CN109920213A - The method that Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning - Google Patents
The method that Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning Download PDFInfo
- Publication number
- CN109920213A CN109920213A CN201910191242.6A CN201910191242A CN109920213A CN 109920213 A CN109920213 A CN 109920213A CN 201910191242 A CN201910191242 A CN 201910191242A CN 109920213 A CN109920213 A CN 109920213A
- Authority
- CN
- China
- Prior art keywords
- rainfall
- flood
- period
- critical
- early warning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 78
- 230000008569 process Effects 0.000 title claims abstract description 49
- 239000002689 soil Substances 0.000 claims abstract description 47
- 238000009825 accumulation Methods 0.000 claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 238000004519 manufacturing process Methods 0.000 claims abstract description 6
- 239000012141 concentrate Substances 0.000 claims description 8
- 238000001556 precipitation Methods 0.000 claims description 7
- 230000001174 ascending effect Effects 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims 1
- 238000011161 development Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 229920006395 saturated elastomer Polymers 0.000 description 2
- 238000012876 topography Methods 0.000 description 2
- 241000723347 Cinnamomum Species 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 235000017803 cinnamon Nutrition 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 230000003694 hair properties Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001314 paroxysmal effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A50/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather
Landscapes
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of method that Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning, the rainfall data before flood peak occurs in all previous peb process in the T period are taken passages first, and calculate the accumulation rainfall in the T period;Secondly, the rainfall data before occurring based on flood peak in the T period construct Lorentz curve, the Gini coefficient of Lorentz curve is calculated, and the rainfall in the preceding T period is occurred into flood peak according to Gini coefficient and is divided into three classes;Then the tension water content saturation degree at T moment, i.e. initial soil moisture content saturation degree before statistics flood peak occurs;Then judge whether all previous flood is super alert flood, respectively to uniform, unevenly, the other rainfall production accumulation rainfall-initial soil moisture content saturation degree scatter plot of three types is concentrated, and the corresponding point of super alert flood is marked, Critical Rainfall line is drawn in conjunction with the corresponding point of super alert flood;Real-time early warning is finally carried out according to Critical Rainfall line.
Description
Technical field
The present invention relates to hydrology technology fields more particularly to a kind of Critical Rainfall based on rainfall rainfall process to carry out in real time
The method of mountain torrents early warning.
Background technique
China river is numerous, drainage area 200 to 3000km2Middle small watershed nearly 9000.In recent years, climate changes
It influences, the sudden flood of the middle and small river as caused by Local Heavy Precipitation frequently occurs, it has also become the main disasters to cause casualties
Kind.Middle small watershed easily forms harm due to being generally in remote mountain areas with a varied topography, that the gradient is steep, the flood hurriedly to go up
The flood of local resident's personal safety and social economy, thus it is prominent according to the rainfall data centering small watershed observed in real time
Hair property flood carries out quick early warning as major issue urgently to be resolved.
Critical Rainfall method is a kind of method of the relatively broad carry out mountain torrents early warning of domestic and international application.Critical Rainfall is guidance
When causing a basin that mountain flood will occur, magnitude or intensity that rainfall is likely to be breached.It is pushed away based on basin actual conditions
It calculates when reliable accurately Critical Rainfall is the key that this method application and where core.However existing inquire into critical rain at present
The method of amount does not account for the rainfall process of rainfall mostly.In fact, the heavy rain of very brief concentration is more for same rainfall
It is easy to produce paroxysmal flood, therefore has more risk.If cannot be to this case during calculating Critical Rainfall
Paid attention to, then it is excessively high to can frequently result in the Critical Rainfall extrapolated, and actual measurement rainfall, which is often not achieved, when mountain torrents real-time early warning faces
Boundary's rainfall brings certain hidden danger to fail to report, for mountain flood prevention.How Critical Rainfall method is carried out it is perfect, thus one
Determine in degree improve for the key points and difficulties in the attention and Critical Rainfall method development process of rainfall rainfall process feature it
One.
In order to further promote the development of Critical Rainfall method, need to consider the uneven item of rainfall rainfall process deeper into research
The evaluation method of part lower critical rainfall.
Lorentz curve (Lorenz curve) is exactly, in a totality (country, area), with population percentage be
Abscissa, the curve formed with the point of the income percentage ordinate of each population percentage of correspondence.It is united by the U.S. originally
Meter scholar M.O. Lorentz (Max Otto Lorenz, 1876-1959) is in proposing in 1907 to study national income in state
The mathematical model of assignment problem between the people.The bending degree (being indicated using Gini coefficient) of its Lorentz curve has important meaning
Justice.In general, it reflects the unequal degree of distribution of earnings.Gini coefficient is bigger, and bending degree is bigger, and distribution of earnings is got over
Inequality, vice versa, therefore the curve is widely used in Science of Economics.In the case where considering rainfall time distribution feature
Critical Rainfall is calculated, key seeks to quantify the degree of irregularity of rainfall sequence, and this is exactly long-range navigation
The hereby range of CURVE STUDY, therefore for the deficiency in existing reckoning Critical Rainfall method, how to consider Lorentz curve
During the reckoning of Critical Rainfall, quantify the time distribution feature of continuous development and change in rainfall, thus
Improve the reliability of Critical Rainfall projectional technique, exactly inventor's problem to be solved.
