CN109861868A - The gateway system of three system architecture of two-stage based on Linux reinforces method - Google Patents

The gateway system of three system architecture of two-stage based on Linux reinforces method Download PDF

Info

Publication number
CN109861868A
CN109861868A CN201910162919.3A CN201910162919A CN109861868A CN 109861868 A CN109861868 A CN 109861868A CN 201910162919 A CN201910162919 A CN 201910162919A CN 109861868 A CN109861868 A CN 109861868A
Authority
CN
China
Prior art keywords
level
primary
gateway
primary system
standby
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910162919.3A
Other languages
Chinese (zh)
Other versions
CN109861868B (en
Inventor
刘松
刘继明
王晓冬
陈冬冬
吴东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ITIBIA TECHNOLOGIES
Original Assignee
ITIBIA TECHNOLOGIES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ITIBIA TECHNOLOGIES filed Critical ITIBIA TECHNOLOGIES
Priority to CN201910162919.3A priority Critical patent/CN109861868B/en
Publication of CN109861868A publication Critical patent/CN109861868A/en
Application granted granted Critical
Publication of CN109861868B publication Critical patent/CN109861868B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Hardware Redundancy (AREA)

Abstract

The present invention relates to the gateway systems of three system architecture of two-stage based on Linux to reinforce method, is set as three system of two-stage, and primary system for upgrading, hardware testing, upgrades control, dual system switching control;Level two is divided into active and standby two system, i.e. main system is level two one, standby system is level two two, the configuration of two system sharing systems, user configuration data, in main system exception, notification message is to primary system, starting system of laying equal stress on, determine that control starts standby system by primary system when system starts, realizes switching;Primary system for rescuing, active and standby two system of second level for controlling, upgrading, hardware testing, level two is divided into level two one and level two two, and system configuration, user configuration and system file separate, can quick-recovery enterprise gateway health operating status fastly;Equipment start-up course judges starting level two one or level two two by primary system, detects the switching of realization system automatically by system.

Description

The gateway system of three system architecture of two-stage based on Linux reinforces method
Technical field
The gateway system for three system architecture of two-stage based on Linux that the present invention relates to a kind of reinforces method.
Background technique
Currently, the system of gateway is usually that dual system realizes the active and standby of gateway, upgrading etc., this pair is implementation method There are problems that three:
1. two systems cannot upgrade simultaneously, can only with current system to standby system upgrade, main preparation system be possible to be not Identical version;
2. hardware testing system needs to install total system before hardware testing using main system test, and tests journey Sequence needs are all installed in main preparation system, waste of storage space;
3. software system updating update is relatively more, it is unfavorable for the test docking system management of production division.
Summary of the invention
The purpose of the present invention is overcoming the shortcomings of the prior art, a kind of three system tray of two-stage based on Linux is provided The gateway system of structure reinforces method, can be realized the dual system requirement of gateway, while being able to solve dual system upgrading and causing System version is inconsistent, dual system change causes the test macro of production plant to dock exploitation and increase plant produced cost etc. Problem.
The purpose of the present invention is achieved through the following technical solutions:
The gateway system of three system architecture of two-stage based on Linux reinforces method, and feature is:
It is set as three system of two-stage, wherein primary system, for upgrading, hardware testing, upgrading controls, dual system switches Control;Level two is divided into active and standby two system, i.e. main system is level two one, and standby system is level two two, and two systems are total With system configuration, user configuration data, in main system exception, notification message is to primary system, starting system of laying equal stress on, system starting When by primary system determine that control starts standby system, realize switching;
Enterprise gateway booting powers on, and first starts primary system, according to data configuration after primary system starting, determines starting Which level two, if restarting after level two starting exception and returning to level two two, if two systems all cannot be just It often works, runs primary system in User space, user's master data function of surfing the Net only can be achieved, and alarm notification user handles event Barrier;
Enterprise gateway gives enterprise gateway, first uploads to enterprise gateway upgrade file under primary system under primary system, Upgrade respectively to level two one and level two two afterwards, is arranged based on level two one after upgrading successfully and under primary system System;
Enterprise gateway upgrades under second level main system, is put in data area by the version that network management issues, weight after setting Starting system gives two level two edition upgradings by the way that primary system is arranged respectively under primary system.
Further, the gateway system of above-mentioned three system architecture of two-stage based on Linux reinforces method, wherein will look forward to Industry gateway upgrade file is uploaded under primary system by USB flash disk, tftp, web mode.
Further, the gateway system of above-mentioned three system architecture of two-stage based on Linux reinforces method, wherein equipment Start-up course judges starting level two one or level two two by primary system, realizes system switching.
Further, the gateway system of above-mentioned three system architecture of two-stage based on Linux reinforces method, wherein level-one System for rescuing, active and standby two system of second level for controlling, upgrading, hardware testing, level two is divided into level two one and two Grade system two, system configuration, user configuration and system file separate, can fast quick-recovery enterprise gateway health operating status.
The present invention has significant advantages and beneficial effects compared with prior art, embodies in the following areas:
1. present invention setting three system of two-stage, level-one test installation system does not influence user job system, and primary system is used In rescue, active and standby two system of second level for controlling, upgrading, hardware testing, level two is divided into level two one and level two Two, system configuration, user configuration and system file separate, can fast quick-recovery enterprise gateway health operating status;
2. equipment start-up course judges starting level two one or level two two by primary system, certainly by system Dynamic detection realization system switching keeps system relatively reliable, safe;
3. utilizing two-stage system, realize that rescue, hardware testing system, system switch while upgrading dual system function;Two-stage System, system configuration data, user data configuration subregion separate, being capable of quick recovery system health operating status.
Other features and advantages of the present invention will be illustrated in subsequent specification, also, partly be become from specification It is clear that by implementing specific embodiment of the invention understanding.The objectives and other advantages of the invention can be by institute Specifically noted structure is achieved and obtained in the specification write, claims.
Detailed description of the invention
Fig. 1: three system architecture schematic diagram of enterprise gateway two-stage;
Fig. 2: three system Booting sequence schematic diagram of enterprise gateway two-stage;
Fig. 3: enterprise gateway upgrades level two flow diagram.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, specific implementation is now described in detail Scheme.
The present invention is based on the gateway systems of three system architecture of two-stage of Linux to reinforce method, also sets on the basis of dual system A primary system is set, as shown in Figure 1, being set as three system of two-stage, wherein primary system, for upgrading, hardware testing, liter Grade control, dual system switching control;Level two is divided into active and standby two system, i.e. main system is level two one, and standby system is two Grade system two, two system sharing systems configuration, user configuration data, in main system exception, notification message to primary system, and Restart system, determines that control starts standby system by primary system when system starts, realize switching, while not influencing number of users According to the fast quick-recovery of guarantee user uses;Facilitate enterprise gateway production test, customer upgrade, the safe and healthy operation of system;
Enterprise gateway booting powers on, and such as Fig. 2, first starts primary system, according to data configuration after primary system starting, sentences Surely which level two started, if restarting after level two starting exception and returning to level two two, if two systems are all Cisco unity malfunction runs primary system in User space, user's master data function of surfing the Net only can be achieved, and at alarm notification user Manage failure;
Enterprise gateway gives enterprise gateway under primary system, and enterprise gateway upgrade file is first passed through USB flash disk, tftp, web Mode uploads under primary system, such as Fig. 3, after upgrade respectively to level two one and level two two, after upgrading successfully and It is main system that level two one is arranged under primary system;
Enterprise gateway upgrades under second level main system, and customer upgrade does not influence user configuration service parameter in this case, It is put in data area by the version that network management issues, restarts system after setting, by the way that primary system is arranged, under primary system Two level two edition upgradings are given respectively, realize that user configuration is not lost, update time is short, dual system version is consistent, user It is good and other effects to experience.
Using two-stage system, level-one test installation system does not influence user job system, and primary system is for rescuing, second level Active and standby two system for controlling, upgrading, hardware testing, level two is divided into level two one and level two two, system configuration, User configuration is separated with system file, can fast quick-recovery enterprise gateway health operating status.
Equipment start-up course judges that starting level two one or level two two, realization system are cut by primary system It changes, keeps system relatively reliable, safe.
In conclusion three system of two-stage is arranged in the present invention, realize that rescue, hardware testing system, system are switched while being upgraded Dual system function;Two-stage system, system configuration data, user data configuration subregion separate, being capable of quick recovery system health fortune Row state;It detects the switching of realization system automatically by system, keeps system relatively reliable, safe.
It should be understood that the foregoing is merely the preferred embodiment of the present invention, the power that is not intended to limit the invention Sharp range;The description above simultaneously, should can be illustrated and implement for the special personage of correlative technology field, thus it is other without departing from The equivalent change or modification completed under disclosed spirit, should be included in claim.

Claims (4)

1. the gateway system of three system architecture of two-stage based on Linux reinforces method, it is characterised in that:
It is set as three system of two-stage, wherein primary system for upgrading, hardware testing, upgrades control, dual system switching control; Level two is divided into active and standby two system, i.e. main system is level two one, and standby system is level two two, two system sharing systems Configuration, user configuration data, in main system exception, notification message is to primary system, starting system of laying equal stress on, and system passes through when starting Primary system determines that control starts standby system, realizes switching;
Enterprise gateway booting powers on, and first starts primary system, according to data configuration after primary system starting, determines which starts Level two, if restarting after level two starting exception and returning to level two two, if two systems all cannot normal work Make, runs primary system in User space, user's master data function of surfing the Net, and alarm notification user's handling failure only can be achieved;
Enterprise gateway gives enterprise gateway, first uploads to enterprise gateway upgrade file under primary system under primary system, and rear point Not Gei level two one and level two two upgrade, it is principal series that level two one is arranged after upgrading successfully and under primary system System;
Enterprise gateway upgrades under second level main system, is put in data area by the version that network management issues, and restarts after setting and is System gives two level two edition upgradings by the way that primary system is arranged respectively under primary system.
2. the gateway system of two-stage three system architecture according to claim 1 based on Linux reinforces method, feature exists In: enterprise gateway upgrade file is uploaded under primary system by USB flash disk, tftp, web mode.
3. the gateway system of two-stage three system architecture according to claim 1 based on Linux reinforces method, feature exists In: equipment start-up course judges starting level two one or level two two by primary system, realizes system switching.
4. the gateway system of two-stage three system architecture according to claim 1 based on Linux reinforces method, feature exists In: primary system for rescuing, active and standby two system of second level for controlling, upgrading, hardware testing, level two is divided into level two One and level two two, system configuration, user configuration and system file separate, can fast quick-recovery enterprise gateway health operation shape State.
CN201910162919.3A 2019-03-05 2019-03-05 Linux-based two-stage three-system architecture gateway system strengthening method Active CN109861868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910162919.3A CN109861868B (en) 2019-03-05 2019-03-05 Linux-based two-stage three-system architecture gateway system strengthening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910162919.3A CN109861868B (en) 2019-03-05 2019-03-05 Linux-based two-stage three-system architecture gateway system strengthening method

Publications (2)

Publication Number Publication Date
CN109861868A true CN109861868A (en) 2019-06-07
CN109861868B CN109861868B (en) 2022-02-22

Family

ID=66899841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910162919.3A Active CN109861868B (en) 2019-03-05 2019-03-05 Linux-based two-stage three-system architecture gateway system strengthening method

Country Status (1)

Country Link
CN (1) CN109861868B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477471A (en) * 2009-01-07 2009-07-08 杭州海康威视数字技术股份有限公司 Embedded system firmware on-line upgrading system
CN103677911A (en) * 2013-12-06 2014-03-26 上海寰创通信科技股份有限公司 Mobile network equipment firmware upgrading system and method
CN105634879A (en) * 2014-10-27 2016-06-01 西安景行数创信息科技有限公司 System for updating home gateway
US20160261481A1 (en) * 2015-03-04 2016-09-08 Hitachi, Ltd. Data collection system, data collection method, server, and gateway
US20160294605A1 (en) * 2014-07-07 2016-10-06 Symphony Teleca Corporation Remote Embedded Device Update Platform Apparatuses, Methods and Systems
CN110188004A (en) * 2019-05-31 2019-08-30 烽火通信科技股份有限公司 A kind of double copies software system management method and system of terminal device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477471A (en) * 2009-01-07 2009-07-08 杭州海康威视数字技术股份有限公司 Embedded system firmware on-line upgrading system
CN103677911A (en) * 2013-12-06 2014-03-26 上海寰创通信科技股份有限公司 Mobile network equipment firmware upgrading system and method
US20160294605A1 (en) * 2014-07-07 2016-10-06 Symphony Teleca Corporation Remote Embedded Device Update Platform Apparatuses, Methods and Systems
CN105634879A (en) * 2014-10-27 2016-06-01 西安景行数创信息科技有限公司 System for updating home gateway
US20160261481A1 (en) * 2015-03-04 2016-09-08 Hitachi, Ltd. Data collection system, data collection method, server, and gateway
CN110188004A (en) * 2019-05-31 2019-08-30 烽火通信科技股份有限公司 A kind of double copies software system management method and system of terminal device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李春雨: "媒体网关系统中的主备倒换设计改进方案", 《微型机与应用》 *

Also Published As

Publication number Publication date
CN109861868B (en) 2022-02-22

Similar Documents

Publication Publication Date Title
CN103152419B (en) A kind of high availability cluster management method of cloud computing platform
CN100407638C (en) Method for software upgrading and withdrawing
CN101908008B (en) Device and method for switching BIOS (Basic Input/Output System)
US10038593B2 (en) Method and system for recovering virtual network
CN110134518B (en) Method and system for improving high availability of multi-node application of big data cluster
CN103902316A (en) Switching method and electronic device
CN104486394B (en) In-service Software Upgrade method and device
CN108153263B (en) DCS controller redundancy method and device
CN102243594A (en) Method for safely and remotely upgrading embedded Linux system software
CN109634638B (en) Cluster software upgrading method, device, equipment and medium
CN108234175A (en) A kind of cloud platform storage switching method and cloud platform based on container
CN104239548A (en) Database disaster recovery system and database disaster recovery method
CN111552489A (en) User mode file system hot upgrading method, device, server and medium
US8589721B2 (en) Balancing power consumption and high availability in an information technology system
CN101114935A (en) System upgrading method, upgrading system and monitoring entity
EP2110748B1 (en) Cluster control apparatus, cluster system and control program
CN105279042A (en) Redundant backup system and method for BSD system
CN109861868A (en) The gateway system of three system architecture of two-stage based on Linux reinforces method
CN102546313B (en) Multi-activation detection method and multi-activation detection device
WO2014176969A1 (en) Automatic disaster recovery switching method and device
CN111367711A (en) Safety disaster recovery method based on super fusion data
JP2003345620A (en) Process monitoring method for multi-node cluster system
CN109101372A (en) Redundancy switching method, storage medium and the Shelf Management Module of Shelf Management Module
CN111431788B (en) High-reliability network communication system and method
CN103747034A (en) Terminal state-machine state conversion method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant