CN109916088A - Wall-mounted stove - Google Patents

Wall-mounted stove Download PDF

Info

Publication number
CN109916088A
CN109916088A CN201910111943.4A CN201910111943A CN109916088A CN 109916088 A CN109916088 A CN 109916088A CN 201910111943 A CN201910111943 A CN 201910111943A CN 109916088 A CN109916088 A CN 109916088A
Authority
CN
China
Prior art keywords
wall
hung boiler
furnace shell
air duct
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910111943.4A
Other languages
Chinese (zh)
Inventor
贺平
邓任飞
张霞
王青松
梁桂源
李良潭
陈佳锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201910111943.4A priority Critical patent/CN109916088A/en
Publication of CN109916088A publication Critical patent/CN109916088A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The invention discloses a wall-mounted furnace, which comprises a furnace shell and heating equipment, wherein the heating equipment is used for heating air in the furnace shell. According to the invention, the heating equipment is additionally arranged to heat the air in the furnace shell, so that the residual water in the wall-mounted furnace is dried or ice formed by the residual water can be melted before starting up, and the normal starting and normal operation of the unit are ensured. The invention does not need manual deicing of users, and has ingenious structure and convenient use.

Description

Wall-hung boiler
Technical field
The present invention relates to wall-hung boiler technical field, especially a kind of wall-hung boiler.
Background technique
Wall-hung boiler is the abbreviation of burnt gas wall hanging furnace, and full name is " fuel wall hanging formula heating stove ", is one kind using natural gas as energy The water heater in source.
Since the environment temperature in the north is low, wall-hung boiler appears in the case where using under 0 DEG C or less of environment, if using Family needs to power off under special circumstances, then needs first to prevent from freezing in wall-hung boiler outside the recirculated water discharge complete machine inside wall-hung boiler Tie situation.But because of complete machine structure and component problem, necessarily have residual water and stay in complete machine or component, is not appointing In the case that is protected, residual water can freeze, in some instances it may even be possible to which freezing component then must when user's complete machine again moisturizing is opened First complete machine must need to be preheated with tool, ice-out, otherwise unit failure, can not start.The use of wall-hung boiler is necessarily caused in this way Family satisfaction is not high.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of wall-hung boilers, can dry residual water, or before being switched on use By the ice-out in furnace, it is ensured that wall-hung boiler, which operates normally, to be used.
In order to achieve the above-mentioned object of the invention, the present invention is the following technical schemes are provided: a kind of wall-hung boiler, including furnace shell, also wraps Heating equipment is included, the heating equipment is used to heat the air in the furnace shell.
Further, the heating equipment is located in the furnace shell.
It further, further include having air duct, the heating equipment heats the air in the furnace shell through the air duct.
Further, the air duct is located in the furnace shell.
Further, the air duct includes the tubular structure being fixed in the furnace shell.
It further, further include having blower, the blower is for circulating air through the air duct.
Further, the blower is located in the air duct.
Further, the axis of the hollow pipe is set as arc or linear.
Further, the axis of the hollow pipe is set as the build-up curve that arc is combined with linear.
Further, the heating equipment includes electric heating sheets or electric heating wire.
Further, the air duct is equipped with several outlets.
Further, the hollow pipe is non-equal gauge structures.
Compared with prior art, the invention has the following advantages that adding heating equipment, the air in furnace shell is added Heat enables the ice that the residual water in wall-hung boiler is oven-dried or residual water is formed to melt before booting, ensure that unit can be normal Starting and normal operation.The present invention is not necessarily to the manual deicing of user, and clever structure is easy to use.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the structural schematic diagram of hot-flow flue formula wall-hung boiler of the present invention;
Diagram label:
1, air duct inlet side;2, blower;3, electric heating sheets;4, air duct;5, air duct air side;6, furnace shell.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that if relating to directionality instruction (such as up, down, left, right, before and after ...) in the embodiment of the present invention, Then directionality instruction be only used for explain under a certain particular pose (as shown in the picture) between each component relative positional relationship, Motion conditions etc., if the particular pose changes, directionality instruction is also correspondingly changed correspondingly.
It in addition, the technical solution between each embodiment can be combined with each other, but must be with ordinary skill Based on personnel can be realized, this technical side will be understood that when the combination of technical solution appearance is conflicting or cannot achieve The combination of case is not present, also not the present invention claims protection scope within.
As shown in Figure 1, a kind of hot-flow flue formula wall-hung boiler, including furnace shell 6, further include heating equipment, heats in the furnace shell 6 Air.
Heating equipment is located in furnace shell 6, is directly heated to the air in furnace shell 6, or is located at outside furnace shell 6, heating Air is guided to be sent into furnace shell 6, and the air themperature in furnace shell 6 can be made to increase, and dries the residual water in furnace shell 6, or melt Change the ice in furnace shell 6, it is ensured that wall-hung boiler is normally started and run.
Heating equipment is located in furnace shell 6 by preferred embodiment, reduces energy loss.
Wall-hung boiler is under 0 DEG C or less of environment in use, even if the recirculated water in wall-hung boiler drains, because of each part of wall-hung boiler The reasons such as the tension of self structure and water also have residual water and are attached in part or its surface, and residual water is readily formed ice. Only after these ice-outs, the normal operation of wall-hung boiler just can ensure that, as ice does not melt and will cause blocking, detector in water pipe Device surface ice, which does not melt, will cause detection inaccuracy.
Really there are the part of residual water, only those parts for easily adhering to residual water in wall-hung boiler, if heating equipment works The heating air of generation is not directed to the part position for needing to heat, and the time for necessarily causing heating equipment to work is long, therefore Wall-hung boiler of the present invention further includes having air duct 4, and the hot-air that can be generated to heating equipment guides, and is sent to the part position that need to be heated It sets, accelerates the drying residual water evaporation time, or accelerate the melting process of residual ice, shorten the heating equipment working time.
When heating equipment is located in furnace shell 6, the air duct 4 is all or part of to be located in furnace shell 6, and the air after heating is through air duct The part position that 4 guidance are heated to needs can fast and effeciently rise if the outlet in air duct 4 is close to the part for having residual water or ice To heat effect;The opening of air duct air side 5 can be set as multiple at this time, for have residual water or ice zero of different location Part carries out separating heating.
Heating equipment be located at furnace shell 6 it is outer when, which is located in furnace shell 6, by heating equipment generate hot-air lead Enter in furnace shell 6, guides to the part for needing to dry residual water or thawing ice.
Wherein, heating equipment can be located in air duct 4, the air after heating is fully used, heat is not easy It scatters and disappears, the speed for drying water or thawing ice is fast, high-efficient.
The scheme being located in furnace shell 6 to air duct 4 below is further described:
Air duct 4 is successively surrounded by the outer wall of each part in furnace shell 6, or the pipeline by addition adding in furnace shell 6 is constituted.
Air duct 4 is set as hollow pipe, the hollow pipe being especially vertically arranged, under heating equipment working condition, the sky of top Air tightness is small, automatic to rise, and negative pressure is caused to hollow pipe lower inlet, so that air is automatically into hollow pipe;Facilitate furnace Air circulation flow in shell 6 accelerates the heating process to unit entire in furnace shell 6.
But for the internal structure of traditional wall-hung boiler, since the installation and setting of each part in furnace shell 6 need, regardless of It is the air duct 4 that each part outer wall surrounds, the air duct 4 that the pipeline still added is formed, according to situation, air duct 4 can be set as arc Type or linear type;Or it is set as camber and build-up curve type hollow pipe that linear type combines.
More rapidly to promote circulating for air in furnace shell 6, blower 2 is added in furnace shell 6, the air that blower 2 is generated Stream accelerates the directed flow of air by air duct 4, so that air circulation speed is accelerated in furnace shell 6, it is corresponding to dry water or thawing The speed of ice is also accelerated.
Preferred embodiment is that blower 2 is directly arranged in air duct 4, is especially located at and is located under the heating equipment in air duct 4 Side, the wind of submitting are directly heated equipment heat treatment.
Further, heating equipment is located in air duct 4, and according to isometrical hollow pipe as air duct 4, heating equipment is set It sets, so that part is obstructed inside hollow pipe, will cause noise, influence service life of equipment, therefore air duct 4 can be set as non-equant Tubular structure.
Above-mentioned heating equipment, mainly comprising electric heating sheets 3, electric heating wire etc., heat dissipation area is big, holds with air heat exchange Easily, the air of process can quickly be heated.
The operating process that wall-hung boiler of the present invention starts in the case where there is residual water in inside or remains ice are as follows: give electric heating sheets 3 are powered, or are powered simultaneously to electric heating sheets 3 and blower 2, make to form a negative pressure at air duct inlet side 1, at this time in furnace shell 6 Air, which enters air duct 4 by air duct inlet side 1, can set the heating temperature of electric heating sheets 3 as 45-50 using electric heating sheets 3 DEG C, wind-warm syndrome can be increased to 40-45 DEG C, finally by 5 outlet air of air duct air side to specific component or entire furnace shell 6.So Circulation, hot wind are uniformly dispersed in the entire unit in wall-hung boiler, and logical heat transfer transfers heat to each part, will remain water Evaporation prevents power-off from icing phenomenon occurs, does not influence directly initiating for next wall-hung boiler;Or it before wall-hung boiler starting, will tie Ice-out (can pass through controller control blower 2 start the time), after ice-out, stop to electric heating sheets 3, blower 2 be powered, Standby, user carries out moisturizing to wall-hung boiler, and wall-hung boiler is normally started and run.
Hot-flow flue formula wall-hung boiler of the present invention, by increasing heating equipment and air duct etc. inside the furnace shell 6 of wall-hung boiler, in wall In the case where hanging part in the unit of furnace and having residual water or remaining water freezing, when needing complete machine moisturizing being opened again, without manual Unit is preheated, only need to start heating equipment of the present invention, the restarting of wall-hung boiler can be facilitated rapidly by ice-out, is solved The pain spot of user.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (12)

