CN109840721A - Cost model system based on online data management under a kind of big data - Google Patents

Cost model system based on online data management under a kind of big data Download PDF

Info

Publication number
CN109840721A
CN109840721A CN201910185775.3A CN201910185775A CN109840721A CN 109840721 A CN109840721 A CN 109840721A CN 201910185775 A CN201910185775 A CN 201910185775A CN 109840721 A CN109840721 A CN 109840721A
Authority
CN
China
Prior art keywords
module
data
cost
management
electrically
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910185775.3A
Other languages
Chinese (zh)
Inventor
卢健妃
宫迅伟
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mining Business (suzhou) Management Consulting Co Ltd
Original Assignee
China Mining Business (suzhou) Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mining Business (suzhou) Management Consulting Co Ltd filed Critical China Mining Business (suzhou) Management Consulting Co Ltd
Priority to CN201910185775.3A priority Critical patent/CN109840721A/en
Publication of CN109840721A publication Critical patent/CN109840721A/en
Withdrawn legal-status Critical Current

Links

Abstract

The invention discloses the cost model systems based on online data management under a kind of big data in cost model systems technology field, electrically output connects cost computing module to the index collection module, the cost computing module electrically inputs link cost management module, electrically input connection data transfer module to the cost management module, electrically output connects data contrast module to the cost computing module, electrically output connects central processing unit to the data comparison module, the model construction module electrically exports connection features value acquisition module, electrically output connects feedback module to the characteristic value acquisition module, electrically output connects central processing unit to the feedback module, collection building data may be implemented, change data in contract dataset and work progress are, it realizes to cost estimation, the measuring and calculating of objective cost and the management of cost risk, It realizes effective cost control, improves work efficiency.

Description

Cost model system based on online data management under a kind of big data
Technical field
The present invention relates to cost model systems technology field, under specially a kind of big data based on online data management at This model system.
Background technique
Cost model management system is the material cost that special disposal uses planned cost accounting, the material of planned costs method Readjusted prices by the system typing planning price single with plan for adjustment unit price, but traditional cost data is mostly derived from cost working people Calculating of the member to the grasp of cost information and to construction project amount, when quantities calculation aspect generally requires to expend a large amount of Between and energy, and often because mistake cause the omission of project amount, rerun, reduce costs the accuracy of data, and And management system is easy to appear the model data deviation after quotation information mistake and modeling in quote process, this is just directly affected To the progress of project cost, real-time monitoring can not be carried out for the index during cost, and cannot find cost mistake in time Deviation and mistake in journey, for this purpose, it is proposed that based on the cost model system of online data management under a kind of big data.
Summary of the invention
The purpose of the present invention is to provide under a kind of big data based on the cost model system of online data management, to solve The problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: based on online data management under a kind of big data Cost model system, the model construction module including carrying out model foundation, electrically output connects index to the model construction module Acquisition module, electrically output connection cost computing module, the cost computing module electrical property input connect the index collection module It is connected into this management module, electrically input connection data transfer module to the cost management module, and the data are transferred module and passed through Network protocol and database are electrically connected, and electrically output connects data contrast module, the data pair to the cost computing module Output connection central processing unit electrically than module, the model construction module electrically exports connection features value acquisition module, described The electrical output connection feedback module of characteristic value acquisition module, the electrical output connection central processing unit of the feedback module, it is described in Electrically output connection wireless transport module, display module and alarm module, the wireless transport module are electrical respectively for central processor Defeated connection remote terminal.
Preferably, the cost management module include bidding management module, facilities management module, contract management module, Risk management module and expenses management module, and the bidding management module, facilities management module, contract management module, wind Dangerous management module and expenses management module electrically input connection data management module, and the bidding management module, facility Electrically output connects the data transmission module for management module, contract management module, risk management module and expenses management module.
Preferably, it includes command analysis module, the electrically output connection of described instruction parsing module that the data, which transfer module, Function transfers module, and the function transfers module, and electrically output link order execution module, described instruction execution module are electrically defeated Connection rings literary sending module out.
Preferably, the data comparison module includes the data acquisition module being electrically connected with cost computing module, described Electrically output connection unit price contrast module and classification contrast module, the unit price compare mould to data acquisition module respectively Electrically output connection data processing module, the data processing module electrically export connection data hair for block and classification contrast module Module is sent, electrically output connects central processing unit to the data transmission blocks.
Preferably, the feedback module includes carrying out received signal to characteristic value acquisition module processing information to receive mould Block, electrically output connection variance analysis module, the variance analysis module electrically input connection benchmark to the signal receiving module Module, electrically output connection Data Integration module, the Data Integration module electrically export connection letter to the variance analysis module Number transmitting module.
Preferably, the display module includes carrying out received data reception module to the data information of central processing unit, Electrically output connection data analysis module, the data analysis module electrically export connection filtering mould to the data reception module Block, electrically output connects display to the filter module.
Preferably, the application method of the cost model system under a kind of big data based on online data management:
S1: realizing the foundation of engineering model by model construction module first, is carried out by index collection module to Engineering Modeling Index collection is easy to implement the collection of unit price index of estimate, these indexs is then transferred to cost computing module, simultaneously Characteristic value acquisition module can be acquired the building parameter in Engineering Modeling, and be transferred to feedback module, be connect by signal It receives module to receive the acquisition data in characteristic value acquisition module, then passes information to variance analysis module, and Modeling reference information can be passed to variance analysis module by base modules, pass through modeling reference information and Real-time modeling set information pair Than, and comparative information is passed into Data Integration module and is integrated, model structure is then transferred to by signal emission module Modeling block is convenient for modeling again, and controls alarm module by central processing unit and alarm, convenient for being repaired in time Just, it improves to the error correction in modeling process;
S2: data are transferred the command analysis module in module and can be parsed to operational order, can by network protocol from Called data information in database, and the corresponding command function of module progress is transferred by function and is transferred, and passes through instruction execution Module executes corresponding instruction, transfers data to cost management module, also, bidding pipe finally by literary sending module is rung Reason module carries out project amount using engineering software and calculates automatically, and compares with the tender documents bill of quantities of tenderer, is convenient for Realize the management optimization of bidding, contract management module is easy to implement convenient for the dynamic of grasp contract in time to the real-time of contract Management, risk management module are used to carry out cost dynamic in real time to manage, when cost is exceeded, carries out the exceeded early warning of cost, take The customisation costs plan of engineering 5D cost model is used with management module, calculating and comparison to cost is realized, will finally transfer number According to cost computing module is transferred to, by being integrated with the collected data of index collection module, to realize to model Cost estimation;
S3: after cost computing module completes estimation, data comparison module is transferred data to, by data acquisition module to cost Data in computing module are acquired, and then determine whether to lead to for minimum quotation information by unit price contrast module It crosses classification contrast module and determines whether cost classification information is correct, then unit price contrast module and classification contrast module will be each Data processing module is transferred to from data measured result to be focused on, and is then transferred to center by data transmission blocks again Processor improves the stringency to construction engineering cost, while may insure work in order to the accuracy of construction engineering cost Lower cost can be obtained when journey cost;
S4: cost data information can be carried out real-time display by display module by central processing unit, and central processing unit can Cost information is transferred to remote terminal by wireless transport module, cost information is understood in time convenient for staff.
Compared with prior art, the beneficial effects of the present invention are:
1. the invention carries out index collection to Engineering Modeling by index collection module, it is easy to implement unit price index of estimate It collects, these indexs is then transferred to cost computing module, while characteristic value acquisition module can be to the structure in Engineering Modeling It builds parameter to be acquired, and is transferred to feedback module, by signal receiving module to the acquisition data in characteristic value acquisition module It is received, then passes information to variance analysis module, and modeling reference information can be passed to deviation by base modules Analysis module is compared by modeling reference information and Real-time modeling set information, and comparative information is passed to Data Integration module It is integrated, model construction module is then transferred to by signal emission module and is convenient for modeling again, and passes through center Processor control alarm module is alarmed, and convenient for being modified in time, is improved to the error correction in modeling process;
2. the invention is transferred the command analysis module in module by data and can be parsed to operational order, net can be passed through Network agreement called data information from database, and the corresponding command function of module progress is transferred by function and is transferred, and is passed through Instruction execution module executes corresponding instruction, transfers data to cost management module finally by literary sending module is rung, also, Bidding management module carries out project amount using engineering software and calculates automatically, and the tender documents bill of quantities pair with tenderer Than being easy to implement the management optimization of bidding, contract management module is easy to implement convenient for the dynamic of grasp contract in time to contract Real-time management, risk management module be used for cost carry out in real time dynamic manage, when cost is exceeded, carry out cost it is exceeded pre- Alert, expenses management module uses the customisation costs plan of engineering 5D cost model, realizes calculating and comparison to cost, will finally adjust Access is according to cost computing module is transferred to, by being integrated with the collected data of index collection module, to realize to mould The cost estimation of type;
3. the invention transfers data to data comparison module, passes through data acquisition module after cost computing module completes estimation Block is acquired the data in cost computing module, is then determined whether by unit price contrast module for minimum quotation Information determines whether cost classification information is correct by classification contrast module, then unit price contrast module and classification comparison Respective data measured result is transferred to data processing module and focused on by module, is then passed again by data transmission blocks It is defeated by central processing unit and improves the stringency to construction engineering cost in order to the accuracy of construction engineering cost, while can Lower cost can be obtained when ensuring project cost.
Detailed description of the invention
Fig. 1 is working principle diagram of the present invention;
Fig. 2 is cost management module frame chart of the present invention;
Fig. 3 is that data of the present invention transfer module frame chart;
Fig. 4 is data comparison module frame chart of the present invention;
Fig. 5 is feedback module block diagram of the present invention;
Fig. 6 is that the invention shows module frame charts.
In figure: 1 model construction module, 2 index collection modules, 3 cost computing modules, 4 cost management modules, 41 biddings Management module, 42 facilities management modules, 43 contract management modules, 44 risk management modules, 45 expenses management modules, 46 data pipes Reason module, 47 data transmission modules, 5 data transfer module, 51 command analysis modules, 52 functions and transfer module, 53 instruction executions The literary sending module of module, 54 sound, 6 databases, 7 data comparison modules, 71 data acquisition modules, 72 unit price contrast modules, 73 classification contrast modules, 74 data processing modules, 75 data transmission blocks, 8 central processing units, 9 characteristic value acquisition modules, 10 are instead Present module, 101 signal receiving modules, 102 variance analysis modules, 103 base modules, 104 Data Integration modules, 105 signals hair Penetrate module, 11 wireless transport modules, 12 remote terminals, 13 display modules, 131 data reception modules, 132 data analysis modules, 133 filter modules, 134 displays, 14 alarm modules.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-6 is please referred to, the present invention provides a kind of technical solution: the cost based on online data management under a kind of big data Model system, the model construction module 1 including carrying out model foundation, electrically output connects index collection mould to model construction module 1 Block 2, electrically output connection cost computing module 3, cost computing module 3 electrically input link cost management to index collection module 2 Module 4, electrically input connection data transfer module 5 to cost management module 4, and data transfer module 5 and pass through network protocol and data Library 6 is electrically connected, and electrically output connects data contrast module 7, the electrically output connection of data comparison module 7 to cost computing module 3 Central processing unit 8, electrically output connection features value acquisition module 9, characteristic value acquisition module 9 electrically export model construction module 1 Feedback module 10 is connected, electrically output connects central processing unit 8, the electrically output connection respectively of central processing unit 8 to feedback module 10 Wireless transport module 11, display module 13 and alarm module 14, the electrically defeated connection remote terminal 12 of wireless transport module 11.
Wherein, cost management module 4 include bidding management module 41, facilities management module 42, contract management module 43, Risk management module 44 and expenses management module 45, and bidding management module 41, facilities management module 42, contract management module 43, risk management module 44 and the electrically input connection data management module 46, and bidding management mould of expenses management module 45 Electrically output connects for block 41, facilities management module 42, contract management module 43, risk management module 44 and expenses management module 45 Connect data transmission module 47;
It includes command analysis module 51 that data, which transfer module 5, and the electrical output connection function of command analysis module 51 transfers module 52, Function transfers the electrically output link order execution module 53 of module 52, and the electrical output connection of instruction execution module 53 rings text transmission mould Block 54 can parse operational order by command analysis module 51 by this set, can by network protocol from Called data information in database 6, and module 52 transferred by function carry out corresponding command function and transfer, and held by instruction Row module 53 executes corresponding instruction, transfers data to cost management module 4 finally by literary sending module 54 is rung;
Data comparison module 7 includes the data acquisition module 71 being electrically connected with cost computing module 3, and data acquisition module 71 divides Not not electrically output connection unit price contrast module 72 and classification contrast module 73, unit price contrast module 72 and classification comparison Electrically output connection data processing module 74, data processing module 74 electrically export connection data transmission blocks 75 to module 73, The electrical output connection central processing unit 8 of data transmission blocks 75, can be by data acquisition module 71 to making by this set Data in valence computing module 3 are acquired, and are then determined whether by unit price contrast module 72 for minimum offer Breath determines whether cost classification information is correct by classification contrast module 73, then unit price contrast module 72 and classification pair Respective data measured result is transferred to data processing module 74 than module 73 to focus on, is then sent again by data Module 75 is transferred to central processing unit 8 in order to the accuracy of construction engineering cost, improves to the stringent of construction engineering cost Property;
Feedback module 10 includes handling characteristic value acquisition module 9 information to carry out received signal receiving module 101, and signal receives Electrically output connection variance analysis module 102, variance analysis module 102 electrically input connection base modules 103 to module 101, partially Electrically output connection Data Integration module 104, Data Integration module 104 electrically export connection signal transmitting to poor analysis module 102 Module 105 can carry out the acquisition data in characteristic value acquisition module 9 by signal receiving module 101 by this set It receives, then passes information to variance analysis module 102, and base modules 103 can pass to modeling reference information partially Poor analysis module 102 is compared by modeling reference information and Real-time modeling set information, and comparative information is passed to Data Integration Module 104 is integrated, and is then transferred to model construction module 1 by signal emission module 105 and is convenient for modeling again, just It is modified in time;
Display module 13 includes carrying out received data reception module 131, data reception to the data information of central processing unit 8 Electrically output connection data analysis module 132, data analysis module 132 electrically export connection filter module 133, filtering to block 131 Electrically output connects display 134 to module 133.
The application method of cost model system based on online data management under a kind of big data:
S1: first by model construction module 1 realize engineering model foundation, by index collection module 2 to Engineering Modeling into Row index acquisition, is easy to implement the collection of unit price index of estimate, these indexs is then transferred to cost computing module 3, Characteristic value acquisition module 9 can be acquired the building parameter in Engineering Modeling simultaneously, and be transferred to feedback module 10, pass through Signal receiving module 101 receives the acquisition data in characteristic value acquisition module 9, then passes information to variance analysis Module 102, and modeling reference information can be passed to variance analysis module 102 by base modules 103, by modeling reference information It is compared with Real-time modeling set information, and comparative information is passed into Data Integration module 104 and is integrated, then sent out by signal It penetrates module 105 and is transferred to model construction module 1 and be convenient for modeling again, and alarm module is controlled by central processing unit 8 14 alarm, and convenient for being modified in time, improve to the error correction in modeling process;
S2: data are transferred the command analysis module 51 in module 5 and can be parsed to operational order, and network protocol can be passed through The called data information from database 6, and module 52 transferred by function carry out corresponding command function and transfer, and pass through instruction Execution module 53 executes corresponding instruction, transfers data to cost management module 4 finally by literary sending module 54 is rung, and And bidding management module 41 carries out project amount using engineering software and calculates automatically, and the tender documents project amount with tenderer Inventory comparison, is easy to implement the management optimization of bidding, and contract management module 43 is convenient for real convenient for the dynamic of grasp contract in time Now to the real-time management of contract, risk management module 44 is used to carry out cost dynamic in real time to manage, and when cost is exceeded, carries out The exceeded early warning of cost, expenses management module 45 use the customisation costs plan of engineering 5D cost model, realize to the calculating of cost and Comparison, is finally transferred to cost computing module 3 for called data, whole by carrying out with the collected data of index collection module 2 It closes, to realize the cost estimation to model;
S3: after cost computing module 3 completes estimation, transferring data to data comparison module 7, right by data acquisition module 71 Data in cost computing module 3 are acquired, and are then determined whether by unit price contrast module 72 for minimum quotation Information determines whether cost classification information is correct by classification contrast module 73, then unit price contrast module 72 and classification Respective data measured result is transferred to data processing module 74 and focused on by contrast module 73, is then sent out again by data It send module 75 to be transferred to central processing unit 8 in order to the accuracy of construction engineering cost, improves to the tight of construction engineering cost Lattice, while may insure that lower cost can be obtained when project cost;
S4: cost data information can be carried out real-time display, and central processing unit by display module 13 by central processing unit 8 Cost information can be transferred to remote terminal 12 by wireless transport module 11 by 8, understand in time convenient for staff cost at This information.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. based on the cost model system of online data management under a kind of big data, it is characterised in that: including carrying out model foundation Model construction module (1), the model construction module (1) electrically output connection index collection module (2), the index collection Module (2) electrically output connection cost computing module (3), electrically input link cost manages mould to the cost computing module (3) Block (4), the cost management module (4) electrically transfer module (5) by input connection data, and the data are transferred module (5) and passed through Network protocol and database (6) are electrically connected, the cost computing module (3) electrically output connection data contrast module (7), institute Data comparison module (7) electrically output connection central processing unit (8) is stated, electrically output connection is special for the model construction module (1) Value indicative acquisition module (9), the characteristic value acquisition module (9) electrically output connection feedback module (10), the feedback module (10) electrically output connection central processing unit (8), the electrical output connection wireless transport module of central processing unit (8) difference (11), display module (13) and alarm module (14), the electrically defeated connection remote terminal (12) of the wireless transport module (11).
2. based on the cost model system of online data management under a kind of big data according to claim 1, feature exists In: the cost management module (4) includes bidding management module (41), facilities management module (42), contract management module (43), risk management module (44) and expenses management module (45), and the bidding management module (41), facilities management module (42), electrically input connects data pipe for contract management module (43), risk management module (44) and expenses management module (45) It manages module (46), and the bidding management module (41), facilities management module (42), contract management module (43), risk pipe Electrically output connects the data transmission module (47) for reason module (44) and expenses management module (45).
3. based on the cost model system of online data management under a kind of big data according to claim 1, feature exists In: it includes command analysis module (51) that the data, which transfer module (5), and electrically output connects function to described instruction parsing module (51) It can transfer module (52), the function transfers module (52) electrically output link order execution module (53), and described instruction executes Electrically output connection rings literary sending module (54) to module (53).
4. based on the cost model system of online data management under a kind of big data according to claim 1, feature exists In: the data acquisition module (71) that the data comparison module (7) includes and cost computing module (3) are electrically connected, the number According to acquisition module (71), electrically output connects unit price contrast module (72) and classification contrast module (73), the unit respectively Cost contrast module (72) and classification contrast module (73) electrically output connection data processing module (74), the data processing Module (74) electrically output connection data transmission blocks (75), the data transmission blocks (75) electrically export connection central processing Device (8).
5. based on the cost model system of online data management under a kind of big data according to claim 1, feature exists In: the feedback module (10) includes carrying out received signal receiving module to characteristic value acquisition module (9) processing information (101), the signal receiving module (101) electrically output connection variance analysis module (102), the variance analysis module (102) electrically input connection base modules (103), the variance analysis module (102) electrically export connection Data Integration module (104), the Data Integration module (104) electrically output connection signal transmitting module (105).
6. based on the cost model system of online data management under a kind of big data according to claim 1, feature exists In: the display module (13) includes carrying out received data reception module (131) to the data information of central processing unit (8), The data reception module (131) electrically output connection data analysis module (132), the data analysis module (132) is electrically Output connection filter module (133), the filter module (133) electrically output connection display (134).
7. a kind of application method of the cost model system under big data based on online data management, it is characterised in that:
S1: the foundation of engineering model is realized by model construction module (1) first, engineering is built by index collection module (2) Mould carries out index collection, is easy to implement the collection of unit price index of estimate, these indexs are then transferred to cost and calculate mould Block (3), while characteristic value acquisition module (9) can be acquired the building parameter in Engineering Modeling, and be transferred to feedback mould Block (10) receives the acquisition data in characteristic value acquisition module (9) by signal receiving module (101), then will letter Breath passes to variance analysis module (102), and modeling reference information can be passed to variance analysis module by base modules (103) (102), it is compared by modeling reference information and Real-time modeling set information, and comparative information is passed into Data Integration module (104) it is integrated, is then transferred to model construction module (1) by signal emission module (105) and is convenient for modeling again, And it is alarmed by central processing unit (8) control alarm module (14), convenient for being modified in time, is improved to modeling Error correction in journey;
S2: data are transferred the command analysis module (51) in module (5) and can be parsed to operational order, and network can be passed through Agreement called data information from database (6), and the corresponding command function of module (52) progress is transferred by function and is transferred, and Corresponding instruction is executed by instruction execution module (53), transfers data to cost pipe finally by literary sending module (54) is rung It manages module (4), also, bidding management module (41) carries out project amount using engineering software and calculates automatically, and with tenderer's The comparison of tender documents bill of quantities is easy to implement the management optimization of bidding, and contract management module (43) is convenient for grasp in time The dynamic of contract, is easy to implement the real-time management to contract, and risk management module (44) is used to carry out cost dynamic in real time to manage Control carries out the exceeded early warning of cost when cost is exceeded, and expenses management module (45) uses engineering 5D cost model customisation costs meter Draw, realize calculating and comparison to cost, called data is finally transferred to cost computing module (3), by and index collection Module (2) collected data are integrated, to realize the cost estimation to model;
S3: after cost computing module (3) completes estimation, data comparison module (7) is transferred data to, data acquisition module is passed through (71) data in cost computing module (3) are acquired, then by unit price contrast module (72) determine whether for Minimum quotation information determines whether cost classification information is correct by classification contrast module (73), and then unit price compares Respective data measured result is transferred to data processing module (74) and carried out at concentration by module (72) and classification contrast module (73) Then reason is transferred to central processing unit (8) by data transmission blocks (75) again in order to the accuracy of construction engineering cost, mentions The high stringency to construction engineering cost, while may insure that lower cost can be obtained when project cost;
S4: cost data information can be carried out real-time display, and centre by display module (13) by central processing unit (8) Cost information can be transferred to remote terminal (12) by wireless transport module (11) by reason device (8), timely convenient for staff Understand cost information.
CN201910185775.3A 2019-03-12 2019-03-12 Cost model system based on online data management under a kind of big data Withdrawn CN109840721A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910185775.3A CN109840721A (en) 2019-03-12 2019-03-12 Cost model system based on online data management under a kind of big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910185775.3A CN109840721A (en) 2019-03-12 2019-03-12 Cost model system based on online data management under a kind of big data

Publications (1)

Publication Number Publication Date
CN109840721A true CN109840721A (en) 2019-06-04

Family

ID=66885634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910185775.3A Withdrawn CN109840721A (en) 2019-03-12 2019-03-12 Cost model system based on online data management under a kind of big data

Country Status (1)

Country Link
CN (1) CN109840721A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112966936A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 System and method for overall process control of survey design project
CN112990532A (en) * 2020-12-26 2021-06-18 广东电网有限责任公司 Power distribution network construction cost accounting system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112990532A (en) * 2020-12-26 2021-06-18 广东电网有限责任公司 Power distribution network construction cost accounting system and method
CN112966936A (en) * 2021-03-05 2021-06-15 广州地铁设计研究院股份有限公司 System and method for overall process control of survey design project

Similar Documents

Publication Publication Date Title
CN108009758B (en) BIM-based intelligent management method for field construction materials
CN111600296B (en) Power load prediction system based on edge calculation and prediction method thereof
CN106443168A (en) Remote acquisition meter reading data analysis system
CN114640173A (en) Early warning model of transformer and generator based on many characteristic quantities
CN104123134A (en) Intelligent electricity use data management method and system based on AMI and J2EE
CN107958357A (en) A kind of Cost Management System of BIM projects
CN109840721A (en) Cost model system based on online data management under a kind of big data
CN106651299A (en) Work order intelligent settlement system and implementation method
CN114422405B (en) Safety detection system and method for payment environment
CN115545868A (en) Financial service integrated fund management system for enterprise operation
CN102355575A (en) Distributed video monitoring device with pre-warning function
CN111369144B (en) Intelligent energy scheduling system and method based on fog calculation and block chain
CN109284330A (en) A kind of Internet of Things big data management system for garden
CN109190947A (en) A kind of traffic control evaluation system
CN111242492B (en) WebService-based resource aggregator regulation and control information interaction system and method
CN107945083A (en) A kind of operation process management method and system
CN106779100A (en) A kind of elevator repair and maintenance handheld terminal and its application method
CN109165874A (en) A kind of work order urgency level analysis method and system based on platform area electricity consumption
CN111090827B (en) Full life cycle management system and method for nuclear power instrument
CN114116756A (en) Engineering cost data correction system and method thereof
CN101493697A (en) Product yield data acquisition and process method in medicine production flow
CN207337196U (en) A kind of plastic tube industry production line wisdom factory data collection system
RU56684U1 (en) AUTOMATED DATA PROCESSING SYSTEM RELATING TO PROPERTY OBJECTS
CN111478340A (en) Distribution network line reactive compensation condition analysis method
CN109358590A (en) A kind of plastic molding and processing plant's management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190604

WW01 Invention patent application withdrawn after publication