CN109872188A - Assets suggest generation method, device, computer equipment and storage medium - Google Patents

Assets suggest generation method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN109872188A
CN109872188A CN201910082344.4A CN201910082344A CN109872188A CN 109872188 A CN109872188 A CN 109872188A CN 201910082344 A CN201910082344 A CN 201910082344A CN 109872188 A CN109872188 A CN 109872188A
Authority
CN
China
Prior art keywords
management level
target
enterprise
target enterprise
cooperation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910082344.4A
Other languages
Chinese (zh)
Inventor
陈晨
彭琛
汪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201910082344.4A priority Critical patent/CN109872188A/en
Publication of CN109872188A publication Critical patent/CN109872188A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application involves big data fields, and in particular to a kind of assets suggest generation method, device, computer equipment and storage medium.The described method includes: receiving the consulting instruction for the Target Enterprise that terminal is sent;Management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction;Obtain the first management level resume information and target project implementation of the Target Enterprise;According to the target the first cooperation matrix of project implementation building, and calculate the first cooperation degree of the Target Enterprise;Each first management level resume information and first cooperation degree are inputted into the management level analysis model and obtain Target Enterprise score;The assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to the terminal.It can not only be taken one thing with another influence of the ability to management level to enterprise development using this method, the efficiency of company also be determined by the cooperation degree between management level, to generate accurate assets suggestion.

Description

Assets suggest generation method, device, computer equipment and storage medium
Technical field
This application involves field of computer technology, suggest that generation method, device, computer are set more particularly to a kind of assets Standby and storage medium.
Background technique
Investment, enterprise's product a surname and traditional forms of enterprises's analytical framework for using of air control be usually by business facility to enterprise, Economic scale, technical capability etc. and the physical resources related data of company are excavated, and the assets suggestion of Target Enterprise is obtained.But Physical resources are the unilateral displaying to Target Enterprise, thus the assets that the traditional forms of enterprises analyzes suggest also more unilateral, nothing Method guarantees its reasonability and objectivity.
Summary of the invention
Based on this, it is necessary to which in view of the above technical problems, accurate investment analysis can be provided to investor by providing one kind Assets suggest generation method, device, computer equipment and storage medium.
A kind of assets suggestion generation method, which comprises
Receive the consulting instruction for the Target Enterprise that terminal is sent;
Management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction;
Obtain the first management level resume information and target project implementation of the Target Enterprise;
According to the target the first cooperation matrix of project implementation building, and calculate the first cooperation of the Target Enterprise Degree;
Each first management level resume information and first cooperation degree are inputted the management level analysis model to obtain Target Enterprise score;
The assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to the terminal.
It is described in one of the embodiments, that management level corresponding with the Target Enterprise are obtained according to consulting instruction Analysis model, comprising:
The the second management level resume information and Enterprise Business Management State of sample companies are obtained according to the consulting instruction;
Acquisition capability index is instructed according to the consulting;
Management level ability information corresponding with the capacity index and sample are extracted from the second management level resume information This project implementation;
According to the sample of each sample companies the second cooperation matrix of project implementation building, and calculate each sample Second cooperation degree of this enterprise;
According to the Enterprise Business Management State, the capacity index, the management level ability information and second cooperation degree Construct management level analysis model.
It is described in one of the embodiments, that acquisition capability index is instructed according to the consulting, comprising:
It is instructed according to the consulting and obtains resume template;
The extract management layer analysis factor from the resume template;
It obtains and the associated spreading factor of management level analysis factor;
The management level analysis factor and the spreading factor are screened to obtain capacity index.
It is described in one of the embodiments, that the management level analysis factor and the spreading factor are screened to obtain Capacity index, comprising:
Obtain sample personal information;
According to the management level analysis factor and the spreading factor, extraction factor is believed from each sample personal information Breath;
Multi-variables analysis is carried out according to the factor information, obtains regression analysis model;
By the parameter extraction used in the regression analysis model for capacity index.
It is described according to the Enterprise Business Management State, the capacity index, the management level energy in one of the embodiments, Force information and second cooperation degree construct management level analysis model, comprising:
It gives a mark to each management level ability information corresponding with each capacity index, obtains index ability and obtain Point;
Classify to the capacity index;
All kinds of classification scorings is obtained according to all kinds of each capacity indexes and the index ability score;
Management level analysis model is constructed according to the Enterprise Business Management State, classification scoring and second cooperation degree.
It is described according to the target the first cooperation matrix of project implementation building in one of the embodiments, and calculate First cooperation degree of the Target Enterprise, comprising:
According to each target, project implementation obtains project personnel's list;
According to the target project implementation and project personnel's list construct the Target Enterprise first cooperation square Battle array;
The first cooperation degree of the Target Enterprise is calculated according to the first cooperation matrix.
It is described in one of the embodiments, that according to the target, project implementation and project personnel's list construct institute State the first cooperation matrix of Target Enterprise, comprising:
Obtain the management level list of the Target Enterprise;
According to the target, project implementation and project personnel's list determine the management level list and each mesh Mark the corresponding project participation of project implementation;
According to the target, project implementation and the management level list determine matrix layout, according to the project participation The first cooperation matrix is obtained with the matrix layout.
A kind of assets suggestion generating means, described device include:
Instruction acquisition module is seeked advice from, the consulting instruction of the Target Enterprise for receiving terminal transmission;
Management level analysis model obtains module, for obtaining pipe corresponding with the Target Enterprise according to consulting instruction Manage layer analysis model;
Resume information obtains module, and the first management level resume information and target for obtaining the Target Enterprise have executed Project;
Matrix constructs computing module, for cooperating matrix according to target project implementation building first, and calculates institute State the first cooperation degree of Target Enterprise;
Enterprise's score generation module, for each first management level resume information and first cooperation degree to be inputted institute It states management level analysis model and obtains Target Enterprise score;
Assets suggest generation module, for being built according to Target Enterprise score generation for the assets of the Target Enterprise It discusses and is sent to the terminal.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing The step of device realizes the above method when executing the computer program.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor The step of above method is realized when row.
Above-mentioned assets suggest generation method, device, computer equipment and storage medium, receive the Target Enterprise that terminal is sent Consulting instruction, corresponding with Target Enterprise management level analysis model is obtained according to consulting instruction, and obtain the of Target Enterprise One management level resume information according to the first management level resume information building the first cooperation matrix, and calculates the first of Target Enterprise Cooperation degree, by the way that each first management level resume information and the first cooperation degree input management layer analysis model are just obtained Target Enterprise Score, and then the assets suggestion for being directed to Target Enterprise can be provided according to Target Enterprise score, it not only takes one thing with another to pipe Influence of the ability of layer to enterprise development is managed, and the development of enterprise is prejudged according to its influence, to generate accurately money It produces and suggests, the efficiency of company is also determined by the cooperation degree between management level, appraiser is avoided to send out because information understanding is unilateral The case where production-goods, which produces, suggests mistake, reduces other people Asset Allocation failures.
Detailed description of the invention
Fig. 1 is the application scenario diagram that assets suggest generation method in one embodiment;
Fig. 2 is the flow diagram that assets suggest generation method in one embodiment;
Fig. 3 is the flow diagram of management level analysis model obtaining step in one embodiment;
Fig. 4 is the flow diagram of capacity index obtaining step in another embodiment;
Fig. 5 is the flow diagram of capacity index screening step in one embodiment;
Fig. 6 is the flow diagram of management level analysis model construction step in another embodiment;
Fig. 7 is the structural block diagram that assets suggest generating means in one embodiment;
Fig. 8 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Assets provided by the present application suggest generation method, can be applied in application environment as shown in Figure 1.Wherein, eventually End 102 is communicated by network with server 104.Wherein, terminal 102 can be, but not limited to be various personal computers, pen Remember that this computer, smart phone, tablet computer and portable intelligent device, server 104 can be with independent servers either The server cluster of multiple servers composition is realized.Terminal 102 obtains the consulting instruction of Target Enterprise, then instructs consulting It is uploaded to server 104, server 104 receives consulting instruction, instructs according to consulting and obtain management level analysis model.Server 104 instruct the first management level resume information for obtaining Target Enterprise and target project implementation according to consulting.104 basis of server Target the first cooperation matrix of project implementation building, and calculate the first cooperation degree of Target Enterprise.Server 104 is again by each first Management level resume information and the first cooperation degree input management layer analysis model obtain Target Enterprise score, and then server 104 can To generate the assets suggestion for being directed to Target Enterprise, and assets suggestion is sent to terminal 102, terminal 102 is built to assets are received View is shown.
In one embodiment, as shown in Fig. 2, providing a kind of assets suggestion generation method, it is applied to Fig. 1 in this way In server 104 for be illustrated, comprising the following steps:
Step 202, the consulting instruction for the Target Enterprise that terminal is sent is received.
Server 104 can receive the consulting instruction that terminal 102 is sent.Consulting instruction may include the enterprise of Target Enterprise Industry title also may include the enterprise name, industry, management level list of Target Enterprise etc. information associated with the query.Consulting Instruct the voice messaging that can be user and input in terminal 102, text information etc..The available user of terminal 102 input Voice messaging or text information, and identify that the consulting of Target Enterprise instructs according to voice messaging or text information.Terminal 102 Consulting instruction can be obtained according to the click action that user executes on the terminal 102.For example, user can use consulting APP During, speech identifying function is clicked, terminal 102 obtains the voice messaging of user's input and identifies consulting instruction;User Consulting webpage can also be opened, and clicks corresponding consulting input button on consulting webpage, terminal 102 is dynamic according to the click of user Make to obtain the text information inputted, and identifies consulting instruction.
Step 204, management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction.
Server 104 can be according to the name search management level analysis model of Target Enterprise in consulting instruction, can also root Management level analysis model is searched for according to the demand of user in consulting instruction.For example, consulting instruction includes title " the XX trade of Target Enterprise Yi company ", server 104 search model name and " XX trading company " name according to the title " XX trading company " of Target Enterprise Claim approximate " trade class management level analysis model ", and using the model as management level analysis model corresponding with Target Enterprise; Title of the consulting instruction comprising Target Enterprise and the demand of user, the demand of user is investment, and server 104 is according to user's need " investment " is asked to find " management of investment layer analysis model ", and using the model as management layer analysis mould corresponding with Target Enterprise Type.
Step 206, the first management level resume information and target project implementation of the Target Enterprise are obtained.
Server 104 can search for the first management level according to the Target Enterprise title in consulting instruction in enterprise database Resume information and target project implementation;Server 104 can also extract the first management level of Target Enterprise from consulting instruction Resume information and target project implementation.Server extracts the first management level resume information of all management level in Target Enterprise. First management level resume information includes the pedagogical experience of management level personnel, working experience, passing experience and states one's views.The One management level resume information embodies the profile of management level personnel with multi-angle from many aspects, passes through the individual to management level The depth of ability is excavated, it will be appreciated that the development prospect of Target Enterprise.
Target project implementation has been held or held comprising Target Enterprise various large-scale activities, targets in the industry Enterprise has completed or ongoing enterprise work project.Activity can be the exchange of technology communication meeting held by enterprise in the industry View etc., for example, the activity in the industry of XX science-and-technology enterprise can be that XX science-and-technology enterprise holds in the industry about " block chain new technology " Meeting is linked up in research and development.Enterprise work project is that project or enterprise's pioneering project are accepted by enterprise.For example, the enterprise of XX science-and-technology enterprise Job can be the ZZ project that XX science-and-technology enterprise is obtained from the competitive bidding of YY company, be also possible to XX science-and-technology enterprise independent research AA project.
Step 208, according to the target the first cooperation matrix of project implementation building, and the of the Target Enterprise is calculated One cooperation degree.
Server 104 can project implementation obtains destination item staff list according to target, analyzes destination item personnel List determines the project implementation number of each objective management layer, constructs column matrix or row matrix according to project implementation number, then calculate column The value of matrix or row matrix obtains the first cooperation degree of Target Enterprise.First cooperation degree not only can be in displaying target enterprise The ability of management level cooperative cooperating, can also show efficiency, the implementation capacity of enterprise, and side shows the prestige of company.
Step 210, each first management level resume information and first cooperation degree are inputted into the management layer analysis Model obtains Target Enterprise score.
Each first management level resume information of Target Enterprise and the input of the first cooperation degree are managed layer analysis mould by server 104 Type obtains Target Enterprise score.Management level analysis model can in advance according to the Enterprise Business Management State of sample companies, capacity index, Second management level ability information and the second cooperation degree carry out deep learning training and obtain.Server 104 can first refer to according to ability Mark extracts the first management level ability information from the first management level resume information, then according to capacity index by the first management level Ability information and the first cooperation degree input management layer analysis model obtain Target Enterprise score.
Step 212, the assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to institute State terminal.
Server 104 judges according to management level ability of the Target Enterprise score to Target Enterprise, and by its energy Power judges to generate the assets suggestion relevant to assets such as whether can be invested, be provided a loan to Target Enterprise.Server 104 can To generate assets suggestion according to demand, and assets suggestion is sent to terminal 102.Server 104 can first obtain score upper bound Value or score lower limit value, then Target Enterprise score is obtained, it is raw according to Target Enterprise score and score upper bound value or score lower limit value At assets suggestion;Server can also first obtain default suggestion score range, then obtain the Target Enterprise score, according to described Target Enterprise score and the default suggestion score range generate assets suggestion.When Target Enterprise score is high, server can be with Generate the assets suggestion of " it is recommended that investment or loan ";When Target Enterprise score is low, server be can be generated " it is recommended that recouping capital outlay Or loan " assets suggestion.For example, score upper bound value is 100 timesharing, service when the management level of Target Enterprise are scored at 90 points Device can be generated " Target Enterprise management level are scored at 90 points, and full marks are 100 points, and the development trend of Target Enterprise is good, it is proposed that The assets suggestion of loan " is sent to terminal 102.
Above-mentioned assets are suggested in generation method, are received the consulting instruction for the Target Enterprise that terminal is sent, are instructed according to consulting Corresponding with Target Enterprise management level analysis model is obtained, and obtains the first management level resume information of Target Enterprise, according to the One management level resume information building the first cooperation matrix, and the first cooperation degree of Target Enterprise is calculated, by the way that each first is managed Layer resume information and the first cooperation degree input management layer analysis model just obtain Target Enterprise score, and then can be looked forward to according to target Industry score provides the assets suggestion for being directed to Target Enterprise, shadow of the ability not only to take one thing with another to management level to enterprise development It rings, and the development of enterprise is prejudged according to its influence, so that accurate assets suggestion is generated, also by between management level Cooperation degree determines the efficiency of company, avoids appraiser that assets suggestion mistake occurs because information understanding is unilateral, reduces other people The case where Asset Allocation fails.
In one embodiment, as shown in figure 3, obtaining management corresponding with the Target Enterprise according to consulting instruction Layer analysis model, has follow steps:
Step 302, according to the consulting instruction obtains the second management level resume information of sample companies, sample has executed item Mesh and Enterprise Business Management State.
Server 104 instructs the second management level resume information for obtaining sample companies, sample project implementation according to consulting And Enterprise Business Management State.Sample companies can store in enterprise database.Enterprise database may include to be runed now Enterprise, stop operation enterprise and operation failure enterprise;Enterprise database, which also may include, does not occur business risk Enterprise and there is the enterprise of business risk.In order to reduce the difficulty of data acquisition, sample companies can containing it is all on City or the enterprise once listed.Second management level resume information of the not only current management level of available sample companies of server 104 And current enterprise management position, also the second management level resume information and history enterprise operation of available history management layer State.
Step 304, acquisition capability index is instructed according to the consulting.
Server 104 instructs acquisition capability index according to consulting, and capacity index can be stored in advance in capacity index library. Capacity index is extracted and is screened from the personal story of a large amount of talent's resume and management level, and expression pipe is substantially covered Manage the important indicator of layer profile.For example, capacity index can be " age, highest education degree, working time, part-time Number, integrity act, states one's views at working duration " etc..
Step 306, management level ability corresponding with the capacity index is extracted from the second management level resume information Information.
Server 104 extracts management level ability information corresponding with capacity index from the second management level resume information.The It age that two management level resume informations contain management level personnel, pedagogical experience, working experience, passing experience and states one's views Layer ability information is managed according to capacity index Deng, server 104 to extract, and establishes management level personnel, capacity index and pipe Manage the corresponding relationship of layer ability information.
Step 308, it according to the sample of each sample companies the second cooperation matrix of project implementation building, and calculates Second cooperation degree of each sample companies.
Server 104 can project implementation obtains sample items staff list according to sample, analyzes sample items personnel List determines the project implementation number of each sample management level, constructs column matrix or row matrix according to project implementation number, then calculate column The value of matrix or row matrix obtains the second cooperation degree of sample companies.
Step 310, according to the Enterprise Business Management State, the capacity index, the management level ability information and described Two cooperation degrees construct management level analysis model.
Server 104 is constructed according to Enterprise Business Management State, capacity index, management level ability information and the second cooperation degree and is managed Layer analysis model.When constructing management level analysis model, server 104 can be by the management of the management level personnel of same sample companies Layer ability information is overlapped, and the different superposition coefficient of different administrative staff can also be given according to different job, then root again Management level analysis model is constructed according to Enterprise Business Management State, capacity index management level ability information and the second cooperation degree.Server 104 Second management level ability information can be given a mark to obtain ability score value, then Enterprise Business Management State is given a mark to obtain enterprise point Value, then the functional relation between ability score value, the second cooperation degree and enterprise's score value is determined according to capacity index.For example, sample The Enterprise Business Management State of enterprise is to manage outstanding, the available corresponding score 90 of server 104, then obtain each second management level The corresponding ability score value of ability information, server are polynary primary further according to the building of ability score value, the second cooperation degree and enterprise's score value Equation determines the corresponding coefficient of each capacity index, and then determines management level analysis equation formula.
Server 104 can also give a mark to obtain ability score value to the second management level ability information, in conjunction in enterprise operation Related physical resources give a mark Enterprise Business Management State to obtain enterprise's score value, then determine ability point according to capacity index Functional relation between value, the second registration and enterprise's score value.Physical resources can be enterprises registration capital, working shop of enterprise valence Value, enterprise's sophisticated equipment value etc..For example, the Enterprise Business Management State of sample companies is that operation is outstanding, when the registration of sample companies When capital is 1,000,000 yuan, the available corresponding score 70 of server 104;When the registered capital of sample companies is 10,000,000 yuan When, the available corresponding score 80 of server 104;When the registered capital of sample companies is 100,000,000 yuan, server 104 can be with Obtain corresponding score 85.
In one embodiment, the second management level resume information for obtaining sample companies and enterprise is instructed to pass through according to consulting Battalion's state, has follow steps: the industry of the Target Enterprise is obtained according to the consulting instruction;According to the industry to sample Enterprise is screened;Obtain the Enterprise Business Management State and sample management layer list of the sample companies filtered out;Acquisition and institute State the corresponding second management level resume information of sample management layer list.
Server 104 can instruct the industry where obtaining Target Enterprise according to consulting, and according to industry to business data All sample companies in library are screened, and select enterprise relevant to Target Enterprise operation as modeling master data.Service Device 104 obtains the Enterprise Business Management State of all sample companies filtered out, sample project implementation and sample management layer list again, And then obtain the second management level resume information corresponding with sample management layer list.Sample management layer list can be only comprising current Management level list also may include current management level list and history management layer list.
Above-mentioned assets suggest screening sample companies in generation method according to the industry of Target Enterprise, avoiding because of row The difference of industry is influenced caused by profile's analysis model, the accuracy of profile's score is improved, so that final goal Enterprise's score is more representative.
In one embodiment, it as shown in figure 4, instructing acquisition capability index according to the consulting, has follow steps:
Step 402, it is instructed according to the consulting and obtains resume template.
Server 104 or terminal 102 are instructed according to consulting obtains resume template from history data library.Resume template It can be general blank resume template, be also possible to the curriculum vitae table of someone or certain people.
Step 404, the extract management layer analysis factor from the resume template.
Server 104 or terminal 102 analyze resume template, can be using title each in resume as management The layer analysis factor, can also be using the title being frequent in curriculum vitae table or noun as management level analysis factor, can also be with More parts of curriculum vitae tables are compared, lap is summarized, and using the word of summary as management level analysis factor. For example, server 104 can be by title " education experience, working experience, academic title, age, locating region, the class origin year of resume The moon, honor, punishment record, promise breaking record " etc. is used as management level analysis factors, can also will be frequent in resume " existing part-time, international study, once appointed post, stated one's views, increasing and decreasing the stock for holding Target Enterprise, industry at working experience of the same trade View " etc. is used as management level analysis factor;Can also according to by the comparison of more parts of curriculum vitae tables obtain " whether 1965 The generality words such as birth and business connection tightness of the same trade, part-time quantity before year " are as management level analysis factor.
Step 406, it obtains and the associated spreading factor of management level analysis factor.
Server 104 obtains associated spreading factor according to pre-defined rule according to management level analysis factor.Spreading factor can To be constantly extended according to management level analysis factor, until it can not be extended.Pre-defined rule may is that when word The semantic semantic similarity with management level analysis factor like when, then determine the word for spreading factor, such as management level analysis factor For legal punishment record, word is regulatory agency's punishment record, and the semanteme of two words is approximate, it is determined that regulatory agency punishes It is recorded as spreading factor;Pre-defined rule is also possible to: when the semanteme of word is opposite with the semanteme of management level analysis factor, then sentencing The fixed word is spreading factor, such as management level analysis factor is domestic work experience, and word is external work experience, two words The semanteme of language is on the contrary, determine that external work experience is spreading factor;Pre-defined rule is also possible to: when word includes management layer analysis Because of the period of the day from 11 p.m. to 1 a.m, then determine the word for spreading factor, such as management level analysis factor be risk, word is risk partiality, and risk is inclined Well containing risky, determine that risk partiality is spreading factor.
Step 408, the management level analysis factor and the spreading factor are screened to obtain capacity index.
Server 104 can be with the degree of correlation of the management of computing layer analysis factor and spreading factor and profile, according to correlation The factor of the size selection predetermined quantity of degree, can also be by trained screening model to management layer analysis as capacity index The factor and spreading factor are screened, and fan-out capability index.Screening model can be by calculating each factor and profile The degree of correlation and therefrom screening obtain capacity index, can also be calculated by regression model and export final capacity index.It returns Model can be Lasso regression model, elastomeric network regression model or ridge regression model etc..
Above-mentioned assets suggest in generation method that management level analysis factor and spreading factor be not preset, from It extracts and expands in different resumes.And spreading factor can be expanded infinitely according to management level analysis factor Exhibition, has not only enriched because of word bank, has been also prevented from because word bank data are very few, improved the final accuracy rate because of the factor in word bank.
In one embodiment, as shown in figure 5, screen to the management level analysis factor and the spreading factor To capacity index, have follow steps:
Step 502, sample personal information is obtained.
Server obtains sample personal information from sample demographic data library, and sample personal information can be with history data library In resume it is corresponding.Sample personal information may include the resume information of sample personnel.
Step 504, it is mentioned from each sample personal information according to the management level analysis factor and the spreading factor Take factor information.
Server 104 first according to management level analysis factor and spreading factor extracted respectively from each sample personal information because Sub-information.For example, factor information is according to the date of birth of sample personnel and currently when management level analysis factor is " age " Days calculated numerical value.When whether spreading factor is " being born before nineteen sixty-five ", factor information is server according to sample people Comparison result between the date of birth and nineteen sixty-five of member can use comparison result for the ease of subsequent machine learning training Numerical value " 0 " and " 1 " are distinguished.
Step 506, multi-variables analysis is carried out according to the factor information, obtains regression analysis model.
Server 104 can be using Principal Component Analysis, logistic regression analysis, multidimensional scale analysis, factorial analysis Method or logistic regression analysis etc. carry out multi-variables analysis to factor information, obtain regression analysis model.For example, server 104 use logistic regression analysis, y=1/ (1+e-z), wherein y is that server is preset according to sample personal information Value, codomain range are (0,1), z=β01×x12×x2+…+βn×xn, parameter x0~xnIt is used for regression analysis model Management level analysis factor and spreading factor.β0nFor the weight coefficient of management level analysis factor and spreading factor.Server according to Management level analysis factor and spreading factor construct multiple and different equations, first filter out the most wide equation of applicability, and make The weight coefficient value of each parameter in equation is determined with maximum likelihood method.
Step 508, by the parameter extraction used in the regression analysis model for capacity index.
Server 104 can be by all parameter extractions used in regression analysis model for capacity index, and ability is referred to Mark is stored in capacity index library.The weight coefficient value of the also available each parameter of server 104 obtains predetermined coefficient threshold value, It is capacity index by the parameter extraction that weight coefficient value is greater than predetermined coefficient threshold value.
In subsequent builds management level analysis model, server can obtain each sample companies using regression analysis model Management level personnel's score, and must be got according to the post information and management level personnel of each management level personnel in sample companies To personnel's score total score of sample companies, so it is more according to personnel's score total score of sample companies and the building of the second cooperation degree First equation obtains management level analysis model.
Suggest in generation method in above-mentioned assets, management level analysis factor and spreading factor are carried out using multi-variables analysis Screening, can filter out with the maximally related management level analysis factor of sample personnel ability and spreading factor, and obtain as from become The management level analysis factor of amount and the weight coefficient value of spreading factor, while can be according to independent variable meter according to the weight coefficient value Calculation obtains the ability score value of a people.
In one embodiment, as shown in fig. 6, according to the Enterprise Business Management State, the capacity index, the management level Ability information and second cooperation degree construct management level analysis model, comprising:
Step 602, it gives a mark to each management level ability information corresponding with each capacity index, obtains index Ability score.
Server 104 determines that each ability refers to by algorithm of giving a mark to each management level ability information corresponding with each capacity index Target score.Marking algorithm can be Palmer-Wu similarity score method, cluster branch mailbox algorithm, minimum entropy branch mailbox algorithm, area Between scale algorithm in any one to multiple kind.Then server 104 obtains each management level ability information and each according to marking algorithm The corresponding index ability score of capacity index.When algorithm of giving a mark uses a variety of, server is first respectively obtained using algorithms of different Each management level ability information score corresponding with each capacity index, then different weight coefficients, Jin Erji are given to algorithms of different Calculate each management level ability information and each capacity index finally corresponding capacity index score.
Step 604, classify to the capacity index.
Server 104 classifies capacity index, and capacity index can be divided into " team structure, senior executive's speech, company 3 classes such as performance ".Server 104 can classify according to the degree of association between capacity index, can also use sorting algorithm pair Capacity index is classified.Sorting algorithm can be algorithm of support vector machine, neural network algorithm, particle swarm algorithm or depth Practise algorithm etc..
Step 606, all kinds of classification is obtained according to all kinds of each capacity indexes and the index ability score to comment Point.
Server 104 integrate training according to all kinds of capacity indexes and index ability score and generates each class now Classification scoring.Server can also directly acquire weight coefficient of each capacity index in regression analysis model, calculate and each The corresponding classification scoring of classification.
Step 608, according to the Enterprise Business Management State, classification scoring and second cooperation degree building management level point Analyse model.
Server 104 carries out integrating training building management level according to Enterprise Business Management State, classification scoring and the second cooperation degree Analysis model.Server can give a mark Enterprise Business Management State to obtain enterprise's score value, score further according to enterprise's score value, classification Multi head linear equation formula is constructed with the second cooperation degree, corresponding coefficient of all categories is determined, obtains management level analysis equation formula.
Above-mentioned assets suggest determining the management level ability information score of each capacity index, and refer to ability in generation method Mark is classified, and can be accelerated the speed for constructing model, quickly be provided counseling services for user.
In one embodiment, according to the target the first cooperation matrix of project implementation building, and the target is calculated First cooperation degree of enterprise, comprising: project implementation obtains project personnel's list according to each target;According to the target Project implementation and project personnel's list construct the first cooperation matrix of the Target Enterprise;According to the first cooperation matrix Calculate the first cooperation degree of the Target Enterprise.
According to target, project implementation obtains project personnel's list of project implementation, each target enterprise to server 104 respectively Industry can have one or more target project implementation, and project personnel's list of different project implementations may change.No Participating in responsible project with management level personnel will not be completely the same.Server can be according to target project implementation and project personnel List constructs the first cooperation matrix of Target Enterprise, and the first cooperation of the Target Enterprise is calculated further according to the first cooperation matrix Degree.
In one embodiment, according to the target, project implementation and project personnel's list construct the target enterprise First cooperation matrix of industry, comprising: obtain the management level list of the Target Enterprise;According to the target project implementation and institute It states project personnel's list and determines the management level list and each target corresponding project participation of project implementation;According to institute Stating target, project implementation and the management level list determine matrix layout, according to the project participation and the matrix layout Obtain the first cooperation matrix.
Server 104 obtains the management level list of Target Enterprise, and according to target, project implementation and project personnel's list are true Determine management level list and each target corresponding project participation of project implementation.Project participation can be according to each administrator Member's leading role played in target project implementation, participation time, technical support etc. determine.Server is according to the target Project implementation and the management level list determine matrix layout, are configured for example, row can be according to management level list, File can be that project implementation is configured according to target, server input management level in corresponding position in matrix layout Project participation obtains the first cooperation matrix.
Suggest in generation method in above-mentioned assets, not only considers the project implementation quantity that management level participate in, it is also contemplated that every Participation of a management level in each project, thus it is rationally accurate by calculating the first participation that the first cooperation matrix obtains Ground shows each mutual cooperative relationship of management level in Target Enterprise.
It should be understood that although each step in the flow chart of Fig. 2-6 is successively shown according to the instruction of arrow, These steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-6 Part steps may include that perhaps these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively It carries out, but can be at least part of the sub-step or stage of other steps or other steps in turn or alternately It executes.
In one embodiment, as shown in fig. 7, providing a kind of assets suggestion generating means, comprising: consulting instruction obtains Module 702, management level analysis model obtain module 704, resume information obtains module 706, matrix building computing module 708, enterprise Industry score generation module 710 and assets suggest generation module 712, in which:
Instruction acquisition module 702 is seeked advice from, the consulting instruction of the Target Enterprise for receiving terminal transmission.
Management level analysis model obtains module 704, corresponding with the Target Enterprise for being obtained according to consulting instruction Management level analysis model.
Resume information obtains module 706, and the first management level resume information and target for obtaining the Target Enterprise are Project implementation.
Matrix constructs computing module 708, for cooperating matrix according to target project implementation building first, and calculates First cooperation degree of the Target Enterprise.
Enterprise's score generation module 710, for each first management level resume information and first cooperation degree is defeated Enter the management level analysis model and obtains Target Enterprise score.
Assets suggest generation module 712, for generating the money for being directed to the Target Enterprise according to the Target Enterprise score It produces and suggests and be sent to the terminal.
In another embodiment, it includes sample companies information acquisition unit, ability that management level analysis model, which obtains module 704, Index selection unit, ability information extraction unit, cooperation degree computing unit and model construction unit, in which:
Sample companies information acquisition unit, for obtaining the second management level resume of sample companies according to the consulting instruction Information, sample project implementation and Enterprise Business Management State.
Capacity index acquiring unit, for instructing acquisition capability index according to the consulting.
Ability information extraction unit, it is corresponding with the capacity index for being extracted from the second management level resume information Management level ability information.
Cooperation degree computing unit, for according to the second cooperation of project implementation building of the sample of each sample companies Matrix, and calculate the second cooperation degree of each sample companies.
Model construction unit, for according to the Enterprise Business Management State, the capacity index, the management level ability information Management level analysis model is constructed with second cooperation degree.
In another embodiment, it further includes resume template acquiring unit, management that management level analysis model, which obtains module 704, Layer analysis factor extraction unit, spreading factor acquiring unit and capacity index screening unit, in which:
Resume template acquiring unit obtains resume template for instructing according to the consulting.
Management level analysis factor extraction unit, for the extract management layer analysis factor from the resume template.
Spreading factor acquiring unit, for obtaining and the associated spreading factor of management level analysis factor.
Capacity index screening unit, for being screened to obtain energy to the management level analysis factor and the spreading factor Power index.
In another embodiment, management level analysis model obtain module 704 further include sample personal information acquiring unit, because Sub-information extraction unit, regression analysis model construction unit and index extraction unit, in which:
Sample personal information acquiring unit, for obtaining sample personal information.
Factor information extraction unit, for according to the management level analysis factor and the spreading factor from each sample Extraction factor information in personal information.
Regression analysis model construction unit obtains regression analysis for carrying out multi-variables analysis according to the factor information Model.
Index extraction unit, the parameter extraction for will use in the regression analysis model is capacity index.
In some embodiments, it further includes index marking unit, index classification list that management level analysis model, which obtains module 704, Member, classification scoring computing unit and analysis model construction unit, in which:
Index is given a mark unit, for beating each management level ability information corresponding with each capacity index Point, obtain index ability score.
Index classification unit, for classifying to the capacity index.
Classification scoring computing unit, for being obtained according to all kinds of each capacity indexes and the index ability score All kinds of classification scorings.
Analysis model construction unit, for according to the Enterprise Business Management State, classification scoring and second cooperation Degree building management level analysis model.
In one embodiment, matrix building computing module 708 further includes staff list acquiring unit, cooperation matrix building list Member and matrix calculation unit, in which:
Staff list acquiring unit, for project implementation to obtain project personnel's list according to each target.
Cooperate matrix construction unit, for according to the target project implementation and project personnel's list building described in First cooperation matrix of Target Enterprise.
Matrix calculation unit, for calculating the first cooperation degree of the Target Enterprise according to the first cooperation matrix.
In another embodiment, matrix building computing module 708 further includes management level list acquiring unit, project participation Determination unit and cooperation matrix construction unit, in which:
Management level list acquiring unit, for obtaining the management level list of the Target Enterprise.
Project participation determination unit, for project implementation and project personnel's list to determine institute according to the target State management level list and each target corresponding project participation of project implementation.
Cooperate matrix construction unit, for project implementation and the management level list to determine matrix cloth according to the target Office, obtains the first cooperation matrix according to the project participation and the matrix layout.
Suggest that the specific of generating means limits the limit that may refer to suggest generation method above for assets about assets Fixed, details are not described herein.Above-mentioned assets suggest the modules in generating means can fully or partially through software, hardware and its Combination is to realize.Above-mentioned each module can be embedded in the form of hardware or independently of in the processor in computer equipment, can also be with It is stored in the memory in computer equipment in a software form, in order to which processor calls the above modules of execution corresponding Operation.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction Composition can be as shown in Figure 8.The computer equipment include by system bus connect processor, memory, network interface and Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating The database of machine equipment generates data for storing assets suggestion, and database may include multiple subdata bases, such as management level Analysis model database, enterprise database, history data library and capacity index database etc..The network interface of the computer equipment For being communicated with external terminal by network connection.To realize a kind of assets suggestion when the computer program is executed by processor Generation method.
It will be understood by those skilled in the art that structure shown in Fig. 8, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, which is stored with Computer program, the processor perform the steps of when executing computer program
Receive the consulting instruction for the Target Enterprise that terminal is sent;
Management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction;
Obtain the first management level resume information and target project implementation of the Target Enterprise;
According to the target the first cooperation matrix of project implementation building, and calculate the first cooperation of the Target Enterprise Degree;
Each first management level resume information and first cooperation degree are inputted the management level analysis model to obtain Target Enterprise score;
The assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to the terminal.
In one embodiment, it realizes when processor executes computer program and is obtained and the mesh according to consulting instruction It when marking the step of the corresponding management level analysis model of enterprise, is also used to: obtaining the second of sample companies according to the consulting instruction Management level resume information, sample project implementation and Enterprise Business Management State;Acquisition capability index is instructed according to the consulting;From institute It states and extracts management level ability information corresponding with the capacity index in the second management level resume information;It is looked forward to according to each sample The sample of industry the second cooperation matrix of project implementation building, and calculate the second cooperation degree of each sample companies;According to The Enterprise Business Management State, the capacity index, the management level ability information and second cooperation degree building management level point Analyse model.
In one embodiment, it is realized when processor executes computer program and acquisition capability index is instructed according to the consulting Step when, be also used to: according to the consulting instruct obtain resume template;The extract management layer point from the resume template Factorial;It obtains and the associated spreading factor of management level analysis factor;To the management level analysis factor and the extension The factor is screened to obtain capacity index.
In one embodiment, it realizes when processor executes computer program to the management level analysis factor and the expansion It when the exhibition factor is screened to obtain the step of capacity index, is also used to: obtaining sample personal information;According to the management layer analysis The factor and the spreading factor extraction factor information from each sample personal information;It is carried out according to the factor information changeable Amount analysis, obtains regression analysis model;By the parameter extraction used in the regression analysis model for capacity index.
In one embodiment, it realizes when processor executes computer program according to the Enterprise Business Management State, the energy When the step of power index, the management level ability information and second cooperation degree building management level analysis model, it is also used to: right Each management level ability information corresponding with each capacity index is given a mark, and index ability score is obtained;To the energy Power index is classified;All kinds of classification is obtained according to all kinds of each capacity indexes and the index ability score to comment Point;Management level analysis model is constructed according to the Enterprise Business Management State, classification scoring and second cooperation degree.
In one embodiment, it is realized when processor executes computer program according to target project implementation building the One cooperation matrix, and when calculating the step of the first cooperation degree of the Target Enterprise, it is also used to: having been executed according to each target Project obtains project personnel's list;According to the target, project implementation and project personnel's list construct the Target Enterprise First cooperation matrix;The first cooperation degree of the Target Enterprise is calculated according to the first cooperation matrix.
In one embodiment, it is realized when processor executes computer program according to target project implementation and described When project personnel's list constructs the step of the first cooperation matrix of the Target Enterprise, it is also used to: obtains the Target Enterprise Management level list;According to the target project implementation and project personnel's list determine the management level list with it is each described The target corresponding project participation of project implementation;According to the target, project implementation and the management level list determine matrix Layout, obtains the first cooperation matrix according to the project participation and the matrix layout.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor
Receive the consulting instruction for the Target Enterprise that terminal is sent;
Management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction;
Obtain the first management level resume information and target project implementation of the Target Enterprise;
According to the target the first cooperation matrix of project implementation building, and calculate the first cooperation of the Target Enterprise Degree;
Each first management level resume information and first cooperation degree are inputted the management level analysis model to obtain Target Enterprise score;
The assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to the terminal.
In one embodiment, computer program realize when being executed by processor according to consulting instruction acquisition with it is described It is also used to when the step of the corresponding management level analysis model of Target Enterprise: obtaining the second of sample companies according to the consulting instruction Management level resume information, sample project implementation and Enterprise Business Management State;Acquisition capability index is instructed according to the consulting;From institute It states and extracts management level ability information corresponding with the capacity index in the second management level resume information;It is looked forward to according to each sample The sample of industry the second cooperation matrix of project implementation building, and calculate the second cooperation degree of each sample companies;According to The Enterprise Business Management State, the capacity index, the management level ability information and second cooperation degree building management level point Analyse model.
In one embodiment, realize when computer program is executed by processor instructs acquisition capability to refer to according to the consulting It is also used to when target step: being instructed according to the consulting and obtain resume template;The extract management layer from the resume template Analysis factor;It obtains and the associated spreading factor of management level analysis factor;To the management level analysis factor and the expansion The exhibition factor is screened to obtain capacity index.
In one embodiment, computer program is realized when being executed by processor to the management level analysis factor and described Spreading factor is screened to be also used to when obtaining the step of capacity index: obtaining sample personal information;According to the management level point Factorial and the spreading factor extraction factor information from each sample personal information;It is carried out according to the factor information more Variable analysis obtains regression analysis model;By the parameter extraction used in the regression analysis model for capacity index.
In one embodiment, computer program is realized when being executed by processor according to the Enterprise Business Management State, described It is also used to when the step of capacity index, the management level ability information and second cooperation degree building management level analysis model: It gives a mark to each management level ability information corresponding with each capacity index, obtains index ability score;To described Capacity index is classified;All kinds of classification is obtained according to all kinds of each capacity indexes and the index ability score to comment Point;Management level analysis model is constructed according to the Enterprise Business Management State, classification scoring and second cooperation degree.
In one embodiment, realize that project implementation constructs according to the target when computer program is executed by processor First cooperation matrix, and calculate the Target Enterprise the first cooperation degree step when be also used to: held according to each target Row project obtains project personnel's list;According to the target, project implementation and project personnel's list construct the target enterprise First cooperation matrix of industry;The first cooperation degree of the Target Enterprise is calculated according to the first cooperation matrix.
In one embodiment, computer program is realized when being executed by processor according to the target project implementation and institute It is also used to when stating the step for the first cooperation matrix that project personnel's list constructs the Target Enterprise: obtaining the Target Enterprise Management level list;According to the target project implementation and project personnel's list determine the management level list with it is each described The target corresponding project participation of project implementation;According to the target, project implementation and the management level list determine matrix Layout, obtains the first cooperation matrix according to the project participation and the matrix layout.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.

Claims (10)

1. a kind of assets suggest generation method, which comprises
Receive the consulting instruction for the Target Enterprise that terminal is sent;
Management level analysis model corresponding with the Target Enterprise is obtained according to consulting instruction;
Obtain the first management level resume information and target project implementation of the Target Enterprise;
According to the target the first cooperation matrix of project implementation building, and calculate the first cooperation degree of the Target Enterprise;
Each first management level resume information and first cooperation degree are inputted into the management level analysis model and obtain target Enterprise's score;
The assets suggestion for the Target Enterprise is generated according to the Target Enterprise score and is sent to the terminal.
2. the method according to claim 1, wherein described obtained according to consulting instruction is looked forward to the target The corresponding management level analysis model of industry, comprising:
The second management level resume information of sample companies, sample project implementation and enterprise operation are obtained according to the consulting instruction State;
Acquisition capability index is instructed according to the consulting;
Management level ability information corresponding with the capacity index is extracted from the second management level resume information;
According to the sample of each sample companies the second cooperation matrix of project implementation building, and calculate each sample enterprise Second cooperation degree of industry;
It is constructed according to the Enterprise Business Management State, the capacity index, the management level ability information and second cooperation degree Management level analysis model.
3. according to the method described in claim 2, it is characterized in that, described instruct acquisition capability index, packet according to the consulting It includes:
It is instructed according to the consulting and obtains resume template;
The extract management layer analysis factor from the resume template;
It obtains and the associated spreading factor of management level analysis factor;
The management level analysis factor and the spreading factor are screened to obtain capacity index.
4. according to the method described in claim 3, it is characterized in that, it is described to the management level analysis factor and the extension because Son is screened to obtain capacity index, comprising:
Obtain sample personal information;
According to the management level analysis factor and the spreading factor from each sample personal information extraction factor information;
Multi-variables analysis is carried out according to the factor information, obtains regression analysis model;
By the parameter extraction used in the regression analysis model for capacity index.
5. according to the method described in claim 2, it is characterized in that, described refer to according to the Enterprise Business Management State, the ability Mark, the management level ability information and second cooperation degree construct management level analysis model, comprising:
It gives a mark to each management level ability information corresponding with each capacity index, obtains index ability score;
Classify to the capacity index;
All kinds of classification scorings is obtained according to all kinds of each capacity indexes and the index ability score;
Management level analysis model is constructed according to the Enterprise Business Management State, classification scoring and second cooperation degree.
6. the method according to claim 1, wherein described close according to target project implementation building first Make matrix, and calculate the first cooperation degree of the Target Enterprise, comprising:
According to each target, project implementation obtains project personnel's list;
According to the target project implementation and project personnel's list construct the Target Enterprise first cooperation matrix;
The first cooperation degree of the Target Enterprise is calculated according to the first cooperation matrix.
7. according to the method described in claim 6, it is characterized in that, described according to the target project implementation and the project Staff list constructs the first cooperation matrix of the Target Enterprise, comprising:
Obtain the management level list of the Target Enterprise;
According to the target, project implementation and project personnel's list have determined the management level list and each target The corresponding project participation of project implementation;
According to the target, project implementation and the management level list determine matrix layout, according to the project participation and institute It states matrix layout and obtains the first cooperation matrix.
8. a kind of assets suggest generating means, which is characterized in that described device includes:
Instruction acquisition module is seeked advice from, the consulting instruction of the Target Enterprise for receiving terminal transmission;
Management level analysis model obtains module, for obtaining management level corresponding with the Target Enterprise according to consulting instruction Analysis model;
Resume information obtains module, and the first management level resume information and target for obtaining the Target Enterprise have executed item Mesh;
Matrix constructs computing module, for cooperating matrix according to target project implementation building first, and calculates the mesh Mark the first cooperation degree of enterprise;
Enterprise's score generation module, for each first management level resume information and first cooperation degree to be inputted the pipe Reason layer analysis model obtains Target Enterprise score;
Assets suggest generation module, for being directed to the assets suggestion of the Target Enterprise simultaneously according to Target Enterprise score generation It is sent to the terminal.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 7 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any one of claims 1 to 7 is realized when being executed by processor.
CN201910082344.4A 2019-01-28 2019-01-28 Assets suggest generation method, device, computer equipment and storage medium Pending CN109872188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910082344.4A CN109872188A (en) 2019-01-28 2019-01-28 Assets suggest generation method, device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910082344.4A CN109872188A (en) 2019-01-28 2019-01-28 Assets suggest generation method, device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN109872188A true CN109872188A (en) 2019-06-11

Family

ID=66918170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910082344.4A Pending CN109872188A (en) 2019-01-28 2019-01-28 Assets suggest generation method, device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109872188A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222097A (en) * 2019-06-18 2019-09-10 北京百度网讯科技有限公司 Method and apparatus for generating information
CN110415094A (en) * 2019-06-18 2019-11-05 重庆金融资产交易所有限责任公司 Asset-liabilities intelligent management, device and computer readable storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222097A (en) * 2019-06-18 2019-09-10 北京百度网讯科技有限公司 Method and apparatus for generating information
CN110415094A (en) * 2019-06-18 2019-11-05 重庆金融资产交易所有限责任公司 Asset-liabilities intelligent management, device and computer readable storage medium

Similar Documents

Publication Publication Date Title
Thangavel et al. Student placement analyzer: A recommendation system using machine learning
Tsolas Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis
Lemire et al. The growth of the evaluation tree in the policy analysis forest: Recent developments in evaluation
Seebacher Predictive intelligence for data-driven managers
O'Shannassy Investigating the role of middle managers in strategy-making process: An Australian mixed method study
Yamada Can a rentier state evolve to a production state? An ‘institutional upgrading’approach
Hume et al. Becoming a data-driven decision making organization
CN110110886A (en) Information forecasting method, device, computer equipment and storage medium
Morioka et al. Systematic review of the literature on corporate sustainability performance measurement: a discussion of contributions and gaps
CN109872188A (en) Assets suggest generation method, device, computer equipment and storage medium
Rodriguez et al. Before and after modelling: Risk knowledge management is required
Beigi et al. A framework for firm performance under the influence of knowledge management and dynamic capabilities: examining the mediating role of sustainable competitive advantage
Colapinto et al. Goal programming for financial portfolio management: a state-of-the-art review
Tenney et al. Development of a strategic roadmap framework for nonprofit organizations: Literature review
Halbwirth et al. Information, knowledge and the organization of the Olympic Games
Bandara et al. An empirical analysis of Sri Lanka's Manufacturing Productivity slow-down
Adebowale et al. Determinants of productivity and inter-firm collaboration in Nigerian clusters
Guadalupe Behavioral economics: A state of the art matrix analysis
Vizcaíno-González et al. Selecting explanatory factors of voting decisions by means of fsQCA and ANN
CN109872053A (en) Assets suggest generation method, device, computer equipment and storage medium
Augenstein et al. Towards Value Proposition Mining" Exploration of Design Principles.
CN109902932A (en) Assets suggest generation method, device, computer equipment and storage medium
Metszősy Investigating the Process of Social Innovation–A Social Learning Based Approach
Khalyasmaa et al. Performance analysis of scientific and technical solutions evaluation based on machine learning
Potoczek Improving business processes and process organization from the Industry 4.0 perspective

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190611