CN109918803A - The flat real-time linkage design method in length and breadth of rail track - Google Patents

The flat real-time linkage design method in length and breadth of rail track Download PDF

Info

Publication number
CN109918803A
CN109918803A CN201910188637.0A CN201910188637A CN109918803A CN 109918803 A CN109918803 A CN 109918803A CN 201910188637 A CN201910188637 A CN 201910188637A CN 109918803 A CN109918803 A CN 109918803A
Authority
CN
China
Prior art keywords
length
breadth
flat
viewport
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910188637.0A
Other languages
Chinese (zh)
Inventor
孔国梁
李顶峰
豆聚文
史艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN201910188637.0A priority Critical patent/CN109918803A/en
Publication of CN109918803A publication Critical patent/CN109918803A/en
Pending legal-status Critical Current

Links

Landscapes

  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a kind of flat real-time linkage design methods in length and breadth of rail track, technical step includes: creation digital terrain model (S1), open item file and auto-initiation digital terrain model (S2), flat design basic parameter (S3) in length and breadth of rail track is set, create flat viewport (S4) in length and breadth of Alignment Design of Railway Line, create flat entity management dictionary (S5) in length and breadth of rail track, interactive floor design (S6) in plane viewport, vertical alignment design (S7) is automated in vertical section viewport, cross-sectional design (S8) is automated in the viewport of cross section, flat real-time linkage formula editorial optimization (S9) in length and breadth of Decision Making of Line Schemes, flat achievement in length and breadth presses mileage simultaneous display and dynamic view (S10), flat achievement in length and breadth is at figure and table (S11) out.Interactive, vertical section cross section the Automation Design that the method achieve Plane Railways and flat scheme real-time collaborative in length and breadth quickly adjust function, design process high degree of automation, it is practical, design efficiency and quality of achievement can be greatly improved, there is apparent application value.

