CN109842949A CN201711206729.4A CN201711206729A CN109842949A CN 109842949 A CN109842949 A CN 109842949A CN 201711206729 A CN201711206729 A CN 201711206729A CN 109842949 A CN109842949 A CN 109842949A
Authority
CN
China
Prior art keywords
user equipment
ctu
label
uplink information
confirmation message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711206729.4A
Other languages
Chinese (zh)
Inventor
沈佳丽
焦淑蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HiSilicon Technologies Co Ltd
Original Assignee
HiSilicon Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HiSilicon Technologies Co Ltd filed Critical HiSilicon Technologies Co Ltd
Priority to CN201711206729.4A priority Critical patent/CN109842949A/en
Priority to PCT/CN2018/117625 priority patent/WO2019101212A1/en
Publication of CN109842949A publication Critical patent/CN109842949A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present application discloses method, user equipment and the network equipment of a kind of scheduling of resource, and the probability of collision is generated when sending uplink information for reducing UE.The embodiment of the present application method includes: that the network equipment receives the first uplink information that the first user equipment is sent;If the network equipment demodulates first uplink information not successfully, then the network equipment is the first label of each user equipment distribution mapped on the corresponding competition transmission unit CTU of first uplink information, and first label is used to indicate each user equipment and sends uplink information using the CTU exclusively enjoyed;The network equipment sends confirmation message to first user equipment, and the confirmation message includes first label, and first label is used to indicate first user equipment and sends the second uplink information using the CTU exclusively enjoyed.

