CN109869788A - Big temperature difference heat-exchanger rig - Google Patents

Big temperature difference heat-exchanger rig Download PDF

Info

Publication number
CN109869788A
CN109869788A CN201711302969.4A CN201711302969A CN109869788A CN 109869788 A CN109869788 A CN 109869788A CN 201711302969 A CN201711302969 A CN 201711302969A CN 109869788 A CN109869788 A CN 109869788A
Authority
CN
China
Prior art keywords
water
steam
temperature
heat
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711302969.4A
Other languages
Chinese (zh)
Inventor
李伟
李金峰
尚德敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIT (HARBIN INSTITUTE OF TECHNOLOGY) KINT TECHNOLOGY Co Ltd
Original Assignee
HIT (HARBIN INSTITUTE OF TECHNOLOGY) KINT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIT (HARBIN INSTITUTE OF TECHNOLOGY) KINT TECHNOLOGY Co Ltd filed Critical HIT (HARBIN INSTITUTE OF TECHNOLOGY) KINT TECHNOLOGY Co Ltd
Priority to CN201711302969.4A priority Critical patent/CN109869788A/en
Publication of CN109869788A publication Critical patent/CN109869788A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The present invention provides a kind of big temperature difference heat-exchanger rig, and heat supply network high-temperature-hot-water enters after high-temperature evaporator heat release becomes middle warm water, continues heat release into cryogenic vaporizer and becomes low-temperature water heating, low-temperature water heating returns to heat supply network water return pipeline;High-temperature-hot-water flows outside heat exchanger tube from top to bottom in high-temperature evaporator, and heating agent water evaporation generates steam in heat exchanger tube;Low-temperature water heating horizontally flows heat release in heat exchanger tube in cryogenic vaporizer, and the heat medium water outside heat exchanger tube is generated steam by thermal evaporation;There is a steam jet ejector, high-temperature evaporator generates steam as driving steam, and for the steam that cryogenic vaporizer generates as sucking steam, the steam that steam jet ejector outlet sprays enters condenser.The condensed water that condenser generates, a part enter cryogenic vaporizer by throttle valve, and another part enters high-temperature evaporator by water pump pressurization;It is heated to heating circulation water the other side of condenser;The steam condensation side lower part of condenser is equipped with a vacuum pumping opening.

Description

Big temperature difference heat-exchanger rig
Technical field
The present invention relates to heat power engineerings, more particularly to a kind of big temperature difference heat-exchanger rig.
Background technique
In recent years, with the continuous development of China's urban construction, the contradiction between regional development and heat demand is also increasingly It highlights.All city cities area is all constantly expanding, and main city zone scale cell is continuously increased, and old town substantially increases newly every year Area, the area of Xincheng District also constantly expand.From the heat source and heat supply network heat capacity of current city, it much can not meet city The needs of city's fast development.If heat supply is not caught up with, it will urban development is made to meet with bottleneck.
To solve this concerning the contradiction of urban development and common people's vital interests, various regions generally start centralized heating project Construction increases area of heat-supply service newly, increases construction investment newly.Specifically include newly-built pipe-networks engineering, the old net improvement project in part, newly-built relaying Pumping plant, the control centre Ji Kong create heat exchange station and heat exchange station improvement project etc..
Heat supply improvement project is divided into heat source side and heat supply network side.
Heat source side generally comprises unit heat supply transformation and heat supply initial station construction project, specially power plant and power & light company are new Increase networking area of heat-supply service, Xincheng District boiler room heat supply network area of heat-supply service, district heating company heat supply network area of heat-supply service etc..
Heat supply network side is mainly that the pipeline to extend service in the army to old town is replaced, and can effectively be controlled after heat supply pipeline replacement Evaporating, emitting, dripping or leaking of liquid or gas processed stops hot number, greatly improves heating effect caused by greatly reducing because of tube leaks.
Central heating is realized in nineteen eighty-three September in certain old town, and pipe network has been run 27 years so far.Through measuring, 1985 10mm when the old pipe network caliber of year installation by installing originally is thinned to 4-6mm, and severe local corrosion, and passes through in heat supply period Often there is leakage event.Heating network section of tubing has extended service in the army, and often occurs tube leaks phenomenon during heat supply, causes Heating quality decline.If without transformation, once occur tube leaks, must stage stop heat, this can make resident living At very big influence.Power & light company's investment is transformed old town heating network, replaces all pipelines being thinned and corrode, changes About 5 kilometers of range pipe network overall length are made, 570,000 square meter area of heat-supply service are related to, is roughly equal to 5000 family of user, is injected capital into 17,000,000 yuan.Work After the completion of journey transformation, the stability of the district heating quality and heat supply is greatly improved.By pipe network improving, main city zone heat source fills Foot, is able to bear the normal heat supply of resident, retail shop and enterprise.
Most of certain power plant's heat supply main pipeline network construction service life, some was even up to 30 years all at 18 years or more.This portion It is in charge of net since building time is long, along with construction period technical matters falls behind, until making heat preservation, protective layer serious damage, pipe network Aging, seriously corroded.In recent years, supervisor's net leakage accident frequently occurred, and each runtime occurs tens times.In every submain During net repairing, repair personnel all suffers from the threat of 95 DEG C or more high pressures, high-temperature water, and repairing sluices all small up to more than 30 every time When, cause large area residential building to stop heat, the serious situation of part underground pipe network bursting by freezing.Existing in terms of central heating secondary network Problem is also more prominent, especially early stage building and pipe abandon arcola room heat supply building grid-connected in recent years, pipe network aging corrosion As many as the weight of degree, quantity have seriously threatened city heat supply safety and have influenced the normal life of resident.
Certain 666 kilometers of heat supply group heating network length, wherein primary net is 165 kilometers long, secondary network is 501 kilometers long. About 400 kilometers of construction before 1995.Since most of pipeline network construction times are long, aging seriously corroded, cause pipe network system Evaporating, emitting, dripping or leaking of liquid or gas is extremely serious, and radiation loss reaches 0.35 giggio/square metre year.Every kilometer of heat distribution pipe network average temperature drop is all 2 DEG C or more, the pipe network system percentage of water loss that is averaged is about 3%.Since fluid loss is big, heat is lost seriously, almost all of primary net, The hydraulic misadjustment problem of secondary network all various degrees, since pipe network aging is adjusted without forensic science again, heating enterprise In the heating quality for hankering being difficult to ensure user.
In decades, central heating cause is that the development construction in China city and the raising of living standards of the people are made that weight Big contribution.Nowadays the central heating network aging of large area, seriously corroded have become the outstanding problem for influencing central heating, sternly Threaten again city for thermally safe and common people's normal life.
Implementing central heating network transformation has been to carry out the task of top priority of city heat supply work.It can be significantly by pipe network improving The evaporating, emitting, dripping or leaking of liquid or gas of pipe network is reduced, reduction energy consumption is energy saving, improves energy utilization rate;Heat supply can be made to look forward to by pipe network improving Sparetime university's amount uses of the new technology, new process, improves the scientific regulating power of heating enterprise, it is horizontal to improve whole heat supply;Pass through pipe network Transformation can General Promotion heating system safety and heat supply supportability, the use thermal mass of numerous residents is continuously improved, benefits The common people.Implementing central heating network transformation is the act benefited the nation and the people, early to implement early be benefited.
Implement central heating network improvement project, emphasis is exactly to remove waste and old heat supply pipeline, is laid with the new pipeline of heat supply, this is needed Put into huge fund.How to accomplish using existing pipeline, or less or thinner pipeline can be laid with, only spends less Investment, equally can achieve the heating load of needs? this is design and construction scientific worker the problem of often thinking deeply.
Summary of the invention
For creating or old heating network being transformed, solve the problems, such as that the generally existing heating load of heating network is insufficient, this Invention provide it is a kind of can reduce heat supply network return water temperature, to increase the big temperature difference heat-exchanger rig of heating network heating load.
A kind of big temperature difference heat-exchanger rig, its structure include: the high-temperature evaporator in left side, the condenser on right side, middle and lower part Cryogenic vaporizer, valve, water pump and some connecting lines;
Heat supply network high-temperature-hot-water enters after high-temperature evaporator heat release becomes middle warm water, continues heat release into cryogenic vaporizer and becomes At low-temperature water heating, low-temperature water heating returns to heat supply network water return pipeline;
High-temperature evaporator is the shell and tube exchanger stood up, and high-temperature-hot-water is flowed outside heat exchanger tube from top to bottom, changed Heat pipe internal heating matchmaker's water evaporation generates steam and exports from high-temperature evaporator upper steam and flows out;
Cryogenic vaporizer is a horizontal shell and tube exchanger, and low-temperature water heating horizontally flows heat release in heat exchanger tube, By thermal evaporation, steam flows out heat medium water outside heat exchanger tube from top venthole;
The condensed water that condenser generates, a part enter cryogenic vaporizer by throttle valve, and another part is added by water pump It is pressed into high-temperature evaporator;It is heated to heating circulation water the other side of condenser;The steam condensation side lower part of condenser is equipped with one A vacuum pumping opening.
The big temperature difference heat-exchanger rig, its structure further include a steam jet ejector, and high-temperature evaporator generates steam and makees To drive steam, into steam jet ejector, the steam that cryogenic vaporizer generates enters the suction chamber of steam jet ejector, steam injection The steam that device outlet sprays enters condenser.
Detailed description of the invention
Fig. 1 is the overall pattern of big temperature difference heat-exchanger rig embodiment of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, present invention is further described in detail.
Fig. 1 gives the overall pattern of big temperature difference heat-exchanger rig embodiment of the invention.
The overall structure of the big temperature difference heat-exchanger rig embodiment of the present invention, its construction include: high-temperature evaporator 100, low temperature Evaporator 400, condenser 300, steam jet ejector 200, several valves, water pump and some connecting lines.In shape, from a left side to The right side is divided into four bulks: 1, vertical high-temperature evaporator 100;2, horizontal cryogenic vaporizer 400;3, vertical condenser 300, 4, steam jet ejector 200, it is horizontally disposed between high-temperature evaporator 100, cryogenic vaporizer 400 and condenser 300.
Its workflow is
1, the high-temperature-hot-water of waterpipe is carried out from heating network, is flowed into from heat supply network water inlet 101, into high-temperature evaporator 100;
2, high-temperature evaporator 100 is a shell and tube exchanger, high-temperature-hot-water in the shell of high-temperature evaporator 100, by Top to bottm flows outside heat exchanger tube, heating agent water evaporation in heat exchanger tube, generates steam from 100 upper steam outlet stream of high-temperature evaporator Out, as driving steam, into steam jet ejector 200;
3, high-temperature-hot-water after flowing heat release from top to bottom, becomes low-temperature water heating, from height in 100 shell of high-temperature evaporator The lower part of the housing side exit of warm evaporator 100 flows out, into cryogenic vaporizer 400;
4, cryogenic vaporizer 400 is a shell and tube exchanger, and low-temperature water heating flows in the heat exchanger tube of cryogenic vaporizer 400 Dynamic heat release, delivers heat to the heat medium water outside heat exchanger tube, after the low-temperature water heating heat release in heat exchanger tube, by outlet pipe, water outlet 401, Return to the water return pipeline of heating network;
5,100 upper steam of high-temperature evaporator outlet outflow high-temperature steam, as driving steam, into steam jet ejector 200, it is sprayed by nozzle, generates low-voltage space in steam jet ejector 200, thus outside 400 heat exchanger tube of injection cryogenic vaporizer The steam that generates of heating agent water evaporation, finally, driving steam and jetting steam caused mixing, and enter the steam of condenser 300 together Condense side;
6, the condensed water that condenser 300 generates, a part enters cryogenic vaporizer 400 by throttle valve 401, supplements low temperature 400 evaporation loss of evaporator, another part enter high-temperature evaporator 100 by water pump 102, and supplement high-temperature evaporator 100 evaporates Loss;
7, the other side of condenser 300 is heated to heating circulation water, and heating water return enters from water return outlet 302, after being heated, It is flowed out from heating water outlet 301, for heating to heat user;
8, the steam condensation side lower part side wall of condenser 300 is equipped with a vacuum pumping opening 303, using aspiration pump, takes out The on-condensible gases such as air remaining in steam condensation side out, maintain the vacuum degree of whole device.

Claims (1)

1. a kind of big temperature difference heat-exchanger rig, its structure includes: the high-temperature evaporator in left side, the condenser on right side, middle and lower part Cryogenic vaporizer, valve, water pump and some connecting lines;Heat supply network high-temperature-hot-water enters high-temperature evaporator heat release and becomes middle warm water Afterwards, continue heat release into cryogenic vaporizer and become low-temperature water heating, low-temperature water heating returns to heat supply network water return pipeline;High-temperature evaporator is one A shell and tube exchanger stood up, high-temperature-hot-water flow outside heat exchanger tube from top to bottom, heating agent water evaporation in heat exchanger tube, generate steaming Vapour is exported from high-temperature evaporator upper steam to flow out;Cryogenic vaporizer is a horizontal shell and tube exchanger, and low-temperature water heating exists Heat release is horizontally flowed in heat exchanger tube, the heat medium water outside heat exchanger tube is flowed out by thermal evaporation, steam from top venthole;Condenser produces Raw condensed water, a part enter cryogenic vaporizer by throttle valve, and another part enters high-temperature evaporator by water pump pressurization; It is heated to heating circulation water the other side of condenser;The steam condensation side lower part of condenser is equipped with a vacuum pumping opening, special Sign is: the big temperature difference heat-exchanger rig, its structure further includes a steam jet ejector, and high-temperature evaporator generates steam conduct Steam is driven, into steam jet ejector, the steam that cryogenic vaporizer generates enters the suction chamber of steam jet ejector, steam jet ejector The steam that outlet sprays enters condenser.
CN201711302969.4A 2017-12-02 2017-12-02 Big temperature difference heat-exchanger rig Pending CN109869788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711302969.4A CN109869788A (en) 2017-12-02 2017-12-02 Big temperature difference heat-exchanger rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711302969.4A CN109869788A (en) 2017-12-02 2017-12-02 Big temperature difference heat-exchanger rig

Publications (1)

Publication Number Publication Date
CN109869788A true CN109869788A (en) 2019-06-11

Family

ID=66916832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711302969.4A Pending CN109869788A (en) 2017-12-02 2017-12-02 Big temperature difference heat-exchanger rig

Country Status (1)

Country Link
CN (1) CN109869788A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106440502A (en) * 2016-11-28 2017-02-22 哈尔滨工大金涛科技股份有限公司 Blast furnace slag-washing water waste heat refrigerating device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101231004A (en) * 2008-02-28 2008-07-30 清华大学 Large temperature-difference central heating system
CN205690489U (en) * 2016-05-27 2016-11-16 哈尔滨工大金涛科技股份有限公司 Direct-connected big temperature difference heat-exchanger rig
CN205717456U (en) * 2016-03-08 2016-11-23 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchanger rig
CN106369654A (en) * 2016-11-28 2017-02-01 哈尔滨工大金涛科技股份有限公司 Large-temperature-difference heat exchange device for Freon
CN206207789U (en) * 2016-11-28 2017-05-31 哈尔滨工大金涛科技股份有限公司 Blast furnace slag quenching water heat refrigeration apparatus
CN106839049A (en) * 2015-12-05 2017-06-13 哈尔滨工大金涛科技股份有限公司 The big temperature difference heat-exchange method of injecting type and the big temperature difference heat-exchanger rig of injecting type
CN107166475A (en) * 2016-03-08 2017-09-15 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchange method and big temperature difference heat-exchanger rig
CN207990747U (en) * 2017-12-02 2018-10-19 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchanger rig

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101231004A (en) * 2008-02-28 2008-07-30 清华大学 Large temperature-difference central heating system
WO2009105930A1 (en) * 2008-02-28 2009-09-03 清华大学 A kind of concentrated heat-supply system
CN106839049A (en) * 2015-12-05 2017-06-13 哈尔滨工大金涛科技股份有限公司 The big temperature difference heat-exchange method of injecting type and the big temperature difference heat-exchanger rig of injecting type
CN205717456U (en) * 2016-03-08 2016-11-23 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchanger rig
CN107166475A (en) * 2016-03-08 2017-09-15 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchange method and big temperature difference heat-exchanger rig
CN205690489U (en) * 2016-05-27 2016-11-16 哈尔滨工大金涛科技股份有限公司 Direct-connected big temperature difference heat-exchanger rig
CN106369654A (en) * 2016-11-28 2017-02-01 哈尔滨工大金涛科技股份有限公司 Large-temperature-difference heat exchange device for Freon
CN206207789U (en) * 2016-11-28 2017-05-31 哈尔滨工大金涛科技股份有限公司 Blast furnace slag quenching water heat refrigeration apparatus
CN207990747U (en) * 2017-12-02 2018-10-19 哈尔滨工大金涛科技股份有限公司 Big temperature difference heat-exchanger rig

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106440502A (en) * 2016-11-28 2017-02-22 哈尔滨工大金涛科技股份有限公司 Blast furnace slag-washing water waste heat refrigerating device

Similar Documents

Publication Publication Date Title
JP6983770B2 (en) Regional thermal energy distribution system
CN205048524U (en) Temperature of heat supply network return water is reduced big difference in temperature heat transfer device
CN107166475A (en) Big temperature difference heat-exchange method and big temperature difference heat-exchanger rig
CN104048161B (en) A kind of combined vaporizing device of liquified natural gas (LNG)
CN108644747B (en) It is a kind of to utilize super pressure-high temperature vapour system in the generation of dyeing waste water waste heat
CN105972681B (en) Water resource heat pump-steam turbine combining heating system complementary with heat supply network
ITAN20120049A1 (en) SYSTEM FOR GENERATION OF ELECTRICITY AND ITS METHOD.
CN205690489U (en) Direct-connected big temperature difference heat-exchanger rig
CN103115388B (en) Thermal power plant circulating water heat supply system
CN106839049A (en) The big temperature difference heat-exchange method of injecting type and the big temperature difference heat-exchanger rig of injecting type
CN207990747U (en) Big temperature difference heat-exchanger rig
CN104180557B (en) Cogeneration, combined cooling and power and the dual-purpose co-feeding system of thermoelectric cold electricity
CN205717456U (en) Big temperature difference heat-exchanger rig
CN203022791U (en) Mine return air heat energy utilizing device based on original diffusion tower
CN109869788A (en) Big temperature difference heat-exchanger rig
CN204962942U (en) Carbon dioxide heat pump heating device
CN204830120U (en) Carbon dioxide heat pump heating device
CN107461958A (en) One kind utilizes jet type heat pump recovery chemical fertilizer factory gas making water residual heat system
CN105546343B (en) A kind of utilization solar heat pump gasification LNG system and method
CN204420978U (en) A kind of energy saving drainage system of boiler hydrophobic development unit
CN206207532U (en) The big temperature difference heat-exchanger rig of freon
CN106152230A (en) Reduce big temperature difference heat-exchange method and the device of heat supply network return water temperature
CN106369654A (en) Large-temperature-difference heat exchange device for Freon
CN107421147A (en) A kind of device for recycling heat energy of steam condensed
CN205664460U (en) Big difference in temperature heat transfer device of injection formula

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination