CN109898867A - The installation method of assembled wall - Google Patents

The installation method of assembled wall Download PDF

Info

Publication number
CN109898867A
CN109898867A CN201711317500.8A CN201711317500A CN109898867A CN 109898867 A CN109898867 A CN 109898867A CN 201711317500 A CN201711317500 A CN 201711317500A CN 109898867 A CN109898867 A CN 109898867A
Authority
CN
China
Prior art keywords
metope
subelement
plasterboard
keel
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711317500.8A
Other languages
Chinese (zh)
Inventor
武发德
王鹏起
何亮
曾繁昌
周建中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN201711317500.8A priority Critical patent/CN109898867A/en
Publication of CN109898867A publication Critical patent/CN109898867A/en
Pending legal-status Critical Current

Links

Abstract

A kind of installation method of assembled wall is disclosed herein, includes the following steps: step a: multiple first metope subelement head and the tail being connected and are installed to predeterminated position;Step b: the first metope subelement is arranged in close to the side of the second metope subelement to be installed in filling plate;Step c: the first end of two-way fastener is connected into the first keel in the first metope subelement;Step d: multiple second metope subelements are passed through respectively on the second keel hanging buckle to the second end of corresponding two-way fastener.

Description

The installation method of assembled wall
Technical field
This application involves but be not limited to building materials technology field, especially a kind of installation method of assembled wall.
Background technique
In the prior art, inner wall production usually carries out site operation using light metal keel and plasterboard, this causes to apply Work scene is in disorder, and the building wastes such as waste material, leftover pieces are excessive, is not appropriate for that wall is removable to be recycled, and scene The amount of labour used is larger, cost of labor is excessively high, construction dimensional accuracy is lower.
It is response country to the environmentally protective of novel building, batch production, rapid, removable, closed matereial cycle political affairs Plan guilding principle is badly in need of greatly developing novel fabricated wall technology at present.But wall element in the prior art there are The low defect of the defect and packaging efficiency of structural stability difference.
Summary of the invention
The technical issues of the application solves is to provide a kind of installation method of assembled wall, can effectively solve the problem that existing skill The defect that wall element structural stability is poor in art and packaging efficiency is low.
In order to solve the above technical problems, including the following steps: this application provides a kind of installation method of assembled wall
Step a: multiple first metope subelement head and the tail are connected and are installed to predeterminated position;
Step b: the first metope subelement is arranged in close to the side of the second metope subelement to be installed in filling plate;
Step c: the first end of two-way fastener is connected into the first keel in the first metope subelement;
Step d: multiple second metope subelements are passed through into the second keel hanging buckle to the of corresponding two-way fastener respectively On two ends.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
Step a further include:
The day ground joist and keelson of first metope are installed to predeterminated position.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
Step d further include:
The day ground joist and keelson of second metope are installed to predeterminated position.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
The first plasterboard head end in the first metope subelement is overlapped in the adjacent first metope subelement in front On first keel, and the first plasterboard tail end in the first metope subelement adjacent with front connects;
The first plasterboard tail end in the first metope subelement is overlapped on first in current first metope subelement On keel, and the first plasterboard head end in the first metope subelement adjacent with rear connects.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
The second plasterboard head end in the second metope subelement is overlapped on second in current second metope subelement On keel, and the second plasterboard tail end in the second metope subelement adjacent with front connects;
The second plasterboard tail end in the second metope subelement is overlapped in the adjacent second metope subelement in rear On second keel, and the second plasterboard head end in the second metope subelement adjacent with rear connects.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
The second plasterboard head end in the second metope subelement is overlapped in the adjacent second metope subelement in front On second keel, and the second plasterboard tail end in the second metope subelement adjacent with front connects;
The second plasterboard tail end in the second metope subelement is overlapped on second in current second metope subelement On keel, and the second plasterboard head end in the second metope subelement adjacent with rear connects.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
The two-way fastener includes the first clamping portion for the first keel of clamping, and for clamping the bicarinate the Two clamping portions.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
First clamping portion is clamped at the notch of the first keel.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
Second clamping portion is clamped at bicarinate notch.
The installation method of above-mentioned assembled wall, can also feature specific as follows;
Step b further include:
Before filling plate setting, the configuration operation of hydroelectric line is carried out.
The application above-mentioned technical proposal has the following beneficial effects:
Compared with the prior art, the installation method of the above-mentioned assembled wall being preferably provided with provided by the present application, Neng Gouyou Effect improves the structural stability of wall element, can also effectively improve the packaging efficiency of wall element.
Other features and advantage will illustrate in the following description, also, partly become from specification It obtains it is clear that being understood by implementing the embodiment of the present invention.The purpose of the application and other advantages can be by illustrating Specifically noted structure is achieved and obtained in book, claims and attached drawing.
Detailed description of the invention
Attached drawing is used to provide to further understand technical scheme, and constitutes part of specification, with this The embodiment of application is used to explain the technical solution of the application together, does not constitute the limitation to technical scheme.
Fig. 1 is the structural schematic diagram one of the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram two of the embodiment of the present invention one;
Fig. 3 is the application schematic diagram of the two-way fastener of the embodiment of the present invention one;
Fig. 4 is the connection status figure one of the two-way fastener of the embodiment of the present invention one;
Fig. 5 is the connection status figure two of the two-way fastener of the embodiment of the present invention one;
Fig. 6 is the structural schematic diagram of the two-way fastener of the embodiment of the present invention one;
Fig. 7 is the structural perspective of the two-way fastener of the embodiment of the present invention one;
Fig. 8 is the structure expanded view of the two-way fastener of the embodiment of the present invention one;
Fig. 9 is the structural schematic diagram one of the embodiment of the present invention two;
Figure 10 is the structural schematic diagram two of the embodiment of the present invention two;
It illustrates:
The two-way fastener of 1-, the first clamping portion 11-, the second clamping portion 12-, the first clamping slot of 13-, the second clamping slot of 14-, The first plate of 15-, the second plate of 16-;
The first plasterboard of 21-, the first keel of 22-, the second plasterboard of 31-, the second keel of 32-, 4- fill plate.
Specific embodiment
Embodiments herein is described in detail below in conjunction with attached drawing.It should be noted that not conflicting In the case of, the features in the embodiments and the embodiments of the present application can mutual any combination.
Embodiment one:
As shown in Figure 1, the present invention provides a kind of assembled wall, including the first metope and the second metope, it further include setting Set the filling plate 4 between the first metope and the second metope.Wherein, pass through two-way buckle between the first metope and the second metope Part 1 connects;First metope includes the first metope subelement of multiple head and the tail connections, and the first metope subelement includes the first keel 22 With the first plasterboard 21 being arranged on the first keel 22;Second metope includes multiple sequentially connected second metope subelements, It keel 32 and the second plasterboard 31 for being arranged on the second keel 32 that second metope subelement, which includes second,.
In concrete operations, above-mentioned first keel 22, the second keel 32 may be configured as centre keel, and assist setting corresponding Transom is stably connected with operation with realize the first plasterboard 21 and the second plasterboard 31;That is, can be set in the first metope subelement 3 centre keels, several transoms are equipped with, transom is uniformly arranged between centre keel, to realize the steady of the first plasterboard 21 Fixed support operation;It can be realized by two-way fastener 1 between above-mentioned first metope subelement and the second metope subelement corresponding Convenient attended operation, assembling operation are time saving and energy saving;Meanwhile the setting of two-way fastener 1, it can replace more multiple in the prior art Miscellaneous keel connecting member, and then overall cost can be reduced to a certain extent.
As shown in Fig. 2, the first metope subelement among Fig. 2 can be identified as current first metope subelement, on the left of Fig. 2 First metope subelement can be identified as the adjacent first metope subelement in rear, and the first metope subelement on the right side of Fig. 2 can be identified as The adjacent first metope subelement in front;Correspondingly, the right end of the first plasterboard 21 can be identified as head end, left end is accordingly determined as tail End.It should be noted that the determination in above-mentioned front, rear, head end and tail end, it is intended to can preferably illustrate this technology side Case can not constitute the limitation to the technical program.
In the present embodiment, 21 head end of the first plasterboard in above-mentioned first metope subelement is overlapped on adjacent first wall in front On the first keel in face unit, and the first plasterboard tail end in the first metope subelement adjacent with front connects;First 21 tail end of the first plasterboard in metope subelement is overlapped on the first keel 22 in current first metope subelement, and with it is rear The first plasterboard head end in Fang Xianglin the first metope subelement connects.
In concrete operations, the first plasterboard 21 of the above-mentioned fissure of displacement connection being preferably provided with can effectively improve adjacent first Connective stability between metope subelement, and then the structural stability of assembled wall entirety can be effectively improved.
In the present embodiment, 31 head end of the second plasterboard in above-mentioned second metope subelement is overlapped on current second metope On the second keel 32 in unit, and the second plasterboard tail end in the second metope subelement adjacent with front connects;Second wall 31 tail end of the second plasterboard in face unit is overlapped on the second keel in the adjacent second metope subelement in rear, and with it is rear The second plasterboard head end in Fang Xianglin the second metope subelement connects.
In concrete operations, the second plasterboard 31 of the above-mentioned fissure of displacement connection being preferably provided with, in addition to can be realized aforementioned first Other than the technical effect for the adjacent metope subelement connection structure stability that plasterboard 21 is realized, additionally it is possible to further increase dress Structural stability with formula wall entirety.That is, the fissure of displacement of aforementioned first plasterboard 21 connects, current first wall can be effectively improved Stable connection between face unit the first metope subelement adjacent with front;So, the fissure of displacement of above-mentioned second plasterboard 31 connects It connects, the connective stability between current second metope subelement the second metope subelement adjacent with rear can be effectively improved.Most Eventually, current first metope subelement is connect with current second metope subelement by two-way fastener 1.Above-mentioned intersection fissure of displacement connection Structure type, be capable of the structural stability of effectively reinforced assembly formula wall entirety.
As shown in figure 3, above-mentioned first plasterboard 21, the second plasterboard 31 can be fixed on respectively by tapping screw it is corresponding On first keel 22 and the second keel 32;Wherein, the notch of the first keel 22 and the notch of the second keel 32 are oppositely arranged, two-way One end of fastener 1 is in clamping connection the notch of the first keel 22, and the other end is in clamping connection the notch of the second keel 32.
In concrete operations, multiple first metope subelement head and the tail can be connected first and be installed to predeterminated position;In turn, will The first metope subelement is arranged in close to the side of the second metope subelement to be installed in filling plate;It then, as shown in figure 4, will The first end of two-way fastener 1 connects the first keel 22 in the first metope subelement;Finally, as shown in figure 5, by multiple second Metope subelement passes through respectively on 32 hanging buckle of the second keel to the second end of corresponding two-way fastener 1.
In conjunction with shown in Fig. 3, Fig. 6, in the present embodiment, above-mentioned two-way fastener 1 includes being separately positioned on 1 liang of two-way fastener First clamping portion 11 and the second clamping portion 12 at end, the first clamping portion 11 are used for connecting the first keel 22, the second clamping portion 12 In the second keel 32 of connection.
In concrete operations, above-mentioned first keel 22 and the second keel 32 are c-type keel, the notch of the first keel 22 and The notch of two keel 32 is oppositely arranged, and two-way in order to two-way fastener 1 snaps connection operation;Wherein, the first clamping portion 11 It can be clamped at the notch position of the first keel 22, the second clamping 12 can be clamped at the notch position of the second keel 32.
Above-mentioned two-way fastener 1 can be realized the convenient attended operation between the keel on the inside of two metopes, can pass through One clamping portion 11 connects the first keel 22, and the second clamping portion 12 connects the second keel 32, the connection behaviour between can be realized Make, and then effectively improves the structural stability of wall element;Above-mentioned attended operation is simple and easy, time saving and energy saving.
As shown in fig. 7, above-mentioned two-way fastener 1 includes that two the first plates 15 disposed in parallel and one are used to connect two The same side of the second plate 16 is arranged in second plate 16 of the first plate 15, two the first plates 15;First plate 15 is close to the second plate 16 Two corner locations offer the first clamping slot 13, and four the first clamping slots 13 of two the first plates 15 constitute the first clamping portion 11;First plate 15 offers the second clamping slot 14 far from two corner locations of the second plate 16, and four of two the first plates 15 Second clamping slot 14 constitutes the second clamping portion 12.
In concrete operations, above-mentioned two-way fastener 1 is preferably integrated bending and molding component, i.e., above-mentioned two first plate, 15 He One the second plate 16 is same plate by bending;The setting of above-mentioned one bending and molding component, can effectively ensure that Material use maximizes, and can guarantee that two-way fastener 1 has enough structural strengths and higher structural stability, can Effectively meet actual installation connection requirement;Above-mentioned first plate 15 is mutually perpendicular to the second plate 16, above-mentioned to be arranged in a mutually vertical manner First plate 15 and the second plate 16, the overall structure stability after capable of being further ensured that connection keel.
As shown in figure 8, four the first clamping slots and four the second clamping slots can be opened up in the predeterminated position of rectangular plate;It will To ipsilateral bending, two folded ends form the first plates at the both ends of rectangular plate, and the plate between two folded ends forms the Two plates, the first clamping slot are located at the first plate close to the corner location of the second plate, and the second clamping slot is located at the first plate far from the second plate Corner location.
In concrete operations, complete rectangular plate can be opened up to eight clamping slots, and cut away extra edge;Into And according to two ends of dotted line position bending sheets;Above-mentioned manufacture craft is simple and easy.
In the present embodiment, above-mentioned first clamping slot and the second clamping slot are the molding groove body of punch process, can be by dedicated Stamping die complete the punching operation of above-mentioned clamping slot.In concrete operations, by installing multiple stamping dies, Ji Keshi simultaneously Existing one time punching molded operation, producing efficiency are high.
Embodiment two:
Second embodiment of the present invention provides a kind of assembled walls, and main structure is similar with embodiment one, about main body knot The record of structure refers to the explanation of embodiment one, is intended to illustrate difference between the two herein.
In conjunction with shown in Fig. 9, Figure 10, in the present embodiment, 21 head end of the first plasterboard in the first metope subelement is overlapped on On the first keel in the adjacent first metope subelement in front, and the first plasterboard in the first metope subelement adjacent with front Tail end connects;21 tail end of the first plasterboard in first metope subelement is overlapped on the first dragon in current first metope subelement On bone 22, and the first plasterboard head end in the first metope subelement adjacent with rear connects.
