CN109888830A - A kind of stored energy capacitance Optimal Configuration Method adapting to extensive new-energy grid-connected consumption - Google Patents

A kind of stored energy capacitance Optimal Configuration Method adapting to extensive new-energy grid-connected consumption Download PDF

Info

Publication number
CN109888830A
CN109888830A CN201910212791.7A CN201910212791A CN109888830A CN 109888830 A CN109888830 A CN 109888830A CN 201910212791 A CN201910212791 A CN 201910212791A CN 109888830 A CN109888830 A CN 109888830A
Authority
CN
China
Prior art keywords
energy
energy storage
new energy
power grid
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910212791.7A
Other languages
Chinese (zh)
Other versions
CN109888830B (en
Inventor
袁伟
王彩霞
李琼慧
雷雪姣
时智勇
叶小宁
李梓仟
黄碧斌
胡静
冯凯辉
洪博文
闫湖
李铁
姜枫
崔岱
张艳军
王钟辉
张彤
宋明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Grid Energy Research Institute Co Ltd
State Grid Energy Research Institute Co Ltd
State Grid Liaoning Electric Power Co Ltd
Original Assignee
National Grid Energy Research Institute Co Ltd
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Grid Energy Research Institute Co Ltd, State Grid Liaoning Electric Power Co Ltd filed Critical National Grid Energy Research Institute Co Ltd
Priority to CN201910212791.7A priority Critical patent/CN109888830B/en
Publication of CN109888830A publication Critical patent/CN109888830A/en
Application granted granted Critical
Publication of CN109888830B publication Critical patent/CN109888830B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

It comprises determining that regional power grid calculating parameter the invention discloses a kind of stored energy capacitance Optimal Configuration Method for adapting to extensive new-energy grid-connected consumption and generates new energy and be obstructed regional gather;Determine regional power grid energy storage initial configuration scale and its relevant parameter;Establish Optimal Operation Model;Determine that current new energy is obstructed area power grid new energy maximum consumption amount;It updates energy storage and configures scale optimization section;Judge whether to need to update system stored energy configuration scale, if desired, update system stored energy and configure scale, and redefine current new energy and be obstructed area power grid new energy maximum consumption amount;If not needing, judge whether set traverses, if set has traversed, it is determined that and export energy storage inverter power, battery capacity and configuration energy storage investment cost and redefine current new energy if not traversing completely and be obstructed area power grid new energy maximum consumption amount.The present invention determines the rational capacity that energy storage configures in system under big regional environment and big time scale.

Description

A kind of stored energy capacitance Optimal Configuration Method adapting to extensive new-energy grid-connected consumption
Technical field
The present invention relates to the technology neighborhoods of Power System Analysis, and in particular to one kind answers extensive new-energy grid-connected consumption item The method of stored energy capacitance reasonable disposition under part.
Background technique
With gradually going deep into for smart grid construction, new energy technology (such as wind-powered electricity generation and photovoltaic) also obtains faster hair Exhibition.Due to new energy unit capacity construction cost rapid decrease, the installed capacity of new energy unit is in total installation of generating capacity in system In specific gravity it is higher and higher, however new energy power supply power output has the characteristics that randomness and fluctuation, and new energy contribute it is anti- Peak-shaving capability is obvious, and after new energy accesses power grid on a large scale, no small challenge can be brought to safe operation of power system.Especially Big in new energy amount and when system consumption insufficient space, the power balance of system is maintained often through " abandonment " " abandoning light ". With the foundation of the rapid growth and a wide range of transregional transmission of electricity pattern of China's generation of electricity by new energy scale, power grid is for alleviating peak regulation The demands such as pressure, raising stand by margin, reduction Network congestion and the transregional channel conveying capacity of promotion are increasingly prominent.
Important technology scheme of the energy storage technology as the reply above problem, has broad application prospects.Since energy storage has There is the characteristic of fast charging and discharging and easily controllable charge-discharge electric power, therefore for the electric system containing extensive new energy, Introduce energy storage after can not only guarantee the requirement for meeting system safe and reliable operation, can also by rational proportion stored energy capacitance, The utilization rate of new energy is improved, the generation that optical phenomenon is abandoned in abandonment is reduced.Energy storage device can be with as the important link of electric system It releases temporary unwanted energy stores and when needed, for peak-load regulating and guarantees that system reserve capacity is filled Abundant property etc. is of great significance.Therefore, the demand dissolved in conjunction with extensive new-energy grid-connected, closes the capacity configuration of energy storage Reason optimization, can not only further alleviate energy waste, reduce new-energy grid-connected to dispatching of power netwoks and run brought impact, also Energy storage investment can be optimized, improve the overall efficiency of society.
But current stored energy capacitance planing method both domestic and external is all based on greatly the new energy power output and workload demand of typical day Characteristic curve is calculated, and the stored energy capacitance Research on configuration under big regional environment and big time scale is lacked.Such place Reason method can not consider new energy power output in daily otherness so that finally optimize obtained stored energy capacitance match it is unreasonable, It is easy to cause a large amount of abandonment to abandon optical phenomenon.It is existing to study the reasonable disposition for being difficult to instruct stored energy capacitance in power grid, it is also difficult to Energy storage Correlative plan is formulated for country and development policies provides effective support.
In view of this, being badly in need of providing one kind under big regional environment and big time scale, extensive new-energy grid-connected is adapted to The method of reasonable disposition stored energy capacitance under the conditions of consumption.
Summary of the invention
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is that providing a kind of extensive new energy of adaptation The stored energy capacitance Optimal Configuration Method of the grid-connected consumption in source, comprising the following steps:
It determines regional power grid calculating parameter and generates new energy and be obstructed regional gather;Determine regional power grid energy storage initial configuration Scale and its relevant parameter;Establish Optimal Operation Model;
Determine that current new energy is obstructed area power grid new energy maximum consumption amount;It updates energy storage and configures scale optimization section;
Judge whether to need to update system stored energy configuration scale, if desired, then update system stored energy configuration scale, and again Determine that current new energy is obstructed area power grid new energy maximum consumption amount;If not needing to update, judge that new energy is obstructed area Whether set traverses, if new energy is obstructed, all elements have been traversed in the set of area, it is determined that and export energy storage inverter function It is new to redefine the current new energy area power grid that is obstructed if not traversing completely for rate, battery capacity and configuration energy storage investment cost Energy maximum consumption amount;
The regional power grid calculating parameter includes that new energy inside regional power grid is obstructed area;The positive/negative spare appearance of the whole network Amount is horizontal, and the heating duration of regional power grid, interconnection yearly plan sequence, regional power grid are complete between regional power grid and external electrical network Year load sequence, the annual normalization sequence of new energy power output, new energy whole year grid connection capacity month by month;
The annual minimum booting side of fired power generating unit type, fired power generating unit number of units, fired power generating unit single-machine capacity, fired power generating unit Formula, fired power generating unit power output bound, fired power generating unit change the maximum rate of power output, regional power grid to utilization of new energy resources in 1min Horizontal requirement;
The relevant parameter includes energy storage inverter power, energy-storage battery capacity, energy storage charge efficiency, energy storage electric discharge effect Rate, energy-storage battery minimum state-of-charge, energy-storage battery maximum state-of-charge, inverter unit capacity construction cost and battery unit Capacity construction cost.
It is in the above-mentioned methods, described to establish Optimal Operation Model specifically:
It establishes using year as the Optimal Operation Model of time cycle, system new energy consumption amount is up to optimization aim, builds Vertical mixed-integer programming model;
Objective function is as follows:
Wherein,For the Wind turbines in the n of region t moment generated output,For the photovoltaic machine in the n of region Group is in the generated output of t moment, and N is that new energy is obstructed regional number, and T is optimization fixed number;
Mixed-integer programming model constraint includes region account load balancing constraints, spinning reserve constraint, regional power grid inside biography Defeated section capacity-constrained, system call instruction constraint, the constraint of thermal power unit operation number of units, thermal power unit operation state constraint, fire The constraint of motor group generated output, the constraint of fired power generating unit generated output climbing rate, new energy units limits, energy storage charging and discharging state are about Beam, the constraint of energy storage charge-discharge electric power and energy storage SOC state constraint.
In the above-mentioned methods, the current new energy of determination area power grid new energy maximum consumption amount of being obstructed includes:
The Long-term Optimal Dispatch model under the conditions of current border is solved using timing production analogy method, determines region electricity New energy maximum consumption amount of net under the conditions of current border.
In the above-mentioned methods, update energy storage configuration scale optimization section the following steps are included:
Whether be for the first time update energy storage configuration scale optimization section, if current new energy if judging that current new energy is obstructed regional Source be obstructed area be for the first time update energy storage configuration scale optimization section, then energy storage configuration scale optimization section left end point update It is 0, right endpoint is updated to current new energy and is obstructed the initial configuration scale of energy storage in area;
If current new energy is obstructed, area is not to update energy storage configuration scale optimization section for the first time, judges current energy storage Whether system utilization of new energy resources rate is able to satisfy requirement to update energy storage configuration scale optimization section, if current energy storage under configuration scale System utilization of new energy resources rate is able to satisfy requirement under configuration scale, then current energy storage configuration scale is updated to energy storage configuration scale Optimize the right endpoint in section, otherwise is updated to the left end point in energy storage configuration scale optimization section with current energy storage configuration scale.
In the above-mentioned methods, energy storage configuration scale optimization section includes:
Energy storage inverter power optimization section and battery capacity optimize section.
In the above-mentioned methods, it is described judge whether to need to update system stored energy configuration scale the following steps are included:
Scale optimization section is configured according to energy storage is updated, determines the length in current energy storage inverter power optimization section, such as The fruit length is not less than preset value, then needs to update system stored energy configuration scale.
In the above-mentioned methods, the update system stored energy configuration scale is using dichotomy or trial and error procedure.
The present invention determines stored energy capacitance according to system loading and timing curve, the power producing characteristics of normal power supplies of scene etc. The boundary condition of configuration comprehensively considers that peak load regulation network, system reserve capacity be abundance and the factors such as utilization of new energy resources rate, in great Qu Under domain environment and big time scale, the rational capacity that energy storage configures in system is determined, realize energy storage and adapting to extensive new energy Quantitative study under the conditions of the grid-connected consumption in source in terms of capacity reasonable disposition, instructs the reasonable disposition of stored energy capacitance in power grid, also for Country formulates energy storage Correlative plan and development policies provides effectively support.
Detailed description of the invention
Fig. 1 is flow chart provided by the invention;
Fig. 2 is the annual 8760 hours load sequence charts of regional power grid provided by the invention;
Fig. 3 is the annual 8760 hours normalization sequence charts of wind power output in power grid provided by the invention;
Fig. 4 is 168 hours normalization sequence charts of photovoltaic power output in power grid provided by the invention.
Specific embodiment
The present invention provides a kind of stored energy capacitance Optimal Configuration Methods for adapting to extensive new-energy grid-connected consumption, in system Under the premise of interior new energy installed capacity is certain, comprehensively consider that peak load regulation network, system reserve capacity be abundance and utilization of new energy resources The factors such as rate determine stored energy capacitance configuration according to system loading and timing curve, the power producing characteristics of normal power supplies of scene etc. Boundary condition, and analogy method is produced using timing, in big regional environment, (being mainly reflected between different zones has profile constraints The case where) and big time scale (the stored energy capacitance Research on configuration under annual time scale) under, determine what energy storage in system configured Rational capacity realizes energy storage quantifying in terms of capacity reasonable disposition under the conditions of adapting to the consumption of extensive new-energy grid-connected and grinds Study carefully, instruct the reasonable disposition of stored energy capacitance in power grid, also formulates energy storage Correlative plan for country and development policies provides effective branch Support.The present invention is described in detail with Figure of description With reference to embodiment.
As shown in Figure 1, a kind of stored energy capacitance for adapting to extensive new-energy grid-connected consumption provided by the invention is distributed rationally Method, comprising the following steps:
S1, determine that regional power grid calculating parameter, parameter are specific as follows:
Under the scene for giving extensive new-energy grid-connected capacity, the prevailing transmission section limit inside the regional power grid is determined New energy is obstructed area caused by volume, section limitation, and generates new energy and be obstructed regional set Ni, i={ 1,2 ... ... n };
The positive/negative spare capacity of the whole network is horizontal, the heating duration of regional power grid, interconnection between regional power grid and external electrical network Yearly plan sequence, regional power grid whole year load sequence, the annual normalization sequence of new energy power output, new energy whole year are grid-connected month by month Capacity;
The annual minimum booting side of fired power generating unit type, fired power generating unit number of units, fired power generating unit single-machine capacity, fired power generating unit Formula, fired power generating unit power output bound, fired power generating unit change the maximum rate of power output, regional power grid to utilization of new energy resources in 1min Horizontal requirement and other power supply architecture data etc..
S2, regional power grid energy storage initial configuration scale and relevant parameter are determined, specific as follows:
Determine each new energy be obstructed area energy storage initial configuration scale and relevant parameter, relevant parameter include that energy storage is inverse Become device power, energy-storage battery capacity, energy storage charge efficiency, energy storage discharging efficiency, energy-storage battery minimum state-of-charge, energy-storage battery Maximum state-of-charge, inverter unit capacity construction cost, battery unit capacity construction cost etc..The energy storage in each area is initial Configuration scale wants sufficiently large.
S3, Optimal Operation Model is established, specific as follows:
The present embodiment is established using year as the Optimal Operation Model of time cycle, and system new energy consumption amount is up to optimization Target establishes mixed-integer programming model;
Objective function is as follows:
Wherein,For the Wind turbines in the n of region t moment generated output,For the photovoltaic unit in the n of region In the generated output of t moment, N is that new energy is obstructed regional number, and T is optimization fixed number.
Mixed-integer programming model constraint includes region account load balancing constraints, spinning reserve constraint, regional power grid inside biography Defeated section capacity-constrained, system call instruction constraint, the constraint of thermal power unit operation number of units, thermal power unit operation state constraint, fire The constraint of motor group generated output, the constraint of fired power generating unit generated output climbing rate, new energy units limits, energy storage charging and discharging state are about Beam, the constraint of energy storage charge-discharge electric power and energy storage SOC state constraint etc..
The system spinning reserve horizontal restraint condition after energy storage power output influences mainly is considered in the present embodiment, as follows:
Wherein, formula (2) indicates the positive stand-by requirement constraint of system, which sets in consideration system wind-powered electricity generation and photovoltaic power generation Under the premise of believing capacity, the sum of maximum power generation and other power supplys power output of all booting units will can satisfy system most Big positive stand-by requirement, energy storage guarantee that system reserve capacity is abundance by discharging at this time;
Formula (3) indicates the negative stand-by requirement constraint of system, which only dispatches conventional thermal power unit and energy storage in system When equipment, the negative stand-by requirement of maximum of system can satisfy, what energy storage at this time met system by charging bears spare water It is flat to require.
In formula, DtFor workload demand of the system on period t;The positive stand-by requirement for being system on period t;For The power that region n is conveyed on period t to exterior;SkindFor fired power generating unit type number;For unit type number j Fired power generating unit maximum output it is horizontal;For operation platform of the fired power generating unit in the t period in the n of region of unit type number j Number;For the credible capacity of Wind turbines in the n of region;For the credible capacity of photovoltaic unit in the n of region;For region n In energy storage t moment discharge power;For the energy storage in the n of region t moment charge power;For unit The minimum load of the fired power generating unit of type number j is horizontal;The negative stand-by requirement for being system on period t.
S4, determine that current new energy is obstructed area power grid new energy maximum consumption amount;Specifically:
Data and energy storage configuration scale are calculated according to step S1~S2 power grid and relevant parameter, solution are established in step s3 Long-term Optimal Dispatch model, the optimal objective value of the model is exactly new energy of given area power grid under the conditions of current border Maximum consumption amount.
Using the Long-term Optimal Dispatch model under the conditions of timing production analogy method solution current border in the present embodiment, obtain Obtain new energy maximum consumption amount of regional power grid under the conditions of current border.
S5, energy storage configuration scale optimization section is updated, comprising the following steps:
Whether be for the first time update energy storage configuration scale optimization section, if current new energy if judging that current new energy is obstructed regional Source be obstructed area be for the first time update energy storage configuration scale optimization section, then energy storage configuration scale optimization section left end point update It is 0, right endpoint is updated to current new energy and is obstructed the initial configuration scale of energy storage in area;
If current new energy is obstructed, area is not to update energy storage configuration scale optimization section for the first time, judges current energy storage Whether system utilization of new energy resources rate is able to satisfy requirement to update energy storage configuration scale optimization section, if current energy storage under configuration scale System utilization of new energy resources rate is able to satisfy requirement under configuration scale, then current energy storage configuration scale is updated to energy storage configuration scale Optimize the right endpoint in section, otherwise is updated to the left end point in energy storage configuration scale optimization section with current energy storage configuration scale. Wherein,
Judge current new energy be obstructed area whether be for the first time update energy storage configuration scale optimization section, specially if Energy storage configuration capacity is that initial capacity is horizontal, then current to configure scale optimization section to update energy storage for the first time.
It is described as follows:
It is assumed that energy storage configuration scale includes energy storage inverter power and energy storage electricity for current new energy is obstructed area Tankage;
The optimization section of energy storage inverter power isThe optimization section of energy-storage battery capacity is
If current new energy is obstructed, area is to change energy storage configuration scale for the first time, and the left and right end in optimization section is arranged Point:
Wherein,Be obstructed the regional initial inverter power of energy storage for current new energy,For current new energy Be obstructed regional energy storage initial battery capacity.
If current new energy is obstructed, area is not to update energy storage configuration scale optimization section for the first time, according to current storage Whether system utilization of new energy resources rate is able to satisfy requirement to update optimization section under energy configuration scale.
The new energy theoretical power generation of regional power grid are as follows:
Wherein,For the installed capacity of wind power plant in the n of region;For the installed capacity of photovoltaic plant in the n of region; For the theoretical normalization power output sequence of wind-powered electricity generation;For the theoretical normalization power output sequence of photovoltaic.
According to the optimum results of step 4, the actual power generation that system new energy can be calculated is
According to formula (4) and (5), the utilization of new energy resources rate of current system can be calculated are as follows:
It is assumed that requirement of the regional power grid to utilization of new energy resources rate is η*If η < η*, then illustrate current energy storage configuration scale Lower system utilization of new energy resources rate cannot be met the requirements, then update energy storage inverter power optimization section and battery capacity optimization section Left end point:
Wherein,For current energy storage inverter power level,For current energy-storage battery capacity water It is flat.
If η >=η*, then illustrate that system utilization of new energy resources rate is able to satisfy requirement under current energy storage configuration scale, then updates storage The right endpoint in energy inverter power optimization section and battery capacity optimization section:
S6, judge whether to need to update system stored energy configuration scale;The following steps are included:
In the present embodiment, it can be held by single determining energy storage inverter power optimization siding-to-siding block length or single determining battery Amount optimization siding-to-siding block length is to determine whether need to update system stored energy configuration scale, because the charge and discharge duration of energy storage is determining , as long as inverter power is certain, battery capacity is also certain value.Concrete analysis is by determining energy storage inverter power below Optimization siding-to-siding block length is to determine whether need to update system stored energy configuration scale;
According to step S5's as a result, length in current energy storage inverter power optimization section can be calculated, if should Length is not less than certain preset value, then needs to update system stored energy configuration scale, then execute next step, that is, go to step S7;Such as The small Mr. Yu's preset value of the fruit length, then go to step S8.
Assuming that it is excellent that current energy storage inverter power can be calculated according to step S5 for very small constant ε in preset value Change the length in section are as follows:
I.e. if δ >=ε, turn S7, then update system stored energy configuration scale and goes to step S4;
If δ < ε, turns S8;
S7, system stored energy configuration scale is updated, and goes to step S4;
It updates system stored energy and configures scale specifically:
In conjunction with the optimization section of energy storage configuration scale, current new energy is updated using dichotomy or trial and error procedure and is obstructed in area Energy storage configures scale, i.e. inverter power and battery capacity, while the energy storage configuration scale that other new energy are obstructed regional is kept It is constant, it is very high based on dichotomy update efficiency, it is calculated below by dichotomy as follows:
Wherein,For updated energy storage inverter power level,For updated energy-storage battery Capacity level.
S8, judge new energy be obstructed area set whether traverse, if new energy be obstructed area set in all elements it is equal It has been traversed that, then go to step S9, if not traversing, gone to step S4.
S9, determination simultaneously export configuration energy storage investment cost, and the be obstructed regional energy storage of each new energy is configured scale optimization area Between right end point value, be obstructed regional energy storage rationally optimal configuration scale as each new energy, in conjunction with energy storage inverter and battery Unit capacity construction cost, can be calculated the investment cost of reasonable allocation optimum energy storage, calculate as follows:
In formula, Cost is the investment cost for the reasonable allocation optimum energy storage that optimization obtains, CbatteryFor energy-storage battery unit Capacity construction cost, CinverterFor energy storage inverter unit capacity construction cost,To optimize obtained reasonable energy storage Battery capacity,To optimize obtained reasonable energy storage inverter power.
Illustrate the present embodiment below by concrete case.
(1) the regional power grid basic parameter needed for calculating is collected according to demand, including the new energy is obstructed in area power grid The prevailing transmission cross-section limitation in portion, the positive/negative spare capacity of the whole network is horizontal, the heating duration of regional power grid, regional power grid and outside Interconnection 8760 hours programmed sequences of whole year between power grid, regional power grid 8760 hours load sequences of whole year, as shown in Figure 2;Newly The energy is contributed annual 8760 hours normalization sequences, as shown in Figure 3-4, including in power grid wind-powered electricity generation and photovoltaic power output annual 8760 are small When normalize sequence chart;New energy whole year grid connection capacity, fired power generating unit type, fired power generating unit number of units, fired power generating unit single machine month by month Capacity, the minimum start-up mode of fired power generating unit whole year, fired power generating unit power output bound, fired power generating unit change power output in 1min The requirement and other power supply architecture data etc. of maximum rate, regional power grid to utilization of new energy resources level, such as following table.
Table 1, new energy is obstructed the transmission cross-section limitation between area inside regional power grid
Circuit number Transmission cross-section The transimission power upper limit (MW)
L1 The regional area 1- 2 (the regional area 2- 1) 1800
L2 The regional area 2- 3 (the regional area 3- 2) 1500
Fired power generating unit parameter in 2 regional power grid of table
2) given area power grid energy storage initial configuration scale and relevant parameter;
Give the energy storage initial configuration scale and relevant parameter in each area, including energy storage inverter power, energy-storage battery Capacity, energy storage charge efficiency, energy storage discharging efficiency, energy-storage battery minimum state-of-charge, energy-storage battery maximum state-of-charge, inversion Device unit capacity construction cost, battery unit capacity construction cost etc.;Full be full of of energy-storage battery puts the time for 4 hours, such as Shown in the following table 3-5.
Energy-storage battery parameter in each department in table 3, regional power grid
Energy-storage battery area Area 1 Area 2 Area 3
Charge efficiency 0.92 0.92 0.92
Discharging efficiency 0.92 0.92 0.92
Minimum state-of-charge 0 0 0
Maximum state-of-charge 1 1 1
4 energy-storage battery construction cost parameter of table
Inverter unit capacity construction cost (Wan Yuan/MW) 85
Battery unit capacity construction cost (Wan Yuan/MWh) 218
The each new energy of table 5 is obstructed the configuration of regional energy storage initial capacity
Energy-storage battery area Area 1 Area 2 Area 3
Inverter power (MW) 4000 4000 4000
Battery capacity (MWh) 16000 16000 16000
3) it establishes using year as the Optimal Operation Model of time cycle, optimization mesh is up to system new energy consumption amount Mark establishes mixed-integer programming model, and model constraint is including in region account load balancing constraints, spinning reserve constraint, regional power grid Transmit section capacity-constrained, system call instruction constraint, the constraint of thermal power unit operation number of units, thermal power unit operation state about in portion Beam, the constraint of fired power generating unit generated output, the constraint of fired power generating unit generated output climbing rate, new energy units limits, energy storage charge and discharge State constraint, the constraint of energy storage charge-discharge electric power and energy storage SOC state constraint etc..
In conjunction with the unit capacity construction cost of energy storage inverter and battery, reasonable allocation optimum energy storage can be calculated Investment cost.In present case, system utilization of new energy resources rate demand is 90% or more, and the energy storage configuration scale in three areas is as follows Shown in table.
Energy storage in 6 three areas of table configures scale
Energy-storage battery area Area 1 Area 2 Area 3
Inverter power (MW) 2400 2500 2400
Battery capacity (MWh) 9600 10000 9600
The energy storage investment cost of the regional power grid is 6,986,1000000 yuan at this time.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn that the knots made under the inspiration of the present invention Structure variation, the technical schemes that are same or similar to the present invention are fallen within the scope of protection of the present invention.

Claims (7)

1. a kind of stored energy capacitance Optimal Configuration Method for adapting to extensive new-energy grid-connected consumption, which is characterized in that including following Step:
It determines regional power grid calculating parameter and generates new energy and be obstructed regional gather;Determine regional power grid energy storage initial configuration scale And its relevant parameter;Establish Optimal Operation Model;
Determine that current new energy is obstructed area power grid new energy maximum consumption amount;It updates energy storage and configures scale optimization section;
Judge whether to need to update system stored energy configuration scale, if desired, then update system stored energy configuration scale, and redefine Current new energy is obstructed area power grid new energy maximum consumption amount;If not needing to update, judge that new energy is obstructed regional gather Whether traverse, if new energy is obstructed, all elements have been traversed in the set of area, it is determined that and export energy storage inverter power, electricity Tankage and configuration energy storage investment cost redefine current new energy and are obstructed area power grid new energy if not traversing completely Maximum consumption amount;
The regional power grid calculating parameter includes that new energy inside regional power grid is obstructed area;The positive/negative spare capacity water of the whole network It puts down, the heating duration of regional power grid, interconnection yearly plan sequence between regional power grid and external electrical network, regional power grid whole year is negative Lotus sequence, the annual normalization sequence of new energy power output, new energy whole year grid connection capacity month by month;
Fired power generating unit type, fired power generating unit number of units, fired power generating unit single-machine capacity, minimum start-up mode, the fire of fired power generating unit whole year Electric unit output bound, fired power generating unit change the maximum rate of power output, regional power grid to utilization of new energy resources level in 1min Requirement;
The relevant parameter includes energy storage inverter power, energy-storage battery capacity, energy storage charge efficiency, energy storage discharging efficiency, storage It can battery minimum state-of-charge, energy-storage battery maximum state-of-charge, inverter unit capacity construction cost and battery unit capacity Construction cost.
2. the method as described in claim 1, which is characterized in that described to establish Optimal Operation Model specifically:
It establishes using year as the Optimal Operation Model of time cycle, system new energy consumption amount is up to optimization aim, establishes mixed Close integer programming model;
Objective function is as follows:
Wherein,For the Wind turbines in the n of region t moment generated output,It is the photovoltaic unit in the n of region The generated output of t moment, N are that new energy is obstructed regional number, and T is optimization fixed number;
Mixed-integer programming model constraint includes region account load balancing constraints, spinning reserve constrains, regional power grid internal transmission is broken Face capacity-constrained, system call instruction constraint, the constraint of thermal power unit operation number of units, thermal power unit operation state constraint, thermal motor Group generated output constraint, the constraint of fired power generating unit generated output climbing rate, new energy units limits, energy storage charging and discharging state constrain, The constraint of energy storage charge-discharge electric power and energy storage SOC state constraint.
3. the method as described in claim 1, which is characterized in that the current new energy of determination is obstructed area power grid new energy most Big consumption amount includes:
The Long-term Optimal Dispatch model under the conditions of current border is solved using timing production analogy method, determines that the regional power grid exists New energy maximum consumption amount under the conditions of current border.
4. the method as described in claim 1, which is characterized in that update energy storage configuration scale optimization section includes following step It is rapid:
Judge current new energy be obstructed area whether be update energy storage configuration scale optimization section for the first time, if current new energy by Resistance area is to update energy storage configuration scale optimization section for the first time, then the left end point in energy storage configuration scale optimization section is updated to 0, Right endpoint is updated to current new energy and is obstructed the initial configuration scale of energy storage in area;
If current new energy is obstructed, area is not to update energy storage configuration scale optimization section for the first time, judges current energy storage configuration Whether system utilization of new energy resources rate is able to satisfy requirement to update energy storage configuration scale optimization section under scale, if current energy storage configuration System utilization of new energy resources rate is able to satisfy requirement under scale, then current energy storage configuration scale is updated to energy storage configuration scale optimization The right endpoint in section, on the contrary the left end point in energy storage configuration scale optimization section is updated to current energy storage configuration scale.
5. method as claimed in claim 4, which is characterized in that energy storage configuration scale optimization section includes:
Energy storage inverter power optimization section and battery capacity optimize section.
6. method as claimed in claim 5, which is characterized in that described to judge whether to need to update system stored energy configuration scale packet Include following steps:
Scale optimization section is configured according to energy storage is updated, determines the length in current energy storage inverter power optimization section, if should Length is not less than preset value, then needs to update system stored energy configuration scale.
7. the method as described in claim 1, which is characterized in that update system stored energy configuration scale be using dichotomy or Trial and error procedure.
CN201910212791.7A 2019-03-20 2019-03-20 Energy storage capacity optimal configuration method suitable for large-scale new energy grid-connected consumption Active CN109888830B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910212791.7A CN109888830B (en) 2019-03-20 2019-03-20 Energy storage capacity optimal configuration method suitable for large-scale new energy grid-connected consumption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910212791.7A CN109888830B (en) 2019-03-20 2019-03-20 Energy storage capacity optimal configuration method suitable for large-scale new energy grid-connected consumption

Publications (2)

Publication Number Publication Date
CN109888830A true CN109888830A (en) 2019-06-14
CN109888830B CN109888830B (en) 2020-09-22

Family

ID=66933193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910212791.7A Active CN109888830B (en) 2019-03-20 2019-03-20 Energy storage capacity optimal configuration method suitable for large-scale new energy grid-connected consumption

Country Status (1)

Country Link
CN (1) CN109888830B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110336334A (en) * 2019-08-01 2019-10-15 国网能源研究院有限公司 The priority scheduling of resource method of peak regulation a few days ago based on the quotation of fired power generating unit peak modulation capacity
CN110401220A (en) * 2019-07-26 2019-11-01 北京华建网源电力设计研究院有限公司 A kind of extensive new energy consumption level evaluation method and system
CN111416388A (en) * 2020-04-26 2020-07-14 中国电力工程顾问集团西北电力设计院有限公司 Method for determining energy storage demand and energy storage duration of high-proportion new energy system
CN111525629A (en) * 2020-05-19 2020-08-11 福州大学 Power supply capacity configuration method and device, computer equipment and storage medium
CN112132379A (en) * 2020-08-03 2020-12-25 国电南瑞科技股份有限公司 Economic-considered new energy cross-region consumption evaluation method and storage medium
CN113972660A (en) * 2021-11-16 2022-01-25 国网江苏省电力有限公司常州供电分公司 Day-ahead scheduling method for AC/DC hybrid power distribution network
CN114069671A (en) * 2021-11-26 2022-02-18 国网甘肃省电力公司电力科学研究院 High-proportion new energy power grid energy storage demand analysis method considering consumption level
CN116976521A (en) * 2023-08-14 2023-10-31 水电水利规划设计总院 Power system peak regulation energy storage capacity demand prediction method with different time scales

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016070319A1 (en) * 2014-11-04 2016-05-12 Abb Technology Ltd Method for coordinating control of wind farm during black start of islanding operation
CN106549380A (en) * 2016-12-29 2017-03-29 哈尔滨工业大学 Multi-modal microgrid energy coordinating and optimizing control method
CN106874630A (en) * 2017-03-28 2017-06-20 上海理工大学 Based on the regional power grid new energy development potential evaluation method that electricity is dissolved
CN109034587A (en) * 2018-07-18 2018-12-18 西安理工大学 A kind of active distribution system Optimization Scheduling for coordinating a variety of controllables

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016070319A1 (en) * 2014-11-04 2016-05-12 Abb Technology Ltd Method for coordinating control of wind farm during black start of islanding operation
CN106549380A (en) * 2016-12-29 2017-03-29 哈尔滨工业大学 Multi-modal microgrid energy coordinating and optimizing control method
CN106874630A (en) * 2017-03-28 2017-06-20 上海理工大学 Based on the regional power grid new energy development potential evaluation method that electricity is dissolved
CN109034587A (en) * 2018-07-18 2018-12-18 西安理工大学 A kind of active distribution system Optimization Scheduling for coordinating a variety of controllables

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄英: "考虑风电接纳能力的储输联合规划", 《电网技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110401220A (en) * 2019-07-26 2019-11-01 北京华建网源电力设计研究院有限公司 A kind of extensive new energy consumption level evaluation method and system
CN110336334A (en) * 2019-08-01 2019-10-15 国网能源研究院有限公司 The priority scheduling of resource method of peak regulation a few days ago based on the quotation of fired power generating unit peak modulation capacity
CN111416388A (en) * 2020-04-26 2020-07-14 中国电力工程顾问集团西北电力设计院有限公司 Method for determining energy storage demand and energy storage duration of high-proportion new energy system
CN111416388B (en) * 2020-04-26 2022-04-01 中国电力工程顾问集团西北电力设计院有限公司 Method for determining energy storage demand and energy storage duration of high-proportion new energy system
CN111525629A (en) * 2020-05-19 2020-08-11 福州大学 Power supply capacity configuration method and device, computer equipment and storage medium
CN112132379A (en) * 2020-08-03 2020-12-25 国电南瑞科技股份有限公司 Economic-considered new energy cross-region consumption evaluation method and storage medium
CN112132379B (en) * 2020-08-03 2022-05-31 国电南瑞科技股份有限公司 Economic-considered new energy cross-region consumption evaluation method and storage medium
CN113972660A (en) * 2021-11-16 2022-01-25 国网江苏省电力有限公司常州供电分公司 Day-ahead scheduling method for AC/DC hybrid power distribution network
CN113972660B (en) * 2021-11-16 2024-02-06 国网江苏省电力有限公司常州供电分公司 Day-ahead scheduling method of AC/DC hybrid power distribution network
CN114069671A (en) * 2021-11-26 2022-02-18 国网甘肃省电力公司电力科学研究院 High-proportion new energy power grid energy storage demand analysis method considering consumption level
CN116976521A (en) * 2023-08-14 2023-10-31 水电水利规划设计总院 Power system peak regulation energy storage capacity demand prediction method with different time scales
CN116976521B (en) * 2023-08-14 2024-01-16 水电水利规划设计总院 Power system peak regulation energy storage capacity demand prediction method with different time scales

Also Published As

Publication number Publication date
CN109888830B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN109888830A (en) A kind of stored energy capacitance Optimal Configuration Method adapting to extensive new-energy grid-connected consumption
Zhou et al. Optimal sizing of PV and BESS for a smart household considering different price mechanisms
CN108123492B (en) A kind of generation schedule optimization method a few days ago considering thermoelectricity electric heat storage combined adjusting peak
KR101500304B1 (en) A control method of charging and discharging of energy storage and system for it
CN102664401B (en) Power grid control method based on battery service life model
CN107546781B (en) Micro-capacitance sensor multiple target running optimizatin method based on PSO innovatory algorithm
CN109802396B (en) Photovoltaic transformer area electric energy quality control system based on voltage sensitivity configuration
CN106384176A (en) Wind-photovoltaic-energy-storage power generation system capacity optimizing method based on wind-photovoltaic hybrid characteristic
CN103944175A (en) Wind-solar-storage combined power generation system output characteristic optimization method
CN108832654A (en) A kind of method and system for photovoltaic generating system economic benefit Optimized Operation
CN108923446A (en) The configuration method of stored energy capacitance in a kind of photovoltaic/energy storage integrated system
Rossi et al. Real-time optimization of the battery banks lifetime in hybrid residential electrical systems
CN113644670A (en) Method and system for optimally configuring energy storage capacity
Zhou et al. Optimal sizing of pv system and bess for smart household under stepwise power tariff
CN113435730A (en) Collaborative configuration method, device and system for energy storage capacity of transformer substation
CN113555908B (en) Intelligent power distribution network energy storage optimal configuration method
CN110689207A (en) Site selection and volume fixing method for connecting electric heat storage type heating equipment to power distribution network
Rigogiannis et al. Incorporation of SmartPV technology in zero energy building concept
CN112865191A (en) Multi-region new energy installed capacity optimization method and device
CN110098623B (en) Prosumer unit control method based on intelligent load
CN116562554A (en) Long-short-period energy storage joint planning method considering flexible supply-demand balance
CN107591794A (en) Active distribution network source storage capacity configuration optimizing method based on load classification
CN116738627A (en) Distributed photovoltaic-oriented power distribution network multi-source load locating and sizing method and system
CN110334856A (en) A kind of wind-light storage method for planning capacity based on carbon transaction mechanism
CN110768306B (en) Power supply capacity configuration method for improving emergency capacity of micro-grid in bottom-protected power grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant