CN109914345A - Mud hydraulic reclamation landscape island lightweight basement process key technology - Google Patents

Mud hydraulic reclamation landscape island lightweight basement process key technology Download PDF

Info

Publication number
CN109914345A
CN109914345A CN201910159185.3A CN201910159185A CN109914345A CN 109914345 A CN109914345 A CN 109914345A CN 201910159185 A CN201910159185 A CN 201910159185A CN 109914345 A CN109914345 A CN 109914345A
Authority
CN
China
Prior art keywords
island
landscape
river
lake
sludge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910159185.3A
Other languages
Chinese (zh)
Inventor
孙秀丽
沈起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan University
Original Assignee
Jiangnan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangnan University filed Critical Jiangnan University
Priority to CN201910159185.3A priority Critical patent/CN109914345A/en
Publication of CN109914345A publication Critical patent/CN109914345A/en
Pending legal-status Critical Current

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The invention belongs to environmental geotechnical technical fields, disclose a kind of mud hydraulic reclamation landscape island lightweight basement process key technology, comprising: the plan boundary line along landscape island ground sets steel sheet-pile cofferdam;River and lake dredging is executed, river and lake silt is obtained;Curing agent is added into dredging silt and bonding packing material forms utilizing solidified earth from sludge;It will treated that utilizing solidified earth from sludge is backfilling into cofferdam to pave carries out compaction in layers;Detection is sampled to soil sample after maintenance to regulation age, sludge solidification processing is completed after reaching design objective, forms landscape island high-strength light ground.The present invention provides a kind of pair of river-lake environments to pollute small, the strong mud hydraulic reclamation landscape island lightweight basement process key technology of structural reliability.

Description

Mud hydraulic reclamation landscape island lightweight basement process key technology
Technical field
The present invention relates to environmental geotechnical technical fields, in particular to a kind of to utilize mud hydraulic reclamation landscape island lightweight ground Handle key technology
Background technique
In order to be dredged and improved water quality to river, countries in the world have been carried out large-scale dredging engineering and Dredging silt engineering, thus the every annual meeting in China generates several hundred million cubes of waste silt.Dredging silt moisture content and compressibility are high, strong Spend low, some of mud also contain the pollutants such as heavy metal, therefore are difficult to be directly used as engineering material.Sludge solidification is resource Change the effective way utilized, i.e., changes the size, form and physics of sludge granules by the way that curing materials are added in mud Mud is finally become soil material and recycled by mechanical property.But many river and lakes are in down town, a large amount of sludge solidification Soil needs to carry out strange land disposition, and transportation cost is very high, and the secondary pollution risk of environment is big.
Curing sludge hydraulic reclamation landscape island ground is utilized in the river and lake of down town, can be improved urban rivers and lakes landscape, is conducive to river The lake ecological balance, and the river and lake silt of the big scale of construction can be dissolved;Sludge solidification can dissolve the solid waste material on city and periphery simultaneously, such as The materials such as miberal powder, flyash and waste foam realize the resource utilization of these wastes.
Summary of the invention
The present invention provides a kind of utilization mud hydraulic reclamation landscape island lightweight basement process key technology.Artificial scape in the prior art See island ground fill earthwork it is huge, it is at high cost, easily lead to secondary environmental pollution and man-made island fastness is poor, in city The technical problems such as heart river and lake silt outlet.
The present invention provides a kind of utilization mud hydraulic reclamation landscape island lightweight basement process key technology, solves scape in the prior art It sees island and fills that earthwork is huge, at high cost easily leads to secondary environmental pollution and the poor technical problem of landscape island fastness.
In order to solve the above technical problems, utilizing mud hydraulic reclamation landscape island lightweight basement process key the present invention provides a kind of Technology, comprising:
Plan boundary line along landscape island ground sets steel sheet-pile cofferdam;River and lake dredging is executed, river and lake silt is obtained;To dredge It dredges and adds curing agent and bonding packing material formation utilizing solidified earth from sludge in mud;By treated, utilizing solidified earth from sludge is backfilling into cofferdam It inside paves and carries out compaction in layers;Detection is sampled to soil sample after maintenance to regulation age, completes mud after reaching design objective Curing process forms landscape island high-strength light ground.
Further, the compaction in layers processing includes: and carries out compacting rolling speed using flat stone roller to be no more than 2km/h, point 250~300mm of thickness degree, every lamination are 6~8 times real.
Further, the method also includes: before island is built in execution, to river and lake silt carry out multi-point sampling reconnoitre, River and lake silt mechanics index of physics is measured, determines amount of sludge and applicable dredging technique;According to dredging silt amount and river and lake week Surrounding environment designs landscape island area of base and shape;Wherein, mechanics index of physics includes moisture content, the content of organic matter, pollutant Characteristic, liquid limit, plastic limit and granulometric composition.
Further, the curing agent and bonding packing material include: miberal powder, flyash, polystyrene foam plastics (EPS) or waste foam, alkyl phenol polyoxyethylene ether and neopelex.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The mud hydraulic reclamation landscape island lightweight basement process key technology provided in the embodiment of the present application is by desilting site When handle dredging silt, remove land hydraulic reclamation from and occupy large amount of land resources, transport outward a large amount of dredging silts to sufficiently reduce and build Build material troublesome operation and high cost problem;Importantly, the river and lake silt used on the spot and locating river and lake ecological environment Suit completely, to guarantee the ecological environment of landscape island ground and the compatibility of river and lake ecological environment, avoids dystrophication;It is another Aspect can also have the function that clear up river and lake silt, have positive effect for river and lake dredging;Most of all, dredging silt Lightweight ground can reduce the additional stress of ground, the settlement issues after reducing work.
Specific embodiment
The embodiment of the present application solves existing skill by providing a kind of mud hydraulic reclamation landscape island lightweight basement process key technology In art landscape island ground constructing soil earthwork it is huge, it is at high cost, easily lead to secondary environmental pollution and landscape island ground fastness The technical problems such as poor and down town river and lake silt outlet;The environment compatibility, reliable for promoting landscape island ground is reached The technical effect of property and economy.
In order to solve the above technical problems, the general thought that the embodiment of the present application provides technical solution is as follows:
Use the primary mud of river and lake for material build landscape island ground, reduce outward transport building materials, thus reduce by bring A series of problems, such as at high cost, pollution weighs;Meanwhile, it is capable to which the adaptability natural to river and lake based on river and lake silt building materials, guarantees life The uniformity of state system;In addition, utilizing solidified earth from sludge as base construction material basically, has the advantages that antiscour, erosion resistant, make It obtains landscape island ground and has better structural reliability.
In order to better understand the above technical scheme, below in conjunction with specification specific embodiment to above-mentioned technical side Case is described in detail, it should be understood that the specific features in the embodiment of the present invention and embodiment are to technical scheme Detailed description, rather than the restriction to technical scheme, in the absence of conflict, the embodiment of the present application and implementation Technical characteristic in example can be combined with each other.
A kind of mud hydraulic reclamation landscape island lightweight basement process key technology, comprising:
Plan boundary line along landscape island ground sets steel sheet-pile cofferdam, when constructing steel sheet-pile cofferdam, cofferdam top surface ratio The peak level that construction period is likely to occur is higher by 0.5m or more.Steel sheet pile adds one of folder every 4~5m using group stake inserting piling Plate, clamping plate are clipped before sheet pile lifting, are removed by paying when inserting piling, are used in turn.Butter mixture is coated in the fore shaft of group stake Ointment, to reduce frictional resistance when inserting piling and reinforce barrier performance.Steel sheet-pile cofferdam need to use the lumps of wood or fashioned iron as interior nose girder, lead Inclosure is made in frame.Inside and outside nose girder spacing is 8cm~10cm bigger than steel sheet pile effective thickness, with the inserting piling of sharp steel sheet pile.Execute hydraulic reclamation Before ground, multi-point sampling is carried out to river and lake silt and is reconnoitred, river and lake silt mechanics index of physics is measured, amount of sludge is determined and fits Dredging technique is constructed to targetedly understand the state of river and lake silt convenient for subsequent design.According to dredging silt amount Landscape island area of base and shape are designed with river and lake surrounding enviroment.Wherein, mechanics index of physics includes: that moisture content, organic matter contain Amount, pollutant characteristic, liquid limit, plastic limit and granulometric composition.After completing above-mentioned survey and design, start to construct according to design Cofferdam prepares dredging operation, to obtain necessary ground hydraulic reclamation material.By river and lake dredging, a large amount of river and lake can be obtained and become silted up Mud material provides sufficient hydraulic reclamation material, while also can play positive effect to river and lake dredging.
Further, curing agent is added into gained dredging silt and bonding packing material forms utilizing solidified earth from sludge.
It further, will treated that utilizing solidified earth from sludge is backfilling into cofferdam to pave carries out compaction in layers.Specifically, it adopts It being compacted with flat stone roller, rolling speed is no more than 2km/h, lift height 250~300mm, and every lamination reality 6~8 times.Meanwhile by It is significant to the adaptability and erosion resistance of river-lake environment in filler itself from river-lake environment herein.
Further, detection is sampled to soil sample after maintenance to regulation age, completion mud is solid after reaching design objective Change processing, forms landscape island high-strength light ground.
Further, the curing agent and bonding packing material include: miberal powder, flyash, polystyrene foam plastics (EPS) or waste foam, alkyl phenol polyoxyethylene ether and neopelex.The curing agent and bonding packing material have Following technical effect: the mechanical strength and stability of curing sludge can be improved in hydration reaction product;Miberal powder and fine coal is utilized Grey two kinds of industrial residues, reduce processing cost, alleviate environmental pressure;Addition foamed plastics or waste foam can reduce cost And environment is protected, while making landscape island ground that there is lightweight nature;Add nonionic surfactant and anion surface active Agent plays the role of blistering and foam stabilizing, and has stronger caking property, can make dredging silt rapid curing, shorten the construction period.
The present embodiment also passes through one and specifically makes island scheme and illustrate the present invention below.
With tubular type sludge sampler, multi-point sampling is reconnoitred in certain lake, and measuring bottom sludge layer average thickness is 0.8m, area of lake 60000m2, current depth of water 1.8m, test result is as follows for laboratory test: gravel content 8% (Zhan Ganchong), The content of organic matter 5% (Zhan Ganchong), natural density 1.2t/m3, clay content 65%, contamination-free, final determine inhaled using twisting Dredging is 60000m to dredging silt amount3;At lake center, round Eco-Island ground, diameter 45m are filled in design;Along design Boundary line sets steel sheet-pile cofferdam outside landscape island ground;Mud in cofferdam twist comprehensively and inhales dredging, dredging mud is delivered to Sludge treatment place adds 40kg modifying agent (miberal powder: flyash: alkyl phenol polyoxyethylene ether: 12 into dredging silt per ton Sodium alkyl benzene sulfonate=4: 4: 1: 1), while adding 500g polystyrene foam plastics (EPS) and forming utilizing solidified earth from sludge;It will processing Utilizing solidified earth from sludge afterwards, which is backfilling into cofferdam, to be paved and is compacted using flat stone roller, rolling speed 2km/h, lift height 250mm, every lamination are 8 times real;Maintenance usually 28 days, is sampled detection to soil sample, after reaching design objective to regulation age Sludge solidification processing is completed, cofferdam is removed, forms landscape island high-strength light ground.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
What is provided in the embodiment of the present application utilizes mud hydraulic reclamation landscape island lightweight basement process key technology, is adopted by scene Collect riverbed sludge, and build island material by being fabricated to the original of landscape island ground to dredging silt progress curing process, to fill Dividing reduces troublesome operation and the high cost problem for transporting outward a large amount of dredging silts and construction material;Importantly, use on the spot River and lake silt suits completely with locating river and lake ecological environment, to guarantee the simultaneous of the ecological environment of landscape island and river and lake ecological environment Capacitive avoids dystrophication;On the other hand, it can also have the function that clear up river and lake silt, have positive meaning for river and lake dredging Justice;Simultaneously by using treated utilizing solidified earth from sludge as the island base of landscape island, and to utilizing solidified earth from sludge progress compaction in layers Processing, enhances the overall stability of landscape island ground.
It should be noted last that the above specific embodiment is only used to illustrate the technical scheme of the present invention and not to limit it, Although being described the invention in detail referring to example, those skilled in the art should understand that, it can be to the present invention Technical solution be modified or replaced equivalently, without departing from the spirit and scope of the technical solution of the present invention, should all cover In the scope of the claims of the present invention.

Claims (4)

1. mud hydraulic reclamation landscape island lightweight basement process key technology characterized by comprising
Plan boundary line along landscape island ground sets steel sheet-pile cofferdam;River and lake dredging is executed, river and lake silt is obtained;
Curing agent is added into dredging silt and bonding packing material forms utilizing solidified earth from sludge;By treated, utilizing solidified earth from sludge is returned It fills out to pave into cofferdam and carries out compaction in layers;Detection is sampled to soil sample after maintenance to regulation age, after reaching design objective Sludge solidification processing is completed, landscape island high-strength light ground is formed.
2. mud hydraulic reclamation landscape island lightweight basement process key technology as described in claim 1, which is characterized in that the layering Compaction treatment includes: to be compacted using flat stone roller, and rolling speed is no more than 2km/h, and 250~300mm of lift height, every lamination is in fact 6~8 times.
3. mud hydraulic reclamation landscape island lightweight basement process key technology as described in claim 1, it is characterised in that: the method Further include: before executing ground and building, multi-point sampling is carried out to river and lake silt and is reconnoitred, measurement river and lake silt physical mechanics refer to Mark determines amount of sludge and applicable dredging technique;According to dredging silt amount and river and lake surrounding enviroment design landscape island basal plane Long-pending and shape;Wherein, mechanics index of physics includes: moisture content, the content of organic matter, pollutant characteristic, liquid limit, plastic limit and granularity Ingredient.
4. mud hydraulic reclamation landscape island lightweight basement process key technology as described in claim 1, it is characterised in that: the solidification Agent and bonding packing material include: miberal powder, flyash, polystyrene foam plastics (EPS) or waste foam, alkyl phenol polyoxy second Alkene ether and neopelex.
CN201910159185.3A 2019-03-03 2019-03-03 Mud hydraulic reclamation landscape island lightweight basement process key technology Pending CN109914345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910159185.3A CN109914345A (en) 2019-03-03 2019-03-03 Mud hydraulic reclamation landscape island lightweight basement process key technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910159185.3A CN109914345A (en) 2019-03-03 2019-03-03 Mud hydraulic reclamation landscape island lightweight basement process key technology

Publications (1)

Publication Number Publication Date
CN109914345A true CN109914345A (en) 2019-06-21

Family

ID=66963066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910159185.3A Pending CN109914345A (en) 2019-03-03 2019-03-03 Mud hydraulic reclamation landscape island lightweight basement process key technology

Country Status (1)

Country Link
CN (1) CN109914345A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230318A (en) * 2019-06-25 2019-09-13 中交上海航道勘察设计研究院有限公司 Raft foundation structure for the construction of lake region man-made island
CN115231779A (en) * 2022-08-04 2022-10-25 中国科学院亚热带农业生态研究所 Silting type lake ecological restoration method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906812A (en) * 2017-03-17 2017-06-30 中国科学院武汉岩土力学研究所 A kind of method that utilization river and lake silt builds artificial ecologic island
CN107267121A (en) * 2017-08-10 2017-10-20 北京中永基固化剂科技发展有限公司 A kind of processing method of dust suppression sludge curing agent
CN107313422A (en) * 2017-07-11 2017-11-03 江苏坤泽科技股份有限公司 A kind of method that road/place basis is prepared under muddy soft soil environment
CN108468325A (en) * 2018-03-23 2018-08-31 葛洲坝中固科技股份有限公司 A kind of large area borders on the sea beach ooze rapid curing construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906812A (en) * 2017-03-17 2017-06-30 中国科学院武汉岩土力学研究所 A kind of method that utilization river and lake silt builds artificial ecologic island
CN107313422A (en) * 2017-07-11 2017-11-03 江苏坤泽科技股份有限公司 A kind of method that road/place basis is prepared under muddy soft soil environment
CN107267121A (en) * 2017-08-10 2017-10-20 北京中永基固化剂科技发展有限公司 A kind of processing method of dust suppression sludge curing agent
CN108468325A (en) * 2018-03-23 2018-08-31 葛洲坝中固科技股份有限公司 A kind of large area borders on the sea beach ooze rapid curing construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110230318A (en) * 2019-06-25 2019-09-13 中交上海航道勘察设计研究院有限公司 Raft foundation structure for the construction of lake region man-made island
CN115231779A (en) * 2022-08-04 2022-10-25 中国科学院亚热带农业生态研究所 Silting type lake ecological restoration method
CN115231779B (en) * 2022-08-04 2024-05-10 中国科学院亚热带农业生态研究所 Ecological restoration method for siltation type lake

Similar Documents

Publication Publication Date Title
CN106836186B (en) A kind of construction technology of utilizing solidified earth from sludge
Zhao et al. Application of construction waste in the reinforcement of soft soil foundation in coastal cities
Chu et al. Methods for improvement of clay slurry or sewage sludge
CN105002884B (en) A kind of river silt from the bottom of lake first solidifies the method excavated afterwards
CN103015367A (en) High-efficiency economical construction method for revetment
CN109914345A (en) Mud hydraulic reclamation landscape island lightweight basement process key technology
CN101575848A (en) Method for treating foundation by combined hammers
CN104532817A (en) Site mixing and blow-filling method of solidified dredged mud
CN106906812B (en) A method of artificial ecologic island is built using river and lake silt
CN113564977A (en) Construction method of soft soil foundation with high water content
CN201406681Y (en) Pre-reinforcement processing device of mixed hydraulic reclamation soft soil foundation
CN217500288U (en) High-energy-level dynamic compaction and replacement and tubular pile combined foundation structure for deep soil filling field
CN216427867U (en) Composite roadbed based on high-water-content thick soft soil layer
Jiang et al. Research progress of soft soil foundation treatment technology
Kitazume Sustainable land reclamation in coastal area
CN111206598B (en) Method for cooperatively utilizing construction waste in hillock landscaping project
CN206438495U (en) Sand filling bag composite pile system is consolidated from after draining
Yin et al. A sustainable approach to marine reclamations and a field trial at Tung Chung new town extension site in Hong Kong
CN101597905A (en) Post hammer associating hammer flattener high level compound dynamic replacement pier method and application thereof
CN202706051U (en) Different elevation electrolytic bath salt heaving preventing foundation exchange filling construction structure
KR102701524B1 (en) METHOD FOR MARINE LAND RECLAMATION by SMARTSOIL USING SOFT SOIL LIKE CLAY AND SILT IN SEA FOR PREVENTING LAND SETTLEMENT
CN216615907U (en) Pile slope and consolidate in grades and cover green structure
Cheng et al. Variation of strength of cement-soil mixing column with depth in dredger fill site
Safhi Dredged Materials as Construction Resource—Up-to-Date Review
Xiong Ecological Engineering Trench Inspection and Foundation Reinforcement in the New Era

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190621

WD01 Invention patent application deemed withdrawn after publication