Description

A kind of method of scheduling of resource, user equipment and the network equipment
Technical field
This application involves the communications field more particularly to a kind of methods of scheduling of resource, user equipment and the network equipment.
Background technique
5G major technique scene first is that magnanimity machine type communication (massive machine type of Communication, mMTC), which is mainly directed towards environmental monitoring, reading intelligent agriculture etc. with sensing and data acquisition as target Internet of things service, have the characteristics that small data packets, low-power consumption, magnanimity connection.For the technical characterstic, the prior art is proposed It is competition-based to exempt to dispatch Sparse Code multiple access schemes.Sparse Code multiple access accesses (sparse code multiple Access, SCMA) technology by the superposed transmission of multi-user improves user's connection number, and blind examination survey technology that it is realized and The random competition for exempting from scheduling accesses to be made it possible again to the insensitivity of code word collision.Exempt to dispatch access mechanism by allowing use (user equipment, UE) is transmitted on the radio resource of predefined contention access at family, and it is small to have significantly simplified magnanimity Lengthy and tedious signaling process caused by packet business, to reduce power consumption.Wherein the radio resource of contention access is referred to as competing Transmission unit (contention transmission unit, CTU), definition include time, frequency, code book, pilot tone four Dimension.Assuming that being defined J independent code books in each time/frequency source block, and L pilot tone sequence is corresponded to for each code book Column.To needing to define LxJ pilot frequency sequence, therefore, in given time/frequency source block a shared LxJ CTU for UE into Row competition.
The mapping relations of UE and CTU are pre-determined.In order to meet the needs of magnanimity connects under mMTC scene, and nothing Line maximum resource utilization often has mapped multiple UE on the same CTU.When multiple UE simultaneous transmissions on the same CTU just Collision can be generated.Under mMTC scene, the data arrival of UE is random, sparse.Therefore, on the one hand, in most of time, CTU sends the idle state of data all in no UE, and there is the wastes of reserved resource;And on the other hand, it is true due to re-transmission Then there is the risks collided again by the UE for needing to transmit in predefined CTU calmly, that is, when retransmitting, with other UE in CTU Just there is random data arrival, to be collided again, waiting is needed to retransmit again.
Summary of the invention
The embodiment of the present application provides method, user equipment and the network equipment of a kind of scheduling of resource, for reducing UE The probability of collision is generated when sending uplink information.
The embodiment of the present application first aspect provides a kind of method of scheduling of resource, may include: that the network equipment receives the The first uplink information that one user equipment is sent;It is understood that the first uplink information is referred to as the first upstream data Or first uplink signal etc..If the network equipment demodulates first uplink information not successfully, the network equipment is The first label of each user equipment distribution mapped on the corresponding competition transmission unit CTU of first uplink information, described the One label is used to indicate each user equipment and sends uplink information using the CTU exclusively enjoyed;The network equipment is to described One user equipment sends confirmation message, and the confirmation message includes first label, and first label is used to indicate described First user equipment sends the second uplink information using the CTU exclusively enjoyed.
In the embodiment of the present application, it should be noted that including the mark information of each user equipment in confirmation message, when When mark information is the first label, indicate that corresponding user equipment sends uplink information using the CTU exclusively enjoyed.Because of the first user Equipment use the first CTU exclusively enjoyed send uplink information, so, UE when retransmitting uplink information, can to avoid with Other UE collide.And it is computed derivation, experiment simulation, provable system ensemble average collision probability is also reduced. Further, since retransmission mechanism is without waiting for back off time, smaller average delay is realized.
Optionally, in some embodiments of the present application, the network equipment is that first uplink information is corresponding competing Strive on transmission unit CTU map each user equipment distribution first label, may include: the network equipment be described first Except the successful user equipment distribution of demodulation first label in each user equipment mapped on the corresponding CTU of uplink information.
In the embodiment of the present application, for the first uplink information demodulated not successfully, the network equipment can determine corresponding Then CTU according to the mapping relations between preset CTU and user equipment, determines other mapped on the corresponding CTU User equipment, still, there may be successful UE is demodulated in these other user equipmenies, the can be distributed by demodulating successful UE Two labels, can distribute the first label to the UE in addition to demodulating successfully.So that distributing each user equipment in ACK message Label it is more acurrate.
Optionally, in some embodiments of the present application, the confirmation message includes the second label, and second label is used The non-CTU exclusively enjoyed is used to send uplink information in instruction first user equipment;The network equipment receives the first user and sets After the first uplink information that preparation is sent, if the method can also include: first described in the network equipment unsuccessful demodulation on Row information, then the network equipment is first user equipment distribution, second label.
In the embodiment of the present application, after the network equipment the first uplink information of unsuccessful demodulation, which can will be right The first user equipment answered uses in the non-CTU transmission exclusively enjoyed labeled as the second label, second label the first user equipment of instruction Row information rationally utilizes CTU resource.
Optionally, in some embodiments of the present application, the confirmation message includes third label, and the third label is used The non-CTU exclusively enjoyed is used to send uplink information in instruction first user equipment;The network equipment receives the first user and sets After the first uplink information that preparation is sent, the method can also include: that the network equipment is not receive uplink information First user equipment distributes the third label.
In the embodiment of the present application, the network equipment is not receive described in the first user equipment distribution of uplink information Third label, the third label are used to indicate first user equipment and send uplink information using the non-CTU exclusively enjoyed, rationally Utilize CTU resource.
Optionally, in some embodiments of the present application, the network equipment is sent to first user equipment to be confirmed Information, may include: the network equipment by way of broadcast, multicast or unicast to first user equipment send described in Confirmation message.The embodiment of the present application provides several several optional implementations for sending confirmation message, increases scheme Feasibility.
The embodiment of the present application second aspect provides a kind of method of scheduling of resource, may include: that the first user equipment receives The confirmation message that the network equipment is sent;If corresponding the first user equipment described in the confirmation message is the first label, institute The first user equipment is stated according to first label, determines the first competition transmission unit CTU, first label is used to indicate each A user equipment sends uplink information using the CTU exclusively enjoyed, each user equipment be sent uplink information last time and not by Demodulate successfully first user equipment, the user equipment mapped on corresponding competition transmission unit CTU;Described first uses Family equipment sends the first uplink information using the first CTU.It is understood that the first uplink information is referred to as first Upstream data or the first uplink signal etc..
In the embodiment of the present application, it should be noted that including the mark information of each user equipment in confirmation message, when When mark information is the first label, indicate that corresponding user equipment sends uplink information using the CTU exclusively enjoyed.Because of the first user Equipment use the first CTU exclusively enjoyed send uplink information, UE when retransmitting uplink information, can to avoid with other UE collides.And it is computed derivation, experiment simulation, provable system ensemble average collision probability is also reduced.Into one Step, since retransmission mechanism is without waiting for back off time, realize smaller average delay.
Optionally, in some embodiments of the present application, first user equipment determines the according to first label One competition transmission unit CTU may include: that first user equipment marks in the confirmation message according to described first Sequentially, it determines the first CTU, includes the label of each user equipment in the confirmation message, wherein each user sets The ID of standby label and each user equipment is corresponded, and the ID sequence of each user equipment arranges.
In the embodiment of the present application, because in ACK information including the mark information of each user equipment, each user equipment Mark information be tactic according to the ID of UE, so, when the first user equipment receives ACK information, according to first The ID of user equipment searches corresponding mark information, provides a kind of reality for determining the corresponding mark information of each user equipment Existing mode.
Optionally, in some embodiments of the present application, if the method can also include: described in the confirmation message Corresponding first user equipment is the second label, then first user equipment sends uplink information using the non-CTU exclusively enjoyed.It can With reasonable utilization CTU resource.
Optionally, in some embodiments of the present application, if the method can also include: described in the confirmation message Corresponding first user equipment is third label, then first user equipment sends uplink information using the non-CTU exclusively enjoyed.It can With reasonable utilization CTU resource.
Optionally, in some embodiments of the present application, the first user equipment receives the confirmation that the network equipment is sent Before information, the method can also include: that the first user equipment is sent according to preset mapping relations to the network equipment Uplink information, the preset mapping relations include the mapping relations of user equipment and competition transmission unit CTU.It is understood that It is that when initial, when user equipment sends uplink information to the network equipment, the mapping relations used are that preset mapping is closed System.
The embodiment of the present application third aspect provides a kind of network equipment, has to reduce to generate when UE sends uplink information and collide Probability.The function can also execute corresponding software realization by hardware realization by hardware.The hardware or software package Include one or more modules corresponding with above-mentioned function.
The embodiment of the present application fourth aspect provides a kind of user equipment, has to reduce to generate when UE sends uplink information and collide Probability.The function can also execute corresponding software realization by hardware realization by hardware.The hardware or software package Include one or more modules corresponding with above-mentioned function.
The 5th aspect of the embodiment of the present application provides a kind of network equipment, may include: memory, transceiver, processor, institute Memory, the transceiver is stated to connect with the processor by bus;
The memory, for storing operational order;
The transceiver, for receiving the first uplink information of the first user equipment transmission;To first user equipment Confirmation message is sent, the confirmation message includes first label, and first label is used to indicate first user and sets It is standby to send the second uplink information using the CTU exclusively enjoyed;
The processor is described first if demodulating first uplink information not successfully for the network equipment The first label of each user equipment distribution mapped on the corresponding competition transmission unit CTU of uplink information, first label are used Uplink information is sent using the CTU exclusively enjoyed in instruction each user equipment.
