CN109873450A - 一种多运行模式平滑切换的配电网超短期规划方法 - Google Patents
一种多运行模式平滑切换的配电网超短期规划方法 Download PDFInfo
- Publication number
- CN109873450A CN109873450A CN201910202384.8A CN201910202384A CN109873450A CN 109873450 A CN109873450 A CN 109873450A CN 201910202384 A CN201910202384 A CN 201910202384A CN 109873450 A CN109873450 A CN 109873450A
- Authority
- CN
- China
- Prior art keywords
- distribution network
- micro
- capacitance sensor
- power distribution
- operational modes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000005611 electricity Effects 0.000 claims abstract description 9
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 238000004146 energy storage Methods 0.000 description 6
- 238000004353 relayed correlation spectroscopy Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种多运行模式平滑切换的配电网超短期规划方法,它包括以下步骤:步骤1,根据配电网输电线路将配电网分解成若干个小规模、相互独立的微电网;步骤2,采集配电网线路上各能源及负荷节点的信息,判断各微电网中,新能源能否满足该微电网的内部电力需求,若不满足,则计算需要供电公司提供的电量,若该微电网能够自给自足并具有一定的余量,则向该微电网的上一级配电网返送余量,形成该微电网的规划结果;步骤3,对各微电网的规划结果进行汇总,形成地区配电网的规划结果。它具有如下优点:确保配电网运行的安全性和可靠性,提高配电网负荷转换能力,降低配电负荷端的停电率。
Description
技术领域
本发明涉及一种多运行模式平滑切换的配电网超短期规划方法。
背景技术
随着新能源的发展,分布式光伏应用越来越普遍;同时随着电池技术的应用,储能系统、电动汽车等同样也普通应用;这与原有水力、风力发电形成了多样性的发用电网。而目前多样性发用电均没有统一纳入配电网规划架构中,使得电网具有越来越多的不确定性。
发明内容
本发明提供了一种多运行模式平滑切换的配电网超短期规划方法,其克服了背景技术中所述的现有技术的不足。
本发明解决其技术问题所采用的技术方案是:
一种多运行模式平滑切换的配电网超短期规划方法,它包括以下步骤:
步骤1,根据配电网输电线路将配电网分解成若干个小规模、相互独立的微电网;
步骤2,采集配电网线路上各能源节点及负荷节点的信息,根据历史负荷量进行短期预测该微电网未来的一个周期内的负荷曲线,同时根据天气等因素预测未来的一个周期内新能源的发电量曲线,判断各微电网中,新能源能否满足该微电网的内部电力需求,若不满足,则计算需要供电公司提供的电量,若该微电网能够自给自足并具有一定的余量,则向该微电网的上一级配电网返送余量,形成该微电网的规划结果;
步骤3,对各微电网的规划结果进行汇总,形成地区配电网的规划结果。
一实施例之中:所述步骤1中,配电网以台区为单位来形成带新能源的各微电网。
一实施例之中:所述步骤2中,该能源节点信息包括各新能源装机容量信息、储能装置容量信息、变电站出线功率信息。
一实施例之中:该周期时长为七天。
本技术方案与背景技术相比,它具有如下优点:
本发明提出一种多运行模式平滑切换的配电网超短期规划方法,其主要是根据电网采集的实时数据,经过多运行模式平滑切换的配电网超短期规划,确保配电网运行的安全性和可靠性,提高配电网负荷转换能力,降低配电负荷端的停电率。
附图说明
下面结合附图和实施例对本发明作进一步说明。
图1为本实施例所述的多运行模式平滑切换的配电网超短期规划方法所适用的微电网结构框图。
图2为多运行模式平滑切换电路的逻辑线路框图。
具体实施方式
请查阅图1,一种多运行模式平滑切换的配电网超短期规划方法,它包括以下步骤:
步骤1,根据配电网输电线路将配电网分解成若干个小规模、相互独立的微电网;本实施例中,配电网以台区为单位来形成带新能源的各微电网。例如,以每个10kV转400V的变压器台区为节点,一个10kV转400V的变压器下的线路即为一个微电网,该微电网中带有新能源。
步骤2,采集配电网线路上各能源节点及负荷节点的信息,根据历史负荷量进行短期预测该微电网未来的一个周期内的负荷曲线,同时根据天气等因素预测未来的一个周期(该周期时长可设为七天)内新能源(光伏、风力、水电)的发电量曲线,判断各微电网中,新能源能否满足该微电网的内部电力需求,若不满足,则计算需要供电公司提供的电量,若该微电网能够自给自足并具有一定的余量,则向该微电网的上一级配电网返送余量(例如,通过10kV转400V的变压器返送至10kV线路),形成该微电网的规划结果;该能源节点信息包括各新能源装机容量信息、储能装置容量信息、变电站出线功率信息等。
步骤3,对各微电网的规划结果进行汇总,形成地区配电网的规划结果。
该配电网超短期规划方法是基于多运行模式平滑切换实现,在实际线路运行中,该平滑切换过程主要依靠平滑切换电路实现,如图2所示,单种供电输入为一个入口,每个入口由固态继电器SSR与磁保持继电器RELAY并联,供电输出口只有一个出口。
SSR具有开关动作快速的特点,能够在交流电波形过零点时进行开关;RELAY具有运行稳定,发热低的特点,能够长期保持电网的开关。因此,日常运行为单个输入的RELAY导通,其他均为断开状态,当需要平滑切换时,如从变电站电量输出平滑切换至储能系统电量输出,动作过程为:
(1)变电站RELAY为投入状态,其他均为断开状态;
(2)投入变电站SSR,断开变电站RELAY,
(3)断开变电站SSR,投入储能SSR
(4)投入储能RELAY,断开储能SSR,平滑切换结束。
以上所述,仅为本发明较佳实施例而已,故不能依此限定本发明实施的范围,即依本发明专利范围及说明书内容所作的等效变化与修饰,皆应仍属本发明涵盖的范围内。
Claims (4)
1.一种多运行模式平滑切换的配电网超短期规划方法,其特征在于:包括以下步骤:
步骤1,根据配电网输电线路将配电网分解成若干个小规模、相互独立的微电网;
步骤2,采集配电网线路上各能源节点及负荷节点的信息,根据历史负荷量进行短期预测该微电网未来的一个周期内的负荷曲线,同时根据天气等因素预测未来的一个周期内新能源的发电量曲线,判断各微电网中,新能源能否满足该微电网的内部电力需求,若不满足,则计算需要供电公司提供的电量,若该微电网能够自给自足并具有一定的余量,则向该微电网的上一级配电网返送余量,形成该微电网的规划结果;
步骤3,对各微电网的规划结果进行汇总,形成地区配电网的规划结果。
2.根据权利要求1所述的一种多运行模式平滑切换的配电网超短期规划方法,其特征在于:所述步骤1中,配电网以台区为单位来形成带新能源的各微电网。
3.根据权利要求1或2所述的一种多运行模式平滑切换的配电网超短期规划方法,其特征在于:所述步骤2中,该能源节点信息包括各新能源装机容量信息、储能装置容量信息、变电站出线功率信息。
4.根据权利要求1所述的一种多运行模式平滑切换的配电网超短期规划方法,其特征在于:该周期时长为七天。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910202384.8A CN109873450A (zh) | 2019-03-11 | 2019-03-11 | 一种多运行模式平滑切换的配电网超短期规划方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910202384.8A CN109873450A (zh) | 2019-03-11 | 2019-03-11 | 一种多运行模式平滑切换的配电网超短期规划方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109873450A true CN109873450A (zh) | 2019-06-11 |
Family
ID=66920725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910202384.8A Pending CN109873450A (zh) | 2019-03-11 | 2019-03-11 | 一种多运行模式平滑切换的配电网超短期规划方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109873450A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115360802A (zh) * | 2022-10-21 | 2022-11-18 | 东方空间技术(北京)有限公司 | 一种火箭的电源控制系统及方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105337301A (zh) * | 2014-08-12 | 2016-02-17 | 国家电网公司 | 微电网并网点的选择方法和装置 |
-
2019
- 2019-03-11 CN CN201910202384.8A patent/CN109873450A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105337301A (zh) * | 2014-08-12 | 2016-02-17 | 国家电网公司 | 微电网并网点的选择方法和装置 |
Non-Patent Citations (6)
Title |
---|
吕勇: "探讨分布式发电接入与电力系统平衡", 《变频器世界》 * |
张祥龙等: "含电力电子变电站的交直流配网调度优化方法", 《电网技术》 * |
李大中等: "基于能量预测的光伏微网储能系统控制策略", 《可再生能源》 * |
詹胜等: "配电网智能化过程中分布式电源接入系统研究", 《电气应用》 * |
赵波等: "考虑需求侧响应及不确定性的微电网双层优化配置方法", 《电工技术学报》 * |
邢晶等: "面向调度考虑不可控广义需求侧响应资源的负荷预测", 《华北电力技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115360802A (zh) * | 2022-10-21 | 2022-11-18 | 东方空间技术(北京)有限公司 | 一种火箭的电源控制系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kikusato et al. | Electric vehicle charge–discharge management for utilization of photovoltaic by coordination between home and grid energy management systems | |
Hosseinzadeh et al. | Robust optimal power management system for a hybrid AC/DC micro-grid | |
Guo et al. | Energy management system for stand-alone wind-powered-desalination microgrid | |
Sechilariu et al. | Building integrated photovoltaic system with energy storage and smart grid communication | |
Li et al. | Emission-concerned wind-EV coordination on the transmission grid side with network constraints: Concept and case study | |
Colet-Subirachs et al. | Centralized and distributed active and reactive power control of a utility connected microgrid using IEC61850 | |
Kanchev et al. | Smart monitoring of a microgrid including gas turbines and a dispatched PV-based active generator for energy management and emissions reduction | |
CN107463732B (zh) | 一种多端交直流主动配电网调度控制仿真系统及方法 | |
CN109713699B (zh) | 一种能源管理方法及智能光储装置 | |
Sanduleac et al. | Integrating the electrical vehicles in the smart grid through unbundled smart metering and multi-objective virtual power plants | |
Lahooti Eshkevari et al. | In‐depth study of the application of solid‐state transformer in design of high‐power electric vehicle charging stations | |
CN105244909A (zh) | 一种直流微网系统及并网自平衡控制策略 | |
CN107658960A (zh) | 居民用电的应急供电方法、装置及系统、设备、存储介质 | |
CN109149562A (zh) | 一种适用于交直流混联电网的经济调度方法及装置 | |
Brenna et al. | From virtual power plant (VPP) to sustainable energy microsystem (SEM): An opportunity for buildings energy management | |
Dong et al. | Coordinated control strategy of railway multisource traction system with energy storage and renewable energy | |
Li et al. | Traction power supply system of China high-speed railway under low-carbon target: Form evolution and operation control | |
CN109873450A (zh) | 一种多运行模式平滑切换的配电网超短期规划方法 | |
Guo et al. | Coordinated dispatching of flexible AC/DC distribution areas considering uncertainty of source and load | |
Jonas | Predictive power dispatch for 100% renewable electricity scenarios using power nodes modeling framework | |
Delfino et al. | MPC-based tertiary and secondary optimal control in islanded microgrids | |
Gao et al. | Optimal sizing and operation of hybrid energy storage systems in co‐phase traction power supply system considering battery degradation | |
CN109802391A (zh) | 一种应用于海岛微电网的能源转换系统及方法 | |
Benoit et al. | Deterministic optimal power flow for smart grid short-term predictive energy management | |
Alvarez et al. | A smart distribution toolbox for distribution system planning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190611 |