1. a kind of wall-hung boiler, including furnace shell, it is characterised in that: further include heating equipment, the heating equipment is described for heating Air in furnace shell.
2. wall-hung boiler as described in claim 1, it is characterised in that: the heating equipment is located in the furnace shell.
3. wall-hung boiler as claimed in claim 1 or 2, it is characterised in that: further include having air duct, the heating equipment is through the wind Heat the air in the furnace shell in road.
4. wall-hung boiler as claimed in claim 3, it is characterised in that: the air duct is located in the furnace shell.
5. wall-hung boiler as claimed in claim 4, it is characterised in that: the air duct includes the hollow pipe being fixed in the furnace shell Structure.
6. wall-hung boiler as claimed in claim 4, it is characterised in that: further include having blower, the blower is for making air through institute Air duct is stated to circulate.
7. wall-hung boiler as claimed in claim 6, it is characterised in that: the blower is located in the air duct.
8. wall-hung boiler as claimed in claim 5, it is characterised in that: the axis of the hollow pipe is set as arc or linear.
9. wall-hung boiler as claimed in claim 5, it is characterised in that: the axis of the hollow pipe is set as arc and mutually ties with linear The build-up curve of conjunction.
10. wall-hung boiler as described in claim 1, it is characterised in that: the heating equipment includes electric heating sheets or electric heating wire.
11. wall-hung boiler as claimed in claim 3, it is characterised in that: the air duct is equipped with several outlets.
12. wall-hung boiler as claimed in claim 5, it is characterised in that: the hollow pipe is non-equal gauge structures.
CN201910111943.4A 2019-02-12 2019-02-12 Wall-mounted stove Pending CN109916088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910111943.4A CN109916088A (en) 2019-02-12 2019-02-12 Wall-mounted stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910111943.4A CN109916088A (en) 2019-02-12 2019-02-12 Wall-mounted stove

Publications (1)

Publication Number Publication Date
CN109916088A true CN109916088A (en) 2019-06-21

Family

ID=66961565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910111943.4A Pending CN109916088A (en) 2019-02-12 2019-02-12 Wall-mounted stove

Country Status (1)

Country Link
CN (1) CN109916088A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060191276A1 (en) * 2005-02-28 2006-08-31 Carrier Corporation Transcritical heat pump water heater with drainage
CN104613642A (en) * 2014-12-31 2015-05-13 浙江聚英风机工业有限公司 Vertical warm air unit
CN106855351A (en) * 2017-02-21 2017-06-16 宁波威斯克电器科技有限公司 One kind flows through formula heating water route draining drying structure
CN206929974U (en) * 2017-07-06 2018-01-26 广州市德而乐施电器科技有限公司 It is a kind of except the electric heater of internal body moisture
CN108711291A (en) * 2018-04-08 2018-10-26 袁静 A kind of intelligent traffic light

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060191276A1 (en) * 2005-02-28 2006-08-31 Carrier Corporation Transcritical heat pump water heater with drainage
CN104613642A (en) * 2014-12-31 2015-05-13 浙江聚英风机工业有限公司 Vertical warm air unit
CN106855351A (en) * 2017-02-21 2017-06-16 宁波威斯克电器科技有限公司 One kind flows through formula heating water route draining drying structure
CN206929974U (en) * 2017-07-06 2018-01-26 广州市德而乐施电器科技有限公司 It is a kind of except the electric heater of internal body moisture
CN108711291A (en) * 2018-04-08 2018-10-26 袁静 A kind of intelligent traffic light

Similar Documents

Publication Publication Date Title
CN105202745A (en) Gas-fired heating wall-mounted stove and operation control method thereof
CN106016691A (en) Gas wall-mounted furnace
CN206467724U (en) A kind of Nti-freezing device for water pipe
KR101393380B1 (en) Warm air circulator using waste-heat of exhaust gas
CN103884095B (en) A kind of safety air-source water heater of Self-controlled
CN201187876Y (en) Electric hot blast heating furnace
CN109916088A (en) Wall-mounted stove
CN205957291U (en) Hanging stove that can automatic temperature adjustment
CN208652622U (en) A kind of temperature automatically controlled heating stove of environmental protection
CN206522845U (en) A kind of water circuit system for heating system for reducing fouling
CN108800534A (en) A kind of temperature adjustment heating furnace
CN109186075A (en) Gas water-heating furnace and its progress control method and device, heating system
CN108489079A (en) A kind of energy saving gas burning water heater
JP6066570B2 (en) Dryer
JP5943633B2 (en) Mist sauna equipment
JP4030248B2 (en) Air conditioner
CN215808596U (en) Gas heat recovery device, gas water heater and dryer
CN215422766U (en) Energy-conserving tobacco flue-curing house of gas full premix furnace end integrated form
CN208443042U (en) A kind of large size plant building special-purpose air thermal device
CN207501448U (en) A kind of novel and multifunctional gas heater
KR200207358Y1 (en) A humidifing device in fan coil unit
JP2016040007A (en) Mist sauna apparatus
KR200223124Y1 (en) Heating apparatus combind with a hearth and a boiler
JP5950609B2 (en) Mist sauna equipment
JP6401631B2 (en) Heat source equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621