CN109857721A - It will be single by GAIA system migration to the method for OSS system on way - Google Patents

It will be single by GAIA system migration to the method for OSS system on way Download PDF

Info

Publication number
CN109857721A
CN109857721A CN201811627930.4A CN201811627930A CN109857721A CN 109857721 A CN109857721 A CN 109857721A CN 201811627930 A CN201811627930 A CN 201811627930A CN 109857721 A CN109857721 A CN 109857721A
Authority
CN
China
Prior art keywords
way
wfm
notification
list
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811627930.4A
Other languages
Chinese (zh)
Inventor
徐健
郑国生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing MetarNet Technologies Co Ltd
Original Assignee
Beijing MetarNet Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing MetarNet Technologies Co Ltd filed Critical Beijing MetarNet Technologies Co Ltd
Priority to CN201811627930.4A priority Critical patent/CN109857721A/en
Publication of CN109857721A publication Critical patent/CN109857721A/en
Pending legal-status Critical Current

Links

Abstract

The embodiment of the present invention provides a kind of method by way list by GAIA system migration to OSS system, and OSS system includes OM, IM, WFM and AM, and method includes: that OM receives the single on way of CRM transmission, and will be sent to IM in information single on the way;IM in the single distribution IM resource in way, and is singly demarcated according in the single information in way on the way, rear send the first notification to OM;After OM receives the first notification, whether being activated in way list for calibration judged, if being activated, activation instruction is sent to network element by AM, whether AM is successfully transmitted activation instruction to OM reply;If OM receives the return information for being successfully transmitted activation instruction, the work order in the list of way is sent to WFM, work order is handled by WFM, WFM be disposed after to OM send the second notification;Notice CRM is closed in way list after OM receives the second notification.The embodiment of the present invention opens the purpose of OSS system migration data with realizing safe and efficient rate from GAIA system to clothes.

