CN109919575A - Management method, managing device and the management system of Farrowing task - Google Patents

Management method, managing device and the management system of Farrowing task Download PDF

Info

Publication number
CN109919575A
CN109919575A CN201910104567.6A CN201910104567A CN109919575A CN 109919575 A CN109919575 A CN 109919575A CN 201910104567 A CN201910104567 A CN 201910104567A CN 109919575 A CN109919575 A CN 109919575A
Authority
CN
China
Prior art keywords
sow
task
childbirth
information
piglet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910104567.6A
Other languages
Chinese (zh)
Inventor
杨翔
王国钊
莫书晓
周俊章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shadow Technology Co Ltd
Original Assignee
Guangzhou Shadow Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shadow Technology Co Ltd filed Critical Guangzhou Shadow Technology Co Ltd
Priority to CN201910104567.6A priority Critical patent/CN109919575A/en
Publication of CN109919575A publication Critical patent/CN109919575A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of management methods of childbirth task.Management method includes judging whether sow has been transferred to childbirth space;If so, judging whether the pre- production time of sow falls within the scope of the scheduled duration relative to current time;And if so, push the childbirth task of sow.Disclosed herein as well is the managing devices and management system of a kind of childbirth task.Childbirth space is transferred in sow, and it is pre- produce the time relative to current time within the scope of scheduled duration when, push the childbirth task of sow, user scheduled duration can receive childbirth task before the pre- production time of sow, it does not need the time that manpower memory executes childbirth task, to avoid cannot get due help when Farrowing, and the information of piglet can be understood in time, it avoids losing sow or piglet during Farrowing, improves breeding efficiency.

Description

Management method, managing device and the management system of Farrowing task
Technical field
This application involves cultural technique field, in particular to a kind of management method of Farrowing task, Farrowing are appointed The managing device of business and the management system of Farrowing task.
Background technique
During Farrowing, it usually needs the case where direct surveillance's Farrowing, to understand Farrowing in real time When physical condition, need to implement the measures such as artificial aiding-birth to sow when necessary, while the health of piglet can also be understood in time The information such as situation usually pass through the expected date of childbirth of micro-judgment sow, are more paid close attention to when sow is soon given a birth sow, And in large-scale farming, since the quantity of sow is more and the time of Farrowing is different, user is difficult to accurately hold every The delivery time of sow causes sow to cannot get necessary help in childbirth or cannot recognize piglet in time Situation be easy to cause loss sow or piglet during Farrowing, and reduces breeding efficiency.
Summary of the invention
Embodiments herein provides a kind of management method of Farrowing task, the managing device of Farrowing task And the management system of Farrowing task.
The management method of the Farrowing task of the application embodiment includes: to judge whether the sow has been transferred to point Give birth to space;If so, judging whether the pre- production time of the sow falls within the scope of the scheduled duration relative to current time;And if It is the childbirth task for pushing the sow.
In some embodiments, the management method further include: appointed according to trigger action is preset with starting the childbirth Business.
In some embodiments, the management method further include: obtain the letter currently with the field of sow binding Breath;Obtain the information for the piglet that the Farrowing obtains;And the information of the binding field and the piglet.
In some embodiments, the field is described to obtain currently configured with pre-bound release and/or feeding instrument Information with the field of sow binding includes: to scan the release and/or the feeding instrument to obtain the field Information.
In some embodiments, the information for obtaining the piglet that the Farrowing obtains, comprising: obtain weighing instrument The weight of the piglet of acquisition;And/or the quantity of the piglet of acquisition user's input, surviving for the piglet count, are described One or more of death toll of piglet.
In some embodiments, the childbirth task includes the multiple tasks node generated according to predesigned order, described Management method further include: when judgement enters next task node, whether current task node is completed;If it is not, push is as predecessor The unfinished prompt information of business.
The managing device of the Farrowing task of the application embodiment include first judgment module, the second judgment module and Pushing module.First judgment module is for judging whether the sow has been transferred to childbirth space;Second judgment module is used for After the sow has been transferred to childbirth space, judge whether the pre- production time of the sow fell into relative to the predetermined of current time Within the scope of duration;Pushing module is used in the pre- production time of the sow be the scheduled duration range fallen into relative to current time When interior, the childbirth task of the sow is pushed.
The management system of the Farrowing task of the application embodiment includes processor, and the processor is used for: judgement Whether the sow has been transferred to childbirth space;If so, judge the pre- production time of the sow whether fall into relative to it is current when Between scheduled duration within the scope of;And if so, push the childbirth task of the sow.
In some embodiments, the processor is also used to: according to default trigger action to start the childbirth task.
In some embodiments, the processor is also used to: obtaining the information currently with the field of sow binding; Obtain the information for the piglet that the Farrowing obtains;And the information of the binding field and the piglet.
In some embodiments, the field is configured with pre-bound release and/or feeding instrument, the management system It further include information acquisition device, the information acquisition device is for scanning the release and/or the feeding instrument to acquire the column The information of position;The processor is used to obtain the information of the collected field of the information acquisition device.
In some embodiments, the management system further includes weighing instrument, and the weighing instrument is for acquiring the piglet Weight;The processor is used to obtain the weight of the piglet of the weighing instrument acquisition.
In some embodiments, the management system further includes message recipient, and the message recipient is for receiving User input the piglet information, the information of the piglet include the quantity of the piglet, the piglet survive number, institute State one or more of the death toll of piglet;The processor is for obtaining the received piglet of the message recipient Information.
In some embodiments, the childbirth task includes the multiple tasks node generated according to predesigned order, described When processor is also used to judge to enter next task node, whether current task node is completed;The management system further includes Prompting device, the prompting device be used for enter next task node, and current task node do not complete when, push current task not The prompt information of completion.
In the management method of the Farrowing task of the application embodiment, managing device and management system, in sow quilt Be transferred to childbirth space, and it is pre- produce the time relative to current time within the scope of scheduled duration when, push the childbirth task of sow, User scheduled duration can receive childbirth task before the pre- production time of sow, do not need manpower memory execute childbirth task when Between, it avoids cannot get due help when Farrowing, and the information of piglet can be understood in time, during avoiding Farrowing Sow or piglet are lost, breeding efficiency is improved.
The additional aspect and advantage of the application will be set forth in part in the description, and will partially become from the following description It obtains obviously, or recognized by the practice of the application.
Detailed description of the invention
The application is above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Obviously and it is readily appreciated that, in which:
Fig. 1 is the flow diagram of the childbirth task management method of the sow of the application certain embodiments;
Fig. 2 and Fig. 3 is the structural schematic diagram of the childbirth task management system of the sow of the application certain embodiments;
Fig. 4 is the module diagram of the childbirth task management device of the sow of the application certain embodiments;
Fig. 5 is the schematic diagram of a scenario of the childbirth task management method of the sow of the application certain embodiments;
Fig. 6 is the flow diagram of the childbirth task management method of the sow of the application certain embodiments;
Fig. 7 is the module diagram of the childbirth task management device of the sow of the application certain embodiments;
Fig. 8 is the schematic diagram of a scenario of the childbirth task management method of the sow of the application certain embodiments;
Fig. 9 is the flow diagram of the childbirth task management method of the sow of the application certain embodiments;
Figure 10 is the module diagram of the childbirth task management device of the sow of the application certain embodiments;
Figure 11 to Figure 13 is the schematic diagram of a scenario of the childbirth task management method of the sow of the application certain embodiments;
Figure 14 is the flow diagram of the childbirth task management method of the sow of the application certain embodiments;
Figure 15 is the module diagram of the childbirth task management device of the sow of the application certain embodiments;
Figure 16 is the schematic diagram of a scenario of the childbirth task management method of the sow of the application certain embodiments;
Figure 17 is the flow diagram of the childbirth task management method of the sow of the application certain embodiments;
Figure 18 is the schematic diagram of a scenario of the childbirth task management method of the sow of the application certain embodiments.
Specific embodiment
Embodiments herein is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the application, and should not be understood as the limitation to the application.
Referring to Fig. 1, the application embodiment provides a kind of management method of Farrowing task.Management method includes step It is rapid:
01: judging whether sow has been transferred to childbirth space;
02: if so, judging whether the pre- production time of sow falls within the scope of the scheduled duration relative to current time;And
03: if so, the childbirth task of push sow.
Please refer to figs. 2 and 3, and the application embodiment also provides a kind of management system 10 of Farrowing task.Management System 10 includes processor 13.The management system 10 of the application embodiment can be used for implementing the manager of the application embodiment Method.Specifically, processor 13 can be used for implementing above-mentioned steps 01,02 and 03, that is, whether processor 13 can be used for judging sow It is transferred to childbirth space;If so, judging whether the pre- production time of sow falls within the scope of the scheduled duration relative to current time; And if so, push the childbirth task of sow.
Referring to Fig. 4, the application embodiment also provides a kind of managing device 20 of Farrowing task.Managing device 20 Including first judgment module 21, the second judgment module 22 and the first pushing module 23.The managing device 20 of the application embodiment It can be used for implementing the management method of the application embodiment.Specifically, first judgment module 21 can be used for implementation steps 01, that is, First judgment module 21 can be used for judging whether sow has been transferred to childbirth space;Second judgment module 22 can be used for implementation steps 02, that is, the second judgment module 22 can be used for judging whether the pre- production time of sow falls into when sow has been transferred to childbirth space Relative within the scope of the scheduled duration of current time.First pushing module 23 can be used for implementation steps 03, that is, the first pushing module 23 childbirths that can be used for pushing sow when falling within the scope of the scheduled duration relative to current time the pre- production time of sow are appointed Business.
In the management method of the Farrowing task of the application embodiment, management system 10 and managing device 20, in mother Pig is transferred to childbirth space, and it is pre- produce the time relative to current time within the scope of scheduled duration when, push the childbirth of sow Task, user scheduled duration can receive childbirth task before the pre- production time of sow, do not need manpower memory and execute childbirth times The time of business avoids cannot get due help when Farrowing, and can understand the information of piglet in time, avoids Farrowing Sow or piglet are lost in the process, improve breeding efficiency.
It is appreciated that judging whether sow needs to give a birth after breeding pregnancy at present, mainly pass through manual record sow Breeding time, and the pre- production time of sow is empirically calculated, sow is more paid close attention to when sow is soon given a birth, with The case where convenient for providing necessary help or in time record piglet in Farrowing.If do not had when Farrowing artificial It helps, when sow encounters emergency case (such as difficult labour etc.) in childbirth, the health of sow and piglet will be on the hazard, and thin and weak Piglet birth after if without manually helping, survival rate can also reduce.Thus it is guaranteed that have artificial nurse when Farrowing, it is right It is of great significance in the loss for reducing sow and piglet.
In the management system 10 of the application embodiment, processor 13 first judges whether sow has been transferred to childbirth space, It specifically can be by judging whether user is completed the task that sow is transferred to childbirth space of the push of management system 10, childbirth Space can be can provide the field of preferably childbirth condition, for example, obstetric table for sow.Usual sow is empty in suitable childbirth Interior cultivation a period of time (such as 4 to 7 days) could have preferable body to prepare to give a birth, and have in space of giving a birth Sufficiently large space avoids sow from weighing piglet wounded to accommodate sow and piglet.Therefore, in order to ensure Farrowing smoothly into Row, the premise of push childbirth task are that sow has been transferred to childbirth space.If processor 13 judges that sow is not transferred to childbirth Space, processor 13 can first judge whether the number of days of sow pregnancy reaches the condition that sow is transferred to childbirth space, If can reach, processor 13 can first push the task that sow is transferred to childbirth space.
Processor 13 judges whether the pre- production time of sow falls within the scope of the scheduled duration relative to current time again.Its In, the pig information of the pre- production basis of time sow of sow and pregnant information obtain, it will be understood that the physiology week of different sows Phase, the development condition of different sows, same sow may influence to produce the time in advance in health status of different times etc., wherein Pig information may include the kind of sow, the age in days of sow, sow the information such as weight.Pregnant information may include sow The information such as the number of the accumulative pregnancy of breeding time, sow.In one example, producing the time in advance can phase with the breeding successful time Every 110 to 120 days, such as 110 days, 114 days, 115 days, 117 days, 120 days etc..Scheduled duration range can be two days, one day, The durations ranges such as half a day, ten hours, five hours, three hours push childbirth task before producing the time in advance, to avoid user Childbirth task cannot be received in a short time and miss the opportunity of Farrowing.
