CN109898994A - 一种煤层卸压方法及其装置 - Google Patents

一种煤层卸压方法及其装置 Download PDF

Info

Publication number
CN109898994A
CN109898994A CN201910218263.2A CN201910218263A CN109898994A CN 109898994 A CN109898994 A CN 109898994A CN 201910218263 A CN201910218263 A CN 201910218263A CN 109898994 A CN109898994 A CN 109898994A
Authority
CN
China
Prior art keywords
pressure relief
pressure
coal seam
series
discharge space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910218263.2A
Other languages
English (en)
Inventor
程领存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910218263.2A priority Critical patent/CN109898994A/zh
Publication of CN109898994A publication Critical patent/CN109898994A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明提供一种煤层卸压方法,采用钻机在煤层上进行钻孔,获取卸压串联通道,卸压串联通道的末端进行扩孔,获取第一卸压空间,沿着所述卸压串联通道的轴线,在距离所述第一卸压空间中心第一距离处进行扩孔,获取第二卸压空间,同时本发明还公开了用于执行煤层卸压方法的卸压装置;本发明一种煤层卸压方法,实现煤层精准定位,局部卸压增透作业过程中钻孔施工与高压水切割作业灵活切换,且不损失高压水射流压力;增大孔内煤体卸压空间,保护煤体支护质量,达到更理想卸压防护效果,方法简单、安全可靠、效果好且不损害煤体质量;用于执行煤层卸压方法的卸压装置,简单易生产。

Description

一种煤层卸压方法及其装置
技术领域
本发明属于煤矿开采设备技术领域,具体涉及一种煤层卸压方法及其装置。
背景技术
目前大多数内蒙古煤矿条件复杂,煤矿煤层单轴抗压强度平均大于31MPa,而且随着开采范围的扩大和开采深度的增加,地压大、煤层应力高、单轴抗压强度高、煤层具有冲击倾向性,严重影响到矿井煤炭资源的开发和工人的身体状况。针对煤矿埋藏深、地压大、煤层应力高、单轴抗压强度高、煤层具有冲击倾向性的问题,综合研究了煤矿地质构造和煤层高应力的成因及治理方法,结合对工作面应力和矿震规律的研究分析。现有技术中,常用煤层大直径卸压钻孔、顶板水力压裂、底板爆破卸压方案,来降低煤层应力集中的效果,但这些方法多数存在钻孔施工工程量大、有效影响范围小和抽采时间长等问题,煤层卸压效果不理想。
发明内容
为了克服现有技术的不足,本发明的目的旨在提供一种煤层卸压方法,对煤层精准多层水力定位旋切,方法简单、安全可靠、效果好。
本发明的另一目的是提供上述煤层卸压方法的装置。
本发明所采用的技术方案是,一种煤层卸压方法,包括:
步骤1:采用钻机在煤层上进行钻孔,获取卸压串联通道,所述卸压串联通道直径与所述钻机的钻头直径相匹配;
步骤2:在所述卸压串联通道的末端进行扩孔,获取第一卸压空间,所述第一卸压空间直径大于所述卸压串联通道的直径;
步骤3:沿着所述卸压串联通道的轴线,在距离所述第一卸压空间中心第一距离处进行扩孔,获取第二卸压空间,所述第二卸压空间的直径大于所述卸压串联通道的直径。
本发明的特征还在于,
第一距离为1米~5米。
第一卸压空间的直径为0.5米~5米,所述第二卸压空间的直径为0.5米~5米。
第一卸压空间和/或所述第二卸压空间沿所述卸压串联通道轴线上的长度100毫米~600毫米。
扩孔包括:通过水压旋切的方式进行扩孔。
本发明所采用的另一技术方案是,用于执行煤层卸压方法的卸压装置:
装置包括:包括钻机,钻机上安装有钻杆,钻杆一端连接有钻头和/或扩孔钻头,钻头用于获取卸压串联通道,扩孔钻头用于进行水压旋切获取第一和/或第二卸压空间,钻杆另一端连接高压水管,高压水管电接连高压水泵,高压水泵连接有供水管,高压水泵设置有高压泵开关,钻机设置有钻机开关。
高压水管上设置有卸压三通。
供水管上安装有球阀。
高压水管另一端连接除尘水管。
扩孔钻头为三翼射流扩孔钻头,钻机为矿用坑道钻机。
与现有技术相比,本发明一种煤层卸压方法,实现煤层精准定位,局部卸压增透作业过程中钻孔施工与高压水切割作业灵活切换,且不损失高压水射流压力;增大孔内煤体卸压空间,保护煤体支护质量,达到更理想卸压防护效果,方法简单、安全可靠、效果好且不损害煤体质量;用于执行煤层卸压方法的卸压装置,简单易生产。
附图说明
图1为本发明实施例1一种煤层卸压方法结构示意图。
附图标记如下:
1——钻机、2——卸压串联通道、2-1——扩孔钻头、2-2——钻杆、3——高压水管、3-1——扩孔、4——卸压三通、5——高压水泵、6——球阀、7——钻机开关、8——高压泵开关、9——除尘水管、10——供水管。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
具体实施过程如下:
如图1所示,一种煤层卸压方法,包括:
步骤1:采用钻机在煤层上进行钻孔,获取卸压串联通道2,卸压串联通道2直径与所述钻机的钻头直径相匹配;
步骤2:在卸压串联通道2的末端进行扩孔,获取第一卸压空间,第一卸压空间直径大于所述卸压串联通道2的直径;
步骤3:沿着卸压串联通道2的轴线,在距离第一卸压空间中心第一距离处进行扩孔,获取第二卸压空间,第二卸压空间的直径大于卸压串联通道2的直径;第一距离为1米~5米;第一卸压空间的直径为0.5米~5米,第二卸压空间的直径为0.5米~5米;第一卸压空间和/或所述第二卸压空间沿卸压串联通道轴线上的长度100毫米~600毫米;扩孔包括:通过水压旋切的方式进行扩孔。
一种用于执行煤层卸压方法的卸压装置,装置包括:包括钻机1,钻机1上安装有钻杆2-2,钻杆2-2一端连接有钻头和/或扩孔钻头2-1,钻头用于获取卸压串联通道,扩孔钻头2-1用于进行水压旋切获取第一和/或第二卸压空间,钻杆2-2另一端连接高压水管3,高压水管3电接连高压水泵5,高压水泵5连接有供水管10,高压水泵10设置有高压泵开关8,钻机1设置有钻机开关7;
高压水管3上设置有卸压三通4;供水管10上安装有球阀6;高压水管3另一端连接除尘水管9;扩孔钻头2-2为三翼射流扩孔钻头,钻机1为矿用坑道钻机。
煤层卸压方法具体为:
步骤1、首先用普通钻在煤层中打孔形成卸压串联通道2,钻机1上安装钻杆2-2,钻杆2-2连接扩孔钻头2-1后下入卸压串联通道2底然后开启钻机开关7;
步骤2、连接高压水管3,打开高压水泵开关5和卸压三通4,打开球阀6;
步骤3、待钻孔孔口2返水后,缓慢关闭卸压三通4球阀6,开启钻机1,进行射流扩孔,高压水从扩孔钻头2-1喷出,进行扩孔,得到直径为0.5米~2米的第一卸压空间;
步骤4、退出钻杆2-2,卸下高压水管3,卸下钻杆2-2完成一个扩孔;
步骤5、重新连接高压水管3,重复以上2~4步骤,直至所需数量卸压空间。
步骤1中:钻机1为矿用坑道钻机。
实施例1
正常钻孔深度20m,直径150mm之后,开始进行扩孔,具体过程为,扩孔钻头2-1连接钻杆2-2逐根下入卸压串联通道2底后,钻机卡盘卡紧钻具,连接高压水管3和供水管路;打开高压水泵5和卸压三通4,打开供水管10上的球阀6,开启高压注水泵5;待卸压串联通道2孔口返水后,缓慢关闭卸压三通4球阀6至泵压上升到10MPa停;开启为矿用坑道钻机1,低速旋转进行射流扩孔,高压水从扩孔钻头2-1喷出,观察孔口回水排粉情况。运转15分钟后若只回水不排粉停钻,高压水泵5调至15MPa后再进行射流扩孔。以此类推,直至孔口回水且排粉后停止高压水泵5泵压调整,低速旋转进行射流扩孔;最后,直至在不超过注水泵额定工作压力30MPa内,达到射流扩孔最佳效果;然后,钻机1保持低速旋转,缓慢操纵手把匀速起钻,达到扩孔长度30mm且不回粉后停止旋钻,打开注水泵卸压三通卸压4至高压水泵50MPa后停泵。退出一根钻杆2-2长度停钻,卸下高压水管3,卸下一根钻杆2-2;重新连接高压水管3,重复扩孔步骤,直至整个钻孔完成;得到扩孔直径不低于500mm,扩孔长度为每米孔长不低于300mm的扩孔。
其中,钻具配以Φ50㎜钻杆2-3及钻杆接头,Φ75㎜三翼射流扩孔钻头2-1,喷嘴采用Φ1.8mm及Φ2.0mm两种规格,Φ50㎜高压水便
高压供水管路使用规格4-25高压钢管,耐压不低于30MPa,阀门管件使用液压支架专用的Φ25球阀6、卸压三通4。
以上所述,仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。
与现有技术相比,本发明一种煤层卸压方法,实现煤层精准定位,局部卸压增透作业过程中钻孔施工与高压水切割作业灵活切换,且不损失高压水射流压力;增大孔内煤体卸压空间,保护煤体支护质量,达到更理想卸压防护效果,方法简单、安全可靠、效果好且不损害煤体质量;用于执行煤层卸压方法的卸压装置,简单易生产。

Claims (10)

1.一种煤层卸压方法,其特征在于,包括:
步骤1:采用钻机在煤层上进行钻孔,获取卸压串联通道(2),所述卸压串联通道(2)的直径与所述钻机的钻头直径相匹配;
步骤2:在所述卸压串联通道(2)的末端进行扩孔,获取第一卸压空间,所述第一卸压空间直径大于所述卸压串联通道(2)的直径;
步骤3:沿着所述卸压串联通道(2)的轴线,在距离所述第一卸压空间中心第一距离处进行扩孔,获取第二卸压空间,所述第二卸压空间的直径大于所述卸压串联通道(2)的直径。
2.根据权利要求1所述的煤层卸压方法,其特征在于,所述第一距离为1米~5米。
3.根据权利要求1所述的煤层卸压方法,其特征在于,所述第一卸压空间的直径为0.5米~2米,所述第二卸压空间的直径为0.5米~5米。
4.根据权利要求1所述的煤层卸压方法,其特征在于,所述第一卸压空间和/或所述第二卸压空间沿所述卸压串联通道轴线上的长度100毫米~600毫米。
5.根据权利要求1所述的煤层卸压方法,其特征在于,所述扩孔包括:通过水压旋切的方式进行扩孔。
6.一种用于执行权利1-5中任意一种煤层卸压方法的卸压装置,其特征在于,所述装置包括:包括钻机(1),所述钻机(1)上安装有钻杆(2-2),所述钻杆(2-2)一端连接有钻头和/或扩孔钻头(2-1),所述钻头用于获取卸压串联通道,所述扩孔钻头(2-1)用于进行水压旋切获取第一和/或第二卸压空间,钻杆(2-2)另一端连接高压水管(3),所述高压水管(3)电接连高压水泵(5),高压水泵(5)连接有供水管(10),高压水泵(10)设置有高压泵开关(8),钻机(1)设置有钻机开关(7)。
7.根据权利要求6所述的卸压装置,其特征在于,所述高压水管(3)上设置有卸压三通(4)。
8.根据权利要求6所述的卸压装置,其特征在于,所述供水管(10)上安装有球阀(6)。
9.根据权利要求6-8任意一项所述的卸压装置,其特征在于,所述高压水管(3)另一端连接除尘水管(9)。
10.根据权利要求9所述的卸压装置,其特征在于,所述扩孔钻头(2-2)为三翼射流扩孔钻头,所述钻机(1)为矿用坑道钻机。
CN201910218263.2A 2019-03-21 2019-03-21 一种煤层卸压方法及其装置 Pending CN109898994A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910218263.2A CN109898994A (zh) 2019-03-21 2019-03-21 一种煤层卸压方法及其装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910218263.2A CN109898994A (zh) 2019-03-21 2019-03-21 一种煤层卸压方法及其装置

Publications (1)

Publication Number Publication Date
CN109898994A true CN109898994A (zh) 2019-06-18

Family

ID=66953180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910218263.2A Pending CN109898994A (zh) 2019-03-21 2019-03-21 一种煤层卸压方法及其装置

Country Status (1)

Country Link
CN (1) CN109898994A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911158A (zh) * 2020-08-12 2020-11-10 华北科技学院 一种用于坚硬顶板的定向压裂控顶卸压装置
CN114320444A (zh) * 2021-12-28 2022-04-12 中国矿业大学 一种复合煤层风水转换扩孔卸压增透方法

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586441A (zh) * 2009-07-01 2009-11-25 煤炭科学研究总院重庆研究院 高压水射流煤层钻扩孔系统和方法
CN101644166A (zh) * 2009-07-14 2010-02-10 中国矿业大学 高瓦斯低透气性煤层冲孔割缝卸压增透瓦斯抽采方法
CN201474608U (zh) * 2009-08-19 2010-05-19 兴和鹏能源技术(北京)有限公司 煤层气增产和瓦斯防突水平井
CN102852547A (zh) * 2012-09-28 2013-01-02 西安美尼矿山设备科技有限公司 矿用钻割一体化防突增透系统
CN103161402A (zh) * 2013-03-27 2013-06-19 华亭煤业集团有限责任公司 煤层高压水力顺层钻割卸压方法
CN103306657A (zh) * 2013-06-28 2013-09-18 陕西煤业化工技术研究院有限责任公司 一种煤层割缝卸压增透和缝槽保持装置及方法
CN104131832A (zh) * 2014-07-14 2014-11-05 中国矿业大学 一种高瓦斯煤层冲割压抽一体化的卸压增透瓦斯抽采方法
CN104389631A (zh) * 2014-09-17 2015-03-04 中国矿业大学 一种低透气性煤层割缝与压裂协同网络化增透方法
US20150252663A1 (en) * 2012-09-27 2015-09-10 Wintershall Holding GmbH Flowable composition, method for producing the flowable composition and method for fracking a subterranean formation using the flowable composition
CN105328574A (zh) * 2015-10-29 2016-02-17 中国矿业大学 高压旋转磨料射流钻扩孔装置
CN106320985A (zh) * 2016-09-18 2017-01-11 重庆大学 煤层高压水射流冲‑钻‑扩‑割一体化增透装置及其方法
CN106894837A (zh) * 2017-03-20 2017-06-27 中国矿业大学 一种递进掩护式瓦斯卸压抽采方法
CN107152302A (zh) * 2017-06-29 2017-09-12 重庆大学 一种复杂地质构造煤层割压均匀增透瓦斯抽采方法
CN108843379A (zh) * 2018-06-25 2018-11-20 中煤科工集团重庆研究院有限公司 一种煤矿井下瓦斯抽采钻孔的轴向切槽卸压增透方法

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586441A (zh) * 2009-07-01 2009-11-25 煤炭科学研究总院重庆研究院 高压水射流煤层钻扩孔系统和方法
CN101644166A (zh) * 2009-07-14 2010-02-10 中国矿业大学 高瓦斯低透气性煤层冲孔割缝卸压增透瓦斯抽采方法
CN201474608U (zh) * 2009-08-19 2010-05-19 兴和鹏能源技术(北京)有限公司 煤层气增产和瓦斯防突水平井
US20150252663A1 (en) * 2012-09-27 2015-09-10 Wintershall Holding GmbH Flowable composition, method for producing the flowable composition and method for fracking a subterranean formation using the flowable composition
CN102852547A (zh) * 2012-09-28 2013-01-02 西安美尼矿山设备科技有限公司 矿用钻割一体化防突增透系统
CN103161402A (zh) * 2013-03-27 2013-06-19 华亭煤业集团有限责任公司 煤层高压水力顺层钻割卸压方法
CN103306657A (zh) * 2013-06-28 2013-09-18 陕西煤业化工技术研究院有限责任公司 一种煤层割缝卸压增透和缝槽保持装置及方法
CN104131832A (zh) * 2014-07-14 2014-11-05 中国矿业大学 一种高瓦斯煤层冲割压抽一体化的卸压增透瓦斯抽采方法
CN104389631A (zh) * 2014-09-17 2015-03-04 中国矿业大学 一种低透气性煤层割缝与压裂协同网络化增透方法
CN105328574A (zh) * 2015-10-29 2016-02-17 中国矿业大学 高压旋转磨料射流钻扩孔装置
CN106320985A (zh) * 2016-09-18 2017-01-11 重庆大学 煤层高压水射流冲‑钻‑扩‑割一体化增透装置及其方法
CN106894837A (zh) * 2017-03-20 2017-06-27 中国矿业大学 一种递进掩护式瓦斯卸压抽采方法
CN107152302A (zh) * 2017-06-29 2017-09-12 重庆大学 一种复杂地质构造煤层割压均匀增透瓦斯抽采方法
CN108843379A (zh) * 2018-06-25 2018-11-20 中煤科工集团重庆研究院有限公司 一种煤矿井下瓦斯抽采钻孔的轴向切槽卸压增透方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911158A (zh) * 2020-08-12 2020-11-10 华北科技学院 一种用于坚硬顶板的定向压裂控顶卸压装置
CN111911158B (zh) * 2020-08-12 2022-02-25 华北科技学院 一种用于坚硬顶板的定向压裂控顶卸压装置
CN114320444A (zh) * 2021-12-28 2022-04-12 中国矿业大学 一种复合煤层风水转换扩孔卸压增透方法

Similar Documents

Publication Publication Date Title
CN102619552B (zh) 导向槽定向水力压穿增透及消突方法
CN103133028B (zh) 井下煤层水力压裂裂缝导向扩展的方法
CN108547604A (zh) 一种钻冲压一体化装置与方法
US10934817B2 (en) System for extracting gas from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
CN105464638A (zh) 煤层气井脉冲径向钻孔与双脉动水力压裂方法
US10830018B1 (en) Method of extracting gas from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
CN110344805B (zh) 一种井下钻孔定向压裂装置及方法
CN108194070A (zh) 一种超声激励与水力割缝一体化装置、复合强化瓦斯抽采系统及方法
CN104632174A (zh) 煤层液态二氧化碳压裂装置及方法
CN104389559B (zh) 一种防治厚煤层开采过程中瓦斯超限的方法及装置
US10941641B2 (en) Long-distance drilling and hydrofracturing integrated device and method in underground mine
CN110195580A (zh) 一种气液两相联合作用煤层增透方法
CN212130537U (zh) 投球式高压水力钻割一体化增渗装置
CN108425661A (zh) 连续油管钢粒射流射孔装置
CN114396244B (zh) 一种深部煤层群井上下联合增透瓦斯抽采方法
CN109898994A (zh) 一种煤层卸压方法及其装置
Yong et al. Technical improvements and application of air-lift reverse circulation drilling technology to ultra-deep geothermal well
CN110388206A (zh) 一种等离子体上行致裂残采区遗留煤柱的方法和装置
CN108661697A (zh) 地面辅助井下长钻孔瓦斯强化抽采方法
CN109578058B (zh) 一种通过辅助钻孔提高抽采钻孔瓦斯抽采浓度的方法
CN208416512U (zh) 一种钻冲压一体化装置
CN105569620A (zh) 用于裸眼井的完井中的深穿透射孔方法及装置
CN107575164A (zh) 一种随钻条件下的高压水力径向钻进导向装置及方法
CN105507939B (zh) 一种注浆置换式钻孔固化密封及瓦斯无管抽采的方法
CN109322621B (zh) 一种破碎层固管注浆方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618

RJ01 Rejection of invention patent application after publication