Description

It will be single by GAIA system migration to the method for OSS system on way
Technical field
The present embodiments relate to Data Transference Technology field, more particularly, to will be single by GAIA system migration on way To the method for OSS system
Background technique
Business is completed from accepting integral construction, and whole process needs to guarantee originally singly moving to new system just in original system Often and in way Dan Zhengchang.
Since operation system is more complicated, it is parallel that operator is not desired to dual system, moves to newly so as to cause the order that is not completed OSS.On the one hand Data Migration needs staff to have and is familiar with business, and be familiar with the importance of key message and process Degree is more demanding;On the other hand, very clear to the overall operation of original system and new system, it needs to take a significant amount of time, imitate Rate is low.
Work is migrated in way list, is that this part of no producer works.The reason is that because data volume is huge and data Inaccuracy, dirty data is relatively more, and for clearance and analysis workload is huge, and problem is inconvenient to find out processing.
Summary of the invention
The embodiment of the present invention provide it is a kind of overcome the above problem or at least be partially solved the above problem will be single on way By GAIA system migration to the method for OSS system.
First aspect, the embodiment of the present invention provide a kind of method by way list by GAIA system migration to OSS system, The OSS system includes OM, IM, WFM and AM, which comprises
OM receives the single on way of CRM transmission, and the information single on way is sent to IM;
IM distributes IM resource in way list to described in the single information in way according to, and singly demarcates to described on the way, It is rear to OM send the first notification;
After OM receives first notification, whether being activated in way list for calibration judged, if being activated, Activation instruction is sent to network element by AM, whether AM is successfully transmitted activation instruction to OM reply;
If OM receives the return information for being successfully transmitted activation instruction, the work order in the list of way is sent to WFM, by WFM handles the work order, WFM be disposed after to OM send the second notification;
Notice CRM closing is described single on way after OM receives second notification.
The second aspect, the embodiment of the present invention provide a kind of OSS system, the OSS system include OM, IM, WFM and AM;Wherein,
The OM is used to receive the single on way of CRM transmission, and the information single on way is sent to IM;
The IM is used for according to the information single on way to described in the single distribution IM resource in way, and to it is described way it is single into Rower is fixed, rear send the first notification to OM;
After the OM is also used to receive first notification, whether being activated in way list for calibration judged, if It is activated, then activation instruction is sent to network element by AM, whether AM is successfully transmitted activation instruction to OM reply;
The OM is also used to receiving the return information for being successfully transmitted activation instruction, then by the construction single-shot in the list of way Send to WFM, the work order handled by WFM, WFM be disposed after to OM send the second notification;
Notice CRM closing is described single on way after the OM is also used to receive second notification.
In terms of third, the embodiment of the present invention provides a kind of electronic equipment, including memory, processor and is stored in storage On device and the computer program that can run on a processor, realize that such as first aspect mentions when the processor executes described program The step of method of confession.
4th aspect, the embodiment of the present invention provide a kind of non-transient computer readable storage medium, are stored thereon with meter Calculation machine program is realized as provided by first aspect when the computer program is executed by processor the step of method.
Method and OSS system provided in an embodiment of the present invention by way list by GAIA system migration to OSS system, it is real With having showed safe and efficient rate from GAIA system to the purpose of OSS system migration data.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 will show to be provided in an embodiment of the present invention in the process of the single method by GAIA system migration to OSS system in way It is intended to;
Fig. 2 is the structural schematic diagram of OSS system provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
Fig. 1 will show to be provided in an embodiment of the present invention in the process of the single method by GAIA system migration to OSS system in way It is intended to, as shown in Figure 1, the OSS system of the embodiment of the present invention is specially to take to open OSS system, which includes OM, IM, WFM And AM, which comprises
S101, OM receive the single on way of CRM transmission, and the information single on way is sent to IM.
It should be noted that CRM issues OM of the order into OSS in the embodiment of the present invention, OM issues order according to CRM Order information receives and starts to carry out flow instance, which ring flow instance is exactly assigned according to set business OM Which system section walks, and in embodiments of the present invention, OM, IM, AM, WFM belong to system.
S102, IM distribute IM resource in way list to described in the single information in way according to, and to described in way Dan Jinhang Calibration, it is rear to OM send the first notification.
It should be noted that singly need IM resource when migration on the way, IM i.e. for providing IM resource way is single, IM can singly be demarcated, and send the first notification to OM, first informs letter to after the single distribution IM resource in way on the way It ceases and has been completed for characterizing IM to the task in the single distribution IM resource in way.First notification includes having distributed resource, money The mark of mark, resource allocation failure that source is allocated successfully.
After S103, OM receive first notification, whether being activated in way list for calibration judged, if being swashed It is living, then activation instruction is sent to network element by AM, whether AM is successfully transmitted activation instruction to OM reply.
It should be noted that OM after receiving the first notification, needs to judge whether being swashed in way list for calibration It is living, wherein activation is completed by AM.If being activated, activation instruction is sent from AM to network element, activation instruction can be out Logical service order tears machine instruction open, is also possible to other business service orders.
OM judges whether to walk AM according to the link of middle table, if it is OM caused by inconvenient judgment, then flows directly to AM.Such as Fruit is OM judgement, IM_skip is issued according to OM to determine whether skip (normally if it is no migration or normal issuing service, No IM_skip or default are not skip);If it is not skipping, then directly by sending instructions under former mode, if it is jump It crosses, then skips receipt automatically to OM, i.e. AM receipt replys the success that whether sends instructions down to OM;Whether this work order runs succeeded.This Sample OM can judge whether to circulate to next link
If S104, OM receive the return information for being successfully transmitted activation instruction, the work order in the list of way is sent to WFM is handled the work order by WFM, WFM be disposed after to OM send the second notification.
It has circulated in original GAIA system to the work order of WFM, also with regard to work order it should be noted that WFM needs to record.With Just compare both sides --- the record of GAIA system and OSS system.
Notice CRM closing is described single on way after S105, OM receive second notification.
The embodiment of the present invention is with realizing safe and efficient rate from GAIA system to the purpose of OSS system migration data.
On the basis of the various embodiments described above, the OM receives the single on way of CRM transmission, before further include:
OM will be stored in pre-set OM middle table in the single order information in way, place link and state.
It should be noted that order information can be the variation of order, place link, movement and product etc..
IM will be stored in pre-set IM middle table in the state of way single required IM resource and IM resource.
The order form data of the work order is stored in pre-set WFM middle table by WFM.
On the basis of the various embodiments described above, the IM is provided to described in the single distribution IM in way according to the information single on way Source, specifically:
It is obtained from the IM middle table described in single allocated data in GAIA system on the way.It should be noted that The data are the data after the conversion of OSS system.
On the basis of the above embodiments, the IM will be stored in pre- in the state of way single required IM resource and IM resource In the IM middle table being first arranged, later further include:
IM is to CRM synchronization criterion address information.Normal address information is used to be characterized in the preservation of the single required IM resource in way Address.
It is described that whether being activated way is single for calibration judged on the basis of the various embodiments described above, specifically: OM according to The calibration recorded in OM middle table judges whether to activate in the link where the list of way.
On the basis of the various embodiments described above, the WFM be disposed after to OM send the second notification, also wrap later Include: OM receives WFM receipt and IM is notified to be handled by the single current state of migration.
Fig. 2 is the structural schematic diagram of OSS system provided in an embodiment of the present invention, as shown in Fig. 2, the OSS system includes: OM201, IM202, AM203 and WFM204, in which:
OM201 is used to receive the single on way of CRM transmission, and the information single on way is sent to IM;
The IM202 is used for according to the information single on way to described in the single distribution IM resource in way, and to described on way Singly demarcated, it is rear to OM201 send the first notification;
After the OM201 is also used to receive first notification, whether being activated in way list for calibration judged, If being activated, activation instruction is sent to network element by AM203, AM203 refers to whether OM201 reply is successfully transmitted activation It enables;
The OM201 is also used to receiving the return information for being successfully transmitted activation instruction, then by the construction in the list of way It is singly sent to WFM204, the work order is handled by WFM204, WFM204 sends second to OM201 after being disposed and accuses Know information;
Notice CRM closing is described single on way after the OM201 is also used to receive second notification.
OSS system provided in an embodiment of the present invention, specifically execute it is above-mentioned respectively will be single by GAIA system migration to OSS system on way The embodiment process of the method for system please be specifically detailed in above-mentioned respectively by the method reality in way list by GAIA system migration to OSS system The content of example is applied, details are not described herein.
Fig. 3 is the entity structure schematic diagram of electronic equipment provided in an embodiment of the present invention, as shown in figure 3, the electronic equipment It may include: processor (processor) 310,320, memory communication interface (Communications Interface) (memory) 330 and communication bus 340, wherein processor 310, communication interface 320, memory 330 pass through communication bus 340 Complete mutual communication.Processor 310 can call the meter that is stored on memory 330 and can run on processor 310 Calculation machine program, with execute the various embodiments described above offer by the single method by GAIA system migration to OSS system in way, such as wrap Include: OM receives the single on way of CRM transmission, and the information single on way is sent to IM;IM is according to the information single on way To described in the single distribution IM resource in way, and singly demarcated to described on the way, rear send the first notification to OM;OM is received To after first notification, whether being activated in way list for calibration judged, if being activated, is sent out by AM to network element Activation instruction is sent, whether AM is successfully transmitted activation instruction to OM reply;If OM receives the reply letter for being successfully transmitted activation instruction Breath, then be sent to WFM for the work order in the list of way, handled by WFM the work order, WFM be disposed after to OM Send the second notification;Notice CRM closing is described single on way after OM receives second notification.
In addition, the logical order in above-mentioned memory 330 can be realized by way of SFU software functional unit and conduct Independent product when selling or using, can store in a computer readable storage medium.Based on this understanding, originally The technical solution of the inventive embodiments substantially part of the part that contributes to existing technology or the technical solution in other words It can be embodied in the form of software products, which is stored in a storage medium, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes the present invention respectively The all or part of the steps of a embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk Etc. the various media that can store program code.
The embodiment of the present invention also provides a kind of non-transient computer readable storage medium, is stored thereon with computer program, What the computer program was implemented to carry out the various embodiments described above offer when being executed by processor will be single by GAIA system migration on way To the method for OSS system, for example, OM receives the single on way of CRM transmission, and the information single on way is sent to IM; IM according to the information single on way to described in the single distribution IM resource in way, and singly demarcated to described on the way, backward OM Send the first notification;After OM receives first notification, whether being activated in way list for calibration judged, if into Line activating then sends activation instruction to network element by AM, and whether AM is successfully transmitted activation instruction to OM reply;If OM is received into Function sends the return information of activation instruction, then the work order in the list of way is sent to WFM, is carried out by WFM to the work order Processing, WFM be disposed after to OM send the second notification;Notice CRM is closed after OM receives second notification It is described single on way.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member It is physically separated with being or may not be, component shown as a unit may or may not be physics list Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (9)

1. a kind of will be single by GAIA system migration to the method for OSS system on way, which is characterized in that the OSS system include OM, IM, WFM and AM, which comprises
OM receives the single on way of CRM transmission, and the information single on way is sent to IM;
IM distributes IM resource in way list to described in the single information in way according to, and singly demarcates to described on the way, later The first notification is sent to OM;
After OM receives first notification, whether being activated in way list for calibration judged, if being activated, is passed through AM sends activation instruction to network element, and whether AM is successfully transmitted activation instruction to OM reply;
If OM receives the return information for being successfully transmitted activation instruction, the work order in the list of way is sent to WFM, by WFM The work order is handled, WFM be disposed after to OM send the second notification;
Notice CRM closing is described single on way after OM receives second notification.
2. also wrapped the method according to claim 1, wherein the OM receives the single on way of CRM transmission before It includes:
OM will be stored in pre-set OM middle table in the single order information in way, place link and state;
IM will be stored in pre-set IM middle table in the state of way single required IM resource and IM resource;
The order form data of the work order is stored in pre-set WFM middle table by WFM.
3. according to the method described in claim 2, it is characterized in that, information of the IM according in way list is to described on way Single distribution IM resource, specifically:
It is obtained from the IM middle table described in single allocated data in GAIA system on the way.
4. according to the method described in claim 2, it is characterized in that, the IM will be in way single required IM resource and IM resource State be stored in pre-set IM middle table, later further include:
IM is to CRM synchronization criterion address information.
5. according to the method described in claim 2, having it is characterized in that, described judge whether being activated in way list for calibration Body are as follows:
OM judges whether to activate according to the calibration recorded in OM middle table in the link where the list of way.
6. the method according to claim 1, wherein the WFM, which sends second to OM after being disposed, informs letter Breath, later further include:
OM receives WFM receipt and IM is notified to be handled by the single current state of migration.
7. a kind of OSS system, which is characterized in that the OSS system includes OM, IM, WFM and AM;Wherein,
The OM is used to receive the single on way of CRM transmission, and the information single on way is sent to IM;
The IM is used for according to the information single on way to described in the single distribution IM resource in way, and is singly marked to described on the way It is fixed, rear send the first notification to OM;
After the OM is also used to receive first notification, whether being activated in way list for calibration judged, if carrying out Activation then sends activation instruction to network element by AM, and whether AM is successfully transmitted activation instruction to OM reply;
The OM is also used to receiving the return information for being successfully transmitted activation instruction, then is sent to the work order in the list of way WFM is handled the work order by WFM, WFM be disposed after to OM send the second notification;
Notice CRM closing is described single on way after the OM is also used to receive second notification.
8. a kind of electronic equipment including memory, processor and stores the calculating that can be run on a memory and on a processor Machine program, which is characterized in that the processor realized when executing described program as it is as claimed in any one of claims 1 to 6 will be The step of single method by GAIA system migration to OSS system in way.
9. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer journey Realization is such as claimed in any one of claims 1 to 6 when sequence is executed by processor will be single by GAIA system migration to OSS system on way Method the step of.
CN201811627930.4A 2018-12-28 2018-12-28 It will be single by GAIA system migration to the method for OSS system on way Pending CN109857721A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811627930.4A CN109857721A (en) 2018-12-28 2018-12-28 It will be single by GAIA system migration to the method for OSS system on way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811627930.4A CN109857721A (en) 2018-12-28 2018-12-28 It will be single by GAIA system migration to the method for OSS system on way

Publications (1)

Publication Number Publication Date
CN109857721A true CN109857721A (en) 2019-06-07

Family

ID=66893160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811627930.4A Pending CN109857721A (en) 2018-12-28 2018-12-28 It will be single by GAIA system migration to the method for OSS system on way

Country Status (1)

Country Link
CN (1) CN109857721A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112671586A (en) * 2020-12-29 2021-04-16 中盈优创资讯科技有限公司 Automatic migration and guarantee method and device for service configuration

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7167550B2 (en) * 1997-04-03 2007-01-23 Southwestern Bell Telephone Company Apparatus and method for facilitating service management of communications services in a communications network
CN102546221A (en) * 2010-12-08 2012-07-04 中国电信股份有限公司 Service configuration method and system for optical network unit
CN105122726A (en) * 2013-03-11 2015-12-02 皇家飞利浦有限公司 Multiple user wireless docking
CN105224292A (en) * 2014-05-28 2016-01-06 中国移动通信集团河北有限公司 A kind of method of service provisioning instruction process and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7167550B2 (en) * 1997-04-03 2007-01-23 Southwestern Bell Telephone Company Apparatus and method for facilitating service management of communications services in a communications network
CN102546221A (en) * 2010-12-08 2012-07-04 中国电信股份有限公司 Service configuration method and system for optical network unit
CN105122726A (en) * 2013-03-11 2015-12-02 皇家飞利浦有限公司 Multiple user wireless docking
CN105224292A (en) * 2014-05-28 2016-01-06 中国移动通信集团河北有限公司 A kind of method of service provisioning instruction process and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
樊林: "《MBOSS中服务开通系统的规划和设计》", 《中国优秀硕士学位论文全文数据库(电子期刊),信息科技辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112671586A (en) * 2020-12-29 2021-04-16 中盈优创资讯科技有限公司 Automatic migration and guarantee method and device for service configuration
CN112671586B (en) * 2020-12-29 2023-04-21 中盈优创资讯科技有限公司 Automatic migration and guarantee method and device for service configuration

Similar Documents

Publication Publication Date Title
US9679029B2 (en) Optimizing storage cloud environments through adaptive statistical modeling
US11797877B2 (en) Automated self-healing of a computing process
CN104301404B (en) A kind of method and device of the adjustment operation system resource based on virtual machine
US10261839B2 (en) Outlier and root cause determination of excessive resource usage in a virtual machine environment
US20130205007A1 (en) Suggesting migration to a cloud computing infrastructure
CN104765678A (en) Method and device for testing applications on mobile terminal
US9935849B2 (en) Assessing a service offering in a networked computing environment
CN111212388B (en) Method, system and electronic equipment for batch short message sending management
US11301226B2 (en) Enterprise deployment framework with artificial intelligence/machine learning
CN103716356B (en) Storing process operating method, device and system based on web
US11029989B2 (en) Distributed notebook kernels in a containerized computing environment
CN107016480A (en) Method for scheduling task, apparatus and system
US9792110B2 (en) Automatic online system upgrade
US9438529B1 (en) Computing process analysis by metrics profiling
US9424525B1 (en) Forecasting future states of a multi-active cloud system
CN112379869A (en) Standardized development training platform
AU2022224845B2 (en) Intelligent vulnerability lifecycle management system
US10025640B2 (en) Balancing work of tasks at a sending node of a transaction server
CN110471769A (en) A kind of method for managing resource and device of virtual machine
CN111062521A (en) Online prediction method, system and server
WO2022225567A1 (en) Report generation from testing a test application in a network-as-a-service
US20220215286A1 (en) Active learning improving similar task recommendations
US20170214588A1 (en) Enterprise cloud garbage collector
CN109857721A (en) It will be single by GAIA system migration to the method for OSS system on way
CN113746676B (en) Network card management method, device, equipment, medium and product based on container cluster

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190607