Description

The flat real-time linkage design method in length and breadth of rail track
Technical field
The present invention relates to rail track flat design methods, the in particular to flat real-time linkage in length and breadth of Methods of Railway Location Schemes in length and breadth Fast design method.
Background technique
The flat, vertical, horizontal design process of traditional rail track is first to carry out planar design, is then saved in panel data Database cuts out vertical section ground line further according to database and digital-to-analogue file, then completes profile grade design, and in vertical section Then upper setting bridge tunnel more new database and updates flat bridge tunnel etc. again, finally according to plane vertical section result of design, creates roadbed Cross-sectional design database completes cross-sectional design.The problem is that: flat design process in length and breadth, which lacks, directly to be contacted, at this It can not accomplish flat Real Time Collaborative Design in length and breadth in matter;Under route selection hard situation, as land used range is hindered by plane is hidden in limited time Hinder, across vertical control point, need to compare the flat vertical scheme of optimization repeatedly, learns Decision Making of Line Schemes to code requirement, flat vertical control in real time System point meets situation etc., and operated in accordance with conventional methods is relatively cumbersome at present, and the degree of automation is low, and every successive step can not be looked into intuitively in real time See adjustment effect, efficiency is relatively low, manual operation heavy workload.
Summary of the invention
The flat design in length and breadth of traditional rail track there are aiming at the problem that, the present invention proposes that a kind of completely new rail track is flat Real-time linkage design method in length and breadth, by creating digital terrain model, opening item file and auto-initiation digitally face mould Type, setting rail track put down design basic parameter, the flat viewport in length and breadth of creation Alignment Design of Railway Line, creation rail track in length and breadth and put down and indulge The interior automation vertical alignment design of interactive floor design, vertical section viewport, cross section view in horizontal entity management dictionary, plane viewport The flat real-time linkage formula editorial optimization in length and breadth of automation cross-sectional design, Decision Making of Line Schemes, flat achievement in length and breadth are synchronized aobvious by mileage in mouthful Show and dynamic view, flat achievement in length and breadth are at figure and table out, realizes that Plane Railway is interactive, the automation of vertical section cross section Design and flat scheme real-time collaborative in length and breadth quickly adjust function, are adapted to the flat design quick in length and breadth of each grade Decision Making of Line Schemes.
The flat real-time linkage design method in length and breadth of rail track according to the present invention, it is characterised in that this method includes following Step:
S1, creation digital terrain model
Creation digital terrain model be according to mapping specialty provide three-dimensional land map on contour, landform point data, The Triangular Grid Model of creation is to first pass through the data for extracting contour, topographic(al) point figure layer, forms the number of dat format According to file, then thus four kinds of files of Generating Data File again: the index file of dex, the elevation file of dtm format, tin format Triangulation network file, top format topological file, these file consolidations are placed under DTM file.
S2, item file and auto-initiation digital terrain model are opened
It opens item file and auto-initiation digital terrain model is first to create a dwg file to put down as rail track Then the item file designed in length and breadth comes in corresponding topographic map file references, later when opening this item file, automatically Retrieve the topographic map filename of reference, and digital terrain model initialized with this filename, with obtain at any time track profile, Cross section ground elevation information, this destructed digital terrain model object when the item file is closed.The project of this dwg format File is put together with DTM file, so as to automatically obtain digital-to-analogue path go forward side by side line number mould initialization.
S3, setting rail track put down and design basic parameter in length and breadth
It is the catalogue where item file, configuration parameter file that the flat basic parameter of design in length and breadth of rail track, which is arranged, comprising: Minimum length of grade, maximum upward slope, maximum downslope, ruling grade algebraic step, the minimum grade algebraic step for setting vertical curve, vertical curve half Diameter, compensation of gradient, the critical raising for setting bridge, the critical digging for setting tunnel are deep, level ground of stand limits slope, length of station site, width of the subgrade surface, at different levels Slope height and ratio of slope.The purpose that this file is arranged is write from memory automatically according to this basic parameter when route is put down and designed in length and breadth Recognize design, increase the degree of automation, reduces user and interactively enter, improve design efficiency.
S4, the flat viewport in length and breadth of creation Alignment Design of Railway Line
The flat viewport in length and breadth of creation Alignment Design of Railway Line is that three viewports are created in current project file as rail track The flat viewport designed in length and breadth, plane viewport above, display plane line position custom entities;Vertical section viewport is in lower section, display Vertical section custom entities;Cross section viewport is arranged successively line position cross section custom entities on right side from bottom to top;It puts down in length and breadth The size of viewport can be customized by users adjustment.
S5, the flat entity management dictionary in length and breadth of creation rail track
The flat entity management dictionary in length and breadth of creation rail track is to create type first in item file as famous object dictionary Plane dictionary, vertical section dictionary, the coded number of coding, all planar line positions in plane dictionary comprising current plane line position Road codes array in group, topographic map;Array is encoded comprising current vertical section coding, all vertical sections in vertical section dictionary; Extension dictionary is added respectively to each planar line position and vertical section custom entities, comprising big jackshaft, tunnel, station, small culvert, Cross section array.
Each plane coding and vertical section coding include entity name keyword, by physical name can by plane coding and Vertical section codes match is pairs of, when it is current plane that a plane, which is arranged, can quickly update corresponding current vertical section coding. When a Plane Entity edit-modify, can first obtain corresponding vertical section, then obtain various planar devices that the plane includes, Then vertical section equipment is again updated these relevant entities.
Interactive floor designs in S6, plane viewport
Interactive floor design is the drive technology based on ARX in plane viewport, adds plane one by one in plane viewport Line position intersection point, editing curve radius and easement curve are long, create the planar line position being made of straight line, easement curve, circular curve certainly Entity is defined, and marks hundred-metre post, kilometer post and profile.At newly-built planar line position, by drag online position end by A addition plane point of intersection is pressed from both sides by dragging when editing line position and clicks through edlin.
Vertical alignment design is automated in S7, vertical section viewport
Automation vertical alignment design is according to planar line position and mileage in vertical section viewport, first in vertical section viewport Vertical section custom entities are created, vertical section ground line is then arranged according to digital terrain model, carry out slope further according to ground line Degree automatic imitation, the minimum length of grade of finally progress, ruling grade, ruling grade algebraic step, perpendicular slow overlapping, compensation of gradient, height are program-controlled System point constraint processing, and bridge and tunnel are arranged according to maximum raising and the deep basic parameter of digging automatically.
It is the existing road, both first on the topographic map that planar line position is passed through when carrying out vertical control point constraint processing There are railway, newly built railway position, it is automatic that grade separation road is set, vertical control point, Clearance requirement are set automatically on vertical section, Again across vertical control point set by lower brill on adjust automatically grade line, the rule for meeting track profile design are finally checked whether Model requirement, is drawn when being unable to satisfy with red color to remind.Each vertical section entity is bottom-up according to the sequencing of creation Successively form a line.
When intersecting automatic setting grade separation road with road railway figure layer according to planar line position, need to consider following factor: road Same position has the problem of double line, road are indicated with two-wire in the figure layer of road, therefore when carrying out line position and road asks friendship, obtains After route mileage, it is also necessary to mileage is ranked up, filter out repetition point, two-phase neighbour's chainage it is very close when by way of among road The operation of point rejects wrong data to reduce redundant data.
Cross-sectional design is automated in S8, cross section viewport
In the viewport of cross section automation cross-sectional design be arranged successively from bottom to top in the viewport of cross section line position every Digging height, road shoulder height are filled out in the cross section custom entities of 50m, drafting road bed, lateral sulcus, side slope, ground line, mileage, roadbed center Journey, ground elevation, bridge notch, tunnel gap.The corresponding cross section of each plane by mileage from small to large, in cross section viewport It inside successively forms a line from bottom to top, multiple planar line positions correspond to multiple row cross section.
The flat real-time linkage formula editorial optimization in length and breadth of S9, Decision Making of Line Schemes
The flat real-time linkage formula editorial optimization in length and breadth of Decision Making of Line Schemes includes three kinds of situations: editor's track plan, then again right Completely carry out Automated Design vertical section and cross section;Track plan is edited, is then retained not by the profile grade of modification range And cross section, vertical section and cross section only are updated on the subrange that modification influences;Vertical section is edited, to impacted cross section It is redesigned.
The flat real-time linkage formula editorial optimization in length and breadth of Decision Making of Line Schemes is realized by the folder point driving of plane, vertical section entity, Plane holder point includes plane point of intersection, intermediate straight line midpoint, circular curve midpoint, realizes that mobile intersection position, translated linear side, modification are bent Line radius and to automatically configure easement curve long;Vertical section folder point includes knick point, slope Duan Zhongdian, realizes mobile knick point, lift drop Grade line.
S10, flat achievement in length and breadth press mileage simultaneous display and dynamic view
Flat achievement in length and breadth is by track plan entity, vertical section entity, cross section by mileage simultaneous display and dynamic view The content of identical mileage is shown in the center of respective viewport that dynamic view is to carry out circulation by step-length to route mileage to pass by entity Increase, the real-time continuous physical contents by same mileage are shown in viewport center.
In any one flat, vertical, horizontal viewport, when being translated using middle button of mouse, calculating current mouse is at this first It is corresponding when the mileage of front position is made a response: then using this translation order of editor's reactor automatic capture by it in viewport The same mileage disposition that the entity of its two viewport is drawn is in its viewport center.In this way, regardless of being translated in which viewport, it is other Each viewport can be according to identical mileage simultaneous display.
The Pan of middle button of mouse is translated, is changed by process control, with the step-length of 10m, from route origin-to-destination, circulation pair Plane viewport carries out auto-translating, and vertical section and cross section viewport also drive according to reactor with mileage simultaneous display, shape simultaneously At line line position by the automatic result of broadcast of the dynamic view of mileage variation.Increase Keyboard Control: ↑ key is clear by increasing step-length quickening Look at speed, ↓ key slows down surfing by reducing step-length, and → key jumps function after realizing by increasing current mileage, and ← key passes through Reduce current mileage and realize front jumping function, esc key terminates dynamic view.
S11, flat achievement in length and breadth are at figure and table out
Flat achievement in length and breadth is to generate strip line plan view, skiagraph, output plane curve table, chain rupture at figure and out table Table, flat grade separation road table, gradient table, coordinate computational chart.
The advantageous effect of the invention is:
The flat real-time linkage design method in length and breadth of rail track, planar design drive by drive technology, a variety of folder points of ARX Technology realizes quick convenient interactive formula design;Vertical section has merged digital terrain model quick obtaining ground line, has indulged and break Face gradient automatic imitation and automatic multiple constraint processing technique, realize the rapid automatized design of profile grade;Cross section is certainly Dynamic design can quick obtaining slope, brush slope position, and draw out plane land used boundary accordingly, can quickly learn railway land situation And pass round whether impediment in plane succeeds;It can fast automatic sound when editing plane, vertical section scheme based on ARX principle of peactor It answers, carries out the update of scheme;The achievements exhibition of flat viewports more in length and breadth, flat achievement in length and breadth press mileage simultaneous display and dynamic view, Significantly increase the displaying intuitive convenience of scheme achievement.Total solution simplifies operating process, has reformed existing work Make means, greatly improves work efficiency.
Detailed description of the invention
Fig. 1 is the flow chart of the flat real-time linkage design method in length and breadth of rail track.
Description of symbols in figure:
S1, creation digital terrain model
S2, item file and auto-initiation digital terrain model are opened
S3, setting rail track put down and design basic parameter in length and breadth
S4, the flat viewport in length and breadth of creation Alignment Design of Railway Line
S5, the flat entity management dictionary in length and breadth of creation rail track
Interactive floor designs in S6, plane viewport
Vertical alignment design is automated in S7, vertical section viewport
Cross-sectional design is automated in S8, cross section viewport
The flat real-time linkage formula editorial optimization in length and breadth of S9, Decision Making of Line Schemes
S10, flat achievement in length and breadth press mileage simultaneous display and dynamic view
S11, flat achievement in length and breadth are at figure and table out
Specific embodiment
It is described with reference to the specific technical solution of the present invention.As shown in the flow chart of Fig. 1, railway line of the present invention The step of flat real-time linkage design method in length and breadth in road, includes: creation digital terrain model, opens item file and auto-initiation Digital terrain model, setting rail track are flat to design basic parameter, the flat viewport in length and breadth of creation Alignment Design of Railway Line, creation iron in length and breadth Interactive floor design, the interior automation vertical section of vertical section viewport are set in the flat entity management dictionary in length and breadth in route road, plane viewport The flat real-time linkage formula editorial optimization in length and breadth of automation cross-sectional design, Decision Making of Line Schemes, flat achievement in length and breadth are pressed in meter, cross section viewport Mileage simultaneous display and dynamic view, flat achievement in length and breadth are at figure and table out.
S1, creation digital terrain model
Creation digital terrain model be according to mapping specialty provide three-dimensional land map on contour, landform point data, The Triangular Grid Model of creation is to first pass through the data for extracting contour, topographic(al) point figure layer, forms the number of dat format According to file, then thus four kinds of files of Generating Data File again: the index file of dex, the elevation file of dtm format, tin format Triangulation network file, top format topological file, these file consolidations are placed under DTM file.
S2, item file and auto-initiation digital terrain model are opened
A dwg file is first created as the flat item file designed in length and breadth of rail track, then by corresponding topographic map File references are come in, later when opening this item file, the topographic map filename of automatically retrieval to reference, and with this filename Digital terrain model is initialized, to obtain track profile, cross section ground elevation information at any time, until the item file is closed When destructed this digital terrain model object.The item file of this dwg format is put together with DTM file, to automatically obtain Digital-to-analogue path go forward side by side line number mould initialization.
The topographic map filename for retrieving reference, is provided by CAD secondary development bag ARX AcedGetCurDwgXrefGraph method first obtains reference paper array, then obtains in array first reference paper name i.e. Topographic map filename carries out digital-to-analogue initialization finally using the catalogue of this landform map file and filename as input parameter.
S3, setting rail track put down and design basic parameter in length and breadth
The catalogue where item file, configuration parameter file, comprising: minimum length of grade, maximum upward slope, maximum downslope, maximum Algebraic difference between adjacent gradients, radius of vertical curve, compensation of gradient, the critical raising for setting bridge, set tunnel at the minimum grade algebraic step for setting vertical curve Critical digging is deep, level ground of stand limits slope, length of station site, width of the subgrade surface, slope height at different levels and ratio of slope.The purpose that this file is arranged is When route is put down and designed in length and breadth, default design is carried out according to this basic parameter automatically, increases the degree of automation, reduces user's interaction Input improves design efficiency.
S4, the flat viewport in length and breadth of creation Alignment Design of Railway Line
Viewport is the rectangular window region that can independently show particular design content, and figure translation, contracting are carried out in a viewport Operation is put, the display of other viewports is not interfered with.It is flat vertical as rail track that three viewports are created in current project file Be horizontally set with the viewport of meter, plane viewport above, display plane line position custom entities;Vertical section viewport is shown vertical disconnected in lower section Face custom entities;Cross section viewport is arranged successively line position cross section custom entities on right side from bottom to top;Flat viewport in length and breadth Size can be customized by users adjustment.
Creation viewport is then viewport title, viewport lower-left to be arranged by creating AcDbViewportTableRecord object The creation of plane viewport is completed at angle, upper right angular coordinate.It creates vertical section, cross section viewport again with the method, and records each viewport Serial number, to be which viewport by the current viewport of serial number automatic distinguishing when user's operation.
S5, the flat entity management dictionary in length and breadth of creation rail track
Dictionary is a kind of container object of AutoCAD, is used for organization and management database entity object.In item file First creation type is plane dictionary, the vertical section dictionary of famous object dictionary, includes the volume of current plane line position in plane dictionary Road codes array in code, the coding array of all planar line positions, topographic map;It is compiled in vertical section dictionary comprising current vertical section Code, all vertical sections encode array;Again extension dictionary is added to each planar line position and vertical section custom entities respectively, includes Big jackshaft, tunnel, station, small culvert, cross section array.
Each plane coding and vertical section coding include entity name keyword, by physical name can by plane coding and Vertical section codes match is pairs of, when it is current plane that a plane, which is arranged, can quickly update corresponding current vertical section coding. When a Plane Entity edit-modify, can first obtain corresponding vertical section, then obtain various planar devices that the plane includes, Then vertical section equipment is again updated these relevant entities.
Creation plane, the method for the famous object dictionary of vertical section are that ARX is provided GetNamedObjectsDictionary, creation planar device, vertical section equipment the method for extension dictionary be ExtensionDictionary method.
Interactive floor designs in S6, plane viewport
Drive technology based on ARX adds planar line position intersection point, editing curve radius and mitigation one by one in plane viewport Curve is long, creates the planar line position custom entities being made of straight line, easement curve, circular curve, and mark hundred-metre post, kilometer post And profile.At newly-built planar line position, plane point of intersection is added one by one by dragging online position end, when editing line position, It is pressed from both sides by dragging and clicks through edlin.
Vertical alignment design is automated in S7, vertical section viewport
According to planar line position and mileage in vertical section viewport, vertical section custom entities are first created, then basis Vertical section ground line is arranged in digital terrain model, carries out gradient automatic imitation further according to ground line, finally carries out minimum length of grade, most Heavy grade, ruling grade algebraic step, perpendicular slow overlapping, compensation of gradient, vertical control point constraint processing, and according to maximum raising and digging Bridge and tunnel is arranged in deep basic parameter automatically.
It is the existing road, both first on the topographic map that planar line position is passed through when carrying out vertical control point constraint processing There are railway, newly built railway position, it is automatic that grade separation road is set, vertical control point, Clearance requirement are set automatically on vertical section, Again across vertical control point set by lower brill on adjust automatically grade line, the rule for meeting track profile design are finally checked whether Model requirement, is drawn when being unable to satisfy with red color to remind.Each vertical section entity is bottom-up according to the sequencing of creation Successively form a line.
When intersecting automatic setting grade separation road with road railway figure layer according to planar line position, need to consider following factor: road Same position has the problem of double line, road are indicated with two-wire in the figure layer of road, therefore when carrying out line position and road asks friendship, obtains After route mileage, it is also necessary to mileage is ranked up, filter out repetition point, two-phase neighbour's chainage it is very close when by way of among road The operation of point rejects wrong data to reduce redundant data.
Cross-sectional design is automated in S8, cross section viewport
Line position is arranged successively from bottom to top in the viewport of cross section every the cross section custom entities of 50m, draws roadbed Face, lateral sulcus, side slope, ground line, mileage, roadbed center, which are filled out, digs height, formation level, ground elevation, bridge notch, tunnel gap. The corresponding cross section of each plane from small to large, successively forms a line from bottom to top by mileage in the viewport of cross section, Duo Geping Upper thread position corresponds to multiple row cross section.
The flat real-time linkage formula editorial optimization in length and breadth of S9, Decision Making of Line Schemes
Including three kinds of situations: then editor's track plan carries out Automated Design vertical section and cross section to all fronts again;It compiles Track plan is collected, is then retained not by the profile grade of modification range and cross section, only more on the subrange of modification influence New vertical section and cross section, concrete methods of realizing, are that the knick point that profile grade information is converted on planar line position plants flag, When plane partial modification, modifies the former knick point in coverage and project to new planar line position and update Barrier facility letter Breath;Vertical section is edited, impacted cross section is redesigned.
It is driven and is realized by the folder point of plane, vertical section entity, plane holder point includes plane point of intersection, intermediate straight line midpoint, circle Mid point of curve realizes mobile intersection position, translated linear side, modifies sweep and automatically configures easement curve and is long;Vertical section Folder point includes knick point, slope Duan Zhongdian, realizes mobile knick point, lift drop grade line.
Flat joint-action mechanism in length and breadth is the response mechanism that the database reactor provided based on ARX is provided, particular by number According to the object addition of library reactor, modify, delet method, i.e. objectAppended, objectModified, ObjectErased method automatically into objectModified function, then carries out vertical section, cross after Plane Entity modification The update of section;When planar device addition, automatically into objectAppended function, then adds corresponding vertical section and set It is standby;When planar device is deleted, automatically into objectErased function, then corresponding vertical section equipment is deleted.
S10, flat achievement in length and breadth press mileage simultaneous display and dynamic view
Track plan entity, vertical section entity, cross-section face entity are shown the content of identical mileage in respective viewport Center, dynamic view are to carry out circulation by step-length to route mileage to be incremented by, and the real-time continuous physical contents by same mileage are shown Show in viewport center.
In any one flat, vertical, horizontal viewport, when being translated using middle button of mouse, calculating current mouse is at this first It is corresponding when the mileage of front position is made a response: then using this translation order of editor's reactor automatic capture by it in viewport The same mileage disposition that the entity of its two viewport is drawn is in its viewport center.In this way, regardless of being translated in which viewport, it is other Each viewport can be according to identical mileage simultaneous display.
The Pan of middle button of mouse is translated, is changed by process control, with the step-length of 10m, from route origin-to-destination, circulation pair Plane viewport carries out auto-translating, and vertical section and cross section viewport also drive according to reactor with mileage simultaneous display, shape simultaneously At line line position by the automatic result of broadcast of the dynamic view of mileage variation.Increase Keyboard Control: ↑ key is clear by increasing step-length quickening Look at speed, ↓ key slows down surfing by reducing step-length, and → key jumps function after realizing by increasing current mileage, and ← key passes through Reduce current mileage and realize front jumping function, esc key terminates dynamic view.
Flat achievement in length and breadth presses mileage simultaneous display, is the response mechanism provided by editing machine reactor, particular by CommandWillStart function enters this function when user is translated using middle button of mouse, first determines whether to be which view Mouthful, then by the corresponding plane mileage of conversion mouse coordinates, then the entity at identical mileage in other two viewport is shown To the center of respective viewport.
S11, flat achievement in length and breadth are at figure and table out
Generate strip line plan view, skiagraph, output plane curve table, chain rupture table, flat grade separation road table, gradient table, Coordinate computational chart.