Summary of the invention
When being based on rainfall the technical problem to be solved by the present invention is to provide one kind for defect involved in background
The method that the Critical Rainfall of journey distribution carries out real-time mountain torrents early warning.
The present invention uses following technical scheme to solve above-mentioned technical problem
The method that Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning, comprising the following steps:
Step 1, the flow and rainfall data information in all previous peb process in basin are collected, for flood mistake each time
Journey takes passages the rainfall data before flood peak occurs in the T period, and calculates the accumulation rainfall in the T period, and T is whole more than or equal to 2
Number;
Step 2, for each flood events, the rainfall data before being occurred according to its flood peak in the T period construct Lorentz
Curve calculates the Gini coefficient of Lorentz curve, then by Gini coefficient respectively with pre-set Gini coefficient threshold X G, DG
It is compared and then the rainfall of peb process is divided, XG < DG, if 0 < G≤XG, it is believed that rain types are equal
It is even, if XG < G≤DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate;
Step 3, the tension water content saturation degree at T moment before flood peak occurs in each flood events is counted, i.e., initial soil
Earth water content saturation degree;
Step 4, for each flood events, judge whether it is super alert flood, and respectively to uniform, uneven, collection
In the other flood peak of three types occur before rainfall production accumulation rainfall-initial soil moisture content saturation degree scatter plot in the T period,
The corresponding point of super alert flood is marked, draws Critical Rainfall line in conjunction with the corresponding point of super alert flood;
Step 5, based on real-time rainfall data and soil moisture content saturation degree, judge whether to occur in conjunction with Critical Rainfall line
Super alert flood such as occurs, and issues mountain torrents early warning to current rainfall.
As the present invention is based on the method that the Critical Rainfall of rainfall rainfall process carries out real-time mountain torrents early warning, the steps 1
Specific step is as follows:
Step 1.1, the flow and rainfall data information in all previous peb process in basin are collected, for flood mistake each time
Journey:
Step 1.1.1, finds out maximum flow value in peb process, and at the time of determine that maximum flow value occurs, i.e.,
MQ_T between the peak of flood is current;
Step 1.1.2 takes passages the rainfall data Seq_P before flood peak occurs in the T period;
Seq_P={ PMQ_T,PMQ_T-1,PMQ_T-2…PMQ_T-T}
In formula, PMQ_TFor the rainfall at MQ_T moment;PMQ_T-1For the rainfall at MQ_T-1 moment;PMQ_T-2When for MQ_T-2
The rainfall at quarter;PMQ_T-TFor the rainfall at MQ_T-T moment;
Step 1.1.3 calculates the accumulation rainfall AccP in the T period;
As the present invention is based on the method that the Critical Rainfall of rainfall rainfall process carries out real-time mountain torrents early warning, the steps 2
In specifically includes the following steps:
Step 2.1, for each flood events:
The ascending sequence of rainfall in Seq_P is obtained NSeq_P by step 2.1.1;
NSeq_P={ P0,P1…Pj…PT}
In formula, j is the integer for being less than or equal to T more than or equal to 0;
Accumulation period Precipitation Series ASeq_P is calculated based on NSeq_P in step 2.1.2;
ASeq_P={ AP0,AP1…APj…APT}
In formula, APjAccumulation period rainfall when for the period being j,
Step 2.1.3 calculates the accumulation period rainfall percentage in Seq_P, obtains accumulation period rainfall Percent sequence
ANSeq_P;
NSeq_P={ F0,F1…Fj…FT}
In formula,
Step 2.1.4 calculates Gini coefficient G based on ASeq_P and ANSeq_P;
Step 2.2, by the Gini coefficient G of all previous rainfall respectively with pre-set Gini coefficient threshold X G, DG into
Row relatively, and then classify to all previous rainfall, XG < DG, if 0 < G≤XG, it is believed that rain types be it is uniform, if XG
< G≤DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate.
As the present invention is based on the method that the Critical Rainfall of rainfall rainfall process carries out real-time mountain torrents early warning, the steps 4
Specific step is as follows:
Step 4.1, for each flood events, judge whether it is super alert flood:
Step 4.1.1 calculates tension water content dynamic changing process and the safety in basin using Xinanjiang model
The Variations in Flow Changes of protected object position;
Step 4.1.2 counts the soil tension water content saturation degree at T moment before flood peak, i.e. initial soil moisture content is saturated
Spend Init_W;
Init_W=WMQ_T-T/WM
In formula, WMQ_T-TFor the tension water content at MQ_T-T moment in basin;WM is basin tension water capacity;
Step 4.1.3, the early warning of taking precautions against natural calamities that river basin authority is investigated or consulted by floodmark on the spot are planned to obtain safety
The Alarm flow Warn_Q of protected object position;
Step 4.1.4 determines maximum stream flow Max_Q based on the Variations in Flow Changes of safeguard protection object position;
Step 4.1.5 judges flood for super alert flood if Max_Q >=Warn_Q in peb process;
Step 4.2, the rainfall before occurring respectively to uniform, uneven, the other flood peak of three types of concentration in the T period
Rainfall-initial soil moisture content saturation degree scatter plot is accumulated in production, is marked in scatter plot using cross symbol super alert big vast
Not super alert flood is marked using circle symbol in water;
Step 4.3, according to cross symbol and circle symbol in accumulation rainfall-initial soil moisture content saturation degree scatter plot
Distribution characteristics, using W-H (widrow-hoff) algorithm based on minimum variance principle, draw critical warning rainfall line to get
Critical Rainfall line into basin under different types of rainfall, under various soil water status conditions.
As the present invention is based on the method that the Critical Rainfall of rainfall rainfall process carries out real-time mountain torrents early warning, the steps 5
Specific step is as follows:
In real-time early warning, the initial soil of accumulation rainfall and preceding T moment before continuous this moment of circle statistics in the T period
Earth water content saturation degree calculates the Gini coefficient of rainfall in preceding T time section, so that the classification of rainfall is judged, by the secondary drop
This turns to data point to rain process, is labeled in accumulation rainfall-initial soil moisture content saturation degree scatter plot of corresponding classification, if
The position of the point marked judges that super alert flood occurs, issues mountain torrents early warning in the top of Critical Rainfall line.
The invention adopts the above technical scheme compared with prior art, has following technical effect that
The method that a kind of Critical Rainfall based on rainfall rainfall process provided by the invention carries out real-time mountain torrents early warning, with shadow
Based on the physical agent for ringing Critical Rainfall, the dynamic of the time distribution feature of rainfall during calculating Critical Rainfall is featured
Development and change, have quantified influence of the rainfall process feature for Critical Rainfall of rainfall, and then have estimated small in the property of mountain area
Critical Rainfall in basin.The precision and reliability of calculated result were not only ensure that in this way, but also can be timely and conveniently in the property of mountain area
The Critical Rainfall of small watershed promotes and applies in calculating.And this method mainly observes data using existing rainfall website, data are come
Source is reliable and stable, and the functional relation in method between variable is clear, is conducive to the fast automatic calculating of Critical Rainfall in basin, can
Further to promote the deep development of small watershed mountain torrents study on prevention in digital hydrology and mountain area property.
Detailed description of the invention
Fig. 1 is calculation process signal;
Fig. 2 is big sill may basin schematic diagram;
Fig. 3 is Lorentz curve schematic diagram;
Fig. 4 is rainfall critical line schematic diagram in the big uniform situation of sill may Basin Rainfall;
Fig. 5 is rainfall critical line schematic diagram in the big uneven situation of sill may Basin Rainfall;
Fig. 6 is rainfall critical line schematic diagram in the case of big sill may Basin Rainfall is concentrated.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing:
As shown in Figure 1, the invention discloses a kind of, the Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning
Method, comprising the following steps:
Step 1, the flow and rainfall data information in all previous peb process in basin are collected, for flood mistake each time
Journey takes passages the rainfall data before flood peak occurs in the T period, and calculates the accumulation rainfall in the T period, and T is whole more than or equal to 2
Number;
Step 1.1, the flow and rainfall data information in all previous peb process in basin are collected, for flood mistake each time
Journey:
Step 1.1.1, finds out maximum flow value in peb process, and at the time of determine that maximum flow value occurs, i.e.,
MQ_T between the peak of flood is current;
Step 1.1.2 takes passages the rainfall data Seq_P before flood peak occurs in the T period;
Seq_P={ PMQ_T,PMQ_T-1,PMQ_T-2…PMQ_T-T}
In formula, PMQ_TFor the rainfall at MQ_T moment;PMQ_T-1For the rainfall at MQ_T-1 moment;PMQ_T-2When for MQ_T-2
The rainfall at quarter;PMQ_T-TFor the rainfall at MQ_T-T moment;
Step 1.1.3 calculates the accumulation rainfall AccP in the T period;
Step 2, for each flood events, the rainfall data before being occurred according to its flood peak in the T period construct Lorentz
Curve calculates the Gini coefficient of Lorentz curve, then by Gini coefficient respectively with pre-set Gini coefficient threshold X G, DG
It is compared and then the rainfall of peb process is divided, XG < DG, if 0 < G≤XG, it is believed that rain types are equal
It is even, if XG < G≤DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate;
Step 2.1, for each flood events:
The ascending sequence of rainfall in Seq_P is obtained NSeq_P by step 2.1.1;
NSeq_P={ P0,P1…Pj…PT}
In formula, j is the integer for being less than or equal to T more than or equal to 0;
Accumulation period Precipitation Series ASeq_P is calculated based on NSeq_P in step 2.1.2;
ASeq_P={ AP0,AP1…APj…APT}
In formula, APjAccumulation period rainfall when for the period being j,
Step 2.1.3 calculates the accumulation period rainfall percentage in Seq_P, obtains accumulation period rainfall Percent sequence
ANSeq_P;
NSeq_P={ F0,F1…Fj…FT}
In formula,
Step 2.1.4 calculates Gini coefficient G based on ASeq_P and ANSeq_P;
Step 2.2, by the Gini coefficient G of all previous rainfall respectively with pre-set Gini coefficient threshold X G, DG into
Row relatively, and then classify to all previous rainfall, XG < DG, if 0 < G≤XG, it is believed that rain types be it is uniform, if XG
< G≤DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate.
Step 3, the tension water content saturation degree at T moment before flood peak occurs in each flood events is counted, i.e., initial soil
Earth water content saturation degree;
Step 4, for each flood events, judge whether it is super alert flood, and respectively to uniform, uneven, collection
In the other flood peak of three types occur before rainfall production accumulation rainfall-initial soil moisture content saturation degree scatter plot in the T period,
The corresponding point of super alert flood is marked, draws Critical Rainfall line in conjunction with the corresponding point of super alert flood;
Step 4.1, for each flood events, judge whether it is super alert flood:
Step 4.1.1 calculates tension water content dynamic changing process and the safety in basin using Xinanjiang model
The Variations in Flow Changes of protected object position;
Step 4.1.2 counts the soil tension water content saturation degree at T moment before flood peak, i.e. initial soil moisture content is saturated
Spend Init_W;
Init_W=WMQ_T-T/WM
In formula, WMQ_T-TFor the tension water content at MQ_T-T moment in basin;WM is basin tension water capacity;
Step 4.1.3, the early warning of taking precautions against natural calamities that river basin authority is investigated or consulted by floodmark on the spot are planned to obtain safety
The Alarm flow Warn_Q of protected object position;
Step 4.1.4 determines maximum stream flow Max_Q based on the Variations in Flow Changes of safeguard protection object position;
Step 4.1.5 judges flood for super alert flood if Max_Q >=Warn_Q in peb process;
Step 4.2, the rainfall before occurring respectively to uniform, uneven, the other flood peak of three types of concentration in the T period
Rainfall-initial soil moisture content saturation degree scatter plot is accumulated in production, is marked in scatter plot using cross symbol super alert big vast
Not super alert flood is marked using circle symbol in water;
Step 4.3, according to cross symbol and circle symbol in accumulation rainfall-initial soil moisture content saturation degree scatter plot
Distribution characteristics, using W-H (widrow-hoff) algorithm based on minimum variance principle, draw critical warning rainfall line to get
Critical Rainfall line into basin under different types of rainfall, under various soil water status conditions.
Step 5, based on real-time rainfall data and soil moisture content saturation degree, judge whether to occur in conjunction with Critical Rainfall line
Super alert flood such as occurs, and issues mountain torrents early warning to current rainfall:
In real-time early warning, the initial soil of accumulation rainfall and preceding T moment before continuous this moment of circle statistics in the T period
Earth water content saturation degree calculates the Gini coefficient of rainfall in preceding T time section, so that the classification of rainfall is judged, by the secondary drop
This turns to data point to rain process, is labeled in accumulation rainfall-initial soil moisture content saturation degree scatter plot of corresponding classification, if
The position of the point marked judges that super alert flood occurs, issues mountain torrents early warning in the top of Critical Rainfall line.
By taking the big sill may basin in Shaanxi Province as an example, as shown in Fig. 2, the basin is located in Qinling Mountains southern foot, water collection basin area is about
2182km2, total river is about 161km, river average gradient about 5.44 ‰., upstream is largely high Zhongshan District, absolute elevation 700-
3500m, mountain shape is grand, and the folded barrier of weight mountains in a range, peak valley is alternate, breaking topography, and hillside is mostly concave-convex slope, and only in watershed, one band is distributed with
Staight slope, mean inclination is between 40-60 °.Along the river there are low mountains and hills, the natural landscape approximation Huashan in two sides.Belong to warm temperature in basin
Band broad-leaved deciduous forest and the wealthy mixed forest belt of needle, the Vertical Distribution Law of forest form is obvious, and basin afforestation rate is 82%.Stream
Domain is ploughed in geology and makes upper category south Qingling fold belt.It is main to build rock are as follows: rotten migmatite class, granite also have fragmentary distribution.
Using yellowish soil, brown earth as representative in basin.SOIL DISTRIBUTION has drab soil, cinnamon soil, brown brown earth, alpine meadow soil from bottom to top.By
In the weathering of parent rock, there is sand soil distribution on basin surface layer.
Basin is located at north temperate zone, belongs to continental monsoon climate, 700~900mm of mean annual precipitation, and river water is main
It is rainwater supply, isolated storm is the main reason for flood occurs.Basin is averaged 100~500mm of height of run-off, runoff coefficient
0.2~0.5, it is relatively high Runoff Generating Area, 100~200t/km of erosion modulus2。
It studies area's rainfall initial data and is seen using 17 precipitation station observations in basin between -2018 years 2010 by hour rainfall
Measured data.
Step 1: collecting flow and rainfall data of the big sill may basin between 2010 to 2018 in all previous peb process
Data, and the rainfall data in each flood events in flood peak appearance preceding 12 period are taken passages, calculate the accumulation drop in 12 periods
Rainfall, specifically includes the following steps:
1) flow and rainfall data information of the big sill may basin between 2010 to 2018 in all previous peb process are collected,
At the time of finding out maximum flow value in peb process, and determine that maximum flow value occurs in each flood events, as
MQ_T between the peak of this flood is current;
2) the rainfall data Seq_P in flood peak appearance preceding 12 period is taken passages;
Seq_P={ PMQ_T,PMQ_T-1,PMQ_T-2…PMQ_T-12}
In formula: PMQ_TFor the rainfall at MQ_T moment;PMQ_T-1For the rainfall at MQ_T-12 moment;PMQ_T-12For MQ_T-12
The rainfall at moment;Successively push away class, PMQ_T-12For the rainfall at MQ_T-12 moment, this series of rainfall is constituted as flood
Rainfall data Seq_P before peak occurs in the T period;The value of T is determined depending on specific watershed concentration feature and Alert Standard.
3) the accumulation rainfall AccP in the T period is calculated;
In formula: MQ_T-i is the subscript of rainfall, changes to MQ_T-12 from MQ_T, i.e. i changes to 12 from 0.
Step 2: the rainfall data in preceding 12 period occur based on the flood peak taken passages out constructs Lorentz curve, such as Fig. 3 institute
Show, calculates the Gini coefficient of Lorentz curve, and the rainfall in the preceding T period is occurred into flood peak according to Gini coefficient and is divided into
It is even, unevenly, three classes are concentrated, specifically includes the following steps:
1) by the ascending sequence of rainfall in Seq_P, NSeq_P is obtained;
NSeq_P={ P0,P1…Pj…P12}
In formula: j is the subscript of rainfall, changes to 12 from 0;And P0<P1<…<Pj<…P12, i.e., with the increase of subscript j,
PjValue be also increasing.
2) accumulation period Precipitation Series ASeq_P is calculated based on NSeq_P;
ASeq_P={ AP0,AP1…APj…AP12}
In formula: APjAccumulation period rainfall when for the period being j, and AP0<AP1<…<APj<…AP12, i.e., with subscript j's
Increase, PjValue be also increasing, maximum AP12Value be Accp.Specific calculation method is as follows:
In formula: k is rainfall P0To PjBetween subscript, change to j from 0.
3) the accumulation period rainfall percentage in Seq_P is calculated, accumulation period rainfall Percent sequence ANSeq_P is obtained;
NSeq_P={ F0,F1…Fj…F12}
In formula: j changes to T from 0;F0<F1<…<Fj<…F12, i.e., with the increase of subscript j, FjValue also constantly increasing
Greatly, maximum F12Value be 1.Specific FjCalculation method it is as follows:
4) Gini coefficient G is calculated based on ASeq_P and ANSeq_P;
5) using 2) between 4) the step of, calculate the Gini coefficient of rainfall each time, and will according to Gini coefficient
The rainfall that flood peak occurred in preceding 12 period is divided into uniformly, unevenly, concentrates three classes;
In conjunction with basin comprehensive natural geographic basis and practical early-warning and predicting operating experience, it is arranged threshold X G (being set as 0.3)
With DG (being set as 0.5), think as 0 < G≤0.3 rain types be it is uniform, think as 0.3 < G≤0.5 rain types be not
Uniformly, rain types are thought when as 0.5 < G to concentrate.
Step 3: judge whether flood is super alert flood, respectively to uniform, unevenly, the other rainfall system of three types is concentrated
Make accumulation rainfall-initial soil moisture content saturation degree scatter plot, and mark the corresponding point of super alert flood, in conjunction with super alert flood pair
The point answered draws Critical Rainfall line, specifically includes the following steps:
1) Xinanjiang model is used, the tension water content dynamic changing process and safeguard protection object in basin are calculated
The Variations in Flow Changes of position;
2) count flood peak before 12 moment soil tension water content saturation degree, i.e. initial soil moisture content saturation degree Init_
W;
Init_W=WMQ_T-12/WM
In formula: WMQ_T-12For the tension water content at MQ_T-12 moment in basin;WM is basin tension water capacity.
3) it plans to obtain safeguard protection object by the investigation of floodmark on the spot or the early warning of taking precautions against natural calamities of access river basin authority
The Alarm flow Warn_Q of position, the value are about 1000m in big sill may basin3/s;
4) Variations in Flow Changes based on the safeguard protection object position being calculated in step 3.1 determines maximum
Flow Max_Q;
If 5) Max_Q >=Warn_Q in peb process, judge this flood for super alert flood.Inhomogeneity is made respectively
Super alert flood is used cross in scatter plot by accumulation rainfall-initial soil moisture content saturation degree scatter plot under the rainfall of type
Symbol is marked, and not super alert flood is marked using circle symbol;
6) distribution according to cross symbol and circle symbol in accumulation rainfall-initial soil moisture content saturation degree scatter plot
Feature draws critical warning rainfall line to get to basin using W-H (widrow-hoff) algorithm based on minimum variance principle
In under different types of rainfall, the Critical Rainfall line under various soil water status conditions, as shown in Fig. 4, Fig. 5, Fig. 6.
Step 4: judging whether to need with soil moisture content saturation degree based on real-time rainfall data in real-time early warning
Mountain torrents early warning is issued to current rainfall, specifically includes the following steps:
In real-time early warning, accumulation rainfall and preceding 12 moment before continuous this moment of circle statistics in 12 periods it is initial
Soil moisture content saturation degree calculates the Gini coefficient of rainfall in preceding 12 period, so that the classification of rainfall is judged, by the secondary drop
This turns to data point to rain process, is labeled in accumulation rainfall-initial soil moisture content saturation degree scatter plot of corresponding classification, if
Mountain torrents early warning is then issued in the top of Critical Rainfall line in the position of the point marked.
Those skilled in the art can understand that unless otherwise defined, all terms used herein (including skill
Art term and scientific term) there is meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Also
It should be understood that those terms such as defined in the general dictionary should be understood that have in the context of the prior art
The consistent meaning of meaning will not be explained in an idealized or overly formal meaning and unless defined as here.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects
It is described in detail, it should be understood that being not limited to this hair the foregoing is merely a specific embodiment of the invention
Bright, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in the present invention
Protection scope within.
Claims (5)
1. the method that the Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning, which is characterized in that including following step
It is rapid:
Step 1, the flow and rainfall data information collected in all previous peb process in basin pluck each flood events
The rainfall data before flood peak occurs in the T period are recorded, and calculate the accumulation rainfall in the T period, T is the integer more than or equal to 2;
Step 2, for each flood events, the rainfall data before being occurred according to its flood peak in the T period construct Lorentz curve,
The Gini coefficient of Lorentz curve is calculated, then carries out Gini coefficient with pre-set Gini coefficient threshold X G, DG respectively
Compare, and then the rainfall of peb process divided, XG < DG, if 0 < G≤XG, it is believed that rain types be it is uniform, such as
Fruit XG < G≤DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate;
Step 3, the tension water content saturation degree at T moment before flood peak occurs in each flood events is counted, i.e. initial soil contains
Water saturation degree;
Step 4, for each flood events, judge whether it is super alert flood, and respectively to uniform, uneven, concentration three
Rainfall production accumulation rainfall-initial soil moisture content saturation degree scatter plot before the other flood peak of type occurs in the T period, marks
The corresponding point of super alert flood draws Critical Rainfall line in conjunction with the corresponding point of super alert flood;
Step 5, based on real-time rainfall data and soil moisture content saturation degree, judge whether that super police occurs in conjunction with Critical Rainfall line
Flood such as occurs, and issues mountain torrents early warning to current rainfall.
2. the method that the Critical Rainfall according to claim 1 based on rainfall rainfall process carries out real-time mountain torrents early warning,
It is characterized in that, specific step is as follows for the step 1:
Step 1.1, the flow and rainfall data information in all previous peb process in basin are collected, for each flood events:
Step 1.1.1, finds out maximum flow value in peb process, and at the time of determine that maximum flow value occurs, i.e. flood
Peak it is current between MQ_T;
Step 1.1.2 takes passages the rainfall data Seq_P before flood peak occurs in the T period;
Seq_P={ PMQ_T,PMQ_T-1,PMQ_T-2…PMQ_T-T}
In formula, PMQ_TFor the rainfall at MQ_T moment;PMQ_T-1For the rainfall at MQ_T-1 moment;PMQ_T-2For the MQ_T-2 moment
Rainfall;PMQ_T-TFor the rainfall at MQ_T-T moment;
Step 1.1.3 calculates the accumulation rainfall AccP in the T period;
3. the method that the Critical Rainfall according to claim 1 based on rainfall rainfall process carries out real-time mountain torrents early warning,
Be characterized in that, it is in the step 2 specifically includes the following steps:
Step 2.1, for each flood events:
The ascending sequence of rainfall in Seq_P is obtained NSeq_P by step 2.1.1;
NSeq_P={ P0,P1…Pj…PT}
In formula, j is the integer for being less than or equal to T more than or equal to 0;
Accumulation period Precipitation Series ASeq_P is calculated based on NSeq_P in step 2.1.2;
ASeq_P={ AP0,AP1…APj…APT}
In formula, APjAccumulation period rainfall when for the period being j,
Step 2.1.3 calculates the accumulation period rainfall percentage in Seq_P, obtains accumulation period rainfall Percent sequence
ANSeq_P;
NSeq_P={ F0,F1…Fj…FT}
In formula,
Step 2.1.4 calculates Gini coefficient G based on ASeq_P and ANSeq_P;
Step 2.2, the Gini coefficient G of all previous rainfall is compared with pre-set Gini coefficient threshold X G, DG respectively
Compared with, and then classify to all previous rainfall, XG < DG, if 0 < G≤XG, it is believed that rain types be it is uniform, if XG < G≤
DG, it is believed that rain types be it is uneven, if DG < G, it is believed that rain types be concentrate.
4. the method that the Critical Rainfall according to claim 1 based on rainfall rainfall process carries out real-time mountain torrents early warning,
It is characterized in that, specific step is as follows for the step 4:
Step 4.1, for each flood events, judge whether it is super alert flood:
Step 4.1.1 calculates tension water content dynamic changing process and the safeguard protection in basin using Xinanjiang model
The Variations in Flow Changes of object position;
Step 4.1.2 counts the soil tension water content saturation degree at T moment before flood peak, i.e. initial soil moisture content saturation degree
Init_W;
Init_W=WMQ_T-T/WM
In formula, WMQ_T-TFor the tension water content at MQ_T-T moment in basin;WM is basin tension water capacity;
Step 4.1.3, the early warning of taking precautions against natural calamities that river basin authority is investigated or consulted by floodmark on the spot are planned to obtain safeguard protection
The Alarm flow Warn_Q of object position;
Step 4.1.4 determines maximum stream flow Max_Q based on the Variations in Flow Changes of safeguard protection object position;
Step 4.1.5 judges flood for super alert flood if Max_Q >=Warn_Q in peb process;
Step 4.2, the rainfall before occurring respectively to uniform, uneven, the other flood peak of three types of concentration in the T period makes
Rainfall-initial soil moisture content saturation degree scatter plot is accumulated, super alert flood is marked, adopts using cross symbol in scatter plot
Not super alert flood is marked with circle symbol;
Step 4.3, point according to cross symbol and circle symbol in accumulation rainfall-initial soil moisture content saturation degree scatter plot
Cloth feature draws critical warning rainfall line using W-H (widrow-hoff) algorithm based on minimum variance principle to get stream is arrived
Critical Rainfall line in domain under different types of rainfall, under various soil water status conditions.
5. the method that the Critical Rainfall according to claim 1 based on rainfall rainfall process carries out real-time mountain torrents early warning,
It is characterized in that, specific step is as follows for the step 5:
In real-time early warning, the initial soil of accumulation rainfall and preceding T moment before continuous this moment of circle statistics in the T period contains
Water saturation degree calculates the Gini coefficient of rainfall in preceding T time section, so that the classification of rainfall is judged, by the secondary rainfall
This turns to data point to journey, is labeled in accumulation rainfall-initial soil moisture content saturation degree scatter plot of corresponding classification, if marking
Point position in the top of Critical Rainfall line, judge to occur super alert flood, issue mountain torrents early warning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910191242.6A CN109920213B (en) | 2019-03-13 | 2019-03-13 | Method for carrying out real-time mountain torrent early warning based on critical rainfall of rainfall time-course distribution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910191242.6A CN109920213B (en) | 2019-03-13 | 2019-03-13 | Method for carrying out real-time mountain torrent early warning based on critical rainfall of rainfall time-course distribution |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109920213A true CN109920213A (en) | 2019-06-21 |
CN109920213B CN109920213B (en) | 2020-10-23 |
Family
ID=66964707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910191242.6A Expired - Fee Related CN109920213B (en) | 2019-03-13 | 2019-03-13 | Method for carrying out real-time mountain torrent early warning based on critical rainfall of rainfall time-course distribution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109920213B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111027764A (en) * | 2019-12-06 | 2020-04-17 | 中国水利水电科学研究院 | Flood forecasting method suitable for runoff data lack basin based on machine learning |
CN111047213A (en) * | 2019-12-25 | 2020-04-21 | 长江水利委员会水文局 | Middle and long term water resource critical early warning index method based on multi-factor joint discrimination |
CN111462450A (en) * | 2020-01-16 | 2020-07-28 | 华中科技大学 | Mountain torrent early warning method considering rainfall spatial heterogeneity |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864750A (en) * | 2010-06-29 | 2010-10-20 | 西安理工大学 | Multi-model meta-synthesis flood forecasting system and forecasting method thereof |
CN102013150A (en) * | 2010-09-28 | 2011-04-13 | 浙江工业大学 | System for predicting geologic hazard based on rainfall intensity, moisture content of slope soil and deformation |
CN102169617A (en) * | 2011-04-15 | 2011-08-31 | 中国科学院水利部成都山地灾害与环境研究所 | Early warning method of mud-rock flow used in regions short of rainfall data |
JP2012086747A (en) * | 2010-10-21 | 2012-05-10 | Bridgestone Corp | Method and device for predicting hydroplaning phenomenon |
CN103197046A (en) * | 2013-04-04 | 2013-07-10 | 中国科学院、水利部成都山地灾害与环境研究所 | Method for measuring volume water content of debris flow critical soil body and debris flow pre-warning method |
CN104299367A (en) * | 2014-10-23 | 2015-01-21 | 中国科学院、水利部成都山地灾害与环境研究所 | Landslide hazard multi-stage comprehensive monitoring and early warning method |
CN204759699U (en) * | 2015-07-31 | 2015-11-11 | 珠江水利委员会珠江水利科学研究院 | Mountain torrents calamity monitoring and early warning device |
CN107085658A (en) * | 2017-04-19 | 2017-08-22 | 郑州大学 | A kind of mountain flood time of causing disaster determines method |
CN108597189A (en) * | 2018-04-24 | 2018-09-28 | 河海大学 | Small watershed geological disaster and flood warning method in distribution based on Critical Rainfall |
CN108647805A (en) * | 2018-04-03 | 2018-10-12 | 郑州大学 | A kind of mountain flood Critical Rainfall comprehensive test method |
-
2019
- 2019-03-13 CN CN201910191242.6A patent/CN109920213B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864750A (en) * | 2010-06-29 | 2010-10-20 | 西安理工大学 | Multi-model meta-synthesis flood forecasting system and forecasting method thereof |
CN102013150A (en) * | 2010-09-28 | 2011-04-13 | 浙江工业大学 | System for predicting geologic hazard based on rainfall intensity, moisture content of slope soil and deformation |
JP2012086747A (en) * | 2010-10-21 | 2012-05-10 | Bridgestone Corp | Method and device for predicting hydroplaning phenomenon |
CN102169617A (en) * | 2011-04-15 | 2011-08-31 | 中国科学院水利部成都山地灾害与环境研究所 | Early warning method of mud-rock flow used in regions short of rainfall data |
CN103197046A (en) * | 2013-04-04 | 2013-07-10 | 中国科学院、水利部成都山地灾害与环境研究所 | Method for measuring volume water content of debris flow critical soil body and debris flow pre-warning method |
CN104299367A (en) * | 2014-10-23 | 2015-01-21 | 中国科学院、水利部成都山地灾害与环境研究所 | Landslide hazard multi-stage comprehensive monitoring and early warning method |
CN204759699U (en) * | 2015-07-31 | 2015-11-11 | 珠江水利委员会珠江水利科学研究院 | Mountain torrents calamity monitoring and early warning device |
CN107085658A (en) * | 2017-04-19 | 2017-08-22 | 郑州大学 | A kind of mountain flood time of causing disaster determines method |
CN108647805A (en) * | 2018-04-03 | 2018-10-12 | 郑州大学 | A kind of mountain flood Critical Rainfall comprehensive test method |
CN108597189A (en) * | 2018-04-24 | 2018-09-28 | 河海大学 | Small watershed geological disaster and flood warning method in distribution based on Critical Rainfall |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111027764A (en) * | 2019-12-06 | 2020-04-17 | 中国水利水电科学研究院 | Flood forecasting method suitable for runoff data lack basin based on machine learning |
CN111027764B (en) * | 2019-12-06 | 2020-07-31 | 中国水利水电科学研究院 | Flood forecasting method suitable for runoff data lack basin based on machine learning |
CN111047213A (en) * | 2019-12-25 | 2020-04-21 | 长江水利委员会水文局 | Middle and long term water resource critical early warning index method based on multi-factor joint discrimination |
CN111462450A (en) * | 2020-01-16 | 2020-07-28 | 华中科技大学 | Mountain torrent early warning method considering rainfall spatial heterogeneity |
Also Published As
Publication number | Publication date |
---|---|
CN109920213B (en) | 2020-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111582755B (en) | Mountain torrent disaster comprehensive risk dynamic assessment method based on multi-dimensional set information | |
CN109920213A (en) | The method that Critical Rainfall based on rainfall rainfall process carries out real-time mountain torrents early warning | |
Meko et al. | The tree‐ring record of severe sustained drought 1 | |
Chu et al. | Spatial and temporal variability of daily precipitation in Haihe River basin, 1958–2007 | |
Mack | Landscape as a predictor of wetland condition: an evaluation of the landscape development index (LDI) with a large reference wetland dataset from Ohio | |
Li et al. | Observed changes in streamflow at the headwaters of the Urumqi River, eastern Tianshan, central Asia | |
Bari Abarghouei et al. | The survey of climatic drought trend in Iran | |
CN109993350A (en) | A kind of Critical Rainfall evaluation method based on spatially distributed rainfall | |
McCabe et al. | Recent declines in western US snowpack in the context of twentieth-century climate variability | |
Baldi et al. | Hail occurrence in Italy: Towards a national database and climatology | |
CN108960599A (en) | Transmission line of electricity Rainfall Disaster fining prediction technique and system based on inversion algorithm | |
Zakhem et al. | Investigation of hydrological drought using Cumulative Standardized Precipitation Index (SPI 30) in the eastern Mediterranean region (Damascus, Syria) | |
Wu et al. | Spatiotemporal variations in extreme precipitation on the middle and lower reaches of the Yangtze River Basin (1970–2018) | |
CN103646157B (en) | Method for evaluating transmission line fault caused by rainstorm | |
Lee et al. | Use of Landsat TM/ETM+ data to analyze urban heat island and its relationship with land use/cover change | |
Lu et al. | Evaluation and spatial distribution characteristics of freeze-thaw erosion intensity in the Yalu Tsangpo River basin on the basis of geographic information system | |
Sharma et al. | Analysis of wind characteristics parameters with the application of lidar and mast | |
Li et al. | Combined effect of boundary layer recirculation factor and stable energy on local air quality in the Pearl River Delta over southern China | |
Esfandiari et al. | The effect of atmospheric rivers on cold-season heavy precipitation events in Iran | |
Freda et al. | A pilot study of the wind speed along the Rome–Naples HS/HC railway line.: Part 2—Probabilistic analyses and methodology assessment | |
Ayantobo et al. | Climatology of landfalling atmospheric rivers and its attribution to extreme precipitation events over Yangtze River Basin | |
Zhang et al. | Mesoscale climatology and variation of surface winds over the Chukchi–Beaufort coastal areas | |
Zhang et al. | A temperature indicator for heavy air pollution risks (TIP) | |
Fan et al. | Near-surface heat transfer at two gentle slope sites with differing aspects, Qinghai-Tibet Plateau | |
Homan et al. | Arctic snow distribution patterns at the watershed scale |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |