CN109899074A - A kind of sliding steel bushing shield machine, which integrally misses the stop, secondary originates construction method - Google Patents

A kind of sliding steel bushing shield machine, which integrally misses the stop, secondary originates construction method Download PDF

Info

Publication number
CN109899074A
CN109899074A CN201910107531.3A CN201910107531A CN109899074A CN 109899074 A CN109899074 A CN 109899074A CN 201910107531 A CN201910107531 A CN 201910107531A CN 109899074 A CN109899074 A CN 109899074A
Authority
CN
China
Prior art keywords
steel bushing
shield machine
rail
steel
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910107531.3A
Other languages
Chinese (zh)
Other versions
CN109899074B (en
Inventor
毛宇飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Railway Construction Investment Group Co Ltd
Original Assignee
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Railway Construction Co Ltd filed Critical PowerChina Railway Construction Co Ltd
Priority to CN201910107531.3A priority Critical patent/CN109899074B/en
Publication of CN109899074A publication Critical patent/CN109899074A/en
Application granted granted Critical
Publication of CN109899074B publication Critical patent/CN109899074B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to urban track traffic and shield tunnel project technical fields, specially a kind of sliding steel bushing shield machine integrally miss the stop it is secondary originate construction method, include the following steps: preparation of construction operation, sliding steel bushing and technique on shield machine's station-crossing, it is mobile after mating trolley, connection and debugging shield machine pipeline, installation sealing reference rings and reaction frame, the negative endless tube piece of installation.Sliding steel bushing shield machine of the present invention, which integrally misses the stop, secondary originates construction method, it does not need to lift again, it does not need to disassemble shield machine, save the duration, cost is reduced, is cooperated by using hydraulic jack and track, entire transfer process is only needed steel bushing pedestal and shield machine lifting 160mm, it is secondary in steel bushing to originate, construction safety.

Description

A kind of sliding steel bushing shield machine, which integrally misses the stop, secondary originates construction method
Technical field
The present invention relates to urban track traffic and shield tunnel project technical field, specially a kind of sliding steel bushing shield Machine, which integrally misses the stop, secondary originates construction method.
Background technique
In multiple continuous tunneling constructions in shield section, shield machine is according to transition mode, it usually needs large-scale crane is adopted Secondary originate is carried out again with disintegrating, hanging out to re-assembly again.If closing, which is completed, in station construction hangs out condition there is no reserved, Or centre station construction field condition is complex, Large-scale Hoisting, transporting equipment disengaging field are difficult, still need to consume using the method It is time-consuming compared with long, costly, risk is big, economy is poor, therefore, saved by the way of technique on shield machine's station-crossing in this case About duration and construction cost at home and abroad have many successful cases at present, but directly utilize steel bushing after receiving using steel bushing Cylinder integrally miss the stop together with shield machine it is settled it is modern thus not yet.It is inherently a kind of using steel bushing balance reception Originating Technique More complicated, novel construction technology has strict requirements to installation, the dismounting of steel bushing, reinforces and receive with shield end It originates and compares, the process hung out is removed in more one of steel bushing installations of shield lifting, and construction technology is more complicated, cumbersome.Pass through In built station base plate paving sliding rail, withstood on using hydraulic jack whole to steel bushing and shield machine on the track laid Body is lifted, is moved, to realize that shield machine and steel bushing integrally miss the stop.This technology, which efficiently solves shield machine, not to be had The station of standby lifting condition is completed to miss the stop the technical problem of construction, and can be saved the duration, is reduced cost, has been evaded shield machine and arrived It many and diverse preparation such as re-assemblies, debug after up to originating terminal, being a kind of safety, economic, quick construction technology, saving is applied 10 days/time of the work duration or so.
Such as Chinese Patent Application No. are as follows: a kind of shield sky of the patent disclosure of CN201811258119.3 is pushed away through tunneling tunnel Road and the secondary construction method and its structure originated, by leading in concrete guide table of the bored tunnel bottom pouring with hole It is laid with track on platform, steel corbel is installed in hole, pushes away stepping with jack collective effect using steel corbel for shield sky and provides Reaction force realizes that the efficient sky of shield pushes away and passes through bored tunnel;It, will be pre-buried separately by bored tunnel secondary lining pre-embedded steel slab Steel plate, the support of fashioned iron counter-force connect with the rigid boxing of counter-force, provide counter-force support for secondary originate of shield, make shield in bored tunnel It is smoothly secondary to originate.The present invention is directed to bored tunnel narrow space, and construction is limited vulnerable to various aspects, pre-buried by ingehious design Part and reserved cavity, and counter-force frame system etc. is improved, is optimized.But the main purpose of the invention is to pass through tunneling Tunnel ressemble shield machine complete it is secondary originate, integral construction amount is larger, for being affected for tunnel structure, consumes simultaneously Shi Jiu.
Summary of the invention
In view of the deficiencies of the prior art, it is an object of the present invention to provide a kind of sliding steel bushing shield machine integrally miss the stop it is secondary Construction method is originated, is integrally missed the stop secondary the step of originating construction for simplifying shield machine.
The sliding steel bushing shield machine integrally miss the stop it is secondary originate construction method, include the following steps:
Step 1, preparation of construction operates:
Step 1.1, review measures station headroom size, it is desirable that needed for station headroom size is greater than steel bushing cylinder size and retains Working space;
Step 1.2, levelling in shield reception end well using horizontal measuring instrument, steel bushing is installed, shield machine driving enters Steel bushing, last assembled endless tube piece simultaneously carry out slip casting closure, complete shield and receive;
The cable and pipeline on shield machine are identified, the cable between shield machine and rear mating trolley is broken with pipeline It opens, separates shield machine with rear mating trolley;
With the connection between the transition rings and portal ring of oxygen welding cutting steel bushing, steel bushing rear end seal cover is opened, clearly Manage cutterhead, cutter soil, check cutterhead, cutter abrasion condition and replace the cutter of serious wear;
Step 1.3,3 groups of longitudinal rail of totally 6 slidings are laid with along former tunneling direction on standard paragraphs bottom plate AT STATION, using straight 22 spiral of diameter φ implantation bottom plate is fixed, and is arranged at points 3, is respectively placed in steel bushing pedestal two sides and middle part, 2, every place, and two Patch is supported between root;
Circular hole is bored on the web of the rail for sliding longitudinal rail with rail bonding drill, the circular hole of 3 diameter phi 20mm is 1 group, often Spacing between group is 400mm, and circular hole spacing is 100mm;
Step 2, steel bushing and technique on shield machine's station-crossing are slid:
Step 2.1,4 100t hydraulic jacks are respectively installed in steel bushing pedestal two sides, using hydraulic jack by shield Machine is lifted at least 160mm together with steel bushing pedestal;
Step 2.2, it is laid with 10mm thick steel plate in steel bushing base bottom, on the steel plate transversely parallel laid 8 removals Lateral rail;Circular hole is bored on the web of the rail of the lateral rail of removal at both ends with rail bonding drill, the circular hole of 3 diameter phi 20mm is Spacing between 1 group, every group is 400mm, and circular hole spacing is 100mm;The coating butter on removing lateral rail;
Step 2.3, steel bushing pedestal and shield machine are placed on the lateral rail of removal by hydraulic jack;
Step 2.4, on the removal transverse direction rail at both ends, steel bushing base side installs 2 100T cross by one end of wall It is synchronous to push steel bushing pedestal and shield machine to the center transverse translation that misses the stop to pipe bending cylinder;
Step 2.5, after steel bushing pedestal and shield machine transverse translation 2175mm to designated position, 8 100t are utilized again Steel bushing pedestal is lifted by hydraulic jack, takes out the removal transverse direction rail under steel bushing pedestal, and is laid with that split heads, to remove end vertical To rail.
Step 2.6, shield machine vertical shift is missed the stop:
On removing end longitudinal direction rail and the longitudinal rail of sliding after coating butter, pass through circle on two side slip longitudinal direction rail Reaction support is arranged in hole, fixes 2 longitudinal direction 100t pipe bending cylinders, withstands steel bushing pedestal two sides, synchronous push steel bushing pedestal It moves forward with shield machine;
When longitudinal pipe bending cylinder reaches range, lower longitudinal pipe bending cylinder is dismantled, installation increases a pushing tow stroke Square steel top iron reinstalls pipe bending cylinder, continues pushing tow moving sleeve, when oil cylinder reaches range again, withdraws longitudinal Pipe bending cylinder dismantles lower longitudinal pipe bending cylinder, square steel top iron and reaction support;Counter-force branch is reinstalled in direction of travel front end Seat reinstalls longitudinal pipe bending cylinder, continues pushing tow steel bushing pedestal and shield machine Forward, when longitudinal pipe bending cylinder reaches maximum When stroke, lower longitudinal pipe bending cylinder is dismantled, reinstalls and increases a pushing tow stroke square steel top iron, installation pipe bending cylinder continues to push up The Forward of pushing sleeve cylinder, circulation is until starting end head well repeatedly;
Step 2.7, when generally longitudinally mobile miss the stop finishes for steel bushing pedestal and shield machine, when apart from portal steel loop 500mm Stop straight skidding, 4 100t hydraulic jack lifting steel bushing pedestals and shield machine are installed at least in steel bushing pedestal 160mm;It hauls out and slides longitudinal rail, laterally penetrate the lateral rail of 8 immigrations;The coating butter on moving into lateral rail, in side 2 traversing pipe bending cylinders of 100t, traversing steel bushing pedestal and shield machine 2175mm are installed on the immigration transverse direction rail of the wall other end, Shield machine, sleeve pedestal are moved in parallel and originate axial location, after measurement is accurate, bottom is taken out and moves into lateral rail, Shield machine and steel bushing pedestal are fallen back on bottom plate pre-embedded steel slab;
Step 2.8, stationary steel bushing cylinder pedestal:
Repetition measurement verify shield machine position, steel bushing pan frontward end apart from portal steel loop be 500mm, stationary steel bushing cylinder pedestal, Steel bushing pedestal and bottom plate pre-embedded steel slab are welded into an entirety, lateral increase I-shaped stull is stable on side wall;In steel bushing Transition rings are installed between cylinder and portal steel loop, mounting flange sealing O-ring is connected and fixed transition rings with high-strength bolt, front end with Portal steel ring welding is secured, first installs transition rings lower half portion, and then installing transition rings top half makes it constitute steel bushing master Body;
Step 3, mating trolley after movement:
1) it is laid with the conveying track of battery truck and rear mating trolley, battery truck and rear mating is connected using split heads setting gentle slope The conveying track of trolley;
2) mating trolley after battery truck being rigidly connected, mating trolley is to originating terminal after battery truck dragging transport;
Step 4, connection and debugging shield machine pipeline:
After mating trolley reaches originating terminal designated position afterwards, the pipeline of rear mating trolley and shield machine, cable are carried out Connection, and carry out assembly and adjustment;
Step 5, sealing reference rings and reaction frame are installed:
1) sealing reference rings are installed in steel bushing body tail section, sealing reference rings and steel bushing main body are closely connected, and inject close Oil sealing rouge;
2) reaction frame is installed outside steel bushing main body and sealing reference rings;
Step 6, negative endless tube piece is installed:
Smearing grease is painted in the shield tail of shield machine, negative endless tube piece is installed, negative endless tube piece and sealing reference rings compression are closely connected, Inject shield tail grease, simultaneous implantation cement mortar, it is ensured that the gap backfill between sleeve and negative endless tube piece is full, and cutterhead pushing tow arrives Chapelet face prepares secondary originate.
Further, in step 2.5, end longitudinal direction steel rail laying 6 is removed, is connected with longitudinal rail is slid in step 1.3.
Further, in step 2.8, the length of sleeve transition rings is 500mm.
Further, in step 2.8, the installation steps of sleeve transition rings are as follows:
1) sleeve transition rings in lower half portion are installed, are connect using high-strength bolt with steel bushing, in the lower half of sleeve transition rings The arc steel plate for sealing water of welding 5mm thickness 80mm wide in part, arc steel plate for sealing water and transition rings intrados are closely connected, while and portal Steel ring welding is secured;;
2) top half sleeve transition rings are installed, are connect using high-strength bolt with steel bushing, in the upper half of sleeve transition rings Portion outboard welds the arc steel plate for sealing water of 5mm thickness 80mm wide, and arc steel plate for sealing water and transition rings extrados are closely connected, while and hole Door steel ring welding is secured;.
Further, in step 2.2, coating butter at least 2mm on lateral rail is removed.
Further, it in step 2.6, removes end longitudinal direction rail and slides coating butter at least 2mm on longitudinal rail.
Further, in step 2.7, coating butter at least 2mm on lateral rail is moved into.
Further, sliding in step 1.3 longitudinal rail, the removal end longitudinal direction rail in step 2.5, in step 2.7 The lateral rail of immigration be all made of the rail of 43kg/m.
The beneficial effects of the present invention are:
1. sliding steel bushing shield machine of the present invention integrally miss the stop it is secondary originate construction method, do not need to lift again, It does not need to disassemble shield machine, saves the duration, reduce cost.
2. sliding steel bushing shield machine of the present invention integrally miss the stop it is secondary originate construction method, by using hydraulic jack Top and track cooperation, entire transfer process only need steel bushing pedestal and shield machine lifting 160mm carrying out two in steel bushing It is secondary to originate, construction safety.
Detailed description of the invention
Fig. 1 is that sliding steel bushing shield machine of the present invention integrally misses the stop and secondary originates shield machine and steel bushing in construction method Cylinder pedestal is lifted status diagram;
Fig. 2 is that sliding steel bushing shield machine of the present invention integrally misses the stop and secondary originates shield machine and steel bushing in construction method The cylinder traversing status diagram of pedestal;
Fig. 3 is that sliding steel bushing shield machine of the present invention integrally misses the stop and secondary originates shield machine and steel bushing in construction method Cylinder pedestal vertically moves status diagram.
In figure: the station 1-, 2- steel bushing pedestal, 3- shield machine, 4- steel plate, 5- hydraulic jack, 6- remove lateral rail, 7- lateral pushing oil cylinder, 8- slide longitudinal rail, 9- removes end longitudinal direction rail, 10- split heads, the longitudinal direction 11- pipe bending cylinder.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings of the specification.
The sliding steel bushing shield machine 3 is whole miss the stop it is secondary originate construction method, include the following steps:
Step 1, preparation of construction operates:
Step 1.1, review measures 1 headroom size of station, it is desirable that 1 headroom size of station is greater than steel bushing cylinder size and retains institute Need working space;
Step 1.2, levelling in shield reception end well using horizontal measuring instrument, steel bushing is installed, the driving of shield machine 3 enters Steel bushing, last assembled endless tube piece simultaneously carry out slip casting closure, complete shield and receive;
The cable and pipeline on shield machine 3 are identified, the cable between shield machine 3 and rear mating trolley is broken with pipeline It opens, separates shield machine 3 with rear mating trolley;
With the connection between the transition rings and portal ring of oxygen welding cutting steel bushing, steel bushing rear end seal cover is opened, clearly Manage cutterhead, cutter soil, check cutterhead, cutter abrasion condition and replace the cutter of serious wear;
Step 1.3,3 groups of longitudinal rail 8 of totally 6 slidings are laid with along former tunneling direction on standard paragraphs bottom plate AT STATION, used 22 spiral of diameter phi implantation bottom plate is fixed, and is arranged at points 3, is respectively placed in steel bushing pedestal two sides and middle part, 2, every place, Patch is supported between two rail;For supporting the steel bushing pedestal 2 and shield machine 3 in longitudinal movement;
Circular hole is bored on the web of the rail for sliding longitudinal rail 8 with rail bonding drill, the circular hole of 3 diameter phi 20mm is 1 group, often Spacing between group is 400mm, and circular hole spacing is 100mm;Circular hole is longitudinally sliding for the fixed longitudinal progress of pipe bending cylinder 11 pushing tow It moves;
Step 2, it slides steel bushing and shield machine 3 misses the stop:
Step 2.1,4 100t hydraulic jacks 5 are respectively installed in 2 two sides of steel bushing pedestal, using hydraulic jack 5 by shield Structure machine 3 is lifted at least 160mm together with steel bushing pedestal 2;
Step 2.2, the steel plate 4 of 10mm thickness is laid in 2 bottom of steel bushing pedestal, on the steel plate transversely parallel laid 8 Remove lateral rail 6;Circular hole is bored on the web of the rail of the lateral rail 6 of removal at both ends with rail bonding drill, 3 diameter phi 20mm's Circular hole is that the spacing between 1 group, every group is 400mm, and circular hole spacing is 100mm;Coating butter is at least on removing lateral rail 6 2mm;
Step 2.3, steel bushing pedestal 2 and shield machine 3 are placed on the lateral rail 6 of removal by hydraulic jack 5;
Step 2.4, on the removal transverse direction rail 6 at both ends, 2 100T are installed by one end of wall in 2 side of steel bushing pedestal Lateral pushing oil cylinder 7, it is synchronous to push steel bushing pedestal 2 and shield machine 3 to the center transverse translation that misses the stop;
Step 2.5, after 3 transverse translation 2175mm to designated position of steel bushing pedestal 2 and shield machine, 8 are utilized again Steel bushing pedestal 2 is lifted by 100t hydraulic jack 5, takes out the removal transverse direction rail 6 under steel bushing pedestal 2, and be laid with split heads 10, end longitudinal direction rail 9 is removed, end longitudinal direction rail 9 is removed and is laid with 6, is connected with longitudinal rail 8 is slid in step 1.3.
Step 2.6,3 vertical shift of shield machine is missed the stop:
It is removing end longitudinal direction rail 9 and is sliding coating butter at least 2mm on longitudinal rail 8, in two side slip longitudinal direction rail 8 It is upper that reaction support is arranged by circular hole, 2 longitudinal direction 100t pipe bending cylinders 11 are fixed, 2 two sides of steel bushing pedestal, synchronous push are withstood Steel bushing pedestal 2 and shield machine 3 move forward;
When longitudinal pipe bending cylinder 11 reaches range, lower longitudinal pipe bending cylinder 11 is dismantled, installation increases a pushing tow Stroke square steel top iron reinstalls pipe bending cylinder 11, continues pushing tow moving sleeve, when oil cylinder reaches range again, receives Longitudinal pipe bending cylinder 11 is returned, lower longitudinal pipe bending cylinder 11, square steel top iron and reaction support are dismantled;Pacify again in direction of travel front end Reaction support is filled, longitudinal pipe bending cylinder 11 is reinstalled, continues pushing tow steel bushing pedestal 2 and shield machine 3 moves forward, when longitudinal pushing tow When oil cylinder 11 reaches range, lower longitudinal pipe bending cylinder 11 is dismantled, reinstalls and increases a pushing tow stroke square steel top iron, peace It fills pipe bending cylinder 11 and continues the Forward of pushing tow sleeve, circulation is until starting end head well repeatedly;
Step 2.7, when generally longitudinally mobile miss the stop finishes for steel bushing pedestal 2 and shield machine 3, apart from portal steel loop 500mm When stop straight skidding, steel bushing pedestal 2 install 4 100t hydraulic jacks 5 be lifted steel bushing pedestals 2 and shield machine 3 to Few 160mm;It hauls out and slides longitudinal rail 8, laterally penetrate the lateral rail (not shown) of 8 immigrations;Moving into lateral rail Upper coating butter at least 2mm installs the traversing pipe bending cylinder 7 of 2 100t, by steel bushing on the immigration transverse direction rail of the side wall other end Cylinder pedestal 2 and the traversing 2175mm of shield machine 3, shield machine 3, sleeve pedestal are moved in parallel and originate axial location, and measurement is accurate After errorless, take out bottom and move into lateral rail, shield machine 3 and steel bushing pedestal 2 are fallen back on bottom plate pre-embedded steel slab;
Step 2.8, stationary steel bushing cylinder pedestal 2:
Repetition measurement verifies 3 position of shield machine, and steel bushing front end is apart from portal steel loop 500mm, stationary steel bushing cylinder pedestal 2, by steel Sleeve pedestal 2 and pre-embedded steel slab are welded into an entirety, are stable on side wall in two sides welding H-bar stull, steel bushing with Transition rings are installed between portal steel loop, mounting flange sealing O-ring is connected and fixed sleeve transition rings with high-strength bolt, front end with Portal steel ring welding is secured, first installs transition rings lower half portion, and then installing transition rings top half makes it constitute steel bushing master Body;The length of sleeve transition rings is 500mm;The installation steps of sleeve transition rings are as follows:
1) sleeve transition rings in lower half portion are installed, are connect using high-strength bolt with steel bushing, in the lower half of sleeve transition rings Part in welding 5mm thickness 80mm wide arc steel plate for sealing water, arc steel plate for sealing water and transition rings intrados are closely connected, and with portal steel Ring firm welding;
2) top half sleeve transition rings are installed, are connect using high-strength bolt with steel bushing, in the upper half of sleeve transition rings Portion outboard welds the arc steel plate for sealing water of 5mm thickness 80mm wide, and arc steel plate for sealing water and transition rings extrados are closely connected, and and portal Steel ring welding is secured;
Step 3, mating trolley after movement:
1) be laid with battery truck and rear mating trolley conveying track, using split heads 10 be arranged gentle slope connect battery truck and after match Cover the conveying track of trolley;
2) mating trolley after battery truck being rigidly connected, mating trolley is to originating terminal after battery truck dragging transport;
Step 4, connection and debugging 3 pipeline of shield machine:
After mating trolley reaches originating terminal designated position afterwards, the pipeline of rear mating trolley and shield machine 3, cable are carried out Connection, and carry out assembly and adjustment;
Step 5, sealing reference rings and reaction frame are installed:
1) sealing reference rings are installed in steel bushing body tail section, sealing reference rings and steel bushing main body are closely connected, and inject close Oil sealing rouge;
2) reaction frame is installed outside steel bushing main body and sealing reference rings;
Step 6, negative endless tube piece is installed:
Smearing grease is painted in the shield tail of shield machine 3, negative endless tube piece is installed, negative endless tube piece compresses close with sealing reference rings Patch injects shield tail grease, simultaneous implantation cement mortar, it is ensured that the gap between sleeve and negative endless tube piece backfills full, cutterhead top It shifts face onto, prepares secondary originate.
Further, the longitudinal rail 8, the removal end longitudinal direction rail 9 in step 2.5, step 2.7 of the sliding in step 1.3 In the lateral rail of immigration be all made of the rail of 43kg/m.
Present invention is not limited to the embodiments described above, without departing from the essence of the present invention, this field skill Any deformation, improvement, the replacement that art personnel are contemplated that each fall within protection scope of the present invention.

Claims (8)

1. a kind of sliding steel bushing shield machine integrally misses the stop and secondary originates construction method, which comprises the steps of:
Step 1, preparation of construction operates:
Step 1.1, review measures station headroom size, it is desirable that work needed for station headroom size is greater than steel bushing cylinder size and retains Space;
Step 1.2, levelling in shield reception end well using horizontal measuring instrument, steel bushing is installed, shield machine driving enters steel bushing Cylinder, last assembled endless tube piece simultaneously carry out slip casting closure, complete shield and receive;
The cable and pipeline on shield machine are identified, the cable between shield machine and rear mating trolley is disconnected with pipeline, is made Shield machine is separated with rear mating trolley;
With the connection between the transition rings and portal ring of oxygen welding cutting steel bushing, steel bushing rear end seal cover is opened, knife is cleared up Disk, cutter soil, check cutterhead, cutter abrasion condition and replace the cutter of serious wear;
Step 1.3,3 groups of longitudinal rail of totally 6 slidings are laid with along former tunneling direction on standard paragraphs bottom plate AT STATION, use diameter phi 22 spirals implantation bottom plate is fixed, and is divided at 3 and is arranged, is respectively placed in sleeve pedestal two sides and middle part, every place's spaced set 2 Root, two rail support patch;
Bore circular hole on the web of the rail for sliding longitudinal rail with rail bonding drill, the circular hole of 3 diameter phi 20mm is 1 group, every group it Between spacing be 400mm, circular hole spacing be 100mm;
Step 2, steel bushing and technique on shield machine's station-crossing are slid:
Step 2.1,4 100t hydraulic jacks are respectively installed in steel bushing pedestal two sides, are connected shield machine using hydraulic jack At least 160mm is lifted with steel bushing pedestal;
Step 2.2, it is laid with 10mm thick steel plate in steel bushing base bottom, transversely 8 removals of parallel laid are lateral on the steel plate Rail;Circular hole is bored on the web of the rail of the lateral rail of removal at both ends with rail bonding drill, the circular hole of 3 diameter phi 20mm is 1 group, Spacing between every group is 400mm, and circular hole spacing is 100mm;The coating butter on removing lateral rail;
Step 2.3, steel bushing pedestal and shield machine are placed on the lateral rail of removal by hydraulic jack;
Step 2.4, on the removal transverse direction rail at both ends, steel bushing base side is installed 2 100T by one end of wall and is laterally pushed up Push oil cylinder, it is synchronous to push steel bushing pedestal and shield machine to the center transverse translation that misses the stop;
Step 2.5, hydraulic using 8 100t again after steel bushing pedestal and shield machine transverse translation 2175mm to designated position Steel bushing pedestal is lifted by jack, takes out the removal transverse direction rail under steel bushing pedestal, and is laid with split heads, is removed end longitudinal direction steel Rail.
Step 2.6, shield machine vertical shift is missed the stop:
On removing end longitudinal direction rail and the longitudinal rail of sliding after coating butter, set on two side slip longitudinal direction rail by circular hole Reaction support is set, 2 longitudinal direction 100t pipe bending cylinders is fixed, withstands steel bushing pedestal two sides, synchronous push steel bushing pedestal and shield The Forward of structure machine;
When longitudinal pipe bending cylinder reaches range, lower longitudinal pipe bending cylinder is dismantled, installation increases a pushing tow stroke square steel Iron is pushed up, pipe bending cylinder is reinstalled, continues pushing tow moving sleeve, when oil cylinder reaches range again, withdraws longitudinal pushing tow Oil cylinder dismantles lower longitudinal pipe bending cylinder, square steel top iron and reaction support;Reaction support is reinstalled in direction of travel front end, weight It is new that longitudinal pipe bending cylinder is installed, continue pushing tow steel bushing pedestal and shield machine Forward, when longitudinal pipe bending cylinder reaches range When, lower longitudinal pipe bending cylinder is dismantled, reinstalls and increases a pushing tow stroke square steel top iron, installation pipe bending cylinder continues pushing tow set Cylinder Forward recycles pushing tow repeatedly until starting end head well;
Step 2.7, it finishes when steel bushing pedestal and shield machine generally longitudinally move to miss the stop, stops when apart from portal steel loop 500mm Straight skidding installs 4 100t hydraulic jack lifting steel bushing pedestals and shield machine at least 160mm in steel bushing pedestal;It drags Longitudinal rail is slid out, laterally penetrates the lateral rail of 8 immigrations;The coating butter on moving into lateral rail, in the side wall other end Immigration transverse direction rail on 2 traversing pipe bending cylinders of 100t are installed, the traversing steel bushing pedestal of synchronous push and shield machine 2175mm, Shield machine, sleeve pedestal are moved in parallel and originate axial location, after measurement is accurate, bottom is taken out and moves into lateral rail, Shield machine and steel bushing pedestal are fallen back on bottom plate pre-embedded steel slab;
Step 2.8, stationary steel bushing cylinder installs transition rings:
Repetition measurement verifies shield machine position, and steel bushing pan frontward end is 500mm, stationary steel bushing cylinder pedestal, by steel apart from portal steel loop Sleeve pedestal and bottom plate pre-embedded steel slab are welded into an entirety, are stable on side wall in two sides welding H-bar stull;In steel bushing Transition rings are installed between cylinder and portal steel loop, mounting flange sealing O-ring is connected and fixed sleeve transition rings with high-strength bolt, preceding End is secured with portal steel ring welding, first installs transition rings lower half portion, and then installing transition rings top half makes its constitute steel bushing Cylinder main body;
Step 3, mating trolley after movement:
1) it is laid with the conveying track of battery truck and rear mating trolley, battery truck and rear mating trolley are connected using split heads setting gentle slope Conveying track;
2) mating trolley after battery truck being rigidly connected, mating trolley is to originating terminal after battery truck dragging transport;
Step 4, connection and debugging shield machine pipeline:
After mating trolley reaches originating terminal designated position afterwards, pipeline, the cable of rear mating trolley and shield machine are attached, And carry out assembly and adjustment;
Step 5, sealing reference rings and reaction frame are installed:
1) sealing reference rings are installed in steel bushing body tail section, sealing reference rings and steel bushing main body are closely connected, and inject Seal Oil Rouge;
2) reaction frame is installed outside steel bushing main body and sealing reference rings;
Step 6, negative endless tube piece is installed:
Smearing grease is painted in the shield tail of shield machine, negative endless tube piece is installed, negative endless tube piece compresses closely connected, injection with sealing reference rings Shield tail grease, simultaneous implantation cement mortar, it is ensured that the gap between sleeve and negative endless tube piece backfills full, cutterhead pushing tow to area Face prepares secondary originate.
2. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.5, removes end longitudinal direction steel rail laying 6, is connected with longitudinal rail is slid in step 1.3.
3. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.8, the length of sleeve transition rings is 500mm.
4. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.8, the installation steps of sleeve transition rings are as follows:
1) sleeve transition rings in lower half portion are installed, are connect using high-strength bolt with steel bushing, in the lower half portion of sleeve transition rings The arc steel plate for sealing water of interior welding 5mm thickness 80mm wide, arc steel plate for sealing water and transition rings intrados are closely connected, and weld with portal steel loop It connects securely;
2) top half sleeve transition rings are installed, are connect using high-strength bolt with steel bushing, in the top half of sleeve transition rings Outside weld 5mm thickness 80mm wide arc steel plate for sealing water, arc steel plate for sealing water and transition rings extrados are closely connected, and with portal steel loop Firm welding.
5. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.2, removes coating butter at least 2mm on lateral rail.
6. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.6, removes end longitudinal direction rail and slide coating butter at least 2mm on longitudinal rail.
7. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, in the step 2.7, moves into coating butter at least 2mm on lateral rail.
8. a kind of sliding steel bushing shield machine according to claim 1 integrally misses the stop and secondary originates construction method, feature It is, the immigration in removal end longitudinal direction rail, step 2.7 in the longitudinal rail of the sliding in the step 1.3, step 2.5 is horizontal The rail of 43kg/m is all made of to rail.
CN201910107531.3A 2019-02-02 2019-02-02 Integral station-crossing secondary starting construction method for sliding steel sleeve shield tunneling machine Active CN109899074B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910107531.3A CN109899074B (en) 2019-02-02 2019-02-02 Integral station-crossing secondary starting construction method for sliding steel sleeve shield tunneling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910107531.3A CN109899074B (en) 2019-02-02 2019-02-02 Integral station-crossing secondary starting construction method for sliding steel sleeve shield tunneling machine

Publications (2)

Publication Number Publication Date
CN109899074A true CN109899074A (en) 2019-06-18
CN109899074B CN109899074B (en) 2020-07-28

Family

ID=66944615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910107531.3A Active CN109899074B (en) 2019-02-02 2019-02-02 Integral station-crossing secondary starting construction method for sliding steel sleeve shield tunneling machine

Country Status (1)

Country Link
CN (1) CN109899074B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374614A (en) * 2019-07-09 2019-10-25 中国铁建大桥工程局集团有限公司 Shield machine quickly receives translation construction method in a kind of cavern
CN112320682A (en) * 2020-11-02 2021-02-05 北京市政建设集团有限责任公司 Vertical lifting method for shield tunneling machine in stage of translating through subway station
CN112796773A (en) * 2020-12-31 2021-05-14 淮安市中球盾构技术服务有限公司 Steel sleeve construction process and assembly method
CN113338964A (en) * 2021-07-20 2021-09-03 中煤第五建设有限公司 Method for transition of tunnel TBM
CN113931654A (en) * 2021-08-26 2022-01-14 中铁三局集团有限公司 Steel sleeve receiving construction method of subway shield machine
CN115977662A (en) * 2022-12-30 2023-04-18 中交四航局第一工程有限公司 Construction method for transverse movement in shield station and construction method for station crossing in shield station

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165885A (en) * 1994-12-13 1996-06-25 Nishimatsu Constr Co Ltd Branch shield machine
JP2003206691A (en) * 2002-01-11 2003-07-25 Maeda Corp Shield machine arrival construction method
CN101922298A (en) * 2010-08-20 2010-12-22 上海市第一市政工程有限公司 Self-walking shield translation station-crossing system
CN102418530A (en) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 Roller guide rail station-passing construction method of whole shield machine
CN103046933A (en) * 2012-12-08 2013-04-17 中铁十二局集团有限公司 Shield station-crossing tunneling and station parallel construction method
CN105587322A (en) * 2015-12-31 2016-05-18 中交一公局第三工程有限公司 TBM integral step station-crossing method
CN109083647A (en) * 2018-08-17 2018-12-25 北京市政建设集团有限责任公司 A kind of shield machine translating station-crossing construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165885A (en) * 1994-12-13 1996-06-25 Nishimatsu Constr Co Ltd Branch shield machine
JP2003206691A (en) * 2002-01-11 2003-07-25 Maeda Corp Shield machine arrival construction method
CN101922298A (en) * 2010-08-20 2010-12-22 上海市第一市政工程有限公司 Self-walking shield translation station-crossing system
CN102418530A (en) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 Roller guide rail station-passing construction method of whole shield machine
CN103046933A (en) * 2012-12-08 2013-04-17 中铁十二局集团有限公司 Shield station-crossing tunneling and station parallel construction method
CN105587322A (en) * 2015-12-31 2016-05-18 中交一公局第三工程有限公司 TBM integral step station-crossing method
CN109083647A (en) * 2018-08-17 2018-12-25 北京市政建设集团有限责任公司 A kind of shield machine translating station-crossing construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374614A (en) * 2019-07-09 2019-10-25 中国铁建大桥工程局集团有限公司 Shield machine quickly receives translation construction method in a kind of cavern
CN112320682A (en) * 2020-11-02 2021-02-05 北京市政建设集团有限责任公司 Vertical lifting method for shield tunneling machine in stage of translating through subway station
CN112796773A (en) * 2020-12-31 2021-05-14 淮安市中球盾构技术服务有限公司 Steel sleeve construction process and assembly method
CN113338964A (en) * 2021-07-20 2021-09-03 中煤第五建设有限公司 Method for transition of tunnel TBM
CN113931654A (en) * 2021-08-26 2022-01-14 中铁三局集团有限公司 Steel sleeve receiving construction method of subway shield machine
CN115977662A (en) * 2022-12-30 2023-04-18 中交四航局第一工程有限公司 Construction method for transverse movement in shield station and construction method for station crossing in shield station
CN115977662B (en) * 2022-12-30 2024-04-09 中交四航局第一工程有限公司 Construction method for transverse movement in shield station and construction method for station crossing in shield station

Also Published As

Publication number Publication date
CN109899074B (en) 2020-07-28

Similar Documents

Publication Publication Date Title
CN109899074A (en) A kind of sliding steel bushing shield machine, which integrally misses the stop, secondary originates construction method
CN102345461B (en) Subsequent project and shield driving parallel construction method for long-distance railway tunnel
CN101831888B (en) 1200 tonner water conservancy aqueduct transportation and erection equipment
CN105127707A (en) Method for disassembling earth pressure balance shield machine in tunnel
CN109372529B (en) In-tunnel dismantling device and method for hard rock heading machine
CN102877851A (en) Arc-shaped bottom stepping passing method of open-type hard rock heading machine in urban subway construction
CN104329096A (en) Shield station-crossing launching translation construction process
CN107255188A (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN213269891U (en) Shield constructs quick-witted dismounting device
CN106837376B (en) Bind module turnover device for subway tunnel section of jurisdiction
US4407609A (en) Apparatus and method for providing negative buoyancy for tunnel forms
CN110056362A (en) Shield receives in a kind of Station air duct and lateral translation hangs out method
CN214421471U (en) Steel arch frame fixing device
CN207470189U (en) For the shield long range translating station-crossing device of karst area
CN215666718U (en) Hoisting device for disassembling shield machine in existing station
CN108821127A (en) The devices and methods therefor of disassembly lifting open type TBM in a kind of hole
CN110761800B (en) Air-assisted launching construction method of launching well in underground excavation tunnel shield machine
CN211874504U (en) Full-automatic tunnel secondary lining material-distributing grouting system
CN208982056U (en) One kind being adapted to effluent tunnel synchronization lining device
CN216665634U (en) Secondary pouring guide platform structure for disassembling trolley in large-diameter shield receiving
CN109139043A (en) One kind being adapted to effluent tunnel synchronization lining device and method
CN220226919U (en) Shield split originating pipeline extension self-moving device
CN204386619U (en) A kind of bend loss reinforcement trolley
CN219449096U (en) TBM cutter head suspension installation system for underground large-section chamber
CN211549691U (en) Rotary translation lifting trolley for shield machine matching equipment in limited space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100160 701, 7th floor, building 3, yard 10, Automobile Museum East Road, Fengtai District, Beijing

Patentee after: China Power Construction Railway Construction Investment Group Co.,Ltd.

Address before: 100089 1001, 10th floor, building 2, yard 22, Chegongzhuang West Road, Haidian District, Beijing

Patentee before: POWERCHINA RAILWAY CONSTRUCTION Co.,Ltd.