CN109838313A CN201910250863.7A CN201910250863A CN109838313A CN 109838313 A CN109838313 A CN 109838313A CN 201910250863 A CN201910250863 A CN 201910250863A CN 109838313 A CN109838313 A CN 109838313A
Authority
CN
China
Prior art keywords
asthma
valve
gas turbine
vent valve
blow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910250863.7A
Other languages
Chinese (zh)
Other versions
CN109838313B (en
Inventor
王凯
徐泽鹏
贾建波
刘志坦
刘江
郝洪亮
胡伟
王文飞
杨勇
李玉刚
曹炼博
贺李龙
李金明
王婷
陈石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guoneng Nanjing Electric Power Test Research Co ltd
Guodian Environmental Protection Research Institute Co Ltd
CHN Energy Group Science and Technology Research Institute Co Ltd
Original Assignee
Guodian Environmental Protection Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian Environmental Protection Research Institute Co Ltd filed Critical Guodian Environmental Protection Research Institute Co Ltd
Priority to CN201910250863.7A priority Critical patent/CN109838313B/en
Publication of CN109838313A publication Critical patent/CN109838313A/en
Application granted granted Critical
Publication of CN109838313B publication Critical patent/CN109838313B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)
  • Control Of Turbines (AREA)

Abstract

The invention discloses a kind of gas turbine anti-asthma blow-off systems, the blowdown piping including being set to two-stage among compressor;The gas turbine anti-asthma blow-off system further include: anti-asthma vent valve is respectively arranged among the compressor on the blowdown piping of two-stage using pneumatic operated valve;Four control solenoid valves control the mobile gas of air rammer that two-stage blowdown piping among compressor corresponds to anti-asthma vent valve respectively;When controlling solenoid valve power loss, controls corresponding anti-asthma vent valve and open.The present invention controls the opening of anti-asthma vent valve, effectively prevents the dangerous situation that power loss causes anti-asthma vent valve that cannot open by the power loss of control solenoid valve.

Description

A kind of gas turbine anti-asthma blow-off system
Technical field
The present invention relates to gas turbine fields, particularly, are related to a kind of gas turbine anti-asthma blow-off system.
Background technique
It can be seen that from the characteristic curve of compressor and work as the air mass flow reduction for flowing through compressor to a certain extent, make to transport Row operating condition enters the left side of surge boundary line, then whole compressor will be unable to steady operation.At that time, air mass flow can neglect big Suddenly small, pressure is low when high when understanding, or even will appear the phenomenon that air-flow is flowed back in ambient atmosphere by compressor, while can also send out The raw huge sound, makes the vibration of unit accompanied by intense, this to phenomenon be commonly referred to as surge.The sky of gas turbine blower itself Aerodynamics characteristic determines that it, once surge occurs for compressor, can will generate pressure very close to stall margin in the start and stop stage The serious consequence that the strong exciting of mechanism of qi, passage component damage even complete machine are scrapped, in consideration of it, gas turbine usually requires to take phase The anti-asthma vibration means answered.
Substantially there are several types of anti-asthma vibration means at present: one, using adjustable inlet guide vane and stator blade;Two, it uses Two-spool compressor;Three, cylinder (casing) processing technique;Four, compressor intergrade is deflated.Wherein, compressor intergrade is deflated It is the air by extracting the specific grade of compressor in specific operating condition, to change the velocity field between compressor stage, comes effectively separate Stall margin avoids accident, this is a kind of simple and easy, anti-asthma vibration means for being widely used.But this technology is to calming the anger There are high requirement, the prior art fails that this want is fully achieved the reliability and fast response characteristic that machine intergrade is deflated Ask, therefore, invent it is a kind of be enable to respond quickly, safe and reliable anti-asthma blow-off system is to the operational safety meaning weight of gas turbine Greatly.
Summary of the invention
The purpose of the present invention is to solve defect existing in the prior art, one kind is provided and is enable to respond quickly and energy Effectively avoid the anti-asthma blow-off system for the dangerous situation for causing anti-asthma vent valve that cannot open because of power loss.
To achieve the goals above, the present invention provides a kind of gas turbine anti-asthma blow-off systems, including are set to compressor The blowdown piping of intermediate two-stage;The gas turbine anti-asthma blow-off system further include:
Anti-asthma vent valve is respectively arranged among the compressor on the blowdown piping of two-stage using pneumatic operated valve;
Four control solenoid valves control the blowdown piping being arranged in two-stage among compressor respectively and correspond to the pneumatic of anti-asthma vent valve The mobile gas of piston;When controlling solenoid valve power loss, controls corresponding anti-asthma vent valve and open.
By solenoid valve, the circulation of gas source is controlled, to control the pneumatic actuator gas of anti-asthma vent valve, is effectively kept away The dangerous situation that power loss causes anti-asthma vent valve that cannot open is exempted from.
Gas turbine anti-asthma blow-off system of the present invention further includes air accumulator;Control solenoid valve is triple valve, one end and gas storage Tank is connected, and one end is connected to atmosphere, and the other end is connected with the corresponding chamber of pneumatic actuator of corresponding anti-asthma vent valve;When each When two control solenoid valves while power loss that the left and right chamber of the pneumatic actuator of anti-asthma vent valve is connected respectively, gas storage Compressed air in tank, which enters via corresponding control solenoid valve in the pneumatic actuator of anti-asthma vent valve, pushes the anti-asthma to put Air valve is opened.
The design of air accumulator and the connection design of triple valve, it is ensured that each switch operation has adequately control empty Gas improves the safety of system.
Further, when two controls that the left and right chamber of pneumatic actuator of each anti-asthma vent valve is connected respectively When solenoid valve processed while power loss, the compressed air in the air accumulator enters the anti-asthma vent valve via corresponding control solenoid valve Pneumatic actuator right chamber, the compression control of the pneumatic actuator left chamber of the anti-asthma vent valve is through corresponding control electricity Magnet valve is put into atmosphere, at this point, the air rammer of the anti-asthma vent valve is pressed towards left side, anti-asthma vent valve is opened.It effectively realizes and works as When corresponding two solenoid valve power loss, corresponding anti-asthma vent valve is opened, and realizes quick response.
Further, the blowdown piping that two-stage is wherein arranged in level-one among compressor is 2, on each blowdown piping Equipped with an anti-asthma vent valve, the left chamber of the pneumatic actuator of two anti-asthma vent valves with same control solenoid valve phase Even, right chamber is connected with another control solenoid valve.
Pass through the two-way design of blowdown piping in two-stage among compressor wherein level-one, it is ensured that it deflates in corresponding operating condition Success, further enhances the safety of system.
Above-mentioned gas turbine anti-asthma blow-off system further include:
Fast open electromagnetic valve, the wherein blowdown piping all the way being arranged in the intermediate level-one that compressor has two-way blowdown piping When anti-asthma vent valve is opened on the corresponding outlet pipe of pneumatic actuator.
By the design of fast open electromagnetic valve, the Rapid degassing function of the blowdown piping at the compressor level position can be realized Can, further increase the fast-response of gas turbine anti-asthma blow-off system.
Further, which further includes filter and non-return valve;The outlet air of compressor Successively it is connected through the filter and non-return valve with air accumulator.
Further, air accumulator is equipped with air intake valve for the first time.
Further, air accumulator is equipped with exhaust valve, throttle orifice and automatic exhaust steam valve;Air accumulator pass sequentially through exhaust valve, Throttle orifice, automatic exhaust steam valve are connected with atmosphere.By the design, the pressure of compressed air in air accumulator is adjusted, it is ensured that gas storage The safe handling of tank.
Further, air accumulator is equipped with pressure monitor valve;Switching knob there are two being set on pressure monitor valve, respectively It is connected with pressure gauge and atmosphere.To the internal pressure real time monitoring of air accumulator.
The present invention has the advantage that compared with prior art
1, the present invention controls the opening of anti-asthma vent valve, is effectively prevented power loss and led by the power loss of control solenoid valve The dangerous situation for causing anti-asthma vent valve that cannot open;
2, control gas source introduces air accumulator from blower outlet, and combines the circulation of control solenoid valve control gas source, to control The pneumatic actuator gas of anti-asthma vent valve, it is ensured that each switch operation has adequately control air, while pressing The Rapid degassing design of certain level-one blowdown piping, can increase safety and the fast-response of system among mechanism of qi;
3, the design of the throttle orifice and automatic exhaust steam valve of air accumulator, further improves the safety of system;
4, two anti-asthma vent valves are arranged in certain level-one blowdown piping simultaneously among compressor, increase system safety margin.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of gas turbine anti-asthma blow-off system of the present invention.
In figure, 1- air accumulator, 2,3,16,17- control solenoid valve, the fast open electromagnetic valve of 4-, 5,6,15- anti-asthma vent valve, 7- Non-return valve, 8- filter, 9- valve, 10- pressure gauge, 11- valve, 12- exhaust valve, 13- throttle orifice, 14- automatic exhaust steam valve.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing.
As shown in Figure 1, the present invention provides a kind of gas turbine anti-asthma blow-off systems, mainly by air accumulator 1, control electromagnetism Valve 2,3,16,17, fast open electromagnetic valve 4, anti-asthma vent valve 5,6,15, non-return valve 7, filter 8, valve 9, pressure gauge 10, valve 11, exhaust valve 12, throttle orifice 13 and automatic exhaust steam valve 14 etc. form.
Anti-asthma blow-off system provided by the invention is to set at the 5th grade of 16 grades of axial-flow compressors there are two blowdown piping, 10th grade is equipped with blowdown piping (different according to the total series of compressor, the series of selected setting blowdown piping is not yet Together, but all it is to choose intermediate certain level-one or certain two-stage, even choose certain intermediate three-level and deflate), and be arranged at the 5th grade Two blowdown pipings on be respectively equipped with the 5,6, the 10th grade of anti-asthma vent valve setting blowdown piping be equipped with anti-asthma vent valve 15. When anti-asthma vent valve 5,6 or 15 is opened, after a certain amount of air of the series is directly discharged into turbine by corresponding blowdown piping In exhaust system, anti-asthma vent valve 5,6 controls the 5th grade of blowdown piping, and anti-asthma vent valve 15 controls the 10th grade of blowdown piping.Anti-asthma Vent valve 5,6,15 is pneumatic operated valve, and "ON" and "Off" are that the air rammer being pressurized by two sides controls, the pressure in air accumulator 1 Contracting air is to push the mobile gas of its air rammer, i.e. the pneumatic actuator gas of anti-asthma vent valve 5,6,15.
Control solenoid valve 2,3,16,17 is triple valve, obtain, power loss when state it is different.When the control power loss of solenoid valve 3 and 17 When, port 3 and 2 communicates, and port 1 is closed;When obtaining electric, port 2 and 1 is communicated, and port 3 is closed.When control solenoid valve 2 and 16 When power loss, port 2 and 3 is communicated, and port 1 is closed;When obtaining electric, port 1 and 2 is communicated, and port 3 is closed.When control solenoid valve 2 When with 3 while power loss, the compressed air in air accumulator 1 enters the pneumatic execution of anti-asthma vent valve 5 through the port 3 to 2 of control valve 3 The compressed air of mechanism right chamber, the pneumatic actuator left chamber of anti-asthma vent valve 5 is placed into through the port 2 to 3 of control valve 2 Atmosphere, the air rammer of the pneumatic actuator of anti-asthma vent valve 5 are pressed towards left side, and anti-asthma vent valve 5 is opened;When control electromagnetism When valve 2 and 3 obtains electric simultaneously, the compressed air in air accumulator 1 enters the pneumatic of anti-asthma vent valve 5 through the port 1 to 2 of control valve 2 Left chamber, executing agency, the compressed air of the pneumatic actuator right chamber of anti-asthma vent valve 5 is through 2 to 1 quilt of port of control valve 3 It is put into atmosphere, the air rammer of the pneumatic actuator of anti-asthma vent valve 5 is pressed towards right side, and anti-asthma vent valve 5 is closed.Similarly, Anti-asthma vent valve 15 is by obtaining, power loss control Qi Guan, opening while control solenoid valve 16 and 17.Anti-asthma vent valve 6 can also lead to It obtains, power loss control Qi Guan, open while crossing control solenoid valve 2 and 3, but in the pneumatic actuator left chamber of anti-asthma vent valve 5,6 Room pipeline (i.e. the corresponding outlet pipe of pneumatic actuator when the anti-asthma vent valve is opened) is equipped with a fast open electromagnetic valve, opens fastly It is opened when pass, power loss when solenoid valve 4 obtains electric, the compression when controlling solenoid valve 3 and the power loss simultaneously of fast open electromagnetic valve 4, in air accumulator 1 Air through control valve 3 port 3 to 2 enter anti-asthma vent valve 6 pneumatic actuator right chamber, anti-asthma vent valve 6 it is pneumatic The compressed air of left chamber, executing agency is quickly put into atmosphere, the pneumatic actuator of anti-asthma vent valve 6 through fast open electromagnetic valve 4 Air rammer by quickly pressed to left side, anti-asthma deflate 6 quickly open.The setting of fast open electromagnetic valve 4 is so that the 5th grade of compressor puts Air pipe has the function of Rapid degassing, further increases the fast-response of gas turbine anti-asthma blow-off system.
The presence of air accumulator 1 makes each switch operation of anti-asthma vent valve 5,6,15 have adequately control air. The air drawn from blower outlet enters air accumulator 1 through filter 8 and non-return valve 7, and non-return valve 7 prevents compressed air from gas storage Tank 1 passes back into gas turbine.The first time of air accumulator 1 inflates, and is to obtain filling from outside by valve 11.Valve 9 is equipped with Two manual switch knobs, one of switching knob are opened, and pressure gauge 10 can be made to put into, and the compression monitored in air accumulator 1 is empty Atmospheric pressure;Another switching knob is opened, and can release compressed air in air accumulator 1, to judge whether pressure gauge 10 is normal.Just In normal situation, exhaust valve 12 is opened, and the compressed air in air accumulator 1 is automatically drained out superpressure through throttle orifice 13 and automatic exhaust steam valve 14 Part, throttle orifice 13 and automatic exhaust steam valve 14 play compressed air pressure in adjustment adjusting air accumulator 1, ensure that 1 safety of air accumulator makes Effect.When it is time for repair, exhaust valve 12 can close, and automatic exhaust steam valve 14 is isolated by it.
When gas turbine starts beginning, 4 power loss of solenoid valve 2,3,16,17 and fast open electromagnetic valve, anti-asthma vent valve are controlled 5,6,15 in open position, if any one anti-asthma vent valve cannot be opened, gas turbine starting just abends.Work as machine Group revolving speed rises to the 2280rpm(value can carry out small range adjustment according to the actual operation) when, control solenoid valve 16 and 17 Obtain electric, the closing of anti-asthma vent valve 15;Small range adjustment can be carried out according to the actual operation when revolving speed rises to the 2940rpm(value) When, it controls solenoid valve 2,3 and fast open electromagnetic valve 4 obtains electric, the closing of anti-asthma vent valve 5 and 6;It is operated normally in gas turbine (specified Revolving speed 3000rpm) during, anti-asthma vent valve is always in closed position, when gas turbine rotary speed is reduced to minimum tolerance limit Value, anti-asthma vent valve are opened, orderly close-down again when revolving speed increases.In stopping process, when fuel valve is closed, all anti-asthmas Vent valve opens simultaneously immediately.Gas turbine during normal operation, is opened if anti-asthma vent valve is all or part of, gas turbine Power and efficiency can reduce, but gas turbine remains operational, because bringing the danger of accident without compressor surge at this time.
Gas turbine anti-asthma blow-off system provided by the invention, compressed air are introduced into from blower outlet through non-return valve 7 Air accumulator 1, it is ensured that each switch operation of anti-asthma vent valve has adequately control air, improves system reliability; Throttle orifice 13 and automatic exhaust steam valve 14 are set, it is ensured that the safe handling of air accumulator 1, pressure are stablized, and the safety and stability of system is improved Property;System is designed to that anti-asthma vent valve is opened when control solenoid valve and fast open electromagnetic valve power loss, and effectively preventing power loss causes to prevent The dangerous situation that asthma vent valve cannot be opened, improves the reliability of system;Two are provided in the 5th grade of blowdown piping of compressor Anti-asthma vent valve, it is ensured that it deflates successfully in corresponding operating condition, increases system safety margin;Meanwhile the 5th grade of bleeder pipe of compressor Road have all the way design have Rapid degassing function, further increase safety and the fast-response of system.

