CN109876637A - Wet process deacidification system - Google Patents

Wet process deacidification system Download PDF

Info

Publication number
CN109876637A
CN109876637A CN201910203074.8A CN201910203074A CN109876637A CN 109876637 A CN109876637 A CN 109876637A CN 201910203074 A CN201910203074 A CN 201910203074A CN 109876637 A CN109876637 A CN 109876637A
Authority
CN
China
Prior art keywords
wet process
level
tower
tower body
process tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910203074.8A
Other languages
Chinese (zh)
Inventor
浦东山
贝宏江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dong Ben Ingegneria Ambientale Srl
Original Assignee
Jiangsu Dong Ben Ingegneria Ambientale Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Dong Ben Ingegneria Ambientale Srl filed Critical Jiangsu Dong Ben Ingegneria Ambientale Srl
Priority to CN201910203074.8A priority Critical patent/CN109876637A/en
Publication of CN109876637A publication Critical patent/CN109876637A/en
Pending legal-status Critical Current

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The present invention relates to technical field of waste gas treatment, disclose wet process deacidification system, including air-introduced machine, level-one wet process tower and second level wet process tower, and air-introduced machine connects level-one wet process tower by flue, and level-one wet process tower connects second level wet process tower by flue.Technical problems to be solved are that wet process deacidification system traditional in the prior art is not thorough the depickling of flue gas.The present invention passes through level-one wet process tower and second level wet process tower; multiple depickling is carried out to flue gas; level-one wet process tower removes most of sour gas in flue gas; second level wet process tower removes the sour gas in remaining flue gas; depickling is more thorough; meet current demand; simultaneously; since the salinity of circulation fluid in second level wet process tower is lower than the salinity in level-one wet process tower; the salinity taken in the droplet of follow-up steam heater in second level wet process tower by flue gas is low; steam heater service life can be extended, strengthen the protection to follow-up steam heater system.

Description

Wet process deacidification system
Technical field
The present invention relates to technical field of waste gas treatment, and in particular to wet process deacidification system.
Background technique
Wet process depickling is traditional exhaust gas treatment technology, and still, traditional wet process deacidification system is not thorough to the depickling of flue gas Bottom, it is difficult to meet current demand.
Summary of the invention
In view of the deficiency of background technique, invention provides wet process deacidification systems, and the technical problem to be solved is that existing There is wet process deacidification system traditional in technology to be not thorough the depickling of flue gas.
In order to solve the above technical problems, the present invention provides the following technical scheme that
Wet process deacidification system, including air-introduced machine, level-one wet process tower and second level wet process tower, the air-introduced machine are connected by flue The level-one wet process tower, the level-one wet process tower connect second level wet process tower by flue.
Preferably, the level-one wet process tower includes the first tower body, and the smoke inlet of first tower body is located at described first The lower part of tower body, the exhanst gas outlet of first tower body are located at the top of first tower body, the first tower body internal upper part edge Several first spraying layers are vertically provided with, first spraying layer connects the depickling liquid cooling outside first tower body but by pipeline Pond.
Preferably, sieve plate is installed below each first spraying layer, the sieve plate is fixedly connected with first tower body.
Preferably, the second level wet process tower includes the second tower body, and second tower body lower part is provided with secondary flue gas entrance, Be arranged at intervals with several orifice plates and several second spraying layers in second tower body of the secondary flue gas entrance top, it is described most It is provided with several flushing layers above second spraying layer of top, Flat defroster is equipped between the flushing layer, it is described Wire mesh demister is equipped with above Flat defroster.
Preferably, the wire mesh demister includes annular lower supporting plate disposed in parallel and annular upper backup pad, the ring Silk screen is connected between shape lower supporting plate and the annular upper backup pad.
Preferably, the annular lower supporting plate bottom is connected with the supporting beam by the center of circle, the supporting beam bottom connection There is the vertical gusset along supporting beam setting.
Preferably, the sieve plate of bottom is made of 2205 stainless steels.
Preferably, first tower body inner wall below sieve plate described in bottom is provided with pyroceram scale.
Preferably, there are two entrances, an entrance to spray into mist using double-current spray gun body for setting on the flue Change water, another described entrance uses screw conic nozzle, and Xiang Suoshu flue inner wall squirts method waste liquid or water.
Compared with the prior art, the invention has the beneficial effects that: it is right by level-one wet process tower and second level wet process tower Flue gas carries out multiple depickling, and level-one wet process tower removes most of sour gas in flue gas, and second level wet process tower removes remaining flue gas In sour gas, depickling is more thorough, meets current demand, simultaneously as the salinity of circulation fluid is lower than in second level wet process tower Salinity in level-one wet process tower, the salinity taken in the droplet of follow-up steam heater by flue gas in second level wet process tower is low, can be with Extend steam heater service life, strengthens the protection to follow-up steam heater system.
Detailed description of the invention
The present invention has following attached drawing:
Fig. 1 is schematic diagram of the invention;
Fig. 2 is the schematic diagram of level-one wet process tower of the present invention;
Fig. 3 is the schematic diagram of second level wet process tower of the present invention;
Fig. 4 is the schematic diagram of wire mesh demister of the present invention.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
As shown in Figs 1-4, wet process deacidification system, including air-introduced machine 1, level-one wet process tower 2 and second level wet process tower 3, air-introduced machine 1 Level-one wet process tower 2 is connected by flue 4, level-one wet process tower 2 connects second level wet process tower 3 by flue 4, and flue gas is taken out by air-introduced machine 1 It is fed into level-one wet process tower 2, level-one wet process tower 2 carries out first time processing to flue gas, discharge treated waste liquid, remaining flue gas Enter second level wet process tower 3 by flue 4, second is carried out to flue gas and is handled, discharge treated waste liquid.
Level-one wet process tower 2 includes the first tower body 21, and the smoke inlet 22 of the first tower body 21 is located at the lower part of the first tower body 21, The exhanst gas outlet 23 of first tower body 21 is located at the top of the first tower body 21, and 21 internal upper part of the first tower body is vertically provided with several One spraying layer 24, the first spraying layer 24 connects the depickling liquid cooling bay outside the first tower body 21 by pipeline, from depickling liquid cooling bay Middle extraction cold water is sprayed into the first tower body 21.
Sieve plate 25 is installed, sieve plate 25 is fixedly connected with the first tower body 21 below each first spraying layer 24.
Second level wet process tower 3 includes the second tower body 31, and 31 lower part of the second tower body is provided with secondary flue gas entrance 32, secondary flue gas Several orifice plates 33 and several second spraying layers 34, the second spray of the top are arranged at intervals in second tower body 31 of 32 top of entrance It is provided with several flushing layers 35 above drenching layer 34, rinses and is equipped with Flat defroster 36 between layer 35, on Flat defroster 36 Side is equipped with wire mesh demister 37.
Since with Flat defroster 36 and wire mesh demister 37, second level wet process tower 3 can either remove biggish droplet, Also short grained droplet and aerosol can be removed, removal effect is good, and traditional wet process tower is to aerosol and little particle mist The removal effect of drop is poor, and removal effect is undesirable.
Wire mesh demister 37 includes annular lower supporting plate 371 disposed in parallel and annular upper backup pad 372, the lower support of annular Silk screen 373 is connected between plate 371 and annular upper backup pad 372.
Annular 371 bottom of lower supporting plate is connected with the supporting beam 374 by the center of circle, and 374 bottom of supporting beam is connected with along branch Support the vertical gusset 375 that beam 374 is arranged.
The sieve plate 25 of bottom is made of 2205 stainless steels, using its high temperature resistance, is resistant to the high temperature of flue gas, protects Hold enough service life.
21 inner wall of the first tower body of 25 lower section of bottom sieve plate is provided with pyroceram scale.
There are two entrances 5, an entrance 5 to spray into atomized water using double-current spray gun body, be used to cigarette for setting on flue 4 Gas cools down, another entrance 5 uses screw conic nozzle, method waste liquid or water is squirted to 4 inner wall of flue, to 4 siding of flue Cool down, protects pyroceram scale, influence its antiseptic property by the high temperature of flue gas.
The present invention carries out multiple depickling by level-one wet process tower and second level wet process tower, to flue gas, and level-one wet process tower removes cigarette Most of sour gas in gas reduces the consumption of water so that most sulphur is discharged from level-one wet process tower in flue gas, and two Grade wet process tower removes the sour gas in remaining flue gas, and salt content substantially reduces from the liquid being discharged in second level wet process tower, takes off Acid is more thorough, so that the longer life expectancy that the heat exchanger connecting with second level wet process tower can be used, while meeting current demand, together When, since the salinity of circulation fluid in second level wet process tower is lower than the salinity in level-one wet process tower, second level wet process tower is interior to be taken to by flue gas Salinity in the droplet of follow-up steam heater is low, can extend steam heater service life, strengthen and add to follow-up steam The protection of hot device system.
It is above-mentioned according to the present invention for enlightenment, through the above description, relevant staff completely can without departing from In the range of this invention technical idea, various changes and amendments are carried out.The technical scope of this invention is not limited to In the content on specification, it is necessary to which the technical scope thereof is determined according to the scope of the claim.

Claims (9)

1. wet process deacidification system, it is characterised in that: including air-introduced machine, level-one wet process tower and second level wet process tower, the air-introduced machine is logical It crosses flue and connects the level-one wet process tower, the level-one wet process tower connects second level wet process tower by flue.
2. wet process deacidification system according to claim 1, it is characterised in that: the level-one wet process tower includes the first tower body, The smoke inlet of first tower body is located at the lower part of first tower body, and the exhanst gas outlet of first tower body is located at described the The top of one tower body, the first tower body internal upper part are vertically provided with several first spraying layers, and first spraying layer passes through Pipeline connects the depickling liquid cooling bay outside first tower body.
3. wet process deacidification system according to claim 2, it is characterised in that: be equipped with sieve below each first spraying layer Plate, the sieve plate are fixedly connected with first tower body.
4. wet process deacidification system according to claim 1, it is characterised in that: the second level wet process tower includes the second tower body, Second tower body lower part is provided with secondary flue gas entrance, and interval is set in second tower body of the secondary flue gas entrance top Several orifice plates and several second spraying layers are equipped with, are provided with several flushing layers above second spraying layer of the top, It is equipped with Flat defroster between the flushing layer, is equipped with wire mesh demister above the Flat defroster.
5. wet process deacidification system according to claim 1, it is characterised in that: the wire mesh demister includes disposed in parallel Annular lower supporting plate and annular upper backup pad are connected with silk screen between the annular lower supporting plate and the annular upper backup pad.
6. wet process deacidification system according to claim 5, it is characterised in that: the annular lower supporting plate bottom is connected with logical The supporting beam in the center of circle is crossed, the supporting beam bottom is connected with the vertical gusset along supporting beam setting.
7. wet process deacidification system according to claim 3, it is characterised in that: the sieve plate of bottom is by 2205 stainless steels It is made.
8. wet process deacidification system according to claim 7, it is characterised in that: described first below sieve plate described in bottom Tower body inner wall is provided with pyroceram scale.
9. wet process deacidification system according to claim 1, it is characterised in that: entrance there are two settings on the flue, One entrance sprays into atomized water using double-current spray gun body, another described entrance uses screw conic nozzle, Xiang Suoshu Flue inner wall squirts method waste liquid or water.
CN201910203074.8A 2019-03-18 2019-03-18 Wet process deacidification system Pending CN109876637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910203074.8A CN109876637A (en) 2019-03-18 2019-03-18 Wet process deacidification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910203074.8A CN109876637A (en) 2019-03-18 2019-03-18 Wet process deacidification system

Publications (1)

Publication Number Publication Date
CN109876637A true CN109876637A (en) 2019-06-14

Family

ID=66932719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910203074.8A Pending CN109876637A (en) 2019-03-18 2019-03-18 Wet process deacidification system

Country Status (1)

Country Link
CN (1) CN109876637A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112844022A (en) * 2020-12-29 2021-05-28 重庆桃园金属表面处理有限公司 Electroplating product waste gas treatment system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE9001957D0 (en) * 1990-05-31 1990-05-31 Chemrec Ab Purification of process gas from partial combustion of black liquor
CN1745875A (en) * 2005-08-18 2006-03-15 湖南省树山环境工程有限公司 Assembling device of double-stage wetting dust-proof desulfurizer
CN201524520U (en) * 2009-05-06 2010-07-14 吴来田 Efficient desulfuration and dedusting device
CN201609633U (en) * 2010-01-12 2010-10-20 上海洁美环保科技有限公司 Ammonia flue gas desulfurization device of byproducts of ammonium hydrogen sulfite and ammonium sulfite
CN102872709A (en) * 2012-09-17 2013-01-16 江苏和亿昌环保工程科技有限公司 Process of efficiently capturing aerosol in desulfurized flue gas
CN205867978U (en) * 2016-08-03 2017-01-11 江苏宇新环保工程管理有限公司 Novel danger waste flue gas deacidification tower
CN106823740A (en) * 2017-01-23 2017-06-13 上海大学 Charcoal element stove, the ammonia process of desulfurization of coke oven flue gas multisection type and dedusting absorption tower
CN206642515U (en) * 2017-03-24 2017-11-17 天津奥展兴达化工技术有限公司 Desulfurization deacidifying dedusting device and the desulfurization depickling dust pelletizing system containing the device
CN206950955U (en) * 2017-05-05 2018-02-02 上海能辉科技股份有限公司 Burning power plant gas cleaning wet scrubber tower
CN108151050A (en) * 2018-02-07 2018-06-12 无锡雪浪环境科技股份有限公司 A kind of dangerous waste burns wet method depickling flue gas and takes off white system and its application method
CN108325355A (en) * 2018-03-05 2018-07-27 洛阳市天誉环保工程有限公司 Ultra-clean tapping equipment and technique after a kind of boiler flue gas desulfurization
CN109126427A (en) * 2018-09-29 2019-01-04 上海盛剑环境系统科技股份有限公司 A kind of deacidifying flue gas device and deacidifying flue gas method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE9001957D0 (en) * 1990-05-31 1990-05-31 Chemrec Ab Purification of process gas from partial combustion of black liquor
CN1745875A (en) * 2005-08-18 2006-03-15 湖南省树山环境工程有限公司 Assembling device of double-stage wetting dust-proof desulfurizer
CN201524520U (en) * 2009-05-06 2010-07-14 吴来田 Efficient desulfuration and dedusting device
CN201609633U (en) * 2010-01-12 2010-10-20 上海洁美环保科技有限公司 Ammonia flue gas desulfurization device of byproducts of ammonium hydrogen sulfite and ammonium sulfite
CN102872709A (en) * 2012-09-17 2013-01-16 江苏和亿昌环保工程科技有限公司 Process of efficiently capturing aerosol in desulfurized flue gas
CN205867978U (en) * 2016-08-03 2017-01-11 江苏宇新环保工程管理有限公司 Novel danger waste flue gas deacidification tower
CN106823740A (en) * 2017-01-23 2017-06-13 上海大学 Charcoal element stove, the ammonia process of desulfurization of coke oven flue gas multisection type and dedusting absorption tower
CN206642515U (en) * 2017-03-24 2017-11-17 天津奥展兴达化工技术有限公司 Desulfurization deacidifying dedusting device and the desulfurization depickling dust pelletizing system containing the device
CN206950955U (en) * 2017-05-05 2018-02-02 上海能辉科技股份有限公司 Burning power plant gas cleaning wet scrubber tower
CN108151050A (en) * 2018-02-07 2018-06-12 无锡雪浪环境科技股份有限公司 A kind of dangerous waste burns wet method depickling flue gas and takes off white system and its application method
CN108325355A (en) * 2018-03-05 2018-07-27 洛阳市天誉环保工程有限公司 Ultra-clean tapping equipment and technique after a kind of boiler flue gas desulfurization
CN109126427A (en) * 2018-09-29 2019-01-04 上海盛剑环境系统科技股份有限公司 A kind of deacidifying flue gas device and deacidifying flue gas method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
全国勘察设计注册工程师环保专业管理委员会: "《注册环保工程师专业考试复习教材 大气污染防治工程技术与实践 下 第4版》", 31 March 2017, 中国环境出版社 *
吴忠标: "《实用环境工程手册 大气污染控制工程》", 30 September 2001, 化学工业出版社 *
王丽萍等: "《大气污染控制工程》", 31 August 2012, 中国矿业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112844022A (en) * 2020-12-29 2021-05-28 重庆桃园金属表面处理有限公司 Electroplating product waste gas treatment system

Similar Documents

Publication Publication Date Title
WO2022032600A1 (en) Water scrubbing tower for waste gas
CN108479368A (en) A kind of micro- eddy flow deep desulfuration dedusting absorption tower device and technique
CN206214976U (en) A kind of energy-conservation exhaust treatment system of application baking box
CN108014578A (en) The method and device of fine grained and condensable particle in low temperature spray cleaning coal-fired flue-gas
AU2010256072B2 (en) Scrubber tower and related flue gas scrubbing device
CN107019986A (en) The method and device of plume drops in a kind of cooling high-temperature fume and acoustic agglomeration water lift
CN204799098U (en) Compound desulfurizing tower
CN109876637A (en) Wet process deacidification system
CN207153459U (en) A kind of acid fog absorption tower
CN210495816U (en) Integrative tower of ammonia nitrogen desorption of desulfurization waste water
CN102921279B (en) Gas desulfurization tower with multi-layers of spraying structures
CN101352651A (en) Integrated equipment for cooling, dedusting and desulfurizing
CN208244357U (en) A kind of flue gas cleaning system
CN105983319B (en) Multi-layer sprinkling device
CN109806697A (en) A kind of flue gas slurries condensate formula disappears white system and method
CN110260679A (en) A kind of spray column, exhaust system and boiler system
CN109603451A (en) A kind of flue gas purification device
CN109289435A (en) A kind of organic exhaust gas vertical active carbon adsorption tower
CN204918630U (en) Slag water smoke granulating device
CN109457205B (en) Air humidifying and cooling method and cooling system for strip steel after plating
CN108744790A (en) A kind of water filtering device preventing air pollution
CN206701069U (en) Desulfuration absorbing tower
CN211798890U (en) Special separator of NMP solvent recovery
CN212971521U (en) Cooling chimney of tea baking device
CN216320947U (en) Acid waste gas treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614