CN109915040A - A kind of marine riser stretcher sliding system and application method - Google Patents

A kind of marine riser stretcher sliding system and application method Download PDF

Info

Publication number
CN109915040A
CN109915040A CN201910045038.3A CN201910045038A CN109915040A CN 109915040 A CN109915040 A CN 109915040A CN 201910045038 A CN201910045038 A CN 201910045038A CN 109915040 A CN109915040 A CN 109915040A
Authority
CN
China
Prior art keywords
stretcher
several
leading block
pedestal
well head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910045038.3A
Other languages
Chinese (zh)
Other versions
CN109915040B (en
Inventor
田雪
何进辉
赵建亭
张海彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ship And Ocean Engineering Design Research Institute (china State Shipbuilding Corp Seventh 0 Eight Institute)
Original Assignee
China Ship And Ocean Engineering Design Research Institute (china State Shipbuilding Corp Seventh 0 Eight Institute)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ship And Ocean Engineering Design Research Institute (china State Shipbuilding Corp Seventh 0 Eight Institute) filed Critical China Ship And Ocean Engineering Design Research Institute (china State Shipbuilding Corp Seventh 0 Eight Institute)
Priority to CN201910045038.3A priority Critical patent/CN109915040B/en
Publication of CN109915040A publication Critical patent/CN109915040A/en
Application granted granted Critical
Publication of CN109915040B publication Critical patent/CN109915040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of marine riser stretcher sliding system and application methods, which is set on rig floor, including stretcher guide assembly and leading block guide assembly;Tight device guide assembly includes stretcher guide rail, stretcher pedestal and stretcher, and the left side and right side of rig floor are equipped with stretcher guide rail, and stretcher pedestal is equipped on two stretcher guide rails, and the upper surface of two stretcher pedestals is equipped with stretcher;Leading block guide assembly includes leading block guide rail, pulley seat and leading block, rig floor lower end surface is equipped with leading block guide rail along the length direction of rig floor, the lower end surface of leading block track is equipped with leading block pedestal, and the lower end surface of leading block pedestal is equipped with leading block.Sliding system provided by the invention and application method can be realized slip operation of traditional wire rope type riser stretcher between two well heads, meet the requirement that the floating drilling rigs such as drill ship or drilling platforms use double-wellhead operation.

Description

A kind of marine riser stretcher sliding system and application method
Technical field
The present invention relates to a kind of sliding system and application method more particularly to a kind of marine riser stretcher sliding system and make Use method.
Background technique
As Oil And Gas Exploration And Development moves towards deep water, ultra-deep-water sea area, deepwater drilling technology and equipment become overdevelopment Point, the technical requirements such as operating water depth, the drilling depth of deep water drilling arrangements are more advanced, the configuration to well system it is also proposed that Higher requirement.The deep water floating drilling rig of mainstream mostly configures double-wellhead operating system at present, to improve drillng operation Efficiency.
The riser system of floating drilling rig is by the axial tensile force or upward buoyancy for acting on riser top To support.At sea in drilling operation course, stretcher controls the stress intensity of riser system, and affects water proof piping The curvature of system.
Currently, there are mainly two types of patterns for floating drilling rig marine riser stretcher: one is traditional wirerope patterns;Separately A kind of pattern directly acted on for novel hydraulic cylinder.Since the marine riser stretcher of hydraulic cylinder direct acting type is arranged in moon pool Interior, the space for occupying moon pool is too many, is unfavorable for the operation of other systems in moon pool area, and the water proof of hydraulic cylinder direct acting type Pipe stretcher can make the height of rig floor design opposite raising, be unfavorable for hull stability, therefore, deepwater drilling ship mostly uses traditional steel Cord formula stretcher.
Traditional steel wire rope type stretcher mainly include with the hydraulic tensioning cylinder of gas-liquid accumulator, safety valve, leading block, Compressed air sled, long-range control panel and compressed air bottle group etc..Stretcher hydraulic cylinder and accumulator are typically mounted on the four of rig floor It is connect by the leading block being mounted under rig floor with marine riser in week.Tradition steel wire rope type stretcher also cannot achieve edge at present Moon pool sliding, seriously affects double-wellhead work flow and efficiency.
To sum up, the existing generally existing following problems of marine riser stretcher: (1) space for occupying moon pool is too many;(2) rig floor Height design is higher to be unfavorable for hull stability;(3) stretcher also cannot achieve slides along moon pool, seriously affects double-wellhead job stream Journey and efficiency.
Therefore, the space for occupying moon pool for existing marine riser stretcher is too many, rig floor height design is higher is unfavorable for Hull stability and stretcher also cannot achieve the problems such as sliding along moon pool, seriously affecting double-wellhead work flow and efficiency, at For those skilled in the art's technical problem urgently to be resolved.
Summary of the invention
The present invention is to solve existing marine riser stretcher to be unfavorable for stability of hull and seriously affect double-wellhead job stream The problems such as journey and efficiency, provides a kind of marine riser stretcher sliding system and application method.
To achieve the above object, the invention adopts the following technical scheme:
The first aspect of the invention is set on rig floor there is provided a kind of marine riser stretcher sliding system, including Stretcher guide assembly and leading block guide assembly, the tight device guide assembly include stretcher guide rail, stretcher pedestal with And several stretchers, the left side and right side of the rig floor are equipped with the stretcher guide rail, two stretcher guide rails On be equipped with the stretcher pedestal, the upper surface of two stretcher pedestals is equidistantly equipped with several stretchers; The leading block guide assembly includes leading block guide rail, pulley seat and several leading blocks, the rig floor lower end surface Middle part is set along the length direction of the rig floor there are two the leading block guide rail, the lower end of two leading block tracks Face is equipped with the leading block pedestal, and the lower end surface of two leading block pedestals is equidistantly equipped with several guiding Pulley.
Further, stretcher driving device is equipped in several stretchers between two adjacent stretchers, if Do the upper surface that the stretcher driving device is set to the stretcher pedestal.
Further, pulley drive device is equipped in several leading blocks between two adjacent leading blocks, Several pulley drive devices are set to the lower end surface of the leading block pedestal.
Further, the quantity of several stretchers is 6-8.
Further, the first well head and the second well are offered from top to bottom in the vertical direction of the lower end surface of the rig floor Mouthful.
Further, two leading block tracks are with the line two sides pair between first well head and the second well head Claim setting.
Further, two stretcher guide rails are consistent with the length of the left side of the rig floor and right side.
Further, two leading block tracks are identical as the length of two stretcher guide rails.
Further, several leading blocks are identical as the quantity of several stretchers.
The second aspect of the invention is including following there is provided a kind of application method of marine riser stretcher sliding system Step:
Step 1: the stretcher pedestal carries the stretcher and the stretcher driving device moves to first well The position of mouth, the leading block pedestal carries the leading block and the pulley drive device moves to first well head Position;
Step 2: starting several stretcher driving devices and several pulley drive devices, the tensioning simultaneously Device pedestal carries several stretcher driving devices of several stretchers from first well head to second well head Position sliding;The leading block pedestal carries several leading blocks and several pulley drive devices described in simultaneously First well head slides to the position of second well head;
Step 3: when at the position that the stretcher pedestal and the leading block pedestal reach second well head, Several stretcher driving devices and several pulley drive devices are simultaneously closed off, several stretchers and several institutes are made Leading block is stated to rest at the position of second well head.
The present invention by adopting the above technical scheme, compared with prior art, has the following technical effect that
Marine riser stretcher sliding system of the invention is realized by stretcher guide assembly and leading block guide assembly Slip operation of traditional wire rope type riser stretcher between two well heads meets the floating type well drillings such as drill ship or drilling platforms dress The requirement using double-wellhead operation is set, drillng operation efficiency is improved.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of marine riser stretcher sliding system of the present invention;
