CN109838432A - New vertical connection structure - Google Patents

New vertical connection structure Download PDF

Info

Publication number
CN109838432A
CN109838432A CN201810622611.8A CN201810622611A CN109838432A CN 109838432 A CN109838432 A CN 109838432A CN 201810622611 A CN201810622611 A CN 201810622611A CN 109838432 A CN109838432 A CN 109838432A
Authority
CN
China
Prior art keywords
locking nut
nut cap
receptacle body
connection structure
vertical connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810622611.8A
Other languages
Chinese (zh)
Other versions
CN109838432B (en
Inventor
张曰明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Mingjiang Building Energy Saving System Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN109838432A publication Critical patent/CN109838432A/en
Application granted granted Critical
Publication of CN109838432B publication Critical patent/CN109838432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The present invention provides a kind of new vertical connection structures, belong to the connection structure on the products such as a kind of door, window, furniture, shelf, it has receptacle body, there is lateral jack in receptacle body, stayed mast is mounted in jack, there is plate in one end of stayed mast, and there is the groove of V-arrangement in the side of stayed mast, is longitudinally mounted to the conical head of the first bolt inner end in receptacle body towards groove.The problem of this vertical connecting structure, in use, being connected firmly, closely, stability is good, cracks when avoiding use, improves service performance.And it is easy to operate in connection procedure, work efficiency is high.

Description

New vertical connection structure
Technical field
A kind of structure the present invention relates to connection structure, on the products such as especially a kind of door, window, furniture, shelf.
Background technique
Usually there is vertical connecting structure on the products such as door, window, furniture, shelf.By taking door and window fan as an example, two upper and lower frames and two Left and right frame vertically connects and composes door and window fan.Current vertical connecting structure is fixed using the connection of right angle corner brace, bolt, and structure is closed Rationality is poor, and without vertical tightening force, compactness, the stability of connection are low.After a period of use, the two connecting portion can be generated and be split Seam, size, the shape of door leaf can change, and influence service performance and safety.And cumbersome in connection procedure, work effect Rate is low.
Summary of the invention
It is connected vertically to improve the technical problem to be solved by the invention is to provide a kind of new vertical connection structure Stability improves service performance.
The invention is realized in this way new vertical connection structure, it has receptacle body, there is lateral jack in receptacle body, Stayed mast is mounted in jack, and there is plate in one end of stayed mast, and there is the groove of V-arrangement in the side of stayed mast, is longitudinally mounted to jack The conical head of the first bolt inner end on body is towards groove.
The side opposite with the first bolt is fixing body in the receptacle body, and installation part is mounted on fixing body.
The jack is circular hole or slotted eye, and the cross sectional shape of stayed mast is corresponding round or ellipse.
The installation part is the second bolt.
The fixing body is cavity, and the installation part is the first locking nut cap, and the first locking nut cap is mounted on installation In first installing port of external side, there is the first spring between the first locking nut cap and receptacle body, the on the inside of the first locking nut cap One baffle wedge is on the cavity inner wall on the inside of the first installing port.
There is installation cavity in the first bolt side of the receptacle body, is equipped in the second installing port that installation cavity is held in vitro Second locking nut cap, has a second spring between the second locking nut cap and receptacle body, and the baffle wedge on the inside of the second locking nut cap is the On installation cavity inner wall on the inside of two installing ports, the second locking nut cap has tool receptacle.
There is third spring between the receptacle body outer wall and plate.
New vertical connection structure using the above structure, in use, being connected firmly, closely, stability is good, and avoiding makes The problem of used time cracks improves service performance.And it is easy to operate in connection procedure, work efficiency is high.
Detailed description of the invention
Fig. 1 is the schematic diagram of the first example structure of the invention.
Fig. 2 is the left view of Fig. 1.
Fig. 3 illustrates the working principle of the invention.
Fig. 4 is the schematic diagram of second of example structure of the invention.
Fig. 5 is the schematic diagram of the third example structure of the invention.
Fig. 6 is the schematic diagram of the 4th kind of example structure of the invention.
Fig. 7 is the schematic diagram of use state of the present invention.
Fig. 8 is the top view of Fig. 7.
Specific embodiment
Below by specific embodiment, and its attached drawing is combined, the present invention will be described in detail.
As shown in the picture, the new vertical connection structure of the present invention, which is characterized in that it has receptacle body 7, has in receptacle body Lateral jack 14, stayed mast 10 are mounted in jack, and there is plate 18 in one end of stayed mast, and there be the recessed of V-arrangement in the side of stayed mast Slot 9 is longitudinally mounted to the conical head 8 of 6 inner end of the first bolt in receptacle body towards groove 9.
Obviously, there should be mounting structure on the first bolt.Mounting structure can be the installation groove 17 at top, be also possible to six Angular head 23 can also have installation groove on the top on hexagonal head.
In use, receptacle body is inserted into a component to be connected, produced in advance on the component corresponding with the first bolt Hole.Plate is inserted into another in the preset connection structure of connecting elements.As shown in figure 3, rotating the first bolt using tool 6, so that conical head is pressed closer the groove on inserted link will make stayed mast inside to plate during the first threaded screw fasteners rotate downlink Side is mobile, realizes locking, complete in a vertical connection.Obviously, the position of groove lowermost end should move inward distance according to plate It needs to set.Initial stage, conical head are in above the cell wall of the separate plate of groove higher position.
The side opposite with the first bolt is fixing body 11 in the receptacle body 7, and installation part 13 is mounted on fixing body On.In use, the installation part on fixing body also functions to installation effect.
The jack 14 is circular hole or slotted eye, and the cross sectional shape of stayed mast is corresponding round or ellipse.
The installation part 13 is the second bolt.Second bolt plays installation fixed function.In the size to connecting elements When smaller, this structure can be used.The bolt will be fixed together to connecting elements and fixing body, but it is relatively multiple to install operation It is miscellaneous.
The fixing body 11 is cavity, and the installation part is the first locking nut cap, and the first locking nut cap is mounted on It fills in the first installing port 16 of external side, there is the first spring 12 between the first locking nut cap and receptacle body 7, first locks in nut cap The first baffle 20 of side is stuck on the cavity inner wall on the inside of the first installing port.Equally, and it is smaller in the size to connecting elements When, this structure can be used.In use, stamping hole in the installation site to connecting elements, the first locking nut cap is with whole device Being packed into should be to connecting elements.When the first locking nut cap is in when the position in the hole on connecting elements, the first locking nut cap is in bullet Automatic spring under the action of spring is stuck on the hole.Installation operation is relatively easy.
There are installation cavity 5, peace in the second installing port 15 that installation cavity is held in vitro in the first bolt side of the receptacle body 7 Equipped with the second locking nut cap 2, there is second spring 4 between the second locking nut cap and receptacle body, second locks first on the inside of nut cap Baffle 3 is stuck on the installation cavity inner wall on the inside of the second installing port, and the second locking nut cap has tool receptacle 1.To connecting elements Size it is larger, when installation space is sufficient, such structure can be used.In use, and being beaten in the installation site to connecting elements Upper hole, the second locking nut cap is packed into whole device should be on connecting elements.When the second locking nut cap is in on connecting elements Hole position when, second locking nut cap pop-up, be stuck on the hole.
There is third spring 19 between 7 outer wall of receptacle body and plate 18.Under original state, which plays tension Effect also can avoid stayed mast and fall off from jack.
The head end of the conical head 8 of first bolt, 6 inner end can be pointed, be also possible to arcwall face.
As shown in Figure 7, Figure 8, the second locking nut cap 2, first locks nut cap and is fixed on to which on connecting elements, plate is inserted in separately One to which in the installation groove bar 22 on connecting elements 21, stayed mast tenses another to connecting elements, the vertical connection of realization.

Claims (7)

1. new vertical connection structure, which is characterized in that it has receptacle body (7), there is lateral jack (14), pulling force in receptacle body Bar (10) is mounted in jack, and one end of stayed mast has plate (18), and the side of stayed mast has the groove of V-arrangement (9), longitudinally mounted The conical head (8) of the first bolt (6) inner end in receptacle body is towards groove (9).
2. new vertical connection structure as described in claim 1, which is characterized in that with first in the receptacle body (7) The opposite side of bolt is fixing body (11), and installation part (13) is mounted on fixing body.
3. new vertical connection structure as claimed in claim 1 or 2, which is characterized in that the jack (14) be circular hole or Slotted eye, the cross sectional shape of stayed mast are corresponding round or ellipse.
4. new vertical connection structure as claimed in claim 2, which is characterized in that the installation part (13) is the second spiral shell Bolt.
5. new vertical connection structure as claimed in claim 4, which is characterized in that the fixing body (11) is cavity, institute The installation part stated is the first locking nut cap, and the first locking nut cap is mounted on the first installing port (16) on the outside of fixing body Nei, first Have the first spring (12) between locking nut cap and receptacle body (7), the first baffle (20) on the inside of the first locking nut cap is stuck in first On cavity inner wall on the inside of installing port.
6. new vertical connection structure as claimed in claim 1 or 2, which is characterized in that the first of the receptacle body (7) Bolt side has installation cavity (5), is equipped with the second locking nut cap (2) in the second installing port (15) that installation cavity is held in vitro, and second Have second spring (4) between locking nut cap and receptacle body, the second baffle (3) on the inside of the second locking nut cap is stuck in the second installing port On the installation cavity inner wall of inside, the second locking nut cap has tool receptacle (1).
7. new vertical connection structure as claimed in claim 1 or 2, which is characterized in that receptacle body (7) outer wall with There are third spring (19) between plate (18).
CN201810622611.8A 2017-11-29 2018-06-15 Vertical connection structure Active CN109838432B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2017216231359 2017-11-29
CN201721623135 2017-11-29

Publications (2)

Publication Number Publication Date
CN109838432A true CN109838432A (en) 2019-06-04
CN109838432B CN109838432B (en) 2024-06-07

Family

ID=65090061

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810622611.8A Active CN109838432B (en) 2017-11-29 2018-06-15 Vertical connection structure
CN201820933445.9U Expired - Fee Related CN208442111U (en) 2017-11-29 2018-06-15 New vertical connection structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201820933445.9U Expired - Fee Related CN208442111U (en) 2017-11-29 2018-06-15 New vertical connection structure

Country Status (1)

Country Link
CN (2) CN109838432B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838432B (en) * 2017-11-29 2024-06-07 滨州明匠建筑节能系统科技有限公司 Vertical connection structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB803854A (en) * 1957-03-21 1958-11-05 John Stanley Nelson Permanent mould for making cast stud link chain
DE1921483A1 (en) * 1969-04-26 1970-11-12 Viktor Mueller Connection fitting, especially for furniture
TW394332U (en) * 1999-10-29 2000-06-11 Yang Shu Shian Betterment of assembly structure for foot post and frame board of the framework
CN202017681U (en) * 2010-12-06 2011-10-26 奉化市华利特厨具有限公司 Fixedly connecting piece for assembly
CN104873256A (en) * 2015-06-19 2015-09-02 陈伟 Splicing device for pulling close fibulas on two sides after fibula section cutting osteotomy
CN204941160U (en) * 2015-09-02 2016-01-06 北京猫王家具有限公司 Aluminium alloy extrusions, doorframe, door and door mounting structure
CN205977923U (en) * 2016-08-17 2017-02-22 中国航空工业集团公司西安飞行自动控制研究所 T type frid connection structure
CN106523483A (en) * 2016-12-29 2017-03-22 江苏隆基铝业有限公司 Connecting piece used for aluminum alloy profile
CN208442111U (en) * 2017-11-29 2019-01-29 张曰明 New vertical connection structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB803854A (en) * 1957-03-21 1958-11-05 John Stanley Nelson Permanent mould for making cast stud link chain
DE1921483A1 (en) * 1969-04-26 1970-11-12 Viktor Mueller Connection fitting, especially for furniture
TW394332U (en) * 1999-10-29 2000-06-11 Yang Shu Shian Betterment of assembly structure for foot post and frame board of the framework
CN202017681U (en) * 2010-12-06 2011-10-26 奉化市华利特厨具有限公司 Fixedly connecting piece for assembly
CN104873256A (en) * 2015-06-19 2015-09-02 陈伟 Splicing device for pulling close fibulas on two sides after fibula section cutting osteotomy
CN204941160U (en) * 2015-09-02 2016-01-06 北京猫王家具有限公司 Aluminium alloy extrusions, doorframe, door and door mounting structure
CN205977923U (en) * 2016-08-17 2017-02-22 中国航空工业集团公司西安飞行自动控制研究所 T type frid connection structure
CN106523483A (en) * 2016-12-29 2017-03-22 江苏隆基铝业有限公司 Connecting piece used for aluminum alloy profile
CN208442111U (en) * 2017-11-29 2019-01-29 张曰明 New vertical connection structure

Also Published As

Publication number Publication date
CN109838432B (en) 2024-06-07
CN208442111U (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN208442111U (en) New vertical connection structure
CN210440348U (en) Furniture assembling and connecting structure
CN103883855B (en) Wall hanging components
CN203640064U (en) Crossbeam and stand column connecting structure
CN207213983U (en) A kind of mounting rod
CN208670573U (en) A kind of house ornamentation aluminium bindiny mechanism
CN206196212U (en) First cabinet of row antidetonation skeleton
CN214223271U (en) Air conditioner plate for placing outdoor unit of air conditioner
CN211804741U (en) Screwing mechanism for guiding recognition cap
CN204213577U (en) Wall hanging components
CN209511479U (en) A kind of steel frame construction for indoor small space distance LED display screen installation
CN210361178U (en) Punch for fastening and mounting expansion bolt
CN202718988U (en) Bidirectional reversely progressive fastening bolt
CN210918609U (en) Damping type door stop
KR101355651B1 (en) Kickstand of furniture
CN102720755B (en) Hasp-type hinge structure and lamp
CN206639439U (en) Portable Chinese says literature Graphic Panel
CN204986323U (en) Quick installing support is used to outdoor instrument
CN211405061U (en) High-end outdoor current acquisition unit cabinet that starts
CN108662003B (en) Anti-loosening bolt and nut combination
CN210480529U (en) Anti-drop elevator well ventilation guard plate
CN204941225U (en) Stile's connector in a kind of alumium alloy door and window use
CN216197344U (en) Side-mounted drawer hinge
CN211344730U (en) Wall-mounted connecting assembly of wireless network receiver
CN208339259U (en) A kind of locker Fast Installation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240515

Address after: No. 731, Shajia village, Bincheng District, Binzhou City, Shandong Province

Applicant after: Binzhou Mingjiang building energy saving system technology Co.,Ltd.

Country or region after: China

Address before: 251900 Shandong County of Wudi city of Binzhou province Di new way seed company hospital

Applicant before: Zhang Yueming

Country or region before: China

GR01 Patent grant