CN109878374A - Charge safeguard management method, computer equipment and storage medium - Google Patents

Charge safeguard management method, computer equipment and storage medium Download PDF

Info

Publication number
CN109878374A
CN109878374A CN201910144264.7A CN201910144264A CN109878374A CN 109878374 A CN109878374 A CN 109878374A CN 201910144264 A CN201910144264 A CN 201910144264A CN 109878374 A CN109878374 A CN 109878374A
Authority
CN
China
Prior art keywords
charging
humidity data
preset threshold
management method
current humidity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910144264.7A
Other languages
Chinese (zh)
Other versions
CN109878374B (en
Inventor
赖文龙
严光荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Evergrande Hengchi New Energy Automobile Research Institute Shanghai Co Ltd
Original Assignee
Hengda Wisdom Charging Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengda Wisdom Charging Technology Co Ltd filed Critical Hengda Wisdom Charging Technology Co Ltd
Priority to CN201910144264.7A priority Critical patent/CN109878374B/en
Publication of CN109878374A publication Critical patent/CN109878374A/en
Application granted granted Critical
Publication of CN109878374B publication Critical patent/CN109878374B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

Whether the present invention provides a kind of charging safeguard management method, comprising steps of obtaining current humidity data, and judge current humidity data more than the first preset threshold;If so, obtaining present charge state, and judge current whether in preset charged state;If so, whether judging current humidity data more than the second preset threshold, second preset threshold is greater than first preset threshold;It instructs and executes if so, sending dehumidifying, equipment function under humidity environment is avoided to be unable to operate normally, situations such as equipment damage or electrical hazard occur, improve the safety of charging.In addition, also providing the medium of a kind of computer equipment for executing above-mentioned charging safeguard management method and readable storage.

Description

Charge safeguard management method, computer equipment and storage medium
Technical field
The present invention relates to charging safety-security areas, specifically, and in particular to a kind of charging safeguard management method, computer are set Standby and storage medium.
Background technique
With scientific and technological level and continuous improvement of people's living standards, more and more people start to buy automobile to promote life Convenience living, quality of making the life better.But ecological ring is given in being increasing due to current automobile capacity, the discharge of vehicle exhaust Border brings larger impact.In order to improve worsening ecological environment, charging vehicle is operated and is given birth to, and charging vehicle passes through electric power Driven by energy vehicle driving is provided, will not generate vehicle exhaust in the process of moving, to reducing vehicle exhaust and improve environment Pollution has larger effect.But it is constrained to the development bottleneck of charging vehicle battery technology, at present the course continuation mileage of charging vehicle It is universal lower, it is not able to satisfy the use of people's long-time long range.Therefore it disposes charging equipment in parking lot or establishes and concentrate The demand of formula charging station is higher and higher.
Parking lot is mainly in underground at present, therefore the charging equipment being laid out in underground will be in certain humidity environment, and Under higher levels of humidity environment, the function of charging equipment cannot be guaranteed to operate normally, and there are security risks, cause equipment damage Or electrical hazard.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of charging safeguard management method is provided, it is ensured that charging It is normally carried out, avoids equipment damage and electrical hazard.
To achieve the goals above, the present invention adopts the following technical scheme that:
In a first aspect, the present invention provides a kind of charging safeguard management method, comprising steps of
Current humidity data are obtained, and judge current humidity data whether more than the first preset threshold;
If so, obtaining present charge state, and judge current whether in preset charged state;
If so, whether judging current humidity data more than the second preset threshold, second preset threshold is greater than described the One preset threshold;
It instructs and executes if so, sending dehumidifying.
Second aspect, the present invention provide a kind of computer equipment, including memory, processor and are stored in the memory Computer program that is upper and can running on the processor, the processor run the computer program so that the calculating The step of charging safeguard management method described in machine equipment execution according to a first aspect of the present invention.
The third aspect, the present invention provide a kind of computer readable storage medium, are stored thereon with computer program, the meter Calculation machine readable storage medium storing program for executing is stored with computer program used in the computer equipment described according to a second aspect of the present invention.
Beneficial effects of the present invention:
The charging safeguard management method provided according to the present invention, by monitoring envionmental humidity, and then according to different Humidity condition takes dehumidification operation, it can be ensured that charging equipment in use, is not influenced by envionmental humidity, avoids setting Situations such as standby function under humidity environment is unable to operate normally, and equipment damage or electrical hazard occur, improves the peace of charging Quan Xing.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of the scope of the invention.
Fig. 1 is the schematic perspective view of charging equipment of the invention;
Fig. 2 is the circuit theory schematic diagram of charging equipment in the present invention;
The circuit theory schematic diagram of wisdom charging system in the present invention of the position Fig. 3;
Fig. 4 is the flow diagram of charging safeguard management method of the invention.
Specific embodiment
Hereinafter, various embodiments of the present invention will be described more fully.The present invention can have various embodiments, and It can adjust and change wherein.It should be understood, however, that: there is no various embodiments of the present invention are limited to spy disclosed herein Determine the intention of embodiment, but should invention is construed as cover in the spirit and scope for falling into various embodiments of the present invention All adjustment, equivalent and/or optinal plan.
Hereinafter, disclosed in the term " includes " that can be used in various embodiments of the present invention or " may include " instruction Function, operation or the presence of element, and do not limit the increase of one or more functions, operation or element.In addition, such as existing Used in various embodiments of the present invention, term " includes ", " having " and its cognate are meant only to indicate special characteristic, number Word, step, operation, the combination of element, component or aforementioned item, and be understood not to exclude first one or more other Feature, number, step, operation, element, component or aforementioned item combined presence or increase one or more features, number, Step, operation, element, component or aforementioned item combination a possibility that.
In various embodiments of the present invention, statement " A or/and B " includes any combination or the institute of the text listed file names with There is combination, such as, it may include A, it may include B or may include A and B both.
The statement (" first ", " second " etc.) used in various embodiments of the present invention can be modified in various implementations Various constituent element in example, but respective sets can not be limited into element.For example, the above statement is not intended to limit the suitable of the element Sequence and/or importance.The above statement is only used for the purpose for differentiating an element and other elements.For example, the first user fills It sets and indicates different user device with second user device, although the two is all user apparatus.For example, of the invention each not departing from In the case where the range of kind embodiment, first element is referred to alternatively as second element, and similarly, second element is also referred to as first Element.
It should also be noted that in the present invention, unless otherwise specific regulation and definition, the arts such as " installation ", " connection ", " fixation " Language shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection or being integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be and be directly connected to, and can be indirectly connected through an intermediary;It can be two Connection inside element.For the ordinary skill in the art, above-mentioned term can be understood at this as the case may be Concrete meaning in invention.
In the present invention, those skilled in the art are it is to be appreciated that indicating position or positional relationship in text Term be orientation based on the figure or positional relationship, be merely for convenience of description of the present invention and simplification of the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.
The term used in various embodiments of the present invention is used only for the purpose of describing specific embodiments and not anticipates In limitation various embodiments of the present invention.Unless otherwise defined, otherwise all terms used herein (including technical term and Scientific term) there is contain identical with the normally understood meaning of various embodiments of the present invention one skilled in the art Justice.The term (term such as limited in the dictionary generally used) be to be interpreted as have in the related technical field The identical meaning of situational meaning and Utopian meaning or meaning too formal will be interpreted as having, unless this It is clearly defined in the various embodiments of invention.
Fig. 1 and Fig. 2 is please referred to, the present invention provides a kind of charging safeguard management methods, are applied to charging equipment 200.Tool Body, charging equipment 200 is electric vehicle to provide charging service, and reality is charging pile or charging socket.Charging equipment 200 wraps Shell 201 is included, the intracorporal master control borad 202 of shell, Temperature Humidity Sensor 203 and heating device 204, the master control borad 202 are set to External electrical network and electric vehicle are connected, electric vehicle charging is embodied as.The Temperature Humidity Sensor 203 is for detecting charging equipment 200 internal relative humidity, master control borad 202 control heating device 204 and hold according to the different situations of the internal relative humidity of monitoring Row dehumidification operation guarantees being normally carried out for charging process so that the internal relative humidity of charging equipment 200 reduces.The present embodiment In, heating device 204 is set as heating coil;In other embodiments, heating device 204 may be arranged as heater circuit, electricity Road has several concatenated resistance.
Referring to FIG. 3, the charging equipment 200 is in the layout of in wisdom charging system 300, wisdom charging system 300 is also wrapped Cloud platform 301 and mobile terminal 302 are included, charging equipment 200 and mobile terminal 302 are electrically connected at cloud platform 302.The wisdom charging Platform 301 is that the data storage of wisdom charging system and processing center, wisdom charging platform 301 are stored with user information, vehicle Information, 302 facility information of mobile terminal and its correspondence relationship information.Mobile terminal 302 is specially the intelligence such as smart phone, plate, computer Energy terminal device, user can be reserved to charging equipment 200 by mobile terminal 302 or the operations such as charge control.
Referring to FIG. 4, the charging safeguard management method, includes the following steps:
Whether step S10 obtains current humidity data, and judges current humidity data more than the first preset threshold;
Whether step S20 if so, obtaining present charge state, and judges current in preset charged state;
Step S30, if so, whether judging current humidity data more than the second preset threshold, second preset threshold is big In first preset threshold;
Step S40 is instructed and is executed if so, sending dehumidifying.
In the present embodiment, in the step S10, different charging equipments 200 has different moisture-resistant degree service abilities, phase Ying Di determines a preset value, definition is when relative humidity is more than preset value, charging equipment for different charging equipments 200 200 need to carry out dehumidification work, are just able to satisfy normal operation.In the present embodiment, the first preset threshold is set as relative humidity 60%, the Temperature Humidity Sensor 203 obtains current temperature and humidity condition, to determine current relative humidity, and then with One preset threshold compares, and is adjusted with the interior humidity for determining the need for charging equipment.It is appreciated that in other implementations In example, the first preset threshold may be arranged as other values, such as relative humidity 55%.Alternatively, the humidity data can also be set It is set to absolute humidity, such as is set as 50g/m3.Correspondingly, humidity data is obtained by humidity sensor.
In the step S20, when judging that current humidity is higher, the operating status of charging equipment 200 is further judged.? In practical application, the state of the operation of charging equipment 200 and different capacity operation will generate corresponding different calorific value, this portion Distribution heat can be adjusted the humidity of charging equipment 200.Therefore further the operating status of charging equipment 200 is carried out Judgement, and corresponding operation process is executed, it being capable of the effectively save energy.
In the step S30, when judgement needs the humidity to charging equipment 200 to be adjusted, and charging equipment 200 is full The preset operating status of foot, further judges humidity, it is compared with the second preset threshold, and therein second is pre- If threshold value is greater than the first preset threshold.When judge current humidity data be greater than the second preset threshold, at this point, charging equipment 200 Operating status caused by calorific value be unable to satisfy the dehumidification of charging equipment 200, need by other means to charging Equipment 200 carries out dehumidification operation.
The step S40, master control borad 202 determines according to estimate of situation above-mentioned and uses dehumidifying measure, controls heating device 204 heating, dehumidify to charging equipment 200.
Further, the preset charged state specifically: charging work state;Alternatively, predetermined power charged state.This In embodiment, charged state is set by the preset state that 200 charged state of charging equipment judges, i.e. charging equipment 200 only wraps Two kinds of situations of charged state or non-charged state are included, such mode meets the charging equipment 200 of fixed output power;And it is directed to function The adjustable charging equipment 200 of rate, the practical various states with different output power of charged state will correspondingly judge Preset state be set as constant power charged state, more accurately realize the judgement to charged state, and then determine and generate Calorific value, to improve the judgment accuracy for whether needing to dehumidify to charging equipment 200.
Further, when judgement is currently at charging work state, the step S30 is executed, judges current humidity data Whether more than the second preset threshold.In the present embodiment, the two kinds of situations that whether charge only are set as preset charged state, when Judgement is in charged state, i.e., further judges the relationship of current humidity data Yu the second preset threshold.
Further, when judgement is currently at the first predetermined power charged state, further judge that current humidity data are No is more than third predetermined threshold value, instructs and executes if so, sending dehumidifying;
When judgement is currently at the second predetermined power state, further judge whether current humidity data are preset more than the 4th Threshold value is instructed and is executed if so, sending dehumidifying;
Wherein, the second predetermined power is greater than the first predetermined power, and the 4th preset threshold is greater than third predetermined threshold value and is greater than the One preset threshold.
In the present embodiment, for preset charged state be multiple power charged state the case where, when judgement in difference Charged state when, it is corresponding, further judge the relationship of current humidity data and preset threshold, wherein it is appreciated that charging When the output power of equipment 200 is higher, generated calorific value will be higher, and then can adjust higher humidity condition, thus, The charge power judged is positively correlated with the corresponding preset threshold further judged.
Further, it when judging that current humidity data are more than third predetermined threshold value, sends the first dehumidifying and instructs and execute, when Judge that current humidity data are more than the 4th preset threshold, sends the second dehumidifying and instruct and execute, the hair of the second dehumidifying instruction Thermal power is greater than the first dehumidifying instruction.
In the present embodiment, when judging that current humidity data are more than preset threshold, i.e., other measures need to be taken to set charging Standby 200 dehumidify.Wherein, when the preset threshold that judgement is more than is higher, i.e., actual humidity is higher, needs to generate more Calorific value dehumidifies to charging equipment 200, thus in the dehumidifying instruction of corresponding production, heating power is also required to higher, that is, sentences The heating power of disconnected humidity data and dehumidifying is positively correlated.
Further, whether the step S20 if so, obtaining present charge state, and judges current in preset charged State further includes, if it is not, executing step S40, sends dehumidifying and instructs and execute.
In the present embodiment, when the charged state for judging charging equipment 200 is unsatisfactory for preset condition, i.e. charging equipment 200 Operation calorific value is unable to satisfy dehumidification, i.e. judgement needs to take other dehumidifying means, and then sends corresponding dehumidifying instruction And it instructs.
Further, whether the step S10 obtains current humidity data, and judges current humidity data more than first Preset threshold further comprises the steps of: before
Step S50 obtains charging reservation instruction;Alternatively, obtaining charging open command.
In the present embodiment, before obtaining current humidity data and being judged, user's filling to charging equipment 200 is received Electric reservation instruction or charging open command.That is, judging charging equipment 200 when receiving reservation charging instruction or charging open command It will come into operation, dehumidification operation is carried out to charging equipment 200 at random.
Further, the step S50 obtains charging reservation instruction, with the step S10, obtains current humidity data, And judge current humidity data whether more than the first preset threshold, between further comprise the steps of:
Step S60 obtains current time, and compares and charge the time started in current time and charging reservation instruction, when sentencing Disconnected current time and reservation charging time started difference meet preset time.
In the present embodiment, when carrying out reservation instruction judgement to charging equipment 200, its subscription time is further judged, it will Dehumidifying adjusts control flow and opens with charging opening time interval preset time, for example, before the charging time is opened in reservation The dehumidifying of unlatching in 30 minutes judges process, is dehumidified in advance to charging equipment 200, so that charging 200 meets charging normally in advance The humidity requirement of operation.
It is appreciated that causing the factor directly affected to the normal operation of charging equipment 200 is condensation in actual conditions, and Decide whether that generating condensation is mainly influenced by relative humidity.Thus, based on the above-mentioned dehumidifying side carried out to charging equipment 200 Case can be adjusted further directed to relative humidity.Specifically, when judgement needs to be implemented step S40, transmission dehumidifying instruction is simultaneously When execution, the step S40 is specifically included:
Obtain current temperature data and absolute humidity data;
The relative humidity data conversion of first preset threshold is obtained into temperature value and humidity value mapping table;
Execute heating and dehumidification operation;
It is spaced preset time period and obtains current temperature data and absolute humidity data, and be compared with mapping table;
When judge current temperature data and absolute humidity data be less than simultaneously one group of temperature value in mapping table with it is wet Angle value stops heating and dehumidification operation.
In the present embodiment, charging equipment 200 carries out the monitoring of temperature and humidity using Temperature Humidity Sensor 203;According to public affairs Formula RH (%)=d1/d2*100%, wherein d1 is actual vapor density (i.e. absolute humidity), and d2 is saturated water under mutually synthermal T Vapour density, the mapping relations of temperature value T and humidity value d1, to obtain the mapping table.Specifically, such as current temperature Degree is 40 DEG C, 70g/m3, mapping table is as follows:
During heating and dehumidification, since heating device 203 works, heat is generated, the temperature of charging equipment 200 will increase, Absolute humidity will reduce, at this point, setting at interval of 5min, is monitored Current Temperatures meter humidity and carries out with mapping table Compare, when judging Current Temperatures and absolute humidity is less than one group of temperature value and humidity value therein simultaneously, charging equipment at this time 200 temperature and moisture condition meet the requirement of relative humidity, can operate normally, need not continue to dehumidify.Further, it reflects It penetrates in relation table, the range of temperature value is the temperature range that charging equipment 200 operates normally, and for example, 20- specifically can be set 60℃。
The charging safeguard management method provided according to the present invention, by monitoring envionmental humidity, and then according to different Humidity condition takes dehumidification operation, it can be ensured that charging equipment in use, is not influenced by envionmental humidity, avoids setting Situations such as standby function under humidity environment is unable to operate normally, and equipment damage or electrical hazard occur, improves the peace of charging Quan Xing.
In all examples being illustrated and described herein, any occurrence should be construed as merely illustratively, without It is as limitation, therefore, other examples of exemplary embodiment can have different values.
It should be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitation of the scope of the invention therefore cannot be interpreted as.It should be pointed out that it will be apparent to those skilled in the art that can basis Technical solution described above and design, make various other corresponding changes and deformation, and all these change with And deformation all should belong within the scope of protection of the claims of the present invention.

Claims (10)

1. a kind of charging safeguard management method, which is characterized in that comprising steps of
Current humidity data are obtained, and judge current humidity data whether more than the first preset threshold;
If so, obtaining present charge state, and judge current whether in preset charged state;
If so, whether judging current humidity data more than the second preset threshold, it is pre- that second preset threshold is greater than described first If threshold value;
It instructs and executes if so, sending dehumidifying.
2. charging safeguard management method according to claim 1, which is characterized in that the preset charged state specifically:
Charging work state;Alternatively, predetermined power charged state.
3. charging safeguard management method according to claim 2, which is characterized in that when judgement is currently at charging work shape Whether state executes the step and judges current humidity data more than the second preset threshold.
4. charging safeguard management method according to claim 2, which is characterized in that when judgement is currently at the first default function Rate charged state further judges whether current humidity data are more than third predetermined threshold value, instructs and holds if so, sending dehumidifying Row;
When judgement is currently at the second predetermined power state, further judge current humidity data whether more than the 4th default threshold Value is instructed and is executed if so, sending dehumidifying;
Wherein, the second predetermined power is greater than the first predetermined power, and the 4th preset threshold is greater than third predetermined threshold value and is greater than first in advance If threshold value.
5. charging safeguard management method according to claim 4, which is characterized in that when judging that current humidity data are more than the Three preset thresholds send the first dehumidifying and instruct and execute, when judging that current humidity data are more than the 4th preset threshold, send second Dehumidifying is instructed and is executed, and the heating power of the second dehumidifying instruction is greater than the first dehumidifying instruction.
6. charging safeguard management method according to claim 1, which is characterized in that the step is currently filled if so, obtaining Electricity condition, and judge currently whether be in preset charged state, it further include sending dehumidifying instruction if it is not, executing step and executing.
7. charging safeguard management method according to claim 1, which is characterized in that the step obtains current humidity number According to, and judge that current humidity data whether more than the first preset threshold, before, further comprise the steps of:
Obtain charging reservation instruction.
8. charging safeguard management method according to claim 7, which is characterized in that the step obtains charging reservation and refers to Enable, obtain current humidity data with the step, and judge current humidity data whether more than the first preset threshold, between, also Comprising steps of
Obtain current time, and compare current time and charging reservation instruction in charge the time started, when judge current time and Reservation charging time started difference meets preset time.
9. a kind of computer equipment, including memory, processor and it is stored on the memory and can be on the processor The computer program of operation, which is characterized in that the processor runs the computer program so that the computer equipment is held The step of capable described in any item charging safeguard management methods according to claim 1~8.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that described computer-readable Storage medium is stored with computer program used in computer equipment according to claim 9.
CN201910144264.7A 2019-02-27 2019-02-27 Charging security management method, computer equipment and storage medium Active CN109878374B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910144264.7A CN109878374B (en) 2019-02-27 2019-02-27 Charging security management method, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910144264.7A CN109878374B (en) 2019-02-27 2019-02-27 Charging security management method, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN109878374A true CN109878374A (en) 2019-06-14
CN109878374B CN109878374B (en) 2021-01-15

Family

ID=66929560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910144264.7A Active CN109878374B (en) 2019-02-27 2019-02-27 Charging security management method, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109878374B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112865227A (en) * 2021-01-08 2021-05-28 时域网络科技(深圳)有限责任公司 Power supply method and device, storage medium and power supply equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19628744A1 (en) * 1995-07-28 1997-01-30 Corroventa Avfuktning Ab Dehumidifier with single and three=phase AC supply connections - has separate sets of contacts and internal wiring to switch serving two identical motor-blower drying units via relays.
CN205646548U (en) * 2016-04-08 2016-10-12 国网江西省电力公司上饶供电分公司 Energy -conserving dehydrating unit of distribution automation terminal
CN207320861U (en) * 2017-08-10 2018-05-04 广州荣知通信息科技有限公司 Intelligent charge cabinet and intelligent charging system
CN207630995U (en) * 2017-11-11 2018-07-20 西藏世峰高科能源技术有限公司 The wet control dust-proof mechanism of charging pile
CN208158202U (en) * 2018-05-23 2018-11-27 深圳市金威澎电子有限公司 Wireless charging device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19628744A1 (en) * 1995-07-28 1997-01-30 Corroventa Avfuktning Ab Dehumidifier with single and three=phase AC supply connections - has separate sets of contacts and internal wiring to switch serving two identical motor-blower drying units via relays.
CN205646548U (en) * 2016-04-08 2016-10-12 国网江西省电力公司上饶供电分公司 Energy -conserving dehydrating unit of distribution automation terminal
CN207320861U (en) * 2017-08-10 2018-05-04 广州荣知通信息科技有限公司 Intelligent charge cabinet and intelligent charging system
CN207630995U (en) * 2017-11-11 2018-07-20 西藏世峰高科能源技术有限公司 The wet control dust-proof mechanism of charging pile
CN208158202U (en) * 2018-05-23 2018-11-27 深圳市金威澎电子有限公司 Wireless charging device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112865227A (en) * 2021-01-08 2021-05-28 时域网络科技(深圳)有限责任公司 Power supply method and device, storage medium and power supply equipment
CN112865227B (en) * 2021-01-08 2024-05-07 时域网络科技(深圳)有限责任公司 Power supply method and device, storage medium and power supply equipment

Also Published As

Publication number Publication date
CN109878374B (en) 2021-01-15

Similar Documents

Publication Publication Date Title
KR102205841B1 (en) Method and apparatus for estimating state of battery
CN106160065B (en) Maintaining vehicle batteries
CN203839477U (en) Low-temperature charging and heating device of automobile power battery and system
US8305044B2 (en) Battery pack, information processing apparatus, charge control system, charge control method by battery pack, and charge control method by charge control system
US9194919B2 (en) Electric storage device, electronic device, power system, and electric vehicle
CN108711662A (en) Battery pack heating device and control method
CN109334505A (en) Charge awakening method
CN103515669A (en) Electronic equipment battery heating apparatus and heating method
CN205565901U (en) Transformer substation storage cell organizes intelligent management system
CN107689662A (en) A kind of electric automobile discrete DC charging motor system and its charging method
CN108666713A (en) Battery pack heating device for double-vehicle heating and control method
CN105048010B (en) A kind of monitoring method and system of batteries of electric automobile bag
CN105098272A (en) Safe charging method and apparatus for lithium secondary battery
JP2013226012A (en) Storage battery system
CN108615958A (en) Power battery method for heating and controlling and system
CN109878374A (en) Charge safeguard management method, computer equipment and storage medium
KR20140045624A (en) Keeping warm device and method for battery
JP2014023276A (en) Storage battery control system
CN105082795A (en) Printing control method and system for thermal printer and electronic payment terminal
CN103311966A (en) Battery self-adaptive control device and method for batteries connected in parallel
CN104348206A (en) Distributed battery management device and dual-redundancy power supply system
KR102382196B1 (en) a ship including a battery
JP7135912B2 (en) Charge/discharge device and power management system using the same
Zhang et al. Hardware platform design of small energy storage system using second life batteries
CN202455123U (en) Self-adaptive battery control device for banked battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210518

Address after: 201613 301 Rong Le Dong Road, Songjiang District, Shanghai.

Patentee after: Hengda hengchi New Energy Vehicle Research Institute (Shanghai) Co.,Ltd.

Address before: 518000 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee before: HENGDA SMART CHARGING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right