CN109914304A - A kind of security protection system of highway construction - Google Patents

A kind of security protection system of highway construction Download PDF

Info

Publication number
CN109914304A
CN109914304A CN201910284397.4A CN201910284397A CN109914304A CN 109914304 A CN109914304 A CN 109914304A CN 201910284397 A CN201910284397 A CN 201910284397A CN 109914304 A CN109914304 A CN 109914304A
Authority
CN
China
Prior art keywords
connecting rod
security protection
highway construction
protection system
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910284397.4A
Other languages
Chinese (zh)
Inventor
李娜
马智强
朱鸽娜
陈博
戚爱华
张少辉
袁方
朱威
郭新东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910284397.4A priority Critical patent/CN109914304A/en
Publication of CN109914304A publication Critical patent/CN109914304A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of security protection systems of highway construction, it is related to highway construction technical field, it includes several support columns and the folding protective fence between adjacent supports column, support column is connected with folding protective fence by quick-connect machanism, the beneficial effects of the present invention are: passing through the effect for folding protective fence, so that the distance of adjacent supports column is adjustable, when carrying out the arrangement of protective fence, it is very convenient, without being arranged again after calculating size at the scene, in addition, support column is connected with folding protective fence by quick-connect machanism, its is convenient and simple for connection, facilitate the arrangement speed of promotion safety guard system.

Description

A kind of security protection system of highway construction
Technical field
The present invention relates to highway construction technical field, the security protection system of specifically a kind of highway construction.
Background technique
With the growth of China's existing highway service time, various diseases are also continuously emerged, and lead to highway maintenance work What work was measured continues to increase;Moreover, with the development of economy, the existing Four-Lane Road highway traffic capacity in part is no longer satisfied The needs of the growing volume of traffic lead to gradually increasing for Expressway Extension Project.This results in highway construction Area increases.Highway construction area usually requires to occupy part runway and passes through provisional protection net for highway construction area Keep apart with runway.In this case, into the public vehicles of construction area inevitably to construction personnel, construction machine Tool has an impact, and leading to construction area, nearby there are severe compromises in section.A kind of typical situation is that public vehicles are not infused It anticipates to construction sign and swarms into construction area, cause collision damage to construction personnel, Construction traffic.
A kind of security protection system of highway construction, specifically discloses protection as disclosed in CN108756450A Net, column, alarming device etc., though having certain beneficial effect, there are still following defects: disassembly and installation is not square enough Just, cause the system more time-consuming in preparatory arrangement;In addition, alarming device needs electricity consumption, and in field work, electric energy supply It is not convenient enough.
Summary of the invention
The purpose of the present invention is to provide a kind of security protection systems of highway construction, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of security protection system of highway construction, including several support columns and between the adjacent supports column Folding protective fence, support column connected with protective fence is folded by quick-connect machanism.
As further scheme of the invention: it is multiple connecting rod I and connecting rod that the folding protective fence, which includes quantity, II, wherein connecting rod I is vertically arranged, and by inclined connecting rod II connection between two adjacent connecting rod I, and the both ends of connecting rod II are equal It is hinged by pin shaft and connecting rod I.
As further scheme of the invention: the surface of the connecting rod I and connecting rod II is pasted with reflective strip.
As further scheme of the invention: being equipped with warning tape between two adjacent support columns.
As further scheme of the invention: being mounted on elastic winding tape device, warning tape volume in each support column It is wound on elastic winding tape device, connection card is fixed at the free end position of warning tape, support column is equipped with and matches with connection card Fixing buckle.
As further scheme of the invention: the quick-connect machanism includes dividing in support column and folding protective fence On female plug connector and male plug connector, female plug connector and male plug connector are mutually inserted cooperation.
As further scheme of the invention: the female plug connector includes lock sleeve, jack tube and extruding steel ball, socket Pipe is fixed on the support columns, and the outer cover of jack tube is equipped with the lock sleeve being slidably matched with it, the outer wall of lock sleeve and jack tube Between be fixed with spring positioning ring, the outer cover of jack tube is equipped with locking spring, and it is fixed that the both ends of locking spring are separately connected spring Position ring and lock sleeve, the tube wall of jack tube are equipped with opening, and opening is interior to be equipped with extruding steel ball by connecting spring, lock sleeve Inner wall has taper at the corresponding position for squeezing steel ball, squeezes steel ball and contacts with the inner wall of lock sleeve;The male plug connector packet Connecting tube is included, the locating slot that a circle is matched with extruding steel ball is offered in connecting tube.
As further scheme of the invention: limited block is fixed in the jack tube, when connecting tube and limited block phase When conflict, locating slot is corresponding with the position of steel ball is squeezed.
Compared with prior art, the beneficial effects of the present invention are: passing through the effect for folding protective fence, so that adjacent supports column Distance it is adjustable, carry out protective fence arrangement when, it is very convenient, without being arranged again after calculating size at the scene, in addition, Support column is connected with folding protective fence by quick-connect machanism, convenient and simple for connection, helps to promote intrinsic safety full protection system The arrangement speed of system.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the security protection system of highway construction.
Fig. 2 is the structural schematic diagram of support column in a kind of security protection system of highway construction.
Fig. 3 is the connection schematic diagram of male plug connector and female plug connector in a kind of security protection system of highway construction.
In figure: 1- support column, 2- fold protective fence, 201- connecting rod I, 202- connecting rod II, 203- reflective strip, 204- pin shaft, 3- female plug connector, 301- lock sleeve, 302- locking spring, 303- jack tube, 304- limited block, 305- spring positioning ring, 306- It is solid to squeeze steel ball, 307- connecting spring, 4- male plug connector, 401- connecting tube, 402- locating slot, 5- warning tape, 6- connection card, 7- Fixed button, 8- elastic winding tape device.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all implementations consistent with this disclosure.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects disclosed in the present embodiment are consistent.
Embodiment 1
Please refer to Fig. 1~2, in the embodiment of the present invention, a kind of security protection system of highway construction, including several Support column 1 and the folding protective fence 2 between adjacent supports column 1, due to folding the foldable effect of protective fence 2, so that The distance of adjacent supports column 1 is adjustable, carry out protective fence arrangement when, it is very convenient, without at the scene calculate size after again into Row arrangement, support column 1 are connected with protective fence 2 is folded by quick-connect machanism.
Specifically, it is multiple connecting rod I201 and connecting rod II202 that the folding protective fence 2, which includes quantity, wherein Connecting rod I201 is vertically arranged, by inclined connecting rod II202 connection between two adjacent connecting rod I201, and connecting rod II202 Both ends pass through pin shaft 204 and connecting rod I201 is hinged, when practical application, when the connecting rod I201 when two sides is moved out, with even Bar II202 gradually tends to horizontal, and the entire length for folding protective fence 2 is able to achieve expansion.
For further, this system in order to remain to play warning effect in night use, in the connecting rod I201 and The surface of connecting rod II202 is pasted with reflective strip 203.
In addition, being equipped with warning tape 5 between two adjacent support columns 1, it can print and " be asked in construction on warning tape 5 Detour " etc. reflective font, to play the role of warning statement, it is further for, be mounted on bullet in each support column 1 Property bandage-winder 8, warning tape 5 is fixed with connection card 6 on elastic winding tape device 8 at the free end position of warning tape 5, support Column 1 is equipped with the fixing buckle 7 matched with connection card 6, in practical application, support column 1 and folding protective fence 2 arrange Afterwards, connection card 6 can be pulled to pull out warning tape 5, is then connected to connection card 6 on the fixing buckle 7 on another support column 1 i.e. It can.
Embodiment 2
Referring to Fig. 3, in the embodiment of the present invention, a kind of security protection system of highway construction, the quick connection Mechanism includes point in support column 1 and folding the female plug connector 3 and male plug connector 4 on protective fence 2, female plug connector 3 and male plug termination First 4 are mutually inserted cooperation, specifically:
The female plug connector 3 includes lock sleeve 301, jack tube 303 and squeezes steel ball 306, and jack tube 303 is fixed on support On column 1, the outer cover of jack tube 303 is equipped with the lock sleeve 301 being slidably matched with it, the outer wall of lock sleeve 301 and jack tube 303 Between be fixed with spring positioning ring 305, the outer cover of jack tube 303 is equipped with locking spring 302, the both ends point of locking spring 302 Other connecting spring positioning ring 305 and lock sleeve 301, so that lock sleeve 301 is without outer masterpiece under the action of locking spring 302 The relatively fixed of relative position is kept with lower, the tube wall of jack tube 303 is equipped with opening, passes through connecting spring 307 in opening It is equipped with and squeezes steel ball 306, the inner wall of lock sleeve 301 has taper at the corresponding position for squeezing steel ball 306, squeezes steel ball 306 contact with the inner wall of lock sleeve 301, so that when relative motion occurs for lock sleeve 301 and jack tube 303, due to lock sleeve 301 be inclined-plane with the contact surface for squeezing steel ball 306, and it is movable to squeeze steel ball 306 for such words;
The male plug connector 4 includes connecting tube 401, offers what a circle was matched with extruding steel ball 306 in connecting tube 401 Locating slot 402.
In the two connection, lock sleeve 301 is pulled out first, so that the inner wall of lock sleeve 301 loses to extruding steel Connecting tube 401 is inserted into jack tube 303 by the effect of pearl 306, then unclamps lock sleeve 301, lock sleeve 301 is in locking bullet Spring 302 resets, at this point, the inner wall of lock sleeve 301 cooperates with steel ball 306 is squeezed, and can drive and squeeze steel ball 306 downwards Movement squeezes steel ball 306 and snaps onto locating slot 402, realizes the quick connection of female plug connector 3 and male plug connector 4.
Further, since the position of locating slot 402 is fixed, in order to guarantee that connecting tube 401 is inserted into jack tube 303 When, locating slot 402 is corresponding with the position of steel ball 306 is squeezed, and herein, limited block 304 is fixed in the jack tube 303, when even When adapter tube 401 and limited block 304 are inconsistent, it is ensured that locating slot 402 is corresponding with the position of steel ball 306 is squeezed.
It should be strongly noted that in the technical program, by folding the effect of protective fence 2, so that adjacent supports column 1 It is very convenient when carrying out the arrangement of protective fence apart from adjustable, without being arranged again after calculating size at the scene, in addition, branch Dagger 1 is connected with protective fence 2 is folded by quick-connect machanism, convenient and simple for connection, helps to promote intrinsic safety full protection system The arrangement speed of system.
Those skilled in the art will readily occur to other realities of the disclosure after considering the disclosure at specification and embodiment Apply scheme.This application is intended to cover any variations, uses, or adaptations of the disclosure, these modifications, purposes or suitable The variation of answering property follows the general principles of this disclosure and including the undocumented common knowledge in the art of the disclosure or used Use technological means.The description and examples are only to be considered as illustrative, and the true scope and spirit of the disclosure are referred to by claim Out.
It should be understood that the present disclosure is not limited to the precise structures that have been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present disclosure is only limited by the accompanying claims.

Claims (8)

1. a kind of security protection system of highway construction, including several support columns (1) and it is in adjacent supports column (1) Between folding protective fence (2), which is characterized in that support column (1) is connected with protective fence (2) are folded by quick-connect machanism.
2. a kind of security protection system of highway construction according to claim 1, which is characterized in that described fold is prevented Guardrail (2) includes that quantity is multiple connecting rod I (201) and connecting rod II (202), and wherein connecting rod I (201) is vertically arranged, adjacent Two connecting rod I (201) between connected by inclined connecting rod II (202), and the both ends of connecting rod II (202) pass through pin shaft (204) hinged with connecting rod I (201).
3. a kind of security protection system of highway construction according to claim 2, which is characterized in that the connecting rod I (201) and the surface of connecting rod II (202) is pasted with reflective strip (203).
4. a kind of security protection system of highway construction according to claim 1 or 2 or 3, which is characterized in that adjacent Two support columns (1) between be equipped with warning tape (5).
5. a kind of security protection system of highway construction according to claim 4, which is characterized in that each branch It is mounted on elastic winding tape device (8) in dagger (1), warning tape (5) is on elastic winding tape device (8), the freedom of warning tape (5) It is fixed at end position connection card (6), support column (1) is equipped with the fixing buckle (7) matched with connection card (6).
6. a kind of security protection system of highway construction described according to claim 1 or 2 or 3 or 5, which is characterized in that The quick-connect machanism includes dividing in support column (1) and folding the female plug connector (3) and male plug connector on protective fence (2) (4), female plug connector (3) and male plug connector (4) are mutually inserted cooperation.
7. a kind of security protection system of highway construction according to claim 6, which is characterized in that the female plug connects Head (3) includes lock sleeve (301), jack tube (303) and squeezes steel ball (306), and jack tube (303) is fixed on support column (1), The outer cover of jack tube (303) is equipped with the lock sleeve (301) being slidably matched with it, and lock sleeve (301) is outer with jack tube (303) It is fixed between wall spring positioning ring (305), the outer cover of jack tube (303) is equipped with locking spring (302), locking spring (302) both ends are separately connected spring positioning ring (305) and lock sleeve (301), and the tube wall of jack tube (303) is equipped with opening, It is equipped in opening by connecting spring (307) and squeezes steel ball (306), the inner wall of lock sleeve (301) squeezes steel ball corresponding (306) there is taper at position, squeeze steel ball (306) and contacted with the inner wall of lock sleeve (301);Male plug connector (4) packet It includes connecting tube (401), the locating slot (402) that a circle is matched with extruding steel ball (306) is offered in connecting tube (401).
8. a kind of security protection system of highway construction according to claim 7, which is characterized in that the jack tube (303) limited block (304) are fixed in, when connecting tube (401) and limited block (304) are inconsistent, locating slot (402) and extruding The position of steel ball (306) is corresponding.
CN201910284397.4A 2019-04-10 2019-04-10 A kind of security protection system of highway construction Pending CN109914304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910284397.4A CN109914304A (en) 2019-04-10 2019-04-10 A kind of security protection system of highway construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910284397.4A CN109914304A (en) 2019-04-10 2019-04-10 A kind of security protection system of highway construction

Publications (1)

Publication Number Publication Date
CN109914304A true CN109914304A (en) 2019-06-21

Family

ID=66969205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910284397.4A Pending CN109914304A (en) 2019-04-10 2019-04-10 A kind of security protection system of highway construction

Country Status (1)

Country Link
CN (1) CN109914304A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719890A (en) * 2020-06-02 2020-09-29 东莞市大乘建筑工程技术有限公司 Floor reinforcing and supporting system
CN112942193A (en) * 2021-02-01 2021-06-11 温州钱城市政建设有限公司 Municipal administration street crash barrier

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130012452A (en) * 2011-07-25 2013-02-04 김강 Reinforcing structure of the guide-rail and its method
CN202899057U (en) * 2012-11-21 2013-04-24 岐周 Retractable roadblock
CN103485297A (en) * 2013-09-25 2014-01-01 芜湖迅丰园林交通科技有限公司 Polymer traffic guardrail
US20140209845A1 (en) * 2011-05-30 2014-07-31 Industrial Galvanizers Corporation Pty Ltd Improved Barrier Construction
CN204491466U (en) * 2015-02-26 2015-07-22 涂凤武 A kind of road maintenance Telescopic guardrail
CN105257203A (en) * 2015-09-24 2016-01-20 红门智能科技股份有限公司 Fence type rotary electric retractable door
CN205576806U (en) * 2016-04-15 2016-09-14 深圳市润信建设工程有限公司 Portable, have a folding function municipal works isolation barrier
CN205636590U (en) * 2016-05-29 2016-10-12 郑显龙 Multi -functional highway jube
CN206015562U (en) * 2016-07-31 2017-03-15 阜阳职业技术学院 A kind of safety post of the highway turning with pooling feature
CN206376624U (en) * 2017-01-12 2017-08-04 安徽三联学院 A kind of traffic control device easy to use
CN206706624U (en) * 2017-05-03 2017-12-05 江苏广吴建设园林有限公司 A kind of road isolated gate for being conveniently replaceable and there is function of warning at night
CN107503309A (en) * 2017-09-15 2017-12-22 黑龙江省龙建路桥第二工程有限公司 Combined changable changes the safety guide rail and combined method of any level angle
CN207377248U (en) * 2017-09-13 2018-05-18 江苏鸿盛电气工程有限公司 Construction collapsible protective grill
CN108442270A (en) * 2018-04-14 2018-08-24 刘梦思 A kind of alarming device of electric power overhaul
CN208564156U (en) * 2018-05-19 2019-03-01 孙梦思 A kind of movable building construction protection column
CN208613435U (en) * 2018-08-01 2019-03-19 苏州市苏城轨道交通设备有限公司 A kind of hydraulic pipe bender bend pipe angle adjusting mechanism

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140209845A1 (en) * 2011-05-30 2014-07-31 Industrial Galvanizers Corporation Pty Ltd Improved Barrier Construction
KR20130012452A (en) * 2011-07-25 2013-02-04 김강 Reinforcing structure of the guide-rail and its method
CN202899057U (en) * 2012-11-21 2013-04-24 岐周 Retractable roadblock
CN103485297A (en) * 2013-09-25 2014-01-01 芜湖迅丰园林交通科技有限公司 Polymer traffic guardrail
CN204491466U (en) * 2015-02-26 2015-07-22 涂凤武 A kind of road maintenance Telescopic guardrail
CN105257203A (en) * 2015-09-24 2016-01-20 红门智能科技股份有限公司 Fence type rotary electric retractable door
CN205576806U (en) * 2016-04-15 2016-09-14 深圳市润信建设工程有限公司 Portable, have a folding function municipal works isolation barrier
CN205636590U (en) * 2016-05-29 2016-10-12 郑显龙 Multi -functional highway jube
CN206015562U (en) * 2016-07-31 2017-03-15 阜阳职业技术学院 A kind of safety post of the highway turning with pooling feature
CN206376624U (en) * 2017-01-12 2017-08-04 安徽三联学院 A kind of traffic control device easy to use
CN206706624U (en) * 2017-05-03 2017-12-05 江苏广吴建设园林有限公司 A kind of road isolated gate for being conveniently replaceable and there is function of warning at night
CN207377248U (en) * 2017-09-13 2018-05-18 江苏鸿盛电气工程有限公司 Construction collapsible protective grill
CN107503309A (en) * 2017-09-15 2017-12-22 黑龙江省龙建路桥第二工程有限公司 Combined changable changes the safety guide rail and combined method of any level angle
CN108442270A (en) * 2018-04-14 2018-08-24 刘梦思 A kind of alarming device of electric power overhaul
CN208564156U (en) * 2018-05-19 2019-03-01 孙梦思 A kind of movable building construction protection column
CN208613435U (en) * 2018-08-01 2019-03-19 苏州市苏城轨道交通设备有限公司 A kind of hydraulic pipe bender bend pipe angle adjusting mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719890A (en) * 2020-06-02 2020-09-29 东莞市大乘建筑工程技术有限公司 Floor reinforcing and supporting system
CN112942193A (en) * 2021-02-01 2021-06-11 温州钱城市政建设有限公司 Municipal administration street crash barrier

Similar Documents

Publication Publication Date Title
CN109914304A (en) A kind of security protection system of highway construction
CN103700315B (en) Fixed nameplate and rollable fixing nameplate
CN213115794U (en) Safety protective guard for civil engineering
CN103245274A (en) Gas cylinder bottleneck inner diameter measuring implement
CN209010939U (en) A kind of vehicle carried folding multiple-lane road graticule one-pass molding pen machine
CN103062694B (en) Street lamp with folding lamp rod
CN202177447U (en) Street lamp detection vehicle and vehicle street lamp detection system
CN103434425B (en) Intermediate hand rail mechanism of vehicle seat
CN210216255U (en) Water horse hard shoulder arrangement car
CN209686211U (en) A kind of municipal works crossing line drawing auxiliary device
CN205001800U (en) Plug -in inflation connecting rod
CN211262184U (en) Caliper convenient to guide slot installation
CN209505633U (en) A kind of Side Drain for Expressway detection device
CN210712469U (en) Flatness detection device for civil engineering
CN206722325U (en) A kind of corner collision-prevention device with fast adjuster
CN108867339B (en) Highway overpass bridge pier protector
CN208350854U (en) Cable testing connecting bar
CN208046145U (en) A kind of cable protecting device
CN112687120A (en) Temporary signal lamp with dual warning structure for road construction
CN202042822U (en) Pavement transition cable protection device
CN114420365B (en) Signal wire protection pipe sleeve with line inspection and line stroking structure
CN220598246U (en) Multifunctional roadblock
CN211646115U (en) Warning device for power transformation maintenance
CN219974089U (en) Warning rod for construction site
CN211698442U (en) Novel monocular formula augmented reality glasses

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621

RJ01 Rejection of invention patent application after publication