The aspect of the embodiment of the present application the 6th provides a kind of user equipment, memory, transceiver, processor, the memory, The transceiver is connected with the processor by bus;
The memory, for storing operational order;
The transceiver, for receiving the confirmation message of network equipment transmission;The first uplink is sent using the first CTU Information;
The processor, if corresponding for the first user equipment described in the confirmation message is the first label, root According to first label, determine that the first competition transmission unit CTU, first label are used to indicate each user equipment and use solely The CTU that enjoys sends uplink information, each user equipment be the uplink information that sent the first user equipment last time not by It demodulates successfully, the user equipment mapped on corresponding competition transmission unit CTU.
The 7th aspect of the embodiment of the present application provides a kind of wireless communication device, may include:
At least one processor, memory, transmission circuit and bus system, the processor, the memory, the receipts Power Generation Road is coupled by the bus system, and the wireless communication device is communicated by the transmission circuit with user equipment, The memory is for storing program instruction, at least one described processor is for executing the journey stored in the memory Sequence instruction, so that the wireless communication device executes network described in the method as described in the embodiment of the present application first aspect is any The part of equipment operation.The wireless communication device is also possible to using executing in the network device either the network equipment The System on Chip/SoC of corresponding function.
The embodiment of the present application eighth aspect provides a kind of wireless communication device, may include:
At least one processor, memory, transmission circuit and bus system, the processor, the memory, the receipts Power Generation Road is coupled by the bus system, and the wireless communication device is communicated by the transmission circuit with the network equipment, The memory is for storing program instruction, at least one described processor is for executing the journey stored in the memory Sequence instruction, so that the wireless communication device executes user described in the method as described in the embodiment of the present application second aspect is any The part of equipment operation.The wireless communication device is also possible to using executing in a user device either user equipment The System on Chip/SoC of corresponding function.
The 9th aspect of the embodiment of the present application provides a kind of communication system, which includes that the network equipment and user set Standby, which is to execute the network equipment described in the application first aspect or any optional implementation of first aspect; The user equipment is to execute user equipment described in the application second aspect or any optional implementation of second aspect.
The tenth aspect of the embodiment of the present application provides a kind of storage medium, it should be noted that the technical solution sheet of the application The all or part of the part that contributes to existing technology or the technical solution can produce mouth with software in other words in matter Form embodies, which is stored in a storage medium, by being stored as based on used in above equipment Calculation machine software instruction, it includes be the network equipment for executing above-mentioned first aspect, second aspect is designed by user equipment Program.
The storage medium includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access The various media that can store program code such as memory (RAM, Random Access Memory), magnetic or disk.
The tenth one side of the embodiment of the present application provides a kind of computer program product comprising instruction, when its on computers When operation, so that computer executes the method as described in the application first aspect or first aspect any optional implementation.
The aspect of the embodiment of the present application the 12nd provides a kind of computer program product comprising instruction, when its on computers When operation, so that computer executes the method as described in the application second aspect or second aspect any optional implementation.
As can be seen from the above technical solutions, the embodiment of the present application has the advantage that
In the embodiment of the present application, the first user equipment receives the confirmation message that the network equipment is sent;If the confirmation message In first user equipment it is corresponding be the first label, then first user equipment according to this first label, determine the first competition Transmission unit CTU, first label are used to indicate each user equipment and send uplink information, each use using the CTU exclusively enjoyed Family equipment is that the uplink information sent the first user equipment last time is not demodulated success, on corresponding competition transmission unit CTU The user equipment of mapping;First user equipment sends the first uplink information using the first CTU.First user equipment can root According to confirmation message, determine then corresponding the first CTU exclusively enjoyed sends the first uplink information on the first CTU, because first CTU is that UE is exclusively enjoyed, so, when reducing UE and sending uplink information to base station, the probability to collide has saved data transmission Resource.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to institute in embodiment and description of the prior art Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is system architecture diagram applied in the embodiment of the present application;
Fig. 2 is one embodiment schematic diagram of the method for scheduling of resource in the embodiment of the present application;
Fig. 3 A is that the mapping ruler of UE and CTU preset in the embodiment of the present application determine the embodiment signal of mapping relations Figure;
Fig. 3 B is a schematic diagram of the ACK information that base station is sent to user equipment in the embodiment of the present application;
Fig. 3 C is the flow diagram exempted from scheduling mechanism in the embodiment of the present application and transmit uplink information;
Fig. 3 D is traditional mapping schemes based on fixed window avoidance mechanism in the embodiment of the present application, is based on exponential backoff machine Collide the statistical chart of number in the traditional mapping schemes of system and the mapping scheme of the application;
Fig. 3 E is that UE collides the relation schematic diagram of UE par in probability and each CTU in the embodiment of the present application;
Fig. 3 F is that collide probability and data of UE reach the relation schematic diagram of probability in the embodiment of the present application;
The collision probability and data arrival rate and each CTU that Fig. 3 G is reduced by the technical solution in the embodiment of the present application The relation schematic diagram of interior corresponding UE par;
Fig. 4 is one embodiment schematic diagram of the network equipment in the embodiment of the present application;
Fig. 5 is one embodiment schematic diagram of user equipment in the embodiment of the present application;
Fig. 6 is another embodiment schematic diagram of the network equipment in the embodiment of the present application;
Fig. 7 is another embodiment schematic diagram of user equipment in the embodiment of the present application.
Specific embodiment
The embodiment of the present application provides a kind of method of scheduling of resource, generates collision when sending uplink information for reducing UE Probability.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, technical solutions in the embodiments of the present application are described, it is clear that described embodiment is only the application a part Embodiment, instead of all the embodiments.Based on the embodiment in the application, it shall fall within the protection scope of the present application.
In a kind of existing technical solution, CTU can be determined according to UE ID (user equipment identity) Serial number, i.e. CTUindex=UE ID mod NCTU(formula 1)
Wherein, in equation 1, CTUindexFor CTU sequence number, NCTUFor CTU quantity.As collision generation, the user that need to be retransmitted Equipment again attempted to send uplink information respectively after a period of time of random back.
But in the mapping scheme, which is a kind of relatively-stationary mapping mechanism.If there is UE ID not Continuously;Portfolio is unbalanced between UE;The data arrival of part UE has situations such as certain correlation, may all collide, meeting Lead to the unjustness problem between UE in collision probability.Although enabling mapping mechanism can per progress linear transformation after a period of time To alleviate the unjustness problem between UE to a certain extent, but can not still solve to retransmit collision problem.Moreover, after UE keeps out of the way During re-transmission collision may be generated with other UE again.Retransmitting caused by same data multiple impacts will lead to additional energy consumption.
In the embodiment of the present application, the network equipment receives the uplink information that the first user equipment is sent;If the network is set Standby to demodulate first uplink information not successfully, then the network equipment is that the corresponding competition transmission of first uplink information is single The first label of each user equipment distribution mapped on first CTU, first label, which is used to indicate each user equipment, to be made Uplink information is sent with the CTU exclusively enjoyed;The network equipment sends confirmation message, the confirmation letter to first user equipment Breath includes first label, and first label is used to indicate first user equipment and sends second using the CTU exclusively enjoyed Uplink information.The application compared to the prior art, the case where colliding again when can retransmit uplink information to avoid UE, also drops The low mean collisional probability of communication system UE entirety;Furthermore, it is possible to solve the sparse arrival bring wasting of resources of uplink information Problem.
Technology described herein can be adapted for long term evolution (Long Term Evolution, abbreviation LTE) system, Or other use the wireless communication system of various wireless access technologys, and for example, by using CDMA, frequency division multiple access, time division multiple acess, Orthogonal frequency division multiple access, the system of the access technologies such as single-carrier frequency division multiple access.Further, it is also possible to be suitable for subsequent using LTE system Evolution system, such as the 5th generation 5G (the fifth generation, 5G) system, including new wireless (New Radio, NR) System or the LTE of evolution (evolved LTE) system etc..As shown in Figure 1, being formed for system provided by the embodiments of the present application Structural schematic diagram, the system can include: the network equipment and terminal device, wherein terminal device can have multiple.
User equipment in the embodiment of the present application can be referred to as terminal device (User Equipment, UE), mobile station (Mobile Station, MS), mobile terminal (Mobile Terminal), intelligent terminal etc., which can be through wireless Access net (Radio Access Network, RAN) is communicated with one or more core nets.For example, terminal device can be with It is mobile phone (or being " honeycomb " phone), computer with mobile terminal etc., terminal device can also be portable, sleeve Precious formula, hand-held, built-in computer or terminal device in vehicle-mounted mobile device and future NR network, they and nothing Line access exchanges voice or data.
The network equipment involved by the application may include base station (base station, abbreviation BS), and the network equipment is It is a kind of to be deployed in wireless access network to provide the device of wireless communication function for UE.The base station may include various forms Macro base station, micro-base station, relay station, access point etc..In the system using different wireless access technologys, has base station function The title of the equipment of energy may be different, such as in LTE system, node B (the evolved NodeB letter of referred to as evolution Claim: eNB or eNodeB), in NR system, referred to as gNB, in third generation 3G system, referred to as node B (Node B) etc..
Below by way of examples, the method for the scheduling of resource in the embodiment of the present application is described further, such as It is one embodiment schematic diagram of the method for scheduling of resource in the embodiment of the present application shown in Fig. 2.
201, uplink information is sent to the network equipment by user equipment.
In the prior art, the mapping relations of UE and CTU are that prior base station determines.It plunges into the commercial sea to meet mMTC scene The demand of connection is measured, and radio resource often has mapped multiple UE on the same CTU using maximizing.I.e. multiple UE can be with Uplink information is sent to base station using the same CTU.Uplink information is referred to as upstream data, uplink signal etc..
It illustratively, as shown in table 1 below, is the mapping table of base station preset UE and CTU.
Title CTU1 CTU2 CTU3 CTU4 CTU5 CTU6 CTU7 CTU8 CTU9 CTU10
UE ID 1,11 2,12 3,13 4,14 5,15 6,16 7,17 8,18 9,19 10,20
Table 1
Fig. 3 A is the mapping relations figure of UE and CTU preset in the embodiment of the present application.In shown in Fig. 3 A, on each CTU Map multiple UE.It should be noted that do not sent not instead of for the first time if uplink information is sent to the network equipment by user equipment, When any primary transmission uplink information after first send, the mapping relations of use are the ACK that the network equipment is sent The mapping relations indicated in information.
202, the network equipment determines ACK information.
It is possible, firstly, to carry out one to acknowledgement frame (acknowledge, the ACK) information being related in the embodiment of the present application Simple illustration.ACK information is that base station (base station, BS) is the signal for indicating whether to receive simultaneously some UE of unsuccessful demodulation And the feedback signal sent to UE.In the prior art, if there is N number of UE, ACK can be defined as N × 1 to Measure x, x=(x1,x2,...,xN)T, wherein xn=1 indicates uplink information of the BS unsuccessful demodulation to n-th of UE, xn=0 indicates Failed demodulation or the uplink information for not receiving the UE.
In the embodiment of the present application, the network equipment determines ACK information, may include:
(1) if the network equipment demodulates first uplink information not successfully, the network equipment is described first The first label of each user equipment distribution mapped on the corresponding competition transmission unit CTU of uplink information, first label are used Uplink information is sent using the CTU exclusively enjoyed in instruction each user equipment.
(2) if the first uplink information described in the network equipment unsuccessful demodulation, the network equipment is first use Family equipment distribution second label;The confirmation message includes the second label, and second label is used to indicate described first User equipment sends uplink information using the non-CTU exclusively enjoyed.
(3) network equipment is the first user equipment distribution third label for not receiving uplink information;It is described Confirmation message includes third label, and the third label is used to indicate first user equipment and is sent using the non-CTU exclusively enjoyed Uplink information.
It should be understood that including at least one of the first label, the second label and third label in ACK information.Optionally, if The network equipment demodulates first uplink information not successfully, then the network equipment is that first uplink information is corresponding Except the successful user equipment distribution of demodulation first label in each user equipment mapped on CTU.
Illustratively, in order to which the UE of the UE and not sent uplink information that distinguish demodulation failure (are not excluded for having sent still BS The case where not receiving), to xnOne processing can be increased.Such as: use xn=00 indicates the UE of not sent uplink information, Use xn=01 indicates the UE not being successfully demodulated, uses xn=11 indicate the UE being successfully demodulated.
It should be noted that just can not learn hair when the uplink information demodulation failure that BS sends a certain user equipment The UE ID of the uplink information is given, but the pilot tone where UE transmission uplink information is known.Wherein, particle CTU divided Degree includes but is not limited to time, frequency, code book, pilot tone.The corresponding pilot tone of each CTU is different, therefore BS can be sentenced by pilot tone Which CTU where the uplink information of disconnected demodulation failure is, then, the UE mapped on the CTU is marked as 01, instruction not by Unsuccessful demodulation;Alternatively, the UE in CTU used in the uplink information of demodulation failure in addition to demodulating successfully can be marked as 01 by BS, Instruction is not successfully demodulated.
Illustratively, ACK information is " 00 01 11 01 00 00 00 00 00 00 00 01 00 01 00 00 00 00 00 00".It should be understood that tag arrangement is tactic from UE1 to UE20 in ACK information here.In practical applications, The mark information of UE can also be arranged in ACK information with inverted order, be also possible to others and put in order, be not specifically limited.
It should be understood that when being determined ACK message for the uplink information that BS is each UE transmission, for determining for 2bit information Justice can also use other mark modes.For example, using xn=00 indicates the UE of not sent uplink information, uses xn=11 indicate not The UE being successfully demodulated, uses xn=01 indicates the UE being successfully demodulated.There are also the combinations of other various arrangements, do not go to live in the household of one's in-laws on getting married one by one herein It states.For ACK information, 3bit, the definition of the information such as 4bit, or alphabetical, the definition that letter is combined with number can also be, It is not specifically limited herein.
203, ACK information is sent to user equipment by the network equipment.
In the embodiment of the present application, ACK information is sent to user equipment by the network equipment, and specific sending method can be The mode of broadcast is also possible to the mode of unicast, can also be the mode of multicast, is not specifically limited.
204, user equipment determines corresponding mark information according to ACK information.
In the embodiment of the present application, user equipment determines corresponding mark information according to ACK information, and corresponding label can be with Including the first label, the second label and third label.Wherein, the first label is used to indicate the first user equipment use and exclusively enjoys CTU send the second uplink information;Second label is used to indicate first user equipment and sends uplink using the non-CTU exclusively enjoyed Information;Third label is used to indicate first user equipment and sends uplink information using the non-CTU exclusively enjoyed.
205, user equipment sends uplink to the network equipment using corresponding CTU resource according to corresponding mark information and believes Breath.
In the embodiment of the present application, user equipment is set using corresponding CTU resource to network according to corresponding mark information Preparation serves row information, may include:
(1) if the first user equipment described in the confirmation message it is corresponding be the first label, first user sets It is standby to be marked according to described first, determine the first competition transmission unit CTU, first label, which is used to indicate each user equipment, to be made Uplink information is sent with the CTU exclusively enjoyed, each user equipment is the uplink information sent the first user equipment last time It is not demodulated success, the user equipment mapped on corresponding competition transmission unit CTU.
(2) if the first user equipment described in the confirmation message it is corresponding be the second label, first user sets It is standby to send uplink information using the non-CTU exclusively enjoyed.
(3) if it is third label that the first user equipment described in the confirmation message is corresponding, first user is set It is standby to send uplink information using the non-CTU exclusively enjoyed.
Optionally, if the first user equipment described in the confirmation message it is corresponding be the first label, it is described first use Family equipment determines that the first competition transmission unit CTU, first label are used to indicate each user and set according to first label Standby to send uplink information using the CTU exclusively enjoyed, each user equipment is the uplink sent the first user equipment last time Information is not demodulated success, the user equipment mapped on corresponding competition transmission unit CTU.
Illustratively, Fig. 3 B is a schematic diagram of the ACK information that base station is sent to user equipment in the embodiment of the present application. Assuming that totally 20 UE, ID are respectively 1~20.Mark information is " 00 01 11 01 00 00 00 00 00 00 00 01 00 01 00 00 00 00 00 00".After UE receives the ACK information of network equipment transmission, where searching oneself in ACK information The x of positionnWhether 01 is equal to determine whether needing to retransmit.Wherein, " 00 " and " 11 " instruction user equipment can be used non-only The CTU enjoyed sends uplink information, and " 01 " instruction user equipment sends uplink information using the CTU exclusively enjoyed, specifically refers to Fig. 3 B It is shown.
When ACK information is broadcast message, each UE does not just know that oneself whether need to retransmit, currently it is also known that needs in all UE The corresponding position in ACK information the UE to be retransmitted.01 UE is marked as in ACK information by the sequence in ACK information sequence It has successively been assigned to the CTU exclusively enjoyed, and other UE are then sequentially allocated in order to remaining CTU.Shown in Fig. 3 B In, in certain transmission time slot, UE2 is collided with UE12, therefore they can be assigned to the CTU exclusively enjoyed. UE4 needs to retransmit due to demodulation failure, and UE14 has then been also indicated as 01 due to sharing the same CTU with UE4, thus It has been also distributed to the CTU exclusively enjoyed.Fig. 3 C is the flow diagram exempted from scheduling mechanism in the embodiment of the present application and transmit uplink information.
In the embodiment of the present application, a CTU is monopolized when retransmitting due to retransmitting UE, touch again when avoiding re-transmission The possibility hit.UE causes the case where retransmitting only possible generation primary due to collision, reduces unnecessary re-transmission.From entirety From the point of view of collision probability, the embodiment of the present application obtains consistency conclusion in terms of theoretical calculation with experiment simulation two, it was demonstrated that This patent mapping scheme reduces the collision probability of system, to reduce power consumption.Further, due to retransmission mechanism without etc. To back off time, smaller average delay is realized.
It should be noted that in addition to Sparse Code multiple access technique, also available to other multiple access technique fields.Example Such as PDMA, MUSA other can realize the multiple access technique for exempting from scheduling mechanism.By the CTU concept in this programme change into PDMA, Corresponding resource concept in MUSA, and resource is exclusively enjoyed to there is the UE for retransmitting and needing to distribute.
Fig. 3 D is traditional mapping schemes based on fixed window avoidance mechanism in the embodiment of the present application, is based on exponential backoff machine Collide the statistical chart of number in the traditional mapping schemes of system and the mapping scheme of the application.In shown in Fig. 3 D, Ke Yifa Existing tradition mapping method is there are data that are more secondary or colliding more than two times, and the data of technical scheme are to mostly occurring Primary collision, the whole number to collide are relatively low.
The collision probability formula of the collision probability and the application that derive prior art can prove that the application is implemented Example has a clear superiority from mathematical probabilities angle.Although if when the quantity of UE is excessive relative to CTU quantity under original state The UE that (i.e. CTU is shared by excessive UE) does not need largely to retransmit has been marked as 01 and has enjoyed the chance for exclusively enjoying CTU, meeting Cause certain wasting of resources.But theoretical formula is derived with the collision probability of simulation results show the application mapping scheme still Advantage is had more than traditional scheme.
It can carry out theory deduction and emulation experiment below to illustrate that the application has lower collision probability.It needs to illustrate , some data proposed in explanation below are only a kind of example, do not constitute the limit to the application protection scope It is fixed.Fig. 3 E is that UE collides the relation schematic diagram of UE par in probability and each CTU in the embodiment of the present application.Fig. 3 F The schematic diagram of probability is reached for collide probability and data of UE in the embodiment of the present application.It wherein, is this in Fig. 3 E and Fig. 3 F Apply for technical solution compared with traditional mapping ruler, traditional mapping ruler may include that fixed window avoidance mechanism is (existing again Scheme 1) and exponential backoff mechanism (existing scheme 2).The collision that Fig. 3 G is reduced by the technical solution in the embodiment of the present application is general The relation schematic diagram of rate and corresponding UE par in data arrival rate and each CTU.
It is assumed that one is exempted from dispatching uplink communication network comprising N number of competition the competition-based of transmission unit (CTU).Each The par for the UE being assigned in CTU is n, therefore, a shared N × n UE in system.NmExpression is assigned to m UE's The quantity of CTU, p indicate the average uplink data arrival rate of each UE, due to exempting from scheduling, stand once upstream data reaches UE It is sent to base station, without a series of handshake operations, so p, that is, upstream data sending probability.It is also possible to by p It is considered as the measurement of communication system traffic busy extent, the quantity of UE is enlivened in the UE of the shared CTU of k expression.Obviously, as k >=2, Two or more user equipmenies send upstream data in same competition transmission unit in this CTU, that is, are collided.
The embodiment of the present application can build the corresponding probability of any active ues quantity in a CTU using bi-distribution Mould.And in order to simplify problem optimization target, it is assumed that the upstream data one for the UE not collided surely by BS receive and at Function demodulation, i.e., re-transmission in need the reason of only be from collision between user equipment.So, n user equipment is assigned CTU in, have k user equipment while sending the probability of upstream data and follow bi-distribution and can be expressed as
Then, the probability for having collision to occur in CTU is i.e. are as follows:
In the embodiment of the present application, by b (k;N, p) use pn,k,pSymbol replaces, and respectively by UE in traditional resource impact Collision probability p under the resource impact scheme that scheme and the application proposeconWith pproIt indicates.Next both will be provided to reflect The collision probability derivation process under scheme is penetrated, the superior of the resource impact scheme that the application is proposed is proved finally by comparing Property.
It 1, can will be all in a communication process when calculating the UE collision probability under existing resource impact scheme UE is divided into two pieces to discuss --- and it include the UE for not including in the UE and CTU of re-transmission demand and having re-transmission demand in CTU.
(1) include in CTU re-transmission demand UE.
Firstly, the UE quantity to collide in a CTU are as follows:
Because CTU quantity is N, in all UE, the UE quantity that needs to retransmit are as follows:
When a collision occurs, it needs to reattempt re-transmission using avoidance mechanism.Ideally, it is had occurred in the same CTU This several UE of collision should be different from each other in randomly selected back off time, and otherwise, the UE to collide still can be in weight It is collided again when biography.In following probability calculation, moving back at random for the user equipment collided under same CTU selection is not considered for the time being Keep away time identical probability.It will prove below, even if this probability to be included in the collision probability of existing scheme, this patent is touched It hits probability and still is below existing scheme.Therefore, in the case that the random-backoff time for considering each re-transmission UE selection is to be staggered, These retransmit the UE quantity to collide again in UE are as follows:
Above-mentioned formula 6 it can be concluded that be because only need consider retransmit UE where CTU in, in addition to re-transmission that UE with Outside, one or more UE has the case where upstream data arrival in remaining UE.
(2) UE for having re-transmission demand is not included in CTU.
Firstly, calculating the CTU probability for not including in CTU and having the UE of re-transmission demand:
Since the UE in this kind of CTU is first transmission upstream data, it is only necessary to can be sent out inside each CTU with simply calculating The UE quantity of raw collision, which is multiplied, obtains the UE quantity that total meeting of this part collides:
Therefore, under existing resource impact scheme, the collision probability of UE are as follows:
2, when calculating the UE collision probability under resource impact scheme proposed in this paper, all UE can also be divided into two Block discusses --- exclusively enjoy the UE of the UE and shared CTU of CTU.
(1) UE of CTU is exclusively enjoyed.
Since exemplified scheme is to analyze it to there is re-transmission UE to provide characteristic as the CTU that one exclusively enjoys When collision probability, consider to calculate total re-transmission UE quantity first, when BS demodulates failure to a certain uplink information, just can not learn The UE ID of the information is sent, therefore, all UE in CTU used in the signal of demodulation failure are marked as 01 by BS, that is, work as CTU Inside there is part UE to collide, then all UE will obtain exclusively enjoying CTU in CTU.Therefore total UE for having obtained exclusively enjoying CTU Quantity are as follows:
(2) UE of CTU is shared.
It can be calculated by formula 10, it is remaining for shared CTU number of resources are as follows:
Nmulti=N-Nsingle(formula 11)
This is to be shared for upstream data by non-zero 1 remaining UE, and UE is spread evenly across this NmultiIn a CTU.By In it is this be averagely it is opposite because the UE quantity of shared CTU may not necessarily be shared CTU quantity and divide exactly, in a part of CTU The UE quantity being assigned to can be 1 more than other CTU, it is assumed that the UE quantity being assigned in shared CTU has k and two kinds of k+1, needs This two parts CTU is individually considered, the UE number of its collision is calculated.Here, N can be solved with simultaneous one group of equationkWith Nk+1 Number:
Nk+Nk+1=Nmulti(formula 12)
It need to obtain NkWith Nk+1Expression formula about n, p.But in above-mentioned equation group, k is by sharing the UE quantity of CTU divided by altogether The quantity for enjoying the CTU of property is rounded downwards gained, is not determining numerical value, thus equation can not solve.If a upper time slot touches Hit that situation is slighter, then the CTU monopolized is less, and the degree of crowding of UE not will increase much in shared CTU, i.e. the number of a It is worth smaller;Conversely, monopolized a large amount of CTU if last round of crash behavior is extremely serious, only remaining a small amount of CTU is distributed to UE without re-transmission shares, then the numerical value of a is larger.Since under normal circumstances, the collision probability of system is no more than 6%.Therefore, A can be considered as 0, i.e. k=n in calculating shared CTU when the distribution situation of number of users by sum up situation.
This part UE due to exclusively enjoying CTU will not necessarily collide, and only need to consider in the embodiment of the present application shared This NmultiThe UE quantity to collide in a CTU inside collides for the CTU shared by k user equipment UE quantity are as follows:
For the CTU shared by k+1 user equipment, the UE quantity that inside collides are as follows:
Therefore, under existing resource impact scheme, the collision probability of UE are as follows:
From formula 9 and formula 17 it is found that having been obtained under existing resource impact scheme and the mentioned mapping scheme of author Collision probability.Therefore, the difference of the two probability are as follows:
It can also attempt to do formula 18 simplification mathematically, due to:
Therefore, formula 18 can be simplified expression are as follows:
Pdiff=(1-qn-1)(1-qn-1+(n-1)p)+(1-qn-npqn-1)(n2-1)(qn-qn-1)
(formula 20)
Wherein, q=1-p.By in Fig. 3 G it can be seen that p=0, when n=2, pdiff=0, and when p >=0, n >=2, function list It adjusts and is incremented by, therefore, the probability that the technical solution in the embodiment of the present application collides when UE sends uplink information is less than Technical solution provided by the prior art.
The embodiment of the method for the scheduling of resource in the embodiment of the present application is illustrated above, corresponding network is set below Standby and user equipment is illustrated, as shown in figure 4, for one embodiment schematic diagram of the network equipment in the embodiment of the present application, it can To include:
Receiving module 401, for receiving the first uplink information of the first user equipment transmission;
Distribution module 402, it is corresponding for the first uplink information if demodulating the first uplink information not successfully for the network equipment Competition transmission unit CTU on the first label of each user equipment distribution for mapping, the first label is used to indicate each user and sets It is standby to send uplink information using the CTU exclusively enjoyed;
Sending module 403, for sending confirmation message to the first user equipment, confirmation message is marked including first, and first Label is used to indicate the first user equipment and sends the second uplink information using the CTU exclusively enjoyed.
Optionally, in some embodiments of the present application,
Distribution module 402, specifically for in each user equipment for being mapped on the corresponding CTU of the first uplink information except solution Adjust successful the first label of user equipment distribution.
Optionally, in some embodiments of the present application, confirmation message includes the second label, and the second label is used to indicate the One user equipment sends uplink information using the non-CTU exclusively enjoyed;
Distribution module 402 is specifically used for the first uplink information of unsuccessful demodulation, then the network equipment is the distribution of the first user equipment Second label.
Optionally, in some embodiments of the present application, confirmation message includes third label, and third label is used to indicate the One user equipment sends uplink information using the non-CTU exclusively enjoyed;
Distribution module 402 distributes third label specifically for the first user equipment not receive uplink information.
Optionally, in some embodiments of the present application,
Sending module 403, specifically for sending confirmation letter to the first user equipment by way of broadcast, multicast or unicast Breath.
As shown in figure 5, may include: for one embodiment schematic diagram of user equipment in the embodiment of the present application
Receiving module 501, for receiving the confirmation message of network equipment transmission;
Determining module 502, if corresponding for the first user equipment in confirmation message is the first label, according to the first mark Note determines that the first competition transmission unit CTU, the first label are used to indicate each user equipment and send uplink using the CTU exclusively enjoyed Information, each user equipment are that the uplink information sent the first user equipment last time is not demodulated success, corresponding competition transmission The user equipment mapped on unit CTU;
Sending module 503, for sending the first uplink information using the first CTU.
Optionally, in some embodiments of the present application,
Determining module 502 determines the first CTU, confirmation letter specifically for the sequence according to the first label in confirmation message It include the label of each user equipment in breath, wherein the label of each user equipment is corresponded with the ID of each user equipment, The ID sequence of each user equipment arranges.
Optionally, in some embodiments of the present application,
Sending module 503, if it is the second label that it is corresponding, which to be also used to the first user equipment in confirmation message, using non-only The CTU enjoyed sends uplink information.
Optionally, in some embodiments of the present application,
Sending module 503, if it is third label that it is corresponding, which to be also used to the first user equipment in confirmation message, using non-only The CTU enjoyed sends uplink information.
Optionally, in some embodiments of the present application,
Sending module 503 is also used to send uplink information, preset mapping to the network equipment according to preset mapping relations Relationship includes the mapping relations of user equipment and competition transmission unit CTU.
Fig. 6 is a kind of structural schematic diagram of network equipment provided in an embodiment of the present invention, which can be because of configuration Or performance is different and generate bigger difference, may include one or more central processing units (central Processing units, CPU) 622 (for example, one or more processors) and memory 632, one or more Store the storage medium 630 (such as one or more mass memory units) of application program 642 or data 644.Wherein, it deposits Reservoir 632 and storage medium 630 can be of short duration storage or persistent storage.The program for being stored in storage medium 630 may include One or more modules (diagram does not mark), each module may include to the series of instructions operation in the network equipment. Further, central processing unit 622 can be set to communicate with storage medium 630, and storage is executed on the network equipment 600 and is situated between Series of instructions operation in matter 630.
The network equipment 600 can also include one or more power supplys 626, one or more wired or wireless nets Network interface 650, one or more input/output interfaces 658, and/or, one or more operating systems 641, such as Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreeBSDTM etc..
The step as performed by the network equipment can be based on the network equipment infrastructure shown in fig. 6 in above-described embodiment, this Place repeats no more.
Fig. 7 shows the block diagram of the part-structure of mobile phone relevant to terminal provided in an embodiment of the present invention.With reference to figure 7, mobile phone include: radio frequency (Radio FreqUEncy, RF) circuit 710, memory 720, input unit 730, display unit 740, Sensor 750, voicefrequency circuit 760, Wireless Fidelity (wireless fidelity, WiFi) module 770, processor 780 and The components such as power supply 790.It will be understood by those skilled in the art that handset structure shown in Fig. 7 does not constitute the restriction to mobile phone, It may include perhaps combining certain components or different component layouts than illustrating more or fewer components.
It is specifically introduced below with reference to each component parts of the Fig. 7 to mobile phone:
RF circuit 710 can be used for receiving and sending messages or communication process in, signal sends and receivees, particularly, by base station After downlink information receives, handled to processor 780;In addition, the data for designing uplink are sent to base station.In general, RF circuit 710 include but is not limited to antenna, at least one amplifier, transceiver, coupler, low-noise amplifier (Low Noise Amplifier, LNA), duplexer etc..In addition, RF circuit 710 can also be communicated with network and other equipment by wireless communication. Any communication standard or agreement, including but not limited to global system for mobile communications (Global can be used in above-mentioned wireless communication System of Mobile communication, GSM), general packet radio service (General Packet Radio Service, GPRS), CDMA (Code Division Multiple Access, CDMA), wideband code division multiple access (Wideband Code Division Multiple Access, WCDMA), long term evolution (Long Term Evolution, LTE), Email, short message service (Short Messaging Service, SMS) etc..
Memory 720 can be used for storing software program and module, and processor 780 is stored in memory 720 by operation Software program and module, thereby executing the various function application and data processing of mobile phone.Memory 720 can mainly include Storing program area and storage data area, wherein storing program area can application journey needed for storage program area, at least one function Sequence (such as sound-playing function, image player function etc.) etc.;Storage data area can be stored to be created according to using for mobile phone Data (such as audio data, phone directory etc.) etc..It, can be in addition, memory 720 may include high-speed random access memory Including nonvolatile memory, for example, at least a disk memory, flush memory device or other volatile solid-states Part.
Input unit 730 can be used for receiving the number or character information of input, and generate with the user setting of mobile phone with And the related key signals input of function control.Specifically, input unit 730 may include that touch panel 731 and other inputs are set Standby 732.Touch panel 731, also referred to as touch screen, collect user on it or nearby touch operation (such as user use The operation of any suitable object or attachment such as finger, stylus on touch panel 731 or near touch panel 731), and root Corresponding attachment device is driven according to preset formula.Optionally, touch panel 731 may include touch detecting apparatus and touch Two parts of controller.Wherein, the touch orientation of touch detecting apparatus detection user, and touch operation bring signal is detected, Transmit a signal to touch controller;Touch controller receives touch information from touch detecting apparatus, and is converted into touching Point coordinate, then gives processor 780, and can receive order that processor 780 is sent and be executed.Furthermore, it is possible to using electricity The multiple types such as resistive, condenser type, infrared ray and surface acoustic wave realize touch panel 731.In addition to touch panel 731, input Unit 730 can also include other input equipments 732.Specifically, other input equipments 732 can include but is not limited to physics One of keyboard, function key (such as volume control button, switch key etc.), trace ball, mouse, operating stick etc. are a variety of.
Display unit 740 can be used for showing information input by user or be supplied to user information and mobile phone it is various Menu.Display unit 740 may include display panel 741, optionally, can use liquid crystal display (Liquid Crystal Display, LCD), the forms such as Organic Light Emitting Diode (Organic Light-Emitting Diode, OLED) it is aobvious to configure Show panel 741.Further, touch panel 731 can cover display panel 741, when touch panel 731 detect it is on it or attached After close touch operation, processor 780 is sent to determine the type of touch event, is followed by subsequent processing device 780 according to touch event Type corresponding visual output is provided on display panel 741.Although in Fig. 7, touch panel 731 and display panel 741 It is that the input and input function of mobile phone are realized as two independent components, but in some embodiments it is possible to by touch-control Panel 731 and display panel 741 are integrated and that realizes mobile phone output and input function.
Mobile phone may also include at least one sensor 750, such as optical sensor, motion sensor and other sensors. Specifically, optical sensor may include ambient light sensor and proximity sensor, wherein ambient light sensor can be according to ambient light Light and shade adjust the brightness of display panel 741, proximity sensor can close display panel 741 when mobile phone is moved in one's ear And/or backlight.As a kind of motion sensor, accelerometer sensor can detect in all directions (generally three axis) and accelerate The size of degree can detect that size and the direction of gravity when static, can be used to identify the application of mobile phone posture, (for example horizontal/vertical screen is cut Change, dependent game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;May be used also as mobile phone The other sensors such as gyroscope, barometer, hygrometer, thermometer, the infrared sensor of configuration, details are not described herein.
Voicefrequency circuit 760, loudspeaker 761, microphone 762 can provide the audio interface between user and mobile phone.Audio-frequency electric Electric signal after the audio data received conversion can be transferred to loudspeaker 761, be converted to sound by loudspeaker 761 by road 760 Signal output;On the other hand, the voice signal of collection is converted to electric signal by microphone 762, after being received by voicefrequency circuit 760 Audio data is converted to, then by after the processing of audio data output processor 780, through RF circuit 710 to be sent to such as the other hand Machine, or audio data is exported to memory 720 to be further processed.
WiFi belongs to short range wireless transmission technology, and mobile phone can help user's transceiver electronics postal by WiFi module 770 Part, browsing webpage and access streaming video etc., it provides wireless broadband internet access for user.Although Fig. 7 is shown WiFi module 770, but it is understood that, and it is not belonging to must be configured into for mobile phone, it can according to need do not changing completely Become in the range of the essence of invention and omits.
Processor 780 is the control centre of mobile phone, using the various pieces of various interfaces and connection whole mobile phone, is led to It crosses operation or executes the software program and/or module being stored in memory 720, and call and be stored in memory 720 Data execute the various functions and processing data of mobile phone, to carry out integral monitoring to mobile phone.Optionally, processor 780 can Including one or more processing units;Preferably, processor 780 can integrate application processor and modem processor, wherein The main processing operation system of application processor, user interface and application program etc., modem processor mainly handles channel radio Letter.It is understood that above-mentioned modem processor can not also be integrated into processor 780.
Mobile phone further includes the power supply 790 (such as battery) powered to all parts, it is preferred that power supply can pass through power supply pipe Reason system and processor 780 are logically contiguous, to realize management charging, electric discharge and power managed by power-supply management system Etc. functions.
Although being not shown, mobile phone can also include camera, bluetooth module etc., and details are not described herein.
It should be noted that the step as performed by user equipment can be based on the use shown in Fig. 7 in above-described embodiment Family device structure, details are not described herein again.
The embodiment of the present application provides a kind of wireless communication device, and the composition component of the communication device can refer to 6 institute of earlier figures The network equipment shown.In a kind of feasible design, the hardware configuration of the communication device is necessary according to the embodiment of the present application institute Important document, may include:
At least one processor, memory, transmission circuit and bus system, the processor, the memory, the receipts Power Generation Road is coupled by the bus system, and the wireless communication device is communicated by the transmission circuit with user equipment, The memory is for storing program instruction, at least one described processor is for executing the journey stored in the memory Sequence instruction, so that the wireless communication device executes the portion of the network device operation as described in the application embodiment shown in Fig. 2 Point.The wireless communication device either the network equipment, be also possible to be using execute corresponding function in the network device System chip.
The embodiment of the present application also provides a kind of wireless communication device, may include:
At least one processor, memory, transmission circuit and bus system, the processor, the memory, the receipts Power Generation Road is coupled by the bus system, and the wireless communication device is communicated by the transmission circuit with the network equipment, The memory is for storing program instruction, at least one described processor is for executing the journey stored in the memory Sequence instruction, so that the wireless communication device executes the portion of the user facility operation as described in the application embodiment shown in Fig. 2 Point.The wireless communication device either user equipment, be also possible to be using execute corresponding function in a user device System chip.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.The computer program Product includes one or more computer instructions.When loading on computers and executing the computer program instructions, all or It partly generates according to process or function described in the embodiment of the present application.The computer can be general purpose computer, dedicated meter Calculation machine, computer network or other programmable devices.The computer instruction can store in computer readable storage medium In, or from a computer readable storage medium to the transmission of another computer readable storage medium, for example, the computer Instruction can pass through wired (such as coaxial cable, optical fiber, number from a web-site, computer, server or data center Word user line (DSL)) or wireless (such as infrared, wireless, microwave etc.) mode to another web-site, computer, server Or data center is transmitted.The computer readable storage medium can be any usable medium that computer can access or Person is comprising data storage devices such as one or more usable mediums integrated server, data centers.The usable medium can To be magnetic medium, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or semiconductor medium (such as solid-state is hard Disk Solid State Disk (SSD)) etc..
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed system, device and method can be with It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit It divides, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or The mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, the indirect coupling of device or unit It closes or communicates to connect, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, the technical solution of the application is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) executes the complete of each embodiment the method for the application Portion or part steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey The medium of sequence code.
The above, above embodiments are only to illustrate the technical solution of the application, rather than its limitations;Although referring to before Embodiment is stated the application is described in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and scope of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution.

Claims (24)

1. a kind of method of scheduling of resource characterized by comprising
The network equipment receives the first uplink information that the first user equipment is sent;
If the network equipment demodulates first uplink information not successfully, the network equipment is first uplink information The first label of each user equipment distribution mapped on corresponding competition transmission unit CTU, first label are used to indicate institute It states each user equipment and sends uplink information using the CTU exclusively enjoyed;
The network equipment sends confirmation message to first user equipment, and the confirmation message includes first label, First label is used to indicate first user equipment and sends the second uplink information using the CTU exclusively enjoyed.
2. the method according to claim 1, wherein the network equipment is that first uplink information is corresponding The first label of each user equipment distribution mapped on competition transmission unit CTU, comprising:
The network equipment is in each user equipment mapped on the corresponding CTU of first uplink information except demodulation is successful User equipment distribution first label.
3. method according to claim 1 or 2, which is characterized in that the confirmation message is marked including second, and described second Label is used to indicate first user equipment and sends uplink information using the non-CTU exclusively enjoyed;
After the network equipment receives the first uplink information that the first user equipment is sent, the method also includes:
If the first uplink information described in the network equipment unsuccessful demodulation, the network equipment is first user equipment point With second label.
4. method according to claim 1 or 2, which is characterized in that the confirmation message includes third label, the third Label is used to indicate first user equipment and sends uplink information using the non-CTU exclusively enjoyed;
After the network equipment receives the first uplink information that the first user equipment is sent, the method also includes:
The network equipment is the first user equipment distribution third label for not receiving uplink information.
5. method according to claim 1 to 4, which is characterized in that the network equipment is to first user equipment Send confirmation message, comprising:
The network equipment sends the confirmation message to first user equipment by way of broadcast, multicast or unicast.
6. a kind of method of scheduling of resource characterized by comprising
First user equipment receives the confirmation message that the network equipment is sent;
If corresponding the first user equipment described in the confirmation message is the first label, first user equipment is according to institute The first label is stated, determines that the first competition transmission unit CTU, first label are used to indicate what each user equipment use exclusively enjoyed CTU sends uplink information, and each user equipment is that the uplink information sent the first user equipment last time is not demodulated Success, it is corresponding to compete the user equipment mapped on transmission unit CTU;
First user equipment sends the first uplink information using the first CTU.
7. according to the method described in claim 6, it is characterized in that, first user equipment is marked according to described first, really Fixed first competition transmission unit CTU, comprising:
Sequence of first user equipment according to first label in the confirmation message, determines the first CTU, institute State the label in confirmation message including each user equipment, wherein the label of each user equipment and each user The ID of equipment is corresponded, and the ID sequence of each user equipment arranges.
8. method according to claim 6 or 7, which is characterized in that the method also includes:
If corresponding the first user equipment described in the confirmation message is the second label, first user equipment uses non- The CTU exclusively enjoyed sends uplink information.
9. method according to claim 6 or 7, which is characterized in that the method also includes:
If corresponding the first user equipment described in the confirmation message is third label, first user equipment uses non- The CTU exclusively enjoyed sends uplink information.
10. according to any method of claim 6-9, which is characterized in that the first user equipment receives the network equipment Before the confirmation message of transmission, the method also includes:
First user equipment sends uplink information to the network equipment according to preset mapping relations, and the preset mapping is closed System includes user equipment and the mapping relations for competing transmission unit CTU.
11. a kind of network equipment characterized by comprising
Receiving module, for receiving the first uplink information of the first user equipment transmission;
Distribution module, if demodulating first uplink information not successfully for the network equipment, for first uplink letter The first label of each user equipment distribution mapped on corresponding competition transmission unit CTU is ceased, first label is used to indicate Each user equipment sends uplink information using the CTU exclusively enjoyed;
Sending module, for sending confirmation message to first user equipment, the confirmation message includes first label, First label is used to indicate first user equipment and sends the second uplink information using the CTU exclusively enjoyed.
12. the network equipment according to claim 11, which is characterized in that
The distribution module, specifically for be removed in each user equipment for being mapped on the corresponding CTU of first uplink information Demodulate successful user equipment distribution first label.
13. the network equipment according to claim 11 or 12, which is characterized in that the confirmation message includes the second label, Second label is used to indicate first user equipment and sends uplink information using the non-CTU exclusively enjoyed;
The distribution module is specifically used for the first uplink information described in unsuccessful demodulation, then the network equipment is first use Family equipment distribution second label.
14. the network equipment according to claim 11 or 12, which is characterized in that the confirmation message includes third label, The third label is used to indicate first user equipment and sends uplink information using the non-CTU exclusively enjoyed;
The distribution module is distributed the third specifically for the first user equipment not receive uplink information and is marked.
15. any network equipment of 1-14 according to claim 1, which is characterized in that
The sending module, specifically for by way of broadcast, multicast or unicast to first user equipment send described in Confirmation message.
16. a kind of user equipment characterized by comprising
Receiving module, for receiving the confirmation message of network equipment transmission;
Determining module, if corresponding for the first user equipment described in the confirmation message is the first label, according to First label determines that the first competition transmission unit CTU, first label are used to indicate what each user equipment use exclusively enjoyed CTU sends uplink information, and each user equipment is that the uplink information sent the first user equipment last time is not demodulated Success, it is corresponding to compete the user equipment mapped on transmission unit CTU;
Sending module, for sending the first uplink information using the first CTU.
17. user equipment according to claim 16, which is characterized in that
The determining module determines described first specifically for the sequence according to first label in the confirmation message CTU includes the label of each user equipment in the confirmation message, wherein the label of each user equipment and described every The ID of a user equipment is corresponded, and the ID sequence of each user equipment arranges.
18. user equipment according to claim 16 or 17, which is characterized in that
Sending module, if it is the second label that it is corresponding, which to be also used to the first user equipment described in the confirmation message, using non- The CTU exclusively enjoyed sends uplink information.
19. user equipment according to claim 16 or 17, which is characterized in that
Sending module, if it is third label that it is corresponding, which to be also used to the first user equipment described in the confirmation message, using non- The CTU exclusively enjoyed sends uplink information.
20. any user equipment of 6-19 according to claim 1, which is characterized in that
The sending module is also used to send uplink information to the network equipment according to preset mapping relations, described preset Mapping relations include user equipment and competition transmission unit CTU mapping relations.
21. a kind of computer readable storage medium, including instruction, when it runs on network devices, so that the network equipment is held Method of the row as described in claim 1-5 any one.
22. a kind of computer readable storage medium, including instruction, when it runs on a user device, so that user equipment is held Method of the row as described in claim 6-10 any one.
23. a kind of computer program product comprising instruction, when run on a computer, so that computer executes such as right It is required that method described in 1-5 any one.
24. a kind of computer program product comprising instruction, when run on a computer, so that computer executes such as right It is required that method described in 6-10 any one.
CN201711206729.4A 2017-11-27 2017-11-27 A kind of method of scheduling of resource, user equipment and the network equipment Pending CN109842949A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711206729.4A CN109842949A (en) 2017-11-27 2017-11-27 A kind of method of scheduling of resource, user equipment and the network equipment
PCT/CN2018/117625 WO2019101212A1 (en) 2017-11-27 2018-11-27 Resource scheduling method, user equipment, and network device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711206729.4A CN109842949A (en) 2017-11-27 2017-11-27 A kind of method of scheduling of resource, user equipment and the network equipment

Publications (1)

Publication Number Publication Date
CN109842949A true CN109842949A (en) 2019-06-04

Family

ID=66631357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711206729.4A Pending CN109842949A (en) 2017-11-27 2017-11-27 A kind of method of scheduling of resource, user equipment and the network equipment

Country Status (2)

Country Link
CN (1) CN109842949A (en)
WO (1) WO2019101212A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105024782A (en) * 2014-06-24 2015-11-04 魅族科技(中国)有限公司 Data transmission method, associated equipment and system
CN105284172A (en) * 2013-03-08 2016-01-27 华为技术有限公司 System and method for uplink grant-free transmission scheme
WO2016206083A1 (en) * 2015-06-26 2016-12-29 华为技术有限公司 Method and apparatus for uplink data transmission
CN106507486A (en) * 2015-09-08 2017-03-15 华为技术有限公司 For the method for transmitting uplink data, the network equipment and terminal unit
CN107113826A (en) * 2015-01-27 2017-08-29 华为技术有限公司 Transmission system and method for exempting from authorized uplink transmission plan
WO2017186160A1 (en) * 2016-04-29 2017-11-02 Huawei Technologies Co., Ltd. System and method for coexistence of grant-free and grant-based uplink traffic

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9743423B2 (en) * 2015-07-27 2017-08-22 Futurewei Technologies, Inc. Link adaptation in grant-free multiple access systems
EP4283896A3 (en) * 2016-05-13 2024-01-10 Sony Group Corporation Communications device and infrastructure equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105284172A (en) * 2013-03-08 2016-01-27 华为技术有限公司 System and method for uplink grant-free transmission scheme
CN105024782A (en) * 2014-06-24 2015-11-04 魅族科技(中国)有限公司 Data transmission method, associated equipment and system
CN107113826A (en) * 2015-01-27 2017-08-29 华为技术有限公司 Transmission system and method for exempting from authorized uplink transmission plan
WO2016206083A1 (en) * 2015-06-26 2016-12-29 华为技术有限公司 Method and apparatus for uplink data transmission
CN106507486A (en) * 2015-09-08 2017-03-15 华为技术有限公司 For the method for transmitting uplink data, the network equipment and terminal unit
WO2017186160A1 (en) * 2016-04-29 2017-11-02 Huawei Technologies Co., Ltd. System and method for coexistence of grant-free and grant-based uplink traffic

Also Published As

Publication number Publication date
WO2019101212A1 (en) 2019-05-31

Similar Documents

Publication Publication Date Title
US20190260521A1 (en) Harq-ack feedback information transmission method and related apparatus
CN110324900B (en) PDSCH receiving method and terminal
JP7170130B2 (en) Feedback information transmission method and terminal device
CN106231637A (en) Secondary cell alternative approach, device and base station
US20210045156A1 (en) Channel access method, user equipment, base station, and related device
CN108811151A (en) A kind of method, terminal device and access network equipment sending uplink information
CN106254043A (en) Method, base station and the target terminal of a kind of data transmission
CN109274470A (en) Control the indicating means and Related product of information
CN109217995A (en) A kind of data processing method, terminal and base station
WO2017101605A1 (en) Data transmission method and station
CN106714207A (en) Information processing method and terminal device
CN109995495A (en) A kind of data transmission method and data transmission set
CN107612643A (en) Channel detection method and channel detection equipment
CN106453839A (en) Antenna adjusting method and mobile terminal
CN106792819A (en) A kind of method and device of the power consumption for reducing mobile terminal
CN109803417A (en) Determine the method, uplink detection reference signal sending method and equipment of reference signal
CN110234172A (en) Method, the method and device of access category creation of a kind of data transmission
CN105792368A (en) Control information processing method and system and related devices
CN109565797A (en) Uplink signal transmission method, terminal device and the network equipment
CN109802753A (en) The transmission method and device of CSI
CN106658353A (en) Data migration method and mobile equipment
CN107105503A (en) A kind of data transmission method and communication equipment, system
CN109803353A (en) A kind of data processing method, access point and work station
CN111278124B (en) Resource allocation method, resource determination method, network side equipment and terminal
CN106792896A (en) A kind of data transmission method for uplink and mobile terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190604