Processor 13 is when falling within the scope of the scheduled duration relative to current time the pre- production time for judging sow, processing The childbirth task of the push sow of device 13.Such as the pre- production time is Tuesday this week, current time is Monday, and duration range is one day, Then think that the pre- production time of sow falls within the scope of the scheduled duration relative to current time, the childbirth for needing to push sow is appointed Business.Childbirth task can be pushed to the equipment connecting with processor 13 or element by processor 13, such as processor 13 is to aobvious Display screen pushes childbirth task, and display screen shows that the childbirth task or processor 13 push childbirth task, language to speech player Sound player plays the childbirth task dispatching.User can then know the shape for needing to pay close attention to the sow by the childbirth task of push Condition provides the opportunity of necessary help in Farrowing to avoid missing.In addition, when judging that the pre- production time of sow does not fall within When relative within the scope of the scheduled duration of current time, processor 13 can not push the childbirth task of sow, not need at this time It pays close attention to whether the sow is giving a birth, saves human resources.
Example as shown in Figure 2 is two different views of management system 10.Management system 10 can be a terminal, pipe Processor 13 and multiple functions device are integrated in reason system 10, function element for example can be display screen, camera etc..Management System 10 can be mobile phone, tablet computer, a laptop etc., and user can manage Farrowing by management system 10 Task.
In example shown in Fig. 3, the processor 13 of management system 10 can be the server in setting beyond the clouds, processor 13 connect with multiple terminal scattering devices and being in communication with each other.User obtains the phases such as pig information, pregnant information by multiple terminals Be sent to processor 13 after closing information, after processor 13 handles these information, the information that can send that treated to terminal or It sends and instructs to terminal.
In one example, incorporated by reference to Fig. 5, the childbirth task that processor 13 pushes can be shown by task icons P1 Come, user can check by clicking task icons P1 or further start corresponding childbirth task.
Referring to Fig. 6, in some embodiments, management method further comprises the steps of: 04: according to default trigger action to open Beginning childbirth task.
Please refer to figs. 2 and 3, and in some embodiments, processor 13 can be used for implementation steps 04, that is, processor 13 It can be used for according to default trigger action to start childbirth task.
Referring to Fig. 7, in some embodiments, managing device 20 further includes trigger module 24, trigger module 24 can be used In implementation steps 04, that is, trigger module 24 can be used for according to default trigger action to start childbirth task.
Trigger action can be the operation of user's touch-control specific region, can be the operation that user inputs special sound information And any other operation.User could start childbirth task by trigger action, to avoid childbirth task by false triggering.
Incorporated by reference to Fig. 5 and Fig. 8, in one example, trigger action can be the childbirth shown in fig. 5 of the successive touch-control of user and appoint Be engaged in icon P1, " entrance " icon P2 shown in fig. 5 and beginning icon P3 shown in Fig. 8.After user clicks " entrance " icon P2, Fig. 8 will show childbirth task multiple tasks node, multiple tasks node may include start, registration, summarize in one or It is multiple.After user has clicked beginning icon P3, it is considered as user and inputs trigger action completion, processor 13 starts childbirth task.
Referring to Fig. 9, in some embodiments, management method further comprises the steps of:
05: obtaining the information currently with the field of sow binding;
06: obtaining the information for the piglet that Farrowing obtains;And
07: the information of binding field and piglet.
Please refer to figs. 2 and 3, and in some embodiments, processor 13 can be used for implementation steps 05,06 and 07, that is, place Reason device 13 can also be used to obtain the information of the piglet currently obtained with the information of the field of sow binding, acquisition Farrowing and tie up Determine the information of field and piglet.
Referring to Fig. 10, in some embodiments, managing device 20 further includes that the first acquisition module 25, second obtains mould Block 26 and processing module 27.First acquisition module 25 can be used for implementation steps 05, that is, the first acquisition module 25, which can be used for obtaining, to be worked as The preceding information with the field of sow binding.Second acquisition module 26 can be used for implementation steps 06, that is, the second acquisition module 26 can be used In the information for obtaining the piglet that Farrowing obtains.Processing module 27 can be used for implementation steps 07, that is, processing module 27 can be used for Bind the information of field and piglet.
It is appreciated that user needs the information by Farrowing piglet to upload to management system 10, and the result of the childbirth Preferably bound with field and sow, it, can be to each column in order to intelligent management, such as after user obtains the information of piglet The piglet quantity of position carries out redistribution, each sow of association and bearing capacity in order to which subsequent screening sow, the every nest of understanding are young The quantity of pig is the employee such as to examine.Therefore, it is necessary to which the information of piglet is bound with field, be also convenient for subsequently through The information searching of sow is to field and the information of piglet, or by the information of the information searching of field to sow and piglet, or Person, to sow and the information of field, is convenient for aquaculture management by the information searching of piglet.
It is appreciated that in the actual implementation process, step 05 can be carried out completion prior to step 06, and step 06 can also be with It is carried out completion prior to step 05, step 05 can also be carried out completion simultaneously with step 06.
In some embodiments, each field includes step configured with pre-bound release and/or feeding instrument, step 05 Rapid 051: scanning information card and/or feeding instrument are to obtain the information of field.
Please refer to figs. 2 and 3, and in some embodiments, management system 10 may include information acquisition device 11.Information collection Device 11 and processor 13 can be used for common implementing step 051, that is, information acquisition device 11 can be with scanning information card and/or feeding instrument To acquire the information of field, processor 13 can be used for obtaining the information of the collected field of information acquisition device 11.
Referring to Fig. 10, in some embodiments, the first acquisition module 25 can be used for implementation steps 051, that is, first obtains Modulus block 25 can be used for scanning information card and/or feed instrument to obtain the information of field.
Specifically, release can be the card of entity, such as the card made of the materials such as plastics, foam, metal, letter Breath card can be fixed on field, could be formed with the patterns such as specific pattern, such as two dimensional code, bar code on release.Letter Breath card is also possible to be formed with the patterns such as the graphical interfaces, such as two dimensional code, bar code of specific pattern, at this point, release can It is stored in managing device 20 or management system 10, also can store in other electronic equipments, such as in computer.Feed instrument It can be and be fixed on around field, for feeding the instrument of pig, in one example, feeding instrument can be essence and feed instrument, and essence is fed Instrument can automatically control nursing time and quantity according to the demand of pig.Specific pattern can be configured on each feeding instrument, Such as two dimensional code or bar code etc..At this point, information acquisition device 11 can be the camera (as shown in Figure 2) of terminal, information collection Device 11 is also possible to the terminal (as shown in Figure 3) with camera.Camera can be by scanning information card and/or feeding instrument to adopt Collect the information of field.The information of the collected field of information acquisition device 11 can be sent to processor 13, and processor 13 receives should The information of the collected field of information acquisition device 11.
Incorporated by reference to Figure 11 and Figure 12, in one example, after user clicks the registration icon P4 in Figure 11, information acquisition device 11 open, and the processing interface for task of giving a birth jumps as interface shown in Figure 12, and information acquisition device 11 can be scanned to be placed on and be swept The specific pattern on the release in frame P5 is retouched, to acquire the information of field.
Certainly, in other embodiments, the concrete form of information acquisition device 11 is not limited to the camera of the example above, information Collector 11 is also possible to the devices such as touch screen, and information acquisition device 11 acquires the coding etc. for the field that user inputs on touch screen Information is simultaneously transferred to processor 13.
In some embodiments, step 06 includes step 061: obtaining the weight of the piglet of weighing instrument acquisition.
Please refer to figs. 2 and 3, and in some embodiments, management system 10 further includes weighing instrument, and weighing instrument can be used for adopting Collect the weight of piglet, processor 13 can be used for implementation steps 061, that is, processor 13 can be used for obtaining the piglet of weighing instrument acquisition Weight.
Referring to Fig. 10, in some embodiments, the second acquisition module 26 can be used for implementation steps 061, that is, second obtains Modulus block 26 can be used for obtaining the weight of the piglet of weighing instrument acquisition.
By the weight for obtaining piglet, it can be realized that the physical condition of piglet, to adjust the nursing to piglet and sow Strategy, such as the weight of weaker piglet (weak son) can be relatively light, when the quantity of weak son is more, can increase the feeding to sow It measures so that sow milk abundance, meets needed for piglet development.
Processor 13 can be communicated to connect with weighing instrument in advance, such as be communicated to connect by bluetooth, wifi etc., and piglet is going out After life, user can make piglet pass through weighing instrument butt and butt, and the weight of weighing instrument automatic collection piglet is simultaneously in this process It is automatically transmitted to processor 13, is registered manually without user, the timeliness and accuracy for executing childbirth task are improved.
In some embodiments, step 06 includes step 062: obtain the quantity of piglet of user's input, piglet at One or more of work number, death toll of piglet.
Please refer to figs. 2 and 3, and in some embodiments, management system 10 further includes message recipient 14, and information receives Device 14 and processor 13 can be used for common implementing step 062, that is, message recipient 14 can be used for receiving the piglet of user's input Information, the information of piglet include that the quantity of piglet, piglet survive number, one or more of death toll of piglet, processor 13 can be used for obtaining the information of the received piglet of message recipient 14.
Referring to Fig. 10, in some embodiments, the second acquisition module 26 can be used for implementation steps 062, that is, second obtains Modulus block 26 can be used for obtaining one or more survived in several, piglet death toll of the quantity of the piglet of user's input, piglet It is a.
The quantity of piglet, several, piglet the death toll that survives of piglet can be used for understanding the fecundity of sow, breeding times The information such as the quality of the previous tasks performances such as business, the quantity of piglet for needing to breast-feed, post piglet in order to subsequent It supports, the feeding scheme of sow be adjusted and to management works such as the examinations of employee.Message recipient 14 can be touch-control Screen etc., user can by touch screen touch-control to input the information of piglet.
Incorporated by reference to Figure 12 and Figure 13, in one example, user is placed on the release in scan box P5 by scanning Specific pattern, and after acquiring the information of field, childbirth task processing interface can be jumped as interface as shown in fig. 13 that, user Above-mentioned data can be inputted in the input frame P7 of the manual registration page P6 of pop-up, such as input young number living, weak young number, total The information such as litter weight, nest counterpoise, stillborn foetus number, mummy number.
Figure 14 is please referred to, in some embodiments, childbirth task includes the multiple tasks section arranged according to predesigned order Point, management method further comprise the steps of:
08: when judgement enters next task node, whether current task node is completed;And
09: if it is not, then pushing the unfinished prompt information of current task.
Please refer to figs. 2 and 3, and in some embodiments, childbirth task includes multiple according to predesigned order arrangement Business node, management system 10 further includes prompting device 14.Processor 13 can be used for implementation steps 08, that is, processor 13 can be used for sentencing When the next task node of disconnected entrance, whether current task node is completed.Prompting device 14 can be used for implementation steps 09, that is, prompt Device 14 can be used for when entering next task node and current task node does not complete, the unfinished prompt letter of push current task Breath.
Figure 15 is please referred to, in some embodiments, childbirth task includes the multiple tasks section arranged according to predesigned order Point, managing device 20 further include third judgment module 28 and the second pushing module 29.Third judgment module 28 can be used for implementing walking Rapid 08, that is, when third judgment module 28 can be used for judging entering next task node, whether current task node is completed.The Two pushing modules 29 can be used for implementation steps 09, that is, the second pushing module 29 can be used for into next task node and currently When task node does not complete, the unfinished prompt information of push current task.
Multiple tasks node is arranged according to predesigned order, which can be practical according to childbirth task for processor 13 The factors such as operation ease when execution are set.When current task node does not complete, it may be possible to which current task node needs The data of acquisition be not fully retrieved or current task node there are also subtask node do not complete, if under entering at this moment One task node, may result in can not execute subsequent task node, or pig information is caused to be lost.Therefore, entering When next task node and unfinished current task node, prompt information is pushed, avoids childbirth task that from can not executing or execute There is shortage of data after the completion.Prompting device 14 specifically can be the devices such as display, loudspeaker, and prompt information can be mentioning for display Show window, suggestion voice of sending etc..
Incorporated by reference to Figure 12 and Figure 16, in one example, when user does not complete registration task, and click as total in Figure 12 When knot icon P8 is intended to enter the task node summarized, prompting device 14 issues prompting frame P9 as shown in figure 16, to prompt on user One node does not complete.
Figure 17 is please referred to, in some embodiments, the childbirth task management method of sow further include:
011: when executing current task node, if receiving preset pause instruction, suspending and execute childbirth task.
Please refer to figs. 2 and 3, and in some embodiments, step 011 can also be realized by processor 13.In other words, Processor 13 can also be used in when executing current task node, if receiving preset pause instruction, suspends execution childbirth and appoints Business.
Referring to Fig. 7, in some embodiments, trigger module 24 can be used for implementation steps 011, that is, trigger module 24 It can be used for when executing current task node, if receiving preset pause instruction, suspend and execute childbirth task.
Specifically, in one example, management system 10 further includes timer, and timer can entirely holding to childbirth task Row process carries out timing, i.e., when user clicks beginning icon P3 (as shown in Figure 8), timer starts timing, clicks in user When summarizing icon P8 (as shown in figure 12), timer stops timing, when the timing time of timer is the execution of childbirth task Between, processor 13 can read the timing time from timer.In another example, processor 13 can calculate execution The duration used of childbirth task, i.e., at the time of user clicks beginning icon P3, processor 13 records this practical start time System time, user click summarize icon P8 at the time of, processor 13 records the system time of this practical cut-off time, Processor 13 is calculated according to the time difference between the system time and the system time of practical cut-off time of practical start time and is held The duration used of row childbirth task.In this way, management system 10 in the implementation procedure of childbirth task, if encountering emergency situations, is used Family can click pause icon P10 (as shown in FIG. 11 and 12) to suspend the execution of childbirth task, at this point, user clicks pause The movement of icon P10 be considered as user input preset pause instruction, timer times timing (or processor 13 record The system time of this intermediate cut-off time).User again tap on pause icon P10 after, timer continue timing, and with Family, which is clicked, to stop timing (or processor 13 records this to obtain executing the duration used of childbirth task when summarizing icon P8 The system time of intermediate initial time, the system time of record practical cut-off time when user clicks and summarizes icon P8, and root The factually system time of border initial time, the system time of intermediate initial time, the system time and reality of intermediate cut-off time The system time of border cut-off time calculates the duration used for executing childbirth task).In this way, available arrive executes childbirth task Really execute duration.
Certainly, in other embodiments, preset pause instruction can be other, such as user inputs phonetic order etc., This is not restricted.
In some embodiments, management method further includes 012: after executing summary task node, delivering and appoints to childbirth Be engaged in performance evaluation, according to user input to execute task summary and user in the feedback of system operability extremely Few one or more.
Please refer to figs. 2 and 3, and in some embodiments, processor 13 can be used for implementation steps 012, that is, processor 13 It can also be used in after executing summary task node, deliver the evaluation to childbirth task performance, inputted according to user to specified The summary of task and user are at least one of feedback of system operability or multiple.Wherein, user's input can be voice Typing or text input.
In some embodiments, managing device further includes summarizing module.Summarizing module can be used for implementation steps 012, that is, Summarizing module can be used for after executing summary task node, delivers the evaluation to childbirth task performance, is inputted according to user Summary and user to the task of execution is at least one of feedback of system operability or multiple.
Specifically, incorporated by reference to Figure 18, after user clicks and summarizes icon P8, childbirth task processing interface can be shown including hair Table is inputted to the summary of the task of execution and user to the evaluation of childbirth task performance, according to user to system operability At least one of feedback or multiple processing block P11.
Wherein, it delivers and management system 10, which executes childbirth task to user, to be referred to the evaluation of childbirth task performance Evaluation.The foundation of evaluation includes at least one of the following: executing the duration used of childbirth task, the completeness for task of giving a birth (for example, data integrity degree etc. that each task node obtains when whether having execution, executing each task node).Evaluation can To be shown in the form of task score, for example, 100 points, 95 points, 80 points, 60 points, 40 points, 0 point etc., it can also be into one The specific evaluation of step display, for example 100 points of specific evaluation is " Good job ", 40 points of specific evaluation is " not complete ' registration ' Task node ", i.e., for may indicate that the defects of task execution process place etc. in the evaluation for not the obtaining full marks of the task. Management system 10 can be by a little evaluations as the performance assessment criteria of employee KPI, and form quantization after doing analysis processing to these evaluations KPI as a result, and shown with intuitive way, facilitate management of the enterprise to employee.
Refer to that gains in depth of comprehension, experience after user executes this subtask etc. are believed to summarys of appointed task according to user's input Breath.What user can be summarized by way of being manually entered or voice inputs fills in, and processor 13 is inputted according to user and controlled Display screen processed shows the summary content of user.Management system 10 can will store the summary of the appointed task, for other Employee, especially new employee check, analyze and learn, and are conducive to the sharing and succession of experience.
User refers to evaluation of the user to system, such as the convenience of the operation to system to the feedback of system operability Property, the integrality of task node, interface aesthetics etc. evaluation.By taking the convenience of the operation of system as an example, interface can be shown Show the icons such as " facilitating handy ", " general ", " very poor " for selection by the user, a box can also be shown for user's input pair The improved suggestion of management system 10.Management system 10 can store these to the evaluation of system, check for developer, To be improved and be improved to for management system 10.
Although presently filed embodiment has been shown and described above, it is to be understood that above embodiment is Illustratively, it should not be understood as the limitation to the application, those skilled in the art within the scope of application can be right Above embodiment is changed, modifies, replacement and variant.

Claims (14)

1. a kind of management method of Farrowing task characterized by comprising
Judge whether the sow has been transferred to childbirth space;
If so, judging whether the pre- production time of the sow falls within the scope of the scheduled duration relative to current time;And
If so, pushing the childbirth task of the sow.
2. management method according to claim 1, which is characterized in that the management method further include:
According to default trigger action to start the childbirth task.
3. management method according to claim 2, which is characterized in that the management method further include:
Obtain the information currently with the field of sow binding;
Obtain the information for the piglet that the Farrowing obtains;And
Bind the information of the field Yu the piglet.
4. management method according to claim 3, which is characterized in that the field configured with pre-bound release and/ Or feeding instrument, the information for the field that the acquisition is currently bound with the sow, comprising:
The release and/or the feeding instrument are scanned to obtain the information of the field.
5. management method according to claim 3, which is characterized in that the piglet that the acquisition Farrowing obtains Information, comprising:
Obtain the weight of the piglet of weighing instrument acquisition;And/or
Obtain the quantity of the piglet of user's input, the piglet survive number, the piglets death toll in one or It is multiple.
6. management method according to claim 2, which is characterized in that the childbirth task includes generating according to predesigned order Multiple tasks node, the management method further include:
When judgement enters next task node, whether current task node is completed;And
If it is not, the prompt information that push current task is unfinished.
7. a kind of managing device of Farrowing task, which is characterized in that the managing device includes:
First judgment module, for judging whether the sow has been transferred to childbirth space;
Second judgment module, for the sow have been transferred to childbirth space after, judge the sow the pre- production time whether It falls within the scope of the scheduled duration relative to current time;And
Pushing module, for when the pre- production time of the sow is fallen within the scope of the scheduled duration relative to current time, Push the childbirth task of the sow.
8. a kind of management system of Farrowing task, which is characterized in that including processor, the processor is used for:
Judge whether the sow has been transferred to childbirth space;
If so, judging whether the pre- production time of the sow falls within the scope of the scheduled duration relative to current time;And
If so, pushing the childbirth task of the sow.
9. management system according to claim 8, which is characterized in that the processor is also used to:
According to default trigger action to start the childbirth task.
10. management system according to claim 9, which is characterized in that the processor is also used to:
Obtain the information currently with the field of sow binding;
Obtain the information for the piglet that the Farrowing obtains;And
Bind the information of the field Yu the piglet.
11. management system according to claim 10, which is characterized in that the field is configured with pre-bound release And/or feeding instrument, the management system further includes information acquisition device, the information acquisition device for scan the release and/ Or the feeding instrument is to acquire the information of the field;
The processor is used to obtain the information of the collected field of the information acquisition device.
12. management system according to claim 10, which is characterized in that the management system further includes weighing instrument, described Weighing instrument is used to acquire the weight of the piglet;
The processor is used to obtain the weight of the piglet of the weighing instrument acquisition.
13. management system according to claim 10, which is characterized in that the management system further includes message recipient, The message recipient is used to receive the information of the piglet of user's input, and the information of the piglet includes the number of the piglet One or more of amount, death toll for surviving several, described piglets of the piglet;
The processor is used to obtain the information of the received piglet of the message recipient.
14. management system according to claim 9, which is characterized in that the childbirth task includes raw according to predesigned order At multiple tasks node, the processor be also used to judge enter next task node when, whether current task node complete At;
The management system further includes prompting device, and the prompting device is used to enter next task node, and current task node When not completing, the unfinished prompt information of push current task.
CN201910104567.6A 2019-02-01 2019-02-01 Management method, managing device and the management system of Farrowing task Pending CN109919575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910104567.6A CN109919575A (en) 2019-02-01 2019-02-01 Management method, managing device and the management system of Farrowing task

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910104567.6A CN109919575A (en) 2019-02-01 2019-02-01 Management method, managing device and the management system of Farrowing task

Publications (1)

Publication Number Publication Date
CN109919575A true CN109919575A (en) 2019-06-21

Family

ID=66961309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910104567.6A Pending CN109919575A (en) 2019-02-01 2019-02-01 Management method, managing device and the management system of Farrowing task

Country Status (1)

Country Link
CN (1) CN109919575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111165430A (en) * 2020-03-13 2020-05-19 高圣玥 Peak shifting breeding method for pigs under big data based on wireless network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5293834A (en) * 1992-12-21 1994-03-15 Eastern Iowa Pork Manufacturing, Inc. Hog farrowing crate and pen
CN203490580U (en) * 2013-07-05 2014-03-19 天津市泰康饲料厂 Estimating disc for pregnant sow
US20160022713A1 (en) * 2013-03-15 2016-01-28 Huiru Wang Compositions and Products for Infectious or Inflammatory Diseases or Conditions
CN107535715A (en) * 2017-10-16 2018-01-05 六安恒佳生物科技有限公司 A kind of Chinese herbal feed additive for preventing Sow abortion stillborn foetus and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5293834A (en) * 1992-12-21 1994-03-15 Eastern Iowa Pork Manufacturing, Inc. Hog farrowing crate and pen
US20160022713A1 (en) * 2013-03-15 2016-01-28 Huiru Wang Compositions and Products for Infectious or Inflammatory Diseases or Conditions
CN203490580U (en) * 2013-07-05 2014-03-19 天津市泰康饲料厂 Estimating disc for pregnant sow
CN107535715A (en) * 2017-10-16 2018-01-05 六安恒佳生物科技有限公司 A kind of Chinese herbal feed additive for preventing Sow abortion stillborn foetus and preparation method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王齐奖等: "规模猪场分娩母猪的饲养管理关键技术", 《中国畜禽种业》 *
赵培杰等: "智能化母猪养殖管理系统设计", 《家畜生态学报》 *
非凡软件站: "宏达猪场管理系统 v1.0 普及版", 《HTTPS://WWW.CRSKY.COM/SOFT/104800.HTML》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111165430A (en) * 2020-03-13 2020-05-19 高圣玥 Peak shifting breeding method for pigs under big data based on wireless network
CN111165430B (en) * 2020-03-13 2022-07-01 高圣玥 Peak shifting breeding method for pigs under big data based on wireless network

Similar Documents

Publication Publication Date Title
RU2675511C2 (en) System, method and feeding device for remote pet monitoring and feeding
CN109618961A (en) A kind of intelligence of domestic animal feeds system and method
WO2006076513A2 (en) Systems and methods for collecting and managing animal-related information
KR101705131B1 (en) Method for providing fishing tournament management service
CN109710665A (en) Report downloading method, apparatus, equipment and readable storage medium storing program for executing
CN109902950A (en) Management method, management equipment and the managing device of cultivation task
CN106203694A (en) Place crowding forecast model foundation, place crowding Forecasting Methodology and device
TW201541396A (en) Information processing device, information processing method, program, and recording medium
CN109919575A (en) Management method, managing device and the management system of Farrowing task
CN109447662A (en) A kind of cultivation monitoring method and system
CN109961371A (en) Management system for breeding
CN109658015A (en) Cultivate task management method, managing device, management equipment and management system
CN109886566A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109685679A (en) Management method, managing device and the management system of sow wean task
JP7286207B1 (en) Livestock breeding management device, livestock breeding management system, livestock breeding management method, and livestock breeding management program
CN109919467A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109691398A (en) Management method, managing device and the management system of the back fat measurement task of pig
CN109906965A (en) Sow looks into the management method, managing device and management system for returning feelings task
CN109872068A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109858881A (en) Management method, managing device and the management system of the immune task of material culture
EP2797056A1 (en) Arrangement for processing data of sport animals
WO2021157663A1 (en) Livestock information management system, livestock information management server, livestock information management method, livestock information management program, and data structure for livestock information management
CN109919457A (en) Cultivate task management method and device, cultivation task management equipment and system
CN109902946A (en) Cultivate task management method, managing device, management equipment and management system
CN109658072A (en) Management method, managing device and the management system of sow production task

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621