Claims (3)

1. a kind of flat real-time linkage design method in length and breadth of rail track, which comprises the following steps: creation digital ground Model (S1), opens item file and auto-initiation digital terrain model (S2), and the flat design in length and breadth of setting rail track is basic Parameter (S3), flat viewport (S4) in length and breadth of creation Alignment Design of Railway Line, flat entity management dictionary (S5) in length and breadth of creation rail track are put down Interactive floor design (S6) in the viewport of face, vertical section viewport is interior to automate vertical alignment design (S7), automatic in the viewport of cross section Change cross-sectional design (S8), flat real-time linkage formula editorial optimization (S9) in length and breadth of Decision Making of Line Schemes, flat achievement in length and breadth is synchronized aobvious by mileage Show and dynamic view (S10), put down in length and breadth achievement at figure and table (S11) out;
The creation digital terrain model (S1) is contour, topographic(al) point on the three-dimensional land map provided according to mapping specialty Data, the Triangular Grid Model of creation;
The opening item file and auto-initiation digital terrain model (S2) are first to create a dwg file as railway The flat item file designed in length and breadth of route, then comes in corresponding topographic map file references, is opening this item file later When, the topographic map filename of automatically retrieval to reference, and digital terrain model is initialized with this filename, to obtain route at any time Vertical section, cross section ground elevation information, this destructed digital terrain model object when the item file is closed;
The setting rail track is flat to design basic parameter (S3) in length and breadth, is the catalogue where item file, configuration parameter file, It include: minimum length of grade, maximum upward slope, maximum downslope, ruling grade algebraic step, the minimum grade algebraic step for setting vertical curve, perpendicular song Line radius, compensation of gradient, the critical raising for setting bridge, the critical digging for setting tunnel are deep, level ground of stand limits slope, length of station site, width of the subgrade surface, Slope heights and ratio of slope at different levels;
Flat viewport (S4) in length and breadth of the creation Alignment Design of Railway Line is that three viewports are created in current project file as railway The flat viewport designed in length and breadth of route, plane viewport above, display plane line position custom entities;Vertical section viewport in lower section, Show vertical section custom entities;Cross section viewport is arranged successively line position cross section custom entities on right side from bottom to top;It is flat The size of viewport can be customized by users adjustment in length and breadth;
Flat entity management dictionary (S5) in length and breadth of the creation rail track is to create type first in item file as famous object Plane dictionary, the vertical section dictionary of dictionary, the coding of coding, all planar line positions in plane dictionary comprising current plane line position Road codes array in array, topographic map;Include current vertical section coding, all vertical section coded numbers in vertical section dictionary Group;Extension dictionary is added to each planar line position and vertical section custom entities respectively, includes big jackshaft, tunnel, station, foot bridge Contain, cross section array;
Interactive floor design (S6), is the drive technology based on ARX, adds one by one in plane viewport in the plane viewport Planar line position intersection point, editing curve radius and easement curve are long, create the planar line being made of straight line, easement curve, circular curve Position custom entities, and mark hundred-metre post, kilometer post and profile;
Vertical alignment design (S7) is automated in the vertical section viewport, is in vertical section viewport according to planar line position and mileage number According to, first create vertical section custom entities, then according to digital terrain model be arranged vertical section ground line, further according to ground line into Row gradient automatic imitation finally carries out minimum length of grade, ruling grade, ruling grade algebraic step, perpendicular slow overlapping, compensation of gradient, height Process control point constraint processing, and bridge and tunnel are arranged according to maximum raising and the deep basic parameter of digging automatically;
Cross-sectional design (S8) is automated in the cross section viewport, is to be arranged successively line position from bottom to top in the viewport of cross section Every the cross section custom entities of 50m, digging height, road are filled out in drafting road bed, lateral sulcus, side slope, ground line, mileage, roadbed center Shoulder height journey, ground elevation, bridge notch, tunnel gap;
The Decision Making of Line Schemes puts down real-time linkage formula editorial optimization (S9), including three kinds of situations in length and breadth: then editor's track plan weighs Automated Design vertical section and cross section newly are carried out to all fronts;Track plan is edited, is then retained not by the vertical section of modification range The gradient and cross section only update vertical section and cross section to the subrange that modification influences;Vertical section is edited, to impacted cross Section is redesigned;
The flat achievement in length and breadth presses mileage simultaneous display and dynamic view (S10), be by track plan entity, vertical section entity, The content of identical mileage is shown in the center of respective viewport that dynamic view is to carry out to route mileage by step-length by cross-section face entity Circulation is incremented by, and the real-time continuous physical contents by same mileage are shown in viewport center;
The flat achievement in length and breadth is to generate strip line plan view, skiagraph, output plane curve at figure and table (S11) out Table, chain rupture table, flat grade separation road table, gradient table, coordinate computational chart.
2. a kind of flat real-time linkage design method in length and breadth of rail track according to claim 1, which is characterized in that described vertical Vertical alignment design (S7) is automated in section viewport, is first to pass through in planar line position when carrying out vertical control point constraint processing Topographic map on existing road, existing railway, newly built railway position, it is automatic that grade separation road is set, it is automatic on vertical section It is arranged across vertical control point set by lower brill on vertical control point, Clearance requirement, then adjust automatically grade line, finally checking is The no code requirement for meeting track profile design, is drawn when being unable to satisfy with red color to remind.
3. a kind of flat real-time linkage design method in length and breadth of rail track according to claim 1, which is characterized in that the line Scheme flat real-time linkage formula editorial optimization (S9) in length and breadth in road is realized by the folder point driving of plane, vertical section entity, plane holder Point includes plane point of intersection, intermediate straight line midpoint, circular curve midpoint, realizes mobile intersection position, translated linear side, modification sweep And it is long to automatically configure easement curve;Vertical section folder point includes knick point, slope Duan Zhongdian, realizes mobile knick point, lift drop grade line.
CN201910188637.0A 2019-03-13 2019-03-13 The flat real-time linkage design method in length and breadth of rail track Pending CN109918803A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910188637.0A CN109918803A (en) 2019-03-13 2019-03-13 The flat real-time linkage design method in length and breadth of rail track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910188637.0A CN109918803A (en) 2019-03-13 2019-03-13 The flat real-time linkage design method in length and breadth of rail track

Publications (1)

Publication Number Publication Date
CN109918803A true CN109918803A (en) 2019-06-21

Family

ID=66964547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910188637.0A Pending CN109918803A (en) 2019-03-13 2019-03-13 The flat real-time linkage design method in length and breadth of rail track

Country Status (1)

Country Link
CN (1) CN109918803A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110569538A (en) * 2019-07-25 2019-12-13 中国铁路设计集团有限公司 Parameterized modeling and design optimization method for construction access road of railway engineering
CN110765529A (en) * 2019-10-21 2020-02-07 周口师范学院 Railway vertical curve design method based on half-wave sine type and railway ramp
CN110929311A (en) * 2019-07-25 2020-03-27 上海钢通网络科技有限公司 Three-dimensional component modeling and construction drawing linkage editing method thereof
CN110929312A (en) * 2019-07-25 2020-03-27 上海钢通网络科技有限公司 Method for designing transverse partition system of component, stiffening plate at section of transverse partition system and manhole
CN111368354A (en) * 2019-09-09 2020-07-03 中国铁路设计集团有限公司 Design method of bridge gap under BIM (building information modeling)
CN112199628A (en) * 2020-08-20 2021-01-08 中建水务环保有限公司 Method and device for calculating engineering quantity of linear engineering
CN112214872A (en) * 2020-09-09 2021-01-12 中铁第五勘察设计院集团有限公司 Automatic calculation method and device for railway line longitudinal section scale information
CN112231870A (en) * 2020-09-23 2021-01-15 西南交通大学 Intelligent generation method for railway line in complex mountain area
CN113190892A (en) * 2021-02-24 2021-07-30 中南大学 Longitudinal section line layout method, system, terminal and readable storage medium
CN116502321A (en) * 2023-06-28 2023-07-28 中铁第一勘察设计院集团有限公司 BIM forward design method and system for railway communication machine room
CN117034434A (en) * 2023-10-09 2023-11-10 中国公路工程咨询集团有限公司 Road model rapid generation method based on safety evaluation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090198505A1 (en) * 2008-02-05 2009-08-06 Peter Gipps Interactive path planning with dynamic costing
CN102651045A (en) * 2012-04-06 2012-08-29 铁道第三勘察设计院集团有限公司 Three-dimensional visualization method for multi-line railway
CN102663192A (en) * 2012-04-12 2012-09-12 铁道第三勘察设计院集团有限公司 Method for automatically designing and optimizing railway vertical profile
CN104314015A (en) * 2014-10-28 2015-01-28 铁道第三勘察设计院集团有限公司 Plane-vertical-horizontal collaborative railroad bed drainage design method
CN104992019A (en) * 2015-07-02 2015-10-21 北京交通大学 Simplified design method for continuously-welded rail of ballastless track of ultra-large bridge of railway
CN105279792A (en) * 2015-10-13 2016-01-27 铁道第三勘察设计院集团有限公司 Railway roadbed draining BIM design method based on curved surface of landform
CN107563076A (en) * 2017-09-08 2018-01-09 中国铁路设计集团有限公司 Rail track protective zone automatic design method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090198505A1 (en) * 2008-02-05 2009-08-06 Peter Gipps Interactive path planning with dynamic costing
CN102651045A (en) * 2012-04-06 2012-08-29 铁道第三勘察设计院集团有限公司 Three-dimensional visualization method for multi-line railway
CN102663192A (en) * 2012-04-12 2012-09-12 铁道第三勘察设计院集团有限公司 Method for automatically designing and optimizing railway vertical profile
CN104314015A (en) * 2014-10-28 2015-01-28 铁道第三勘察设计院集团有限公司 Plane-vertical-horizontal collaborative railroad bed drainage design method
CN104992019A (en) * 2015-07-02 2015-10-21 北京交通大学 Simplified design method for continuously-welded rail of ballastless track of ultra-large bridge of railway
CN105279792A (en) * 2015-10-13 2016-01-27 铁道第三勘察设计院集团有限公司 Railway roadbed draining BIM design method based on curved surface of landform
CN107563076A (en) * 2017-09-08 2018-01-09 中国铁路设计集团有限公司 Rail track protective zone automatic design method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110929311A (en) * 2019-07-25 2020-03-27 上海钢通网络科技有限公司 Three-dimensional component modeling and construction drawing linkage editing method thereof
CN110929312A (en) * 2019-07-25 2020-03-27 上海钢通网络科技有限公司 Method for designing transverse partition system of component, stiffening plate at section of transverse partition system and manhole
CN110569538A (en) * 2019-07-25 2019-12-13 中国铁路设计集团有限公司 Parameterized modeling and design optimization method for construction access road of railway engineering
CN111368354A (en) * 2019-09-09 2020-07-03 中国铁路设计集团有限公司 Design method of bridge gap under BIM (building information modeling)
CN110765529A (en) * 2019-10-21 2020-02-07 周口师范学院 Railway vertical curve design method based on half-wave sine type and railway ramp
CN112199628A (en) * 2020-08-20 2021-01-08 中建水务环保有限公司 Method and device for calculating engineering quantity of linear engineering
CN112199628B (en) * 2020-08-20 2024-06-04 中建生态环境集团有限公司 Engineering quantity calculating method and device for linear engineering
CN112214872B (en) * 2020-09-09 2023-07-07 中铁第五勘察设计院集团有限公司 Automatic calculation method and device for railway line longitudinal section scale information
CN112214872A (en) * 2020-09-09 2021-01-12 中铁第五勘察设计院集团有限公司 Automatic calculation method and device for railway line longitudinal section scale information
CN112231870A (en) * 2020-09-23 2021-01-15 西南交通大学 Intelligent generation method for railway line in complex mountain area
CN112231870B (en) * 2020-09-23 2022-08-02 西南交通大学 Intelligent generation method for railway line in complex mountain area
CN113190892A (en) * 2021-02-24 2021-07-30 中南大学 Longitudinal section line layout method, system, terminal and readable storage medium
CN113190892B (en) * 2021-02-24 2022-06-10 中南大学 Longitudinal section line layout method, system, terminal and readable storage medium
CN116502321A (en) * 2023-06-28 2023-07-28 中铁第一勘察设计院集团有限公司 BIM forward design method and system for railway communication machine room
CN116502321B (en) * 2023-06-28 2023-08-29 中铁第一勘察设计院集团有限公司 BIM forward design method and system for railway communication machine room
CN117034434A (en) * 2023-10-09 2023-11-10 中国公路工程咨询集团有限公司 Road model rapid generation method based on safety evaluation

Similar Documents

Publication Publication Date Title
CN109918803A (en) The flat real-time linkage design method in length and breadth of rail track
CN105279792B (en) Railway bed draining BIM design methods based on terrain surface
CN112257137B (en) BIM (building information modeling) forward automatic design method of building structure based on Revit
CN104008252B (en) Buried cable pipeline plane cross section automatic generation method
CN103366633B (en) Water conservation map data model-based flood risk map drawing method and system thereof
US5278946A (en) Method of presenting multimedia data in a desired form by comparing and replacing a user template model with analogous portions of a system
CN102314711B (en) Three-dimensional visualization method and device for mineral resource evaluation information
CN107609321A (en) Continuous bridge parametric modeling method based on Revit platforms
CN110222445A (en) Based on BIM and the integrated of design information, collaborative design and delivery method and system
CN104008241B (en) A kind of transmission line of electricity multiwindow linkage route selection, row tower alignment system and method
CN106250615A (en) Circuit vertical section design method before laying a railway track
CN104314015B (en) Railway bed row of horizontal collaborative design method in length and breadth
CN109147045A (en) City section geology three-dimensional method for automatic modeling based on topological subregion
CN101593454A (en) A kind of intelligent output method for land parcel maps
CN110569538A (en) Parameterized modeling and design optimization method for construction access road of railway engineering
CN103954970B (en) A kind of topographic(al) feature acquisition method
CN108022273A (en) A kind of figure number Detachable drafting method and system
CN104091005B (en) A kind of Overhead Line Project measures indoor and field integration system
CN106484943A (en) A kind of online generation method of the log sheet based on nonlinear fitting control
CN100552723C (en) A kind of ridge crossing line method for designing based on digital elevation model DEM
CN101694726B (en) Fusing and drawing method based on multi-source terrain data
CN115238343B (en) BIM technology-based intelligent construction method for foundation pit support
CN110929363A (en) Communication line investigation design method and system
CN105320802B (en) A method of it is designed based on AutoCAD general graphical object implementatio8 auxiliary programmings
CN104658036B (en) A kind of quick method for establishing intelligent transportation three dimensional field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621