similar Documents

Publication Publication Date Title
US11372669B2 (en) System and method of cross-silo discovery and mapping of storage, hypervisors and other network objects
US11886440B1 (en) Guided creation interface for streaming data processing pipelines
US20230205603A1 (en) Communications Framework for Multi-Cluster Management Systems
CN102075409B (en) Method and system for processing request message as well as load balancer equipment
US11665183B2 (en) Secure incident investigation event capture
CN108810594A (en) Remote screen projection method, device and system
CN106294151B (en) Log test method and device
US8909622B1 (en) Time-based log and alarm integration search tool for trouble-shooting
CN107688611B (en) Saltstack-based Redis key value management system and method
CN108427619B (en) Log management method and device, computing equipment and storage medium
CN108139961A (en) Telemetering defines system
CN109922316A (en) Media resource scheduling and managing medium resource method, apparatus and electronic equipment
CN113127307A (en) Method for processing tracing request, related device, system and storage medium
CN109800081A (en) A kind of management method and relevant device of big data task
JP2024045209A (en) Blockchain data search method
CN114338172A (en) Mobile network target range system and network flow attack simulation method
US11630684B2 (en) Secure incident investigation workspace generation and investigation control
CN111756784B (en) Session method, session device, computer equipment and medium
US20120150995A1 (en) Transfer apparatus, message transfer system, message transfer method, and program
US20160105419A1 (en) Method for logging of a remote control session
JP2020053079A (en) Content deployment, scaling, and telemetry
CN112738153B (en) Gateway selection method, system, device, server and medium in service system
US11153388B2 (en) Workflow engine framework for cross-domain extension
CN109525642B (en) LIMS system client data automatic reporting method under user mechanism
US10419368B1 (en) Dynamic scaling of computing message architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621