Correspondingly, 31 head end of the second plasterboard in above-mentioned second metope subelement is overlapped on adjacent second metope in front On the second keel in unit, and the second plasterboard tail end in the second metope subelement adjacent with front connects;Second metope 31 tail end of the second plasterboard in subelement is overlapped on the second keel 32 in current second metope subelement, and with rear phase The second plasterboard head end in adjacent second metope subelement connects.
In concrete operations, the above-mentioned fissure of displacement connection being preferably provided with can be effectively improved between adjacent first metope subelement Connective stability between adjacent second metope subelement, and then the stable structure of assembled wall entirety can be effectively improved Property.
Embodiment three:
The present invention implements three and provides a kind of peace applied to the assembled wall recorded in embodiment one or embodiment two Dress method, includes the following steps:
Step a: multiple first metope subelement head and the tail are connected and are installed to predeterminated position;Step b: filling plate is set It sets in the first metope subelement close to the side of the second metope subelement to be installed;Step c: the first end of two-way fastener is connected Connect the first keel in the first metope subelement;Step d: multiple second metope subelements are passed through into the second keel hanging buckle respectively and are arrived In the second end of corresponding two-way fastener.
In concrete operations, step a further include: the day ground joist and keelson of the first metope are installed to predeterminated position, Operation is connected and fixed with the first metope of realization.
Correspondingly, step d further include: the day ground joist and keelson of the second metope are installed to predeterminated position, with reality Existing second metope is connected and fixed operation.
In the present embodiment, above-mentioned steps b further include: before filling plate setting, carry out the configuration operation of hydroelectric line;Root It is according to interior space demand, corresponding pipe installation is good, and then corresponding padding, above-mentioned filling are carried out plate will be filled Plate includes sound-and-fire proof rock wool or cotton carding, and rock wool or cotton carding are all made of the strip plate cotton after package;Above-mentioned filling plate is excellent It is selected as the cotton carding of lighter weight.
In the present embodiment, the first plasterboard head end in above-mentioned first metope subelement is overlapped on adjacent first metope in front On the first keel in subelement, and the first plasterboard tail end in the first metope subelement adjacent with front connects;First wall The first plasterboard tail end in face unit is overlapped on the first keel in current first metope subelement, and adjacent with rear The first plasterboard head end in first metope subelement connects.
Following set-up mode can be used in above-mentioned second metope subelement:
The second plasterboard head end in second metope subelement is overlapped on the second keel in current second metope subelement On, and the second plasterboard tail end in the second metope subelement adjacent with front connects;The second stone in second metope subelement Cream plate tail end is overlapped on the second keel in the adjacent second metope subelement in rear, and the second metope subelement adjacent with rear In the second plasterboard head end connect.
Following set-up mode can also be used in above-mentioned second metope subelement:
The second plasterboard head end in second metope subelement is overlapped on second in the adjacent second metope subelement in front On keel, and the second plasterboard tail end in the second metope subelement adjacent with front connects;In second metope subelement Two plasterboard tail ends are overlapped on the second keel in current second metope subelement, and the second metope subelement adjacent with rear In the second plasterboard head end connect.
In the present embodiment, above-mentioned two-way fastener includes the first clamping portion for the first keel of clamping, and is used for clamping Bicarinate second clamping portion;First clamping portion can be clamped at the notch of the first keel, and the second clamping portion can be clamped on At bicarinate notch.
In the description of the present application, term " installation ", " connected ", " connection ", " fixation " etc. be shall be understood in a broad sense, example Such as, " connection " may be fixed connection or may be dismantle connection, or integral connection;It can be directly connected, it can also be with Indirectly connected through an intermediary.For the ordinary skill in the art, above-mentioned art can be understood as the case may be The concrete meaning of language in this application.
In the description of this specification, the description of term " one embodiment ", " some embodiments ", " specific embodiment " etc. Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the application It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or reality Example.Moreover, description particular features, structures, materials, or characteristics can in any one or more of the embodiments or examples with Suitable mode combines.
Although those skilled in the art should be understood that embodiment disclosed by the embodiment of the present invention is as above, described The content only embodiment of the present invention and the embodiment that uses for ease of understanding, be not intended to limit the invention embodiment.It is any Technical staff in fields of the embodiment of the present invention, in the premise for not departing from spirit and scope disclosed by the embodiment of the present invention Under, any modification and variation, but the scope of patent protection of the embodiment of the present invention can be carried out in the form and details of implementation, Still it should be subject to the scope of the claims as defined in the appended claims.

Claims (10)

1. a kind of installation method of assembled wall, which comprises the steps of:
Step a: multiple first metope subelement head and the tail are connected and are installed to predeterminated position;
Step b: the first metope subelement is arranged in close to the side of the second metope subelement to be installed in filling plate;
Step c: the first end of two-way fastener is connected into the first keel in the first metope subelement;
Step d: by multiple second metope subelements pass through respectively the second keel hanging buckle to corresponding two-way fastener second end On.
2. the installation method of assembled wall according to claim 1, which is characterized in that step a further include:
The day ground joist and keelson of first metope are installed to predeterminated position.
3. the installation method of assembled wall according to claim 1, which is characterized in that step d further include:
The day ground joist and keelson of second metope are installed to predeterminated position.
4. the installation method of assembled wall according to claim 1 or 2 or 3, which is characterized in that
The first plasterboard head end in the first metope subelement is overlapped on first in the adjacent first metope subelement in front On keel, and the first plasterboard tail end in the first metope subelement adjacent with front connects;
The first plasterboard tail end in the first metope subelement is overlapped on the first keel in current first metope subelement On, and the first plasterboard head end in the first metope subelement adjacent with rear connects.
5. the installation method of assembled wall according to claim 4, which is characterized in that
The second plasterboard head end in the second metope subelement is overlapped on the second keel in current second metope subelement On, and the second plasterboard tail end in the second metope subelement adjacent with front connects;
The second plasterboard tail end in the second metope subelement is overlapped on second in the adjacent second metope subelement in rear On keel, and the second plasterboard head end in the second metope subelement adjacent with rear connects.
6. the installation method of assembled wall according to claim 4, which is characterized in that
The second plasterboard head end in the second metope subelement is overlapped on second in the adjacent second metope subelement in front On keel, and the second plasterboard tail end in the second metope subelement adjacent with front connects;
The second plasterboard tail end in the second metope subelement is overlapped on the second keel in current second metope subelement On, and the second plasterboard head end in the second metope subelement adjacent with rear connects.
7. the installation method of assembled wall according to claim 1 or 2 or 3, which is characterized in that
The two-way fastener includes the first clamping portion for the first keel of clamping, and for bicarinate second card of clamping Socket part.
8. the installation method of assembled wall according to claim 7, which is characterized in that
First clamping portion is clamped at the notch of the first keel.
9. the installation method of assembled wall according to claim 7, which is characterized in that
Second clamping portion is clamped at bicarinate notch.
10. the installation method of assembled wall according to claim 7, which is characterized in that step b further include:
Before filling plate setting, the configuration operation of hydroelectric line is carried out.
CN201711317500.8A 2017-12-11 2017-12-11 The installation method of assembled wall Pending CN109898867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711317500.8A CN109898867A (en) 2017-12-11 2017-12-11 The installation method of assembled wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711317500.8A CN109898867A (en) 2017-12-11 2017-12-11 The installation method of assembled wall

Publications (1)

Publication Number Publication Date
CN109898867A true CN109898867A (en) 2019-06-18

Family

ID=66943166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711317500.8A Pending CN109898867A (en) 2017-12-11 2017-12-11 The installation method of assembled wall

Country Status (1)

Country Link
CN (1) CN109898867A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111604348A (en) * 2019-06-26 2020-09-01 北新集团建材股份有限公司 Assembled wall body recovery system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2390935Y (en) * 1999-11-05 2000-08-09 张福长 Multifunction combined keel
CN1295163A (en) * 1999-11-05 2001-05-16 张福长 Combined wall keel
CN2457262Y (en) * 2000-12-27 2001-10-31 邢瑞利 Composite inner wall partition with cement surface
CN104032920A (en) * 2014-06-13 2014-09-10 张爱军 Paper honeycomb composite wall board and installing method of paper honeycomb composite wall board
CN206581433U (en) * 2017-02-28 2017-10-24 河北卓秋实业有限公司 Double keel connect combined wall
CN107435397A (en) * 2016-05-25 2017-12-05 北新集团建材股份有限公司 A kind of assembled plasterboard partition wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2390935Y (en) * 1999-11-05 2000-08-09 张福长 Multifunction combined keel
CN1295163A (en) * 1999-11-05 2001-05-16 张福长 Combined wall keel
CN2457262Y (en) * 2000-12-27 2001-10-31 邢瑞利 Composite inner wall partition with cement surface
CN104032920A (en) * 2014-06-13 2014-09-10 张爱军 Paper honeycomb composite wall board and installing method of paper honeycomb composite wall board
CN107435397A (en) * 2016-05-25 2017-12-05 北新集团建材股份有限公司 A kind of assembled plasterboard partition wall
CN206581433U (en) * 2017-02-28 2017-10-24 河北卓秋实业有限公司 Double keel connect combined wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111604348A (en) * 2019-06-26 2020-09-01 北新集团建材股份有限公司 Assembled wall body recovery system

Similar Documents

Publication Publication Date Title
CN104929287B (en) Modular assembled lower-layer thin-walled cold-formed steel floor module
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN208604757U (en) The movable plank house of unit splicing
CN109898867A (en) The installation method of assembled wall
CN109898737A (en) Assembled wall
CN103912074B (en) A kind of framework-steel pipe bundle and steel plate concrete shear wall combined structure system
CN205046844U (en) Clear water concrete window steel form structure device that wafts
CN103850367A (en) L-shaped steel pipe bundle composite structure
CN109898688A (en) It is equipped with the assembled wall of hydroelectric line
CN105839917A (en) Complete steel formwork fair-faced finish concrete exposed joint strip and exposed joint constructing method thereof
CN206952389U (en) A kind of rib pressing device for thin-wall T-shaped joint laser welding
CN109898736A (en) Two-way fastener and preparation method
CN211114233U (en) Vertical connection structure of assembled shear force wall
CN208346986U (en) A kind of assembled steel tube-bamboo slab rubber combination node of column and beam
CN203795713U (en) Plate-splicing type wall block
CN109898710A (en) Assembled wall frame
CN203977692U (en) A kind of steel pipe bundle combined structure system for industrialization residential building
CN109898709A (en) The two-way keel structure snapped connection
CN213234736U (en) High-efficient disconnected hot aluminum alloy ex-trusions structure
CN103850349A (en) Frame-steel pipe bundle combined structure system for industrial residential building
CN205276543U (en) Assembled wall body with L connecting piece that appears
CN210713494U (en) Steel plate composite shear wall connected by cross bending type partition plates
CN208934195U (en) Assembled wall body
CN2570377Y (en) Lock joint plastic formwork for construction
CN209114337U (en) A kind of sliceable steel form of science of bridge building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618