CN109914675A - A kind of logical construction method in dome arc-shaped aluminum side - Google Patents

A kind of logical construction method in dome arc-shaped aluminum side Download PDF

Info

Publication number
CN109914675A
CN109914675A CN201910310579.4A CN201910310579A CN109914675A CN 109914675 A CN109914675 A CN 109914675A CN 201910310579 A CN201910310579 A CN 201910310579A CN 109914675 A CN109914675 A CN 109914675A
Authority
CN
China
Prior art keywords
arc
logical
shaped aluminum
led
aluminum side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910310579.4A
Other languages
Chinese (zh)
Inventor
张亚东
郝加生
陈汉成
江继武
孙嘉伟
陈智坚
李欣鹏
李剑东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Overseas Decoration Engineering Co Ltd
Original Assignee
Shenzhen Overseas Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Overseas Decoration Engineering Co Ltd filed Critical Shenzhen Overseas Decoration Engineering Co Ltd
Priority to CN201910310579.4A priority Critical patent/CN109914675A/en
Publication of CN109914675A publication Critical patent/CN109914675A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A kind of logical construction method in dome arc-shaped aluminum side, one, the production of steelframe conversion layer;S1, field measurement steel frame size;S2, load calculating is carried out with pkpm software, designs the steelframe conversion layer for meeting dome structure;S3, with welding technique angle steel is welded on steel frame again;Two, the logical production in arc-shaped aluminum side and installation;S1, preliminary typesetting is carried out with CAD software is logical to arc-shaped aluminum side on steelframe transferred floor design figure;S2, led to according to live customization profile side;S3, the different radians led to according to arc square regulate the radian of bender, and other side is logical to carry out curved arc;S4, arc square is led to and is cut, and cut oblique angle;S5, the logical progress cure process of other side, wash decontamination;S6, the logical progress of other side are fluorocarbon-sprayed;S7, the main bone in upper layer is finally recycled, is led to screw and component with arc-shaped aluminum side and is connect.Solves the problems, such as large-span domes steelframe conversion layer welding technique using the corresponding steelframe conversion layer of software design according to the spherical structure of dome.

Description

A kind of logical construction method in dome arc-shaped aluminum side
Technical field
The present invention relates to building decoration technology field, specially a kind of dome arc-shaped aluminum side leads to construction method.
Background technique
Aluminium side leads to furred ceiling and is widely used, and either house ornamentation, which is still handled official business, fills or commercially fill, it can be seen that, decorative effect Mostly based on smartness.Aluminum current side is logical to be had the following characteristics that
1, aluminium side is logical can be divided mainly into that aluminium sheet aluminium side is logical and profile aluminium side is logical, it has the characteristics that good decorating effect, windproof strong;
2, the logical installation in aluminium side can be according to different height and spacing, can be one high and one low, and one thin one is close, then is equipped with reasonable face Color collocation, can design different decorative effects;
3, the logical installation in aluminium side is simple and easy to maintain, it can arbitrarily be mounted and dismounted, and not need special tool.
But current aluminium side is logical during the installation process, especially there are larger in the welding of large-span domes steelframe conversion layer Technical problem, positioning accuracy is insufficient in construction, cumbersome, it is difficult to meet existing decoration demand.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of dome arc-shaped aluminum sides to lead to construction method, has easy to operate, province The advantages that work is time saving, cheap, accurate positioning solves current aluminium side and leads to during the installation process, especially large span vault There are biggish technical problems in the steelframe conversion layer welding of top, and positioning accuracy is insufficient in construction, cumbersome, it is difficult to meet existing The problem of some decoration demands.
(2) technical solution
To realize the purpose of aforesaid operations are convenient, and saving of work and time is cheap, accurate positioning, the present invention provides following technical side A kind of case: logical construction method in dome arc-shaped aluminum side, comprising the following steps:
One, steelframe conversion layer makes
S1, field measurement steel frame size;
S2, load calculating is carried out with pkpm software, designs the steelframe conversion layer for meeting dome structure;
S3, with welding technique angle steel is welded on steel frame again;
Two, the logical production in arc-shaped aluminum side and installation
S1, preliminary typesetting is carried out with CAD software is logical to arc-shaped aluminum side on steelframe transferred floor design figure;
S2, led to according to the customization profile side that scene needs;Profile side, which is got out, according to different length leads to raw material;
S3, the different radians led to according to arc square regulate the radian of bender, and other side is logical to carry out curved arc;
S4, it is logical to arc square cut (size needed for installing), and cut oblique angle (different radian sides be logical, the oblique angle of splicing It is different);
S5, the logical progress cure process of other side, are washed decontamination (including pickling degreasing, washing, chromate conversion, washing etc.);
S6, other side, which are led to, carries out fluorocarbon-sprayed (bake using three paintings two, wherein three paintings refer to priming paint, finishing coat, varnish;Current three spraying Layer generally requires secondary curing;Substrate enters curing oven processing, and solidification temperature is generally between 180 DEG C -250 DEG C, curing time It is 15-25 minutes);
S7, finally recycle the main bone in upper layer, led to screw and the special component made and arc-shaped aluminum side and connect (component that spy makes using with Arc-shaped aluminum side leads to compatible steel connector and is made, according to the unused component of the logical selection in different arc-shaped aluminum sides).
Preferably, before step S1 is carried out in the steelframe conversion layer production, the elevation line of furred ceiling is verified, and verify and install Finish various pipelines and ventilating duct in furred ceiling, determines lamp position, ventilation opening and the various bright orifice positions of dew.
Preferably, every side is logical at the scene with customization profile Fang Tongxu in step S2 in installation for the logical production in the arc-shaped aluminum side Add 60cm on the basis of length.
Preferably, 24 aluminium sides are arranged altogether and lead to for the top in longitudinal height, and height difference is at arithmetic progression, first term height difference between side is logical For 20 mm, tolerance is 1 mm, total a height of 713mm.
Preferably, 32 aluminium sides are arranged altogether and lead to for the middle part in longitudinal height, and height difference is at arithmetic progression, first term height difference between side is logical For 44 mm, tolerance is 2 mm, total a height of 2400mm.
Preferably, 13 aluminium sides are arranged altogether and lead to for the bottom in longitudinal height, and height difference is at arithmetic progression, first term height difference between side is logical For 109 mm, tolerance is 3 mm, total a height of 1651mm.
Preferably, 69 aluminium sides are arranged altogether and lead to for the bottom of lateral length, and at arithmetic progression, innermost circle radius is the logical radius in side 3150 mm, tolerance are 150 mm, and outmost turns radius is 13350mm.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of dome arc-shaped aluminum side lead to construction method, have it is following the utility model has the advantages that
1, the dome arc-shaped aluminum side leads to construction method, according to the spherical structure of dome, is converted using the corresponding steelframe of software design Layer, solves the problems, such as large-span domes steelframe conversion layer welding technique.
2, the dome arc-shaped aluminum side leads to construction method, according to typesetting figure, leads to manufacturing technology, production and peace using arc-shaped aluminum side It is logical to fill arc-shaped aluminum side, easy to operate, saving of work and time, cheap, accurate positioning.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
A kind of logical construction method in dome arc-shaped aluminum side, comprising the following steps:
One, steelframe conversion layer makes
S1, field measurement steel frame size, and base is cleared up, it is ready for subsequent installation;
S2, with pkpm software carry out load calculating, design the steelframe conversion layer for meeting dome structure, reprocessed angle steel and Steel frame and synchronizing is pre-installed;
S3, with welding technique angle steel is welded on steel frame again;
Two, the logical production in arc-shaped aluminum side and installation
S1, preliminary typesetting is carried out with CAD software is logical to arc-shaped aluminum side on steelframe transferred floor design figure;
S2, led to according to the customization profile side that scene needs;Profile side, which is got out, according to different length leads to raw material;
S3, the different radians led to according to arc square regulate the radian of bender, and other side is logical to carry out curved arc;
S4, it is logical to arc square cut (size needed for installing), and cut oblique angle (different radian sides be logical, the oblique angle of splicing It is different);
S5, the logical progress cure process of other side, wash decontamination (including pickling degreasing, washing, chromate conversion, washing etc.), guarantee Just logical durability;
S6, other side, which are led to, carries out fluorocarbon-sprayed (bake using three paintings two, wherein three paintings refer to priming paint, finishing coat, varnish;Current three spraying Layer generally requires secondary curing;Substrate enters curing oven processing, and solidification temperature is generally between 180 DEG C -250 DEG C, curing time It is 15-25 minutes);
S7, finally recycle the main bone in upper layer, led to screw and the special component made and arc-shaped aluminum side and connect (component that spy makes using with Arc-shaped aluminum side leads to compatible steel connector and is made, according to the unused component of the logical selection in different arc-shaped aluminum sides).
In the present invention, before step S1 is carried out in the steelframe conversion layer production, the elevation line of furred ceiling is verified, and verify installation Various pipelines and ventilating duct in furred ceiling are finished, lamp position, ventilation opening and the various bright orifice positions of dew are determined.
In the present invention, the every side at the scene profile Fang Tongxu is customized in the logical production in the arc-shaped aluminum side and step S2 in installation Add 60cm on the basis of elongated degree.
In the present invention, 24 aluminium sides are arranged altogether and lead to for the top in longitudinal height, and for height difference at arithmetic progression, first term is high between side is logical Difference is 20 mm, and tolerance is 1 mm, total a height of 713mm.
In the present invention, 32 aluminium sides are arranged altogether and lead to for the middle part in longitudinal height, and for height difference at arithmetic progression, first term is high between side is logical Difference is 44 mm, and tolerance is 2 mm, total a height of 2400mm.
In the present invention, 13 aluminium sides are arranged altogether and lead to for the bottom in longitudinal height, and for height difference at arithmetic progression, first term is high between side is logical Difference is 109 mm, and tolerance is 3 mm, total a height of 1651mm.
In the present invention, 69 aluminium sides are arranged altogether and lead to for the bottom of lateral length, and the logical radius in side is at arithmetic progression, innermost circle radius For 3150 mm, tolerance is 150 mm, and outmost turns radius is 13350mm.
Above-mentioned aluminium side is logical can to guarantee enough intensity and aesthetics, guarantee the weldering of the logical construction in large-span domes arc-shaped aluminum side What is connect is smooth.
In conclusion the dome arc-shaped aluminum side leads to construction method, it is corresponding using software design according to the spherical structure of dome Steelframe conversion layer, solve the problems, such as large-span domes steelframe conversion layer welding technique.
The dome arc-shaped aluminum side leads to construction method, according to typesetting figure, leads to manufacturing technology, production and installation using arc-shaped aluminum side Arc-shaped aluminum side is logical, and easy to operate, saving of work and time, cheap, accurate positioning solves current aluminium side and leads in installation process In, especially there are biggish technical problems in the welding of large-span domes steelframe conversion layer, and positioning accuracy is insufficient in construction, behaviour Make cumbersome, it is difficult to the problem of meeting existing decoration demand.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of dome arc-shaped aluminum side leads to construction method, which comprises the following steps:
One, steelframe conversion layer makes
S1, field measurement steel frame size;
S2, load calculating is carried out with pkpm software, designs the steelframe conversion layer for meeting dome structure;
S3, with welding technique angle steel is welded on steel frame again;
Two, the logical production in arc-shaped aluminum side and installation
S1, preliminary typesetting is carried out with CAD software is logical to arc-shaped aluminum side on steelframe transferred floor design figure;
S2, led to according to live customization profile side;
S3, the different radians led to according to arc square regulate the radian of bender, and other side is logical to carry out curved arc;
S4, arc square is led to and is cut, and cut oblique angle;
S5, the logical progress cure process of other side, wash decontamination;
S6, the logical progress of other side are fluorocarbon-sprayed;
S7, the main bone in upper layer is finally recycled, is led to screw and component with arc-shaped aluminum side and is connect.
2. a kind of dome arc-shaped aluminum side according to claim 1 leads to construction method, it is characterised in that: the steelframe conversion layer Before step S1 is carried out in production, the elevation line of furred ceiling is verified, and verify and install various pipelines and ventilating duct in furred ceiling, Determine lamp position, ventilation opening and the various bright orifice positions of dew.
3. a kind of dome arc-shaped aluminum side according to claim 1 leads to construction method, it is characterised in that: the arc-shaped aluminum side is logical Add 60cm on the basis of production and customization profile Fang Tongxu in step S2 in the installation at the scene elongated degree in every side.
CN201910310579.4A 2019-04-17 2019-04-17 A kind of logical construction method in dome arc-shaped aluminum side Pending CN109914675A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910310579.4A CN109914675A (en) 2019-04-17 2019-04-17 A kind of logical construction method in dome arc-shaped aluminum side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910310579.4A CN109914675A (en) 2019-04-17 2019-04-17 A kind of logical construction method in dome arc-shaped aluminum side

Publications (1)

Publication Number Publication Date
CN109914675A true CN109914675A (en) 2019-06-21

Family

ID=66977602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910310579.4A Pending CN109914675A (en) 2019-04-17 2019-04-17 A kind of logical construction method in dome arc-shaped aluminum side

Country Status (1)

Country Link
CN (1) CN109914675A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787761A (en) * 2010-03-25 2010-07-28 北京建工集团有限责任公司 Special aluminum square tube ceiling and construction method thereof
EP2309070A1 (en) * 2009-08-06 2011-04-13 Armstrong Metalldecken AG Construction element for ceiling and wall arc boards and method for its manufacture
CN204551854U (en) * 2015-04-21 2015-08-12 上海康业建筑装饰工程有限公司 Ultra-thin special-shaped aluminium flake furred ceiling suspension
CN107299715A (en) * 2017-07-19 2017-10-27 江苏东保装饰集团有限公司 A kind of Large size Aluminium side leads to installation of ceiling method
CN207314637U (en) * 2017-10-26 2018-05-04 苏州金螳螂建筑装饰股份有限公司 A kind of assembly wood imitation structure and molding body
CN208168112U (en) * 2018-01-02 2018-11-30 广州金霸建材股份有限公司 A kind of curved section bars combination furred ceiling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2309070A1 (en) * 2009-08-06 2011-04-13 Armstrong Metalldecken AG Construction element for ceiling and wall arc boards and method for its manufacture
CN101787761A (en) * 2010-03-25 2010-07-28 北京建工集团有限责任公司 Special aluminum square tube ceiling and construction method thereof
CN204551854U (en) * 2015-04-21 2015-08-12 上海康业建筑装饰工程有限公司 Ultra-thin special-shaped aluminium flake furred ceiling suspension
CN107299715A (en) * 2017-07-19 2017-10-27 江苏东保装饰集团有限公司 A kind of Large size Aluminium side leads to installation of ceiling method
CN207314637U (en) * 2017-10-26 2018-05-04 苏州金螳螂建筑装饰股份有限公司 A kind of assembly wood imitation structure and molding body
CN208168112U (en) * 2018-01-02 2018-11-30 广州金霸建材股份有限公司 A kind of curved section bars combination furred ceiling

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴启星 等: "复杂结构顶棚大波浪形铝方通吊顶施工技术", 《施工技术》 *
陈煜杰: "浅析提高莲花造型吊顶质量的正确做法", 《2017年7月建筑科技与管理学术交流会论文集》 *

Similar Documents

Publication Publication Date Title
US9464435B2 (en) Metal curtain wall system of monolayer structure and construction method thereof
CN206625507U (en) The assembled skirting of LED light bar can be filled
CN204163259U (en) The ceiling structure of integrated interior decoration
CN109914675A (en) A kind of logical construction method in dome arc-shaped aluminum side
CN101769023B (en) Composite decorative board curtain wall
CN102121287B (en) Invisible connected composite plate curtain wall
CN201991160U (en) Heat-preserving and decorative integrated external wall board
CN100451280C (en) Method for processing integrated shower room for use in wood house
CN202936978U (en) Installation structure of large-space decorative surface
CN205077793U (en) Decorate top surface expansion joint structure
CN206487100U (en) A kind of integrated wall keel
CN209907771U (en) Stack-level awning installation system
CN102704636B (en) Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN110670787A (en) Groove profile special for ceiling gypsum board suspended ceiling and mounting method thereof
CN218933568U (en) Gypsum line molding structure
CN221298462U (en) Unit type GRG plate splicing structure
CN103015661B (en) Decorate the construction method that large plate seamless entirety manufactured, installed integration within doors
CN205382829U (en) Novel flat -open window casement aluminum profile struction
CN217518022U (en) Circular post structure
CN215760133U (en) Adjustable assembly type lamp groove line installation structure
CN101876423A (en) Installation method of LED landscape lamp
CN205296666U (en) Architectural decoration is with real mineral varnish coating aluminium veneer
CN202787621U (en) Connecting structure for connecting decoration panel and wall
CN218597493U (en) Molding aluminum plate furred ceiling molding structure
CN203066378U (en) Plug-in quickly-installed board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621