Claims (9)

1. a kind of gas turbine anti-asthma blow-off system, the blowdown piping including being set to two-stage among compressor;It is characterized in that, institute State gas turbine anti-asthma blow-off system further include:
Anti-asthma vent valve is respectively arranged among the compressor on the blowdown piping of two-stage using pneumatic operated valve;
Four control solenoid valves control the blowdown piping being arranged in two-stage among compressor respectively and correspond to the pneumatic of anti-asthma vent valve The mobile gas of piston;When controlling solenoid valve power loss, controls corresponding anti-asthma vent valve and open.
2. gas turbine anti-asthma blow-off system according to claim 1, which is characterized in that the gas turbine anti-asthma is deflated System further includes air accumulator;The control solenoid valve is triple valve, and one end is connected with air accumulator, and one end is connected to atmosphere, the other end It is connected with the corresponding chamber of pneumatic actuator of corresponding anti-asthma vent valve;When the pneumatic actuator of each anti-asthma vent valve When two control solenoid valves while power loss that left and right chamber is connected respectively, the compressed air in the air accumulator is via right The control solenoid valve answered, which enters in the pneumatic actuator of anti-asthma vent valve, pushes the anti-asthma vent valve to open.
3. gas turbine anti-asthma blow-off system according to claim 2, which is characterized in that when the gas of each anti-asthma vent valve Compression when two control solenoid valves while power loss that the dynamic left and right chamber of executing agency is connected respectively, in the air accumulator Air enters the pneumatic actuator right chamber of the anti-asthma vent valve, the gas of the anti-asthma vent valve via corresponding control solenoid valve The compression control of dynamic left chamber, executing agency is put into atmosphere through corresponding control solenoid valve, at this point, the anti-asthma vent valve is pneumatic Piston is pressed towards left side, and anti-asthma vent valve is opened.
4. gas turbine anti-asthma blow-off system according to claim 3, which is characterized in that among the compressor two-stage its The blowdown piping being arranged in middle level-one is 2, is equipped with an anti-asthma vent valve, two anti-asthma vent valves on each blowdown piping The left chamber of pneumatic actuator be connected with same control solenoid valve, right chamber is connected with another control solenoid valve.
5. gas turbine anti-asthma blow-off system according to claim 4, which is characterized in that the gas turbine anti-asthma is deflated System further include:
Fast open electromagnetic valve, the wherein blowdown piping all the way being arranged in the intermediate level-one that compressor has two-way blowdown piping When anti-asthma vent valve is opened on the corresponding outlet pipe of pneumatic actuator.
6. gas turbine anti-asthma blow-off system according to claim 5, which is characterized in that the gas turbine anti-asthma is deflated System further includes filter and non-return valve;The outlet air of the compressor is successively through the filter and non-return valve and air accumulator It is connected.
7. gas turbine anti-asthma blow-off system according to claim 6, which is characterized in that the air accumulator is equipped with for the first time Air intake valve.
8. gas turbine anti-asthma blow-off system according to claim 7, which is characterized in that the air accumulator is equipped with exhaust Valve, throttle orifice and automatic exhaust steam valve;The air accumulator passes sequentially through exhaust valve, throttle orifice, automatic exhaust steam valve and is connected with atmosphere.
9. gas turbine anti-asthma blow-off system according to claim 7, which is characterized in that the air accumulator is equipped with pressure Monitor valve;Switching knob there are two setting on the pressure monitor valve, is connected with pressure gauge and atmosphere respectively.
CN201910250863.7A 2019-03-29 2019-03-29 Anti-asthma deflation system of gas turbine Active CN109838313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910250863.7A CN109838313B (en) 2019-03-29 2019-03-29 Anti-asthma deflation system of gas turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910250863.7A CN109838313B (en) 2019-03-29 2019-03-29 Anti-asthma deflation system of gas turbine

Publications (2)

Publication Number Publication Date
CN109838313A true CN109838313A (en) 2019-06-04
CN109838313B CN109838313B (en) 2024-02-06

Family

ID=66886564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910250863.7A Active CN109838313B (en) 2019-03-29 2019-03-29 Anti-asthma deflation system of gas turbine

Country Status (1)

Country Link
CN (1) CN109838313B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412864A (en) * 2020-12-11 2021-02-26 中国航发上海商用航空发动机制造有限责任公司 Compressor experiment platform and surging and deep stall exit method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5235801A (en) * 1991-12-12 1993-08-17 Allied-Signal Inc. On/off surge prevention control for a variable geometry diffuser
DE102007037696B3 (en) * 2007-08-09 2009-01-22 Samson Ag Anti-surge protection device for pneumatic actuator, has position controller pneumatically controlling actuating drive, where two control signals are respectively produced by pressures of actuating drive and controller
KR20140115572A (en) * 2013-03-21 2014-10-01 두산중공업 주식회사 Bleed air extraction apparatus for turbine and control method thereof
CN104088706A (en) * 2014-07-01 2014-10-08 中国船舶重工集团公司第七�三研究所 Pneumatic controller for preventing gas turbine from surging and deflating
CN204186477U (en) * 2014-10-13 2015-03-04 深圳大唐宝昌燃气发电有限公司 A kind of gas turbine anti-asthma blow-off system
CN105422970A (en) * 2015-11-22 2016-03-23 沈阳黎明航空发动机(集团)有限责任公司 Gas turbine vent valve and control method thereof
CN208203638U (en) * 2018-05-10 2018-12-07 华电浙江龙游热电有限公司 A kind of Surge Prevention System of gas turbine
CN209621475U (en) * 2019-03-29 2019-11-12 国电环境保护研究院有限公司 A kind of gas turbine anti-asthma blow-off system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5235801A (en) * 1991-12-12 1993-08-17 Allied-Signal Inc. On/off surge prevention control for a variable geometry diffuser
DE102007037696B3 (en) * 2007-08-09 2009-01-22 Samson Ag Anti-surge protection device for pneumatic actuator, has position controller pneumatically controlling actuating drive, where two control signals are respectively produced by pressures of actuating drive and controller
KR20140115572A (en) * 2013-03-21 2014-10-01 두산중공업 주식회사 Bleed air extraction apparatus for turbine and control method thereof
CN104088706A (en) * 2014-07-01 2014-10-08 中国船舶重工集团公司第七�三研究所 Pneumatic controller for preventing gas turbine from surging and deflating
CN204186477U (en) * 2014-10-13 2015-03-04 深圳大唐宝昌燃气发电有限公司 A kind of gas turbine anti-asthma blow-off system
CN105422970A (en) * 2015-11-22 2016-03-23 沈阳黎明航空发动机(集团)有限责任公司 Gas turbine vent valve and control method thereof
CN208203638U (en) * 2018-05-10 2018-12-07 华电浙江龙游热电有限公司 A kind of Surge Prevention System of gas turbine
CN209621475U (en) * 2019-03-29 2019-11-12 国电环境保护研究院有限公司 A kind of gas turbine anti-asthma blow-off system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
汤代荣;: "9FA燃气轮机防喘放气阀故障处理及系统优化措施探讨", 内燃机与配件, no. 12 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412864A (en) * 2020-12-11 2021-02-26 中国航发上海商用航空发动机制造有限责任公司 Compressor experiment platform and surging and deep stall exit method thereof
CN112412864B (en) * 2020-12-11 2022-07-19 中国航发上海商用航空发动机制造有限责任公司 Compressor experiment platform and surging and deep stall exit method thereof

Also Published As

Publication number Publication date
CN109838313B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN102023654B (en) Large environment simulation laboratory pressure control system and control method thereof
CN101082302B (en) Air current system of engines with series turbo-charger
CN101876323A (en) Energy-recuperation system in the gas compressing equipment
CN103511833B (en) Portable self-cooling is high pressure hydrogen supercharging device and method but
CN209621475U (en) A kind of gas turbine anti-asthma blow-off system
CN205956044U (en) Anti -surge valve gas circuit
CN103392121A (en) Unit for simulating the pressure and temperature conditions of the air drawn in by a reciprocating internal combustion engine
CN108547763A (en) A kind of air inlet regulating device for reciprocating compressor enclosed performance test system
CN109838313A (en) A kind of gas turbine anti-asthma blow-off system
CN104697775A (en) Automatic precise debugging system of gas lift valve
JP5893098B2 (en) Method of operating a gas turbine power plant for carbon dioxide separation
WO2022111577A1 (en) Bypass auxiliary system for closed brayton cycle heat engine system, heat engine device, and regulation method therefor
CN107076012B (en) Compressor set and its operation method
CN108592518B (en) Cryogenic liquefied air energy storage power generation system and start-stop control method thereof
CN107655670A (en) A kind of safety valve testing device and a kind of safety valve testing method
CN102359413B (en) Turbocharging system
CN111691967A (en) Two-stage supercharger and engine
CN105864087B (en) High-speed centrifugal blower automatically starts control method
CN204186477U (en) A kind of gas turbine anti-asthma blow-off system
CN206785638U (en) A kind of bavin moves screw compressor control system
CN110966456B (en) Air filtering differential pressure overrun protector for blast furnace blower
CN111486007B (en) Pneumatic control system of gas turbine
CN105422970B (en) A kind of gas turbine vent valve and its control method
CN210013763U (en) Anti-surge air bleed system of 9FA gas turbine
CN209324608U (en) A kind of compressed-air energy storage compressor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20231222

Address after: 210023 10 fairyland Road, Xianlin street, Qixia District, Nanjing, Jiangsu

Applicant after: Guoneng Nanjing Electric Power Test Research Co.,Ltd.

Applicant after: GUODIAN ENVIRONMENTAL PROTECTION RESEARCH INSTITUTE Co.,Ltd.

Applicant after: National Energy Group Science and Technology Research Institute Co.,Ltd.

Address before: 210031 No. 10, Pudong Road, Pukou District, Jiangsu, Nanjing

Applicant before: GUODIAN ENVIRONMENTAL PROTECTION RESEARCH INSTITUTE Co.,Ltd.