Fig. 2 is the planar structure schematic diagram of marine riser stretcher sliding system of the present invention;
Fig. 3 is the plane that stretcher and directive slide track are moved to the second well head in marine riser stretcher sliding system of the present invention Structural schematic diagram;
Wherein, each appended drawing reference are as follows:
1- stretcher, 11- stretcher pedestal, 12- stretcher guide rail, 13- stretcher driving device;2- leading block;21- Leading block pedestal, 22- leading block guide rail, 23- pulley drive device;3- rig floor;The first well head of 4-;The second well head of 5-.
Specific embodiment
The present invention is described in more detail below by specific embodiment, for a better understanding of the present invention, But following embodiments are not intended to limit the scope of the invention.
As shown in Figs. 1-2, it the embodiment of the invention provides a kind of marine riser stretcher sliding system, is set on rig floor 3, It is characterised in that it includes stretcher guide assembly and leading block guide assembly, the tight device guide assembly includes that stretcher is led Rail 12, stretcher pedestal 11 and several stretchers 1, the left side and right side of the rig floor 3 are equipped with the stretcher and lead Rail 12 is equipped with the stretcher pedestal 11 on two stretcher guide rails 12, and stretcher pedestal 11 can be led along stretcher Rail 12 is moved at the second well head of position 5 by the first well head of position 4, and the left side of two stretcher guide rails 12 and rig floor 3 It is consistent with the length of right side.The upper surface of two stretcher pedestals 11 is equidistantly equipped with several stretchers 1;Institute Stating leading block guide assembly includes leading block guide rail 22, pulley seat 21 and several leading blocks 2, under the rig floor 3 Set along the length direction of the rig floor 3 that there are two the leading block guide rail 22, two leading block rails in the middle part of end face The lower end surface in road 22 is equipped with the leading block pedestal 21, and the lower end surface of two leading block pedestals 21 is equidistantly set There are several leading blocks 2, leading block pedestal 21 can be moved to along leading block guide rail 22 by the first well head of position 4 At the second well head of position 5.
The one side of the present embodiment is equipped with tensioning as shown in Figs. 1-2 between two adjacent tension devices 1 in several stretchers 1 Device driving device 13, the size of stretcher pedestal 11 can accommodate multiple stretchers 1 and multiple stretcher shift drives 13; Several stretcher driving devices 13 are set to the upper surface of stretcher pedestal 11, and several stretchers 1 are by being arranged in stretcher Stretcher driving device 13 on guide rail 12 drives, and realizes the movement of stretcher 1.
The one side of the present embodiment is equipped between two adjacent leading blocks 2 in several leading blocks 2 as shown in Figs. 1-2 Pulley drive device 23, several pulley drive devices 23 are set to the lower end surface of leading block pedestal 21, and several leading blocks 2 are Pulley drive device 23 by the way that 21 lower end of leading block pedestal is arranged in drives the movement to realize leading block 2.
The one side of the present embodiment, as shown in Fig. 2, matching for floating drilling rigs such as deepwater drilling ship or drilling platforms The quantity for the stretcher 1 set is 6-8, is arranged symmetrically in 3 two sides of rig floor, stretcher shift drive 13 is mountable two Between a stretcher 1.
The one side of the present embodiment, as shown in Figure 1-3, offered from top to bottom in the vertical direction of the lower end surface of rig floor 3 First well head 4 and the second well head 5, stretcher 1 and leading block 2 can move between the first well head 4 and the second well head 5 to realize Sliding between two well heads.
The one side of the present embodiment, as shown in Figure 1-3, two leading block guide rails 22 are parallel to moonpool openings length Direction, and two leading block tracks 22 are symmetrical arranged with the line two sides between the first well head 4 and the second well head 5.Guiding is slided Take turns the length and 12 equal length of stretcher guide rail of guide rail 22.
The embodiment of the present invention provides a kind of application method of marine riser stretcher sliding system according to above-mentioned sliding system, The following steps are included:
Step 1: stretcher pedestal 11 carries stretcher 1 and stretcher driving device 13 moves to the position of the first well head 4, Leading block pedestal 21 carries leading block 2 and pulley drive device 23 moves to the position of the first well head 4;
Step 2: starting several stretcher driving devices 13 and several pulley drive devices 23, stretcher pedestal 11 simultaneously It carries several stretcher driving devices 13 of several stretchers 1 and is slid from the first well head 4 to the position of the second well head 5;It is oriented to simultaneously It is sliding from the first well head 4 to the position of the second well head 5 that pulley seat 21 carries several leading blocks 2 and several pulley drive devices 23 It moves;
Step 3: being simultaneously closed off when at the position that stretcher pedestal 11 and leading block pedestal 21 reach the second well head 5 Several stretcher driving devices 13 and several pulley drive devices 23 make several stretchers 1 and several leading blocks 2 rest on At the position of two well heads 5.
The space that the present invention occupies moon pool for existing marine riser stretcher is too many, rig floor height design is higher is unfavorable for Hull stability and stretcher also cannot achieve the problems such as sliding along moon pool, seriously affecting double-wellhead work flow and efficiency, this Invention can be realized slip operation of traditional wire rope type riser stretcher between two well heads, meet drill ship or drilling platforms Equal floating drilling rigs use the requirement of double-wellhead operation, improve drillng operation efficiency.
The specific embodiment of marine riser stretcher sliding system of the present invention and application method is described in detail above, But it is merely an example, and the present invention is not restricted to particular embodiments described above.To those skilled in the art, It is any that equivalent modifications and substitutions to the present invention are also within the scope of the present invention.Therefore, do not depart from it is of the invention Made equal transformation and modification, all should be contained within the scope of the invention under spirit and scope.

Claims (10)

1. a kind of marine riser stretcher sliding system is set on rig floor (3), which is characterized in that including stretcher guide assembly With leading block guide assembly;Wherein, the tight device guide assembly include stretcher guide rail (12), stretcher pedestal (11) and Several stretchers (1), the left side and right side of the rig floor (3) are equipped with the stretcher guide rail (12), open described in two It is equipped with the stretcher pedestal (11) on tight device guide rail (12), the upper surface of two stretcher pedestals (11) is equidistant Equipped with several stretchers (1);The leading block guide assembly include leading block guide rail (22), pulley seat (21) with And several leading blocks (2), rig floor (3) the lower end surface middle part are set there are two described in along the length direction of the rig floor (3) Leading block guide rail (22), the lower end surface of two leading block tracks (22) are equipped with the leading block pedestal (21), The lower end surface of two leading block pedestals (21) is equidistantly equipped with several leading blocks (2).
2. marine riser stretcher sliding system according to claim 1, which is characterized in that in several stretchers (1) Stretcher driving device (13) are equipped between two adjacent stretchers (1), several stretcher driving devices (13) are equal Set on the upper surface of the stretcher pedestal (11).
3. marine riser stretcher sliding system according to claim 1, which is characterized in that several leading blocks (2) In be equipped with pulley drive device (23) between two adjacent leading blocks (2), several pulley drive devices (23) are equal Set on the lower end surface of the leading block pedestal (21).
4. marine riser stretcher sliding system according to claim 1, which is characterized in that several stretchers (1) Quantity is 6-8.
5. marine riser stretcher sliding system according to claim 1, which is characterized in that the lower end surface of the rig floor (3) Vertical direction on offer the first well head (4) and the second well head (5) from top to bottom.
6. marine riser stretcher sliding system according to claim 5, which is characterized in that two leading block tracks (22) it is symmetrical arranged with the line two sides between first well head (4) and the second well head (5).
7. marine riser stretcher sliding system according to claim 1, which is characterized in that two stretcher guide rails (12) consistent with the length of the left side of the rig floor (3) and right side.
8. marine riser stretcher sliding system according to claim 1, which is characterized in that two leading block tracks (22) identical as the length of two stretcher guide rails (12).
9. marine riser stretcher sliding system according to claim 1, which is characterized in that several leading blocks (2) It is identical as the quantity of several stretchers (1).
10. a kind of application method of the marine riser stretcher sliding system as described in claim any one of 1-9, which is characterized in that The following steps are included:
Step 1: the stretcher pedestal (11) carries the stretcher (1) and the stretcher driving device (13) moves to institute The position of the first well head (4) is stated, the leading block pedestal (21) carries the leading block (2) and the pulley drive device (23) position of first well head (4) is moved to;
Step 2: start several stretcher driving devices (13) and several pulley drive devices (23) simultaneously, it is described Stretcher pedestal (11) carries several several stretcher driving devices (13) of stretcher (1) from first well head (4) the position sliding of the second well head of Xiang Suoshu (5);The leading block pedestal (21) carries several leading blocks simultaneously (2) it is slid with several pulley drive devices (23) from the position of the first well head (4) second well head of Xiang Suoshu (5);
Step 3: when the stretcher pedestal (11) and the leading block pedestal (21) reach the position of second well head (5) When setting place, several stretcher driving devices (13) and several pulley drive devices (23) are simultaneously closed off, several institutes are made It states stretcher (1) and several leading blocks (2) rests at the position of second well head (5).
CN201910045038.3A 2019-01-17 2019-01-17 Riser tensioner sliding system and using method Active CN109915040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910045038.3A CN109915040B (en) 2019-01-17 2019-01-17 Riser tensioner sliding system and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910045038.3A CN109915040B (en) 2019-01-17 2019-01-17 Riser tensioner sliding system and using method

Publications (2)

Publication Number Publication Date
CN109915040A true CN109915040A (en) 2019-06-21
CN109915040B CN109915040B (en) 2021-06-15

Family

ID=66960311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910045038.3A Active CN109915040B (en) 2019-01-17 2019-01-17 Riser tensioner sliding system and using method

Country Status (1)

Country Link
CN (1) CN109915040B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296821A (en) * 2019-06-27 2019-10-01 宝鸡石油机械有限责任公司 A kind of wire rope type riser stretcher compensation function experimental rig and test method
CN110685615A (en) * 2019-10-25 2020-01-14 四川宏华石油设备有限公司 Marine drilling riser tensioner translation device and translation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212122Y (en) * 2008-06-11 2009-03-25 胜利油田高原石油装备有限责任公司 Rail foundation for wheeled type land mobile drill
CN202055764U (en) * 2011-02-28 2011-11-30 中国海洋石油总公司 Sliding base of ocean drilling and repairing machine
CN203321316U (en) * 2013-09-06 2013-12-04 宝鸡石油机械有限责任公司 Bidirectional movement device of drilling machine
CN203925341U (en) * 2014-02-20 2014-11-05 山东科瑞机械制造有限公司 BOP preventer pallet slippage guide rail
CN107366514A (en) * 2016-05-12 2017-11-21 辽宁陆海石油装备研究院有限公司 A kind of self-elevating drilling platform marine riser stretcher
CN108343388A (en) * 2018-02-12 2018-07-31 新疆石油管理局有限公司准东勘探开发分公司 Tube pulling and pendulum comb bar integrated apparatus and its application method
CN108691307A (en) * 2017-04-11 2018-10-23 烟台中集来福士海洋工程有限公司 Self-elevating drilling platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212122Y (en) * 2008-06-11 2009-03-25 胜利油田高原石油装备有限责任公司 Rail foundation for wheeled type land mobile drill
CN202055764U (en) * 2011-02-28 2011-11-30 中国海洋石油总公司 Sliding base of ocean drilling and repairing machine
CN203321316U (en) * 2013-09-06 2013-12-04 宝鸡石油机械有限责任公司 Bidirectional movement device of drilling machine
CN203925341U (en) * 2014-02-20 2014-11-05 山东科瑞机械制造有限公司 BOP preventer pallet slippage guide rail
CN107366514A (en) * 2016-05-12 2017-11-21 辽宁陆海石油装备研究院有限公司 A kind of self-elevating drilling platform marine riser stretcher
CN108691307A (en) * 2017-04-11 2018-10-23 烟台中集来福士海洋工程有限公司 Self-elevating drilling platform
CN108343388A (en) * 2018-02-12 2018-07-31 新疆石油管理局有限公司准东勘探开发分公司 Tube pulling and pendulum comb bar integrated apparatus and its application method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵建亭等: "《水管张紧器滑移系统。对比文件1("浮式钻井装置隔水管张紧系统研究》", 《上海造船》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296821A (en) * 2019-06-27 2019-10-01 宝鸡石油机械有限责任公司 A kind of wire rope type riser stretcher compensation function experimental rig and test method
CN110685615A (en) * 2019-10-25 2020-01-14 四川宏华石油设备有限公司 Marine drilling riser tensioner translation device and translation method
CN110685615B (en) * 2019-10-25 2024-04-09 四川宏华石油设备有限公司 Marine drilling riser tensioner translation device and translation method

Also Published As

Publication number Publication date
CN109915040B (en) 2021-06-15

Similar Documents

Publication Publication Date Title
US9714546B2 (en) Offshore drilling rig and a method of operating the same
US9051783B2 (en) Vessel for operating on underwater wells and working methods of said vessel
US9458671B2 (en) Method and apparatus for drilling multiple subsea wells from an offshore platform at a single site
US9266586B2 (en) Offshore vessel and method of operation of such an offshore vessel
US8522880B2 (en) Floating offshore structure for hydrocarbon production
CN111491857B (en) Vessel and method for performing subsea wellbore related activities
CN109915040A (en) A kind of marine riser stretcher sliding system and application method
EA025077B1 (en) Floating offshore facility and method for drilling a well
KR101299868B1 (en) Drillship having double derrick
US4470721A (en) Crane assembly for floatable oil/gas production platforms
US10202808B2 (en) Offshore drilling rig and a method of operating the same
KR20110026057A (en) Oil prospecting ship having a gantry type derrick and two lifting means
EP3755618B1 (en) Vessel and method for performing subsea wellbore related activities, e.g. workover activities, well maintenance, installing an object on a subsea well bore
NO342639B1 (en) Riser tensioning system
KR20110094895A (en) Derrick lifting structure and oil prospecting ship including the same
KR101460252B1 (en) Method for handling X-mas tree of dual-well type drillship
KR20150093392A (en) Derrick module and drilling unit with the same
KR20200009675A (en) A drillship
KR101628868B1 (en) Retractable thruster system of semi-rig
KR20170098038A (en) Floating structure without moonpool
KR20180000861A (en) Marine structure and Operation method of the same
KR200492200Y1 (en) Apparatus of riser capture
GB2085051A (en) Crane assembly for floatable oil/gas production platforms
KR20190042965A (en) Load test system of trolley for drilling rig
CN110914145A (en) Vessel and method for performing subsea wellbore related operations

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant