CN109837884A - A kind of composite construction and preparation method thereof having both drainage and enhance the heavy ability of bending resistance - Google Patents

A kind of composite construction and preparation method thereof having both drainage and enhance the heavy ability of bending resistance Download PDF

Info

Publication number
CN109837884A
CN109837884A CN201910159291.1A CN201910159291A CN109837884A CN 109837884 A CN109837884 A CN 109837884A CN 201910159291 A CN201910159291 A CN 201910159291A CN 109837884 A CN109837884 A CN 109837884A
Authority
CN
China
Prior art keywords
geotechnique
gauge
composite material
bamboo
composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910159291.1A
Other languages
Chinese (zh)
Other versions
CN109837884B (en
Inventor
苏永华
邹宇恒
苏雅
柳程柱
廖君橙
黄腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201910159291.1A priority Critical patent/CN109837884B/en
Publication of CN109837884A publication Critical patent/CN109837884A/en
Application granted granted Critical
Publication of CN109837884B publication Critical patent/CN109837884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of composite constructions and preparation method thereof for having both drainage and enhance the heavy ability of bending resistance, reinforce composite material and quick hitch including the geotechnique with water filtering performance;It includes bamboo reinforcement net that the geotechnique, which reinforces composite material, and bamboo reinforcement is equipped with composite earthwork cloth on the net, and geotechnique reinforces composite material top and bottom and is separately installed with buckle and lower pinch plate;Upper buckle and lower pinch plate are by being fixed to each other;Geotechnique reinforces between composite material to be connected by quick hitch;Quick hitch includes the upper connection snap-gauge and lower connection snap-gauge for being respectively at geotechnique and reinforcing composite material top and bottom;Upper connection snap-gauge and lower connection snap-gauge have been respectively formed on prefabricated connecting pore, and prefabricated connecting pore is interior inserted with connection bolt.The present invention can prevent it is empty in remodeling stratum breed, elimination collapses or is translated into slow subsidence without omen burst type, to avoid city earth's surface, the property sent out collapses the generation of calamity suddenly.

Description

A kind of composite construction and preparation method thereof having both drainage and enhance the heavy ability of bending resistance
Technical field
The present invention relates to technical field of civil engineering more particularly to it is a kind of have both drainage and enhance bending resistance sink ability it is compound Structure and preparation method thereof.
Background technique
In city when development & construction, it usually needs the processing such as dug, filled out, rammed to developing zone and forming stratum.By digging, Fill out and the stratum formed after tamping and natural stratum it is widely different, so be known as remodeling stratum.It the various buildings in city and constructs Object is all built in remodeling stratum or above it.
For a long time, the various motor vehicle major trunk roads in city, pavement, Entertainment Plaza, station even multi-story structure bottom Floor often meet with the rapid hair that several people are dead, injure huge property loss caused to collapse disaster.This kind of earth's surface before being collapsed upon generation There is no appreciable sedimentation, hole of collapsing appears to be upright tubulose in geometric shape.
It is that there are large volume of cavities in stratum that rapid hair property, which collapses the basic reason of generation,;Earth's surface is without heavy before collapsing generation It drops phenomenon and the pitted surface that collapses is upright, it is meant that stratum does not have flexure (flexure) deformability.
Occur the cavity for causing top to collapse in stratum, it is most probable the reason is that forming flowing water via seepage flow derivative in stratum Channel.Certain position filler particles are constantly taken away through channel by flowing water in stratum, accumulate over a long period to be formed with large volume of Cavity.
Presently relevant earth working material performance is single, the result added such as TGXG, geotechnical grid in stratum filling construction It is to increase local strength, geotextiles function only as water filtering function.In order to prevent the generation that the property sent out collapses suddenly, need to research and develop a kind of same When have both drainage and enhance stratum flexure ability composite geotextile material and corresponding building technology.
Summary of the invention
In view of the problems of the existing technology, the purpose of this project is to research and develop and a kind of can filter water from the filling body of stratum Except the geotechnological reinforcement material simultaneously simultaneously with the heavy ability of enhancing stratum bending resistance, building blocking remodeling stratum breeds the rapid property sent out and collapses way The specific construction technology of diameter.
In order to achieve the above objectives, invention broadly provides following schemes:
A kind of composite construction having both drainage and enhance the heavy ability of bending resistance, is reinforced compound including the geotechnique with water filtering performance Material and quick hitch;It includes bamboo reinforcement net 3 that the geotechnique, which reinforces composite material, is equipped with composite earthwork cloth on bamboo reinforcement net 3 4, geotechnique reinforces composite material top and bottom and is separately installed with buckle 1 and lower pinch plate 2;Upper buckle 1 and lower pinch plate 2 are mutual by 9 It is fixed;Geotechnique reinforces between composite material to be connected by quick hitch;Quick hitch includes being respectively at geotechnique to add Gu the upper connection snap-gauge 6 of composite material top and bottom and lower connection snap-gauge 7;Upper connection snap-gauge 6 and lower connection snap-gauge 7 have been respectively formed on Prefabricated connecting pore 8, prefabricated connecting pore 8 are interior inserted with connection bolt 10;The connection bolt 10 includes fastening body 101, fastens 101 bottom axis of body It is connected to strip 102, is connected by spring 11 with body 101 is fastened at the top of strip 102.
Further to improve, the bamboo reinforcement net 3 that the geotechnique reinforces in composite material is woven by bamboo, is located at upper buckle Between 1 and lower pinch plate 2;Every bamboo reinforcement width is 2mm on bamboo reinforcement net 3, with a thickness of 2mm, length 2m.
Further to improve, the upper buckle 1 and lower pinch plate 2 are bamboo.
Further to improve, the upper buckle 1 and lower pinch plate 2 form frame buckling device and reinforce buckling device;Frame Buckling device is set to geotechnique and reinforces composite material surrounding, plays fixed boundary;The upper buckle 1 of frame buckling device and lower button The width of plate 2 is 20mm, with a thickness of 2mm, length 2m;And three complete phases are placed equidistant on upper buckle 1 and hypostoma 2 respectively Same radius is the prefabricated fastening hole 5 of 5mm;Reinforce buckling device and be placed in the inside that geotechnique reinforces composite material, every 500mm cloth It sets together, in a crisscross manner, plays enhancing fixed function;The width of the upper buckle 1 and lower pinch plate 2 of reinforcing buckling device is 20mm, thick Degree is 2mm, length 0.4m;And being placed equidistant with three identical radiuses on upper buckle 1 and hypostoma 2 respectively is 5mm's Prefabricated fastening hole 5.
It is further to improve, utilize fastening bolt 9 to pass through between the upper buckle 1 and lower pinch plate 2 in the buckling device prefabricated 5 fast fastening of fastening hole, so that bamboo reinforcement net 3 and composite earthwork cloth 4 are closely fastened by upper buckle 1 and lower pinch plate 2.
Further to improve, the fastening bolt 9 includes fastening body 91 with externally threaded, fastens and is hinged with first connecting rod on body 91 92, first connecting rod 92 is hinged with second connecting rod 93, fastens and shapes fluted 94 on body 91, and groove 94 is slidably connected matches with groove 94 The sliding block 95 of conjunction, the articulated connection second connecting rod 93 of sliding block 95, the groove is T-slot or dovetail groove.
Further to improve, the quick hitch is identical and with identical prefabricated connecting pore 8 by two pieces Upper connection snap-gauge 6, lower connection snap-gauge 7 and connection bolt 10 are constituted;Wherein upper connection snap-gauge 6, lower 7 width of connection snap-gauge are 40mm, With a thickness of 2mm, a length of 1.8m is arranged the prefabricated connecting pore 8 of a radius 10mm every 400mm on it, and constructs at the scene When be set to the lap-joint away from frame buckling device 200mm.
Further to improve, the spring 11 is made of high strength steel strand, installs that will be coupled bolt 10 into upper connection snap-gauge 6, spring 11 can shrink and pass through prefabricated connecting pore 8 when lower connection snap-gauge 7, when completely by prefabricated connecting pore 8 after be coupled 10 spring 11 of bolt trails, so that conehead be allowed to expand to two sides, has the function that fixed connection.
A kind of production method for the composite construction for having both drainage and enhancing the heavy ability of bending resistance, includes the following steps:
Age is fabricated to bamboo chip not less than 3 years moso bamboos by step 1, bamboo chip be respectively used to production bamboo reinforcement, buckle and It is coupled snap-gauge;Buckle includes upper buckle 1 and lower pinch plate 2;Being coupled snap-gauge includes upper connection snap-gauge 6 and lower connection snap-gauge 7;
Step 2 first sterilizes bamboo chip, insect prevention, preservative treatment: the boric acid for being 6~8% with boric acid and water configuration concentration Bamboo chip is immersed in boric acid solution by solution, is completely submerged in bamboo chip in boric acid solution 24 hours: and then bamboo chip takes out wind It is dry, the natural air drying 5~7 days when temperature is at 20 DEG C or more, the natural air drying 7~10 days when temperature is at 20 DEG C or less;Then right Bamboo chip carries out water-proofing treatment: being applied the styrene-butadiene-styrence modified asphalt waterproof mixed thoroughly using hairbrush Expect brushing bamboo chip surface, brush 2 layers altogether, stands 6~8 hours brushing second layers again, the thickness control of total film after first layer brush is complete System is in 0.4~0.6mm, and bamboo chip dried coating film finishes after 24 hours;
Bamboo reinforcement is carried out braiding and bamboo reinforcement net is made by step 3, and wherein the size of each grid is 1~2cm × 1~2cm; Woven bamboo reinforcement net is aligned with one piece of composite earthwork cloth 4, geotechnique is formed and reinforces composite material;Composite material is reinforced in geotechnique Four frame buckling devices are arranged in surrounding, play the role of fixed boundary;Then composite inner arrangement is reinforced in geotechnique again to add Strong buckling device, reinforcement buckling device is criss-cross, and geotechnique is reinforced composite material by prefabricated fastening hole 5 using bolt 8 is fastened Fast fastening, so that bamboo reinforcement net 3 and composite earthwork cloth 4 are snapped device and closely fasten;Single geotechnique reinforces composite gauge For 2m × 2m;
Adjacent geotechnique is reinforced composite material overlap joint when site operation by step 5;And it is arranged in lap-joint and is coupled 6 He of snap-gauge Lower connection snap-gauge 7, and make the prefabricated all alignment of connecting pore 8, the joint geotechnique of laying reinforces composite material overall size with embankment area Area;
Step 6 is passed through prefabricated on identical two pieces upper connection snap-gauges 6 and lower connection snap-gauge 7 using connection bolt 9 Multiple geotechniques are reinforced composite material and are coupled by connecting pore 8, and composition joint geotechnique reinforces composite material;The joint geotechnique made is added Gu composite material layering is laid in remodeling stratum, the difference in height that different geotechniques reinforce between composite material is h, while h is also weight Mould every layer of thickness when native compaction in layers.
It is further to improve, in the step 1, moso bamboo is fabricated to thickness 2mm respectively, width is respectively 2mm, 20mm And 40mm, long is respectively the bamboo chip of 0.4m, 1.8m and 2m;In the step 3, bamboo reinforcement is subjected to braiding, 2m × 2m is being made just Rectangular bamboo reinforcement net;Composite inner, which is reinforced, in geotechnique arranges a reinforcement buckling device every 500mm;Step 5 kind is adjacent The lap of splice that geotechnique reinforces composite material is 200mm.
The present invention has a characteristic that
1, it is provided simultaneously with filling body drainage and enhances the remodeling stratum consolidation material of whole flexure ability composite performance, mainly Raw material-bamboo, widely distributed, materials convenience.And entire manufacture craft, it is easy to grasp.In addition, cheap, green ring It protects.
2, in remodeling stratum construction, which will be laid on adjacent only on packing layer by quick hitch Vertical monolithic geotechnique reinforcing composite material is coupled to form firm entirety, sinks with draining and providing whole bending resistance for the filter of remodeling stratum The complex function of ability.Constructing operation is convenient, efficient simultaneously.
3, compared with current existing stratum fill placement technique, on the one hand, it is hollow that the technology can effectively prevent remodeling stratum The forming feature that the property sent out collapses suddenly in stratum is remolded in the growth and growth course in hole, cutting;It on the other hand, can be by other defect The rapid hair ground subsidence calamity that (for example, the primary cavity that do not grasped in the remodeling following natural stratum in stratum) may cause turns Change have early warning phenomenon (for example, within one section of long period before collapsing, biggish continuous sedimentation is slowly presented in earth's surface), Harmfulness is controllable, recoverable engineering disease.
Detailed description of the invention
Fig. 1 is that the monolithic that present example provides has both drainage and geotechnique's reinforcing composite material of the heavy ability of enhancing bending resistance is whole Body schematic diagram;
Fig. 2 is that the monolithic that present example provides has both drainage and enhances geotechnique's reinforcing composite material office of the heavy ability of bending resistance Portion's enlarged diagram;
Fig. 3 is bamboo reinforcement net;
Fig. 4 is geotextiles;
Fig. 5 is to be coupled snap-gauge lap-joint schematic diagram;
Fig. 6 is buckling device;
Fig. 7 is to fasten bolt original state schematic diagram;
Fig. 8 is to fasten bolt conehead unfolded state schematic diagram;
Fig. 9 is to be coupled bolt contraction state schematic diagram;
Figure 10 is to be coupled bolt pressured state schematic diagram;
Figure 11 is quick hitch;
Figure 12 is integral construction schematic diagram;
Figure 13 is to fasten stud structure schematic diagram
Each label indicates in figure:
Wherein 1 is upper buckle, and 2 be lower pinch plate, and 3 be bamboo reinforcement net, and 4 be composite earthwork cloth, and 5 be prefabricated fastening hole, and 6 be the first line of a couplet Snap-gauge is tied, 7 be lower connection snap-gauge, and 8 be prefabricated connecting pore, and 9 is fasten bolt, and 10 is are coupled bolt, and 11 be spring.
Specific embodiment
In order to which the purpose of the present invention, advantage is more clearly understood, with reference to the accompanying drawings and embodiments to of the invention one Kind has both drainage and the composite construction and preparation method thereof of the heavy ability of enhancing bending resistance is described in further detail.
The basic original material of bamboo reinforcement net of the invention, buckling device and quick hitch is common common bamboo, It is not less than 3 years moso bamboos or bamboo first with age, is processed into thickness 2mm, width is respectively 2mm, 20mm and 40mm, Long is respectively the bamboo wood of 0.4m, 1.8m and 2m, is then pre-processed.
It is mainly sterilization, insect prevention, anti-corrosion to the pretreatment of material in the present invention: is 6~8% with boric acid and water configuration concentration Boric acid solution, bamboo wood is completely submerged in boric acid solution 24 hours, then take out it is air-dried, when temperature is at 20 DEG C or more from It so air-dries 5 to 7 days, when temperature is at 20 DEG C or less natural air drying 7 to 10 days.Then it carries out water-proofing treatment: will be mixed using hairbrush Even styrene-butadiene-styrence modified asphalt water-repellent paint brushing brushes 2 layers in bamboo material surface altogether, the One layer has been brushed 6~8 hours brushing second layers again of standing, and total coating thickness control was in 0.4~0.6mm, to 24 hours dried coating films Afterwards, it is reused to make bamboo reinforcement, buckle respectively and be coupled snap-gauge.
Single piece composite material production method of the present invention is as follows:
1, bamboo reinforcement is subjected to the square bamboo reinforcement net that 2m × 2m is made in braiding, wherein the size of each grid is 1~2cm × 1~2cm is arranged according to actual needs.The bamboo reinforcement net of 2m × 2m is aligned placement with the geotextiles of 2m × 2m and forms complex;
2, four frame buckling devices are arranged in complex surrounding to fix boundary;
3, it is criss-cross arranged inside frame every 500mm and reinforces buckling device, keep bamboo reinforcement net 3 and geotextiles 4 close It fastens, forms complete monolithic geotechnique having a size of 2m × 2m and reinforce composite material.
The construction technology of quick-jointing of the present invention is as follows:
1, when remolding stratum filling construction, layer position is arranged according to the geotechnological reinforcement material of setting, by earthwork composite material It is successively laid on the entire packing layer being compacted piecewise;
2, adjacent monolithic earthwork composite material is overlapped according to the overlap length of 20cm, utilizes upper and lower connection in lap-joint Knot snap-gauge (snap-gauge 6 will be coupled and is coupled all alignment of prefabricated connecting pore 8 of snap-gauge 7, bolt 10 will be coupled and pass through prefabricated connecting pore 8, Will two sheet material mutually lockings) make adjacent monolithic geotechnique reinforce composite material and interconnect into extend completely across answering for embankment region Condensation material adding layers;
3, the filler → compacting → that successively paves in adding layers paves filler → compacting ..., fills formation thickness to next Composite material adding layers are arranged according to process above in a composite material adding layers position;
4, the reciprocal above circulation constructs the remodeling stratum to be formed and collapse function with the rapid hair property of prevention.
The above is only a specific implementation examples of the invention, not delimit the scope of the invention, in design of the invention Any modifications, equivalent replacements and improvements with being done within principle, belong within protection scope of the present invention.

Claims (10)

1. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance, it is characterized in that: including the geotechnique with water filtering performance Reinforce composite material and quick hitch;It includes bamboo reinforcement net (3) that the geotechnique, which reinforces composite material, and bamboo reinforcement net is laid on (3) Have composite earthwork cloth (4), geotechnique reinforces composite material top and bottom and is separately installed with buckle (1) and lower pinch plate (2);Upper buckle (1) it is fixed to each other with lower pinch plate (2) by (9);Geotechnique reinforces between composite material to be connected by quick hitch;Quickly connection Knot device includes the upper connection snap-gauge (6) and lower connection snap-gauge (7) for being respectively at geotechnique and reinforcing composite material top and bottom;Upper connection Snap-gauge (6) and lower connection snap-gauge (7) have been respectively formed on prefabricated connecting pore (8), inserted with connection bolt in prefabricated connecting pore (8) (10);The connection bolt (10) includes fastening body (101), fastens body (101) bottom and is connected with strip (102), logical at the top of strip (102) It crosses spring (11) and is connected with body (101) is fastened.
2. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance according to claim 1, it is characterized in that: described The bamboo reinforcement net (3) that geotechnique reinforces in composite material is woven by bamboo, between upper buckle (1) and lower pinch plate (2);Bamboo reinforcement The upper every bamboo reinforcement width of net (3) is 2mm, with a thickness of 2mm, length 2m.
3. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance according to claim 1, it is characterized in that: described Upper buckle (1) and lower pinch plate (2) are bamboo.
4. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance according to claim 1, it is characterized in that: described Upper buckle (1) and lower pinch plate (2) form frame buckling device and reinforce buckling device;Frame buckling device is set to geotechnological reinforcing Composite material surrounding, plays fixed boundary;The upper buckle (1) of frame buckling device and the width of lower pinch plate (2) are 20mm, thick Degree is 2mm, length 2m;And being placed equidistant with three identical radiuses on upper buckle (1) and hypostoma (2) respectively is 5mm Prefabricated fastening hole (5);Reinforce buckling device and be placed in the inside that geotechnique reinforces composite material, together every 500mm arrangement, in length and breadth Staggeredly, enhancing fixed function is played;The width of the upper buckle (1) and lower pinch plate (2) of reinforcing buckling device is 20mm, with a thickness of 2mm, Length is 0.4m;And being placed equidistant with three identical radiuses on upper buckle (1) and hypostoma (2) respectively is the prefabricated of 5mm Fastening hole (5).
5. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance according to claim 1, it is characterized in that: described Using bolt (9) are fastened by prefabricated fastening hole (5) fast fastening between upper buckle (1) in buckling device and lower pinch plate (2), make Bamboo reinforcement net (3) and composite earthwork cloth (4) is obtained closely to be fastened by upper buckle (1) and lower pinch plate (2).
6. fastening bolt according to claim 5, it is characterized in that: the fastening bolt (9) includes fastening body with externally threaded (91), fasten and be hinged on body (91) first connecting rod (92), first connecting rod (92) is hinged with second connecting rod (93), fasten on body (91) at Shape is fluted (94), and groove (94) slidably connects the sliding block (95) with groove (94) cooperation, sliding block (95) articulated connection second Connecting rod (93), the groove are T-slot or dovetail groove;
After fastening bolt (9) installs buckle (1) and lower pinch plate (2), is fastened by nut thread connection and push away the second company under body (91) Bar (93), so that the conehead structure that first connecting rod (92) and second connecting rod (93) connection are formed is unfolded to form triangular structure, from And play the role of fastening.
7. a kind of composite construction for having both drainage and enhance the heavy ability of bending resistance according to claim 1, it is characterized in that: described Quick hitch is blocked by two pieces of identical and upper connection snap-gauges (6) with identical prefabricated connecting pore (8), lower connections Plate (7) and connection bolt (10) are constituted;Wherein upper connection snap-gauge (6), lower connection snap-gauge (7) width are 40mm, long with a thickness of 2mm For 1.8m, the prefabricated connecting pore (8) of one radius 10mm is set every 400mm on it, and be set to during on-site construction away from The lap-joint of frame buckling device 200mm.
8. connection bolt according to claim 1 will join it is characterized in that: the spring (11) is made of high strength steel strand Spring (11), which can be shunk, when knot bolt (10) is installed into upper connection snap-gauge (6), lower connection snap-gauge (7) passes through prefabricated connecting pore (8), it is coupled bolt (10) spring (11) after passing through prefabricated connecting pore (8) completely to trail, so that conehead be allowed to expand to two sides, reaches To the effect of fixed connection.
9. a kind of production method for the composite construction for having both drainage and enhancing the heavy ability of bending resistance, it is characterized in that: including the following steps:
Step 1, the moso bamboo by age not less than 3 years are fabricated to bamboo chip, and bamboo chip is respectively used to production bamboo reinforcement, buckle and connection Snap-gauge;Buckle includes upper buckle (1) and lower pinch plate (2);Being coupled snap-gauge includes upper connection snap-gauge (6) and lower connection snap-gauge (7);
Step 2 first sterilizes bamboo chip, insect prevention, preservative treatment: the boric acid solution for being 6~8% with boric acid and water configuration concentration, Bamboo chip is immersed in boric acid solution, is completely submerged in bamboo chip in boric acid solution 24 hours: and then bamboo chip takes out and air-dries, and works as gas Temperature is at 20 DEG C or more natural air drying 5~7 days, the natural air drying 7~10 days when temperature is at 20 DEG C or less;Then bamboo chip is carried out Water-proofing treatment: the styrene-butadiene-styrence modified asphalt water-repellent paint brushing bamboo that will be mixed thoroughly using hairbrush Piece surface brushes 2 layers altogether, stands 6~8 hours brushing second layers again after first layer brush is complete, the thickness control of total film 0.4~ 0.6mm, bamboo chip dried coating film finishes after 24 hours;
Bamboo reinforcement is carried out braiding and bamboo reinforcement net is made by step 3, and wherein the size of each grid is 1~2cm × 1~2cm;It will compile The bamboo reinforcement net woven is aligned with one piece of composite earthwork cloth (4), is formed geotechnique and is reinforced composite material;Composite material four is reinforced in geotechnique Four frame buckling devices of week setting, play the role of fixed boundary;Then composite inner arrangement is reinforced in geotechnique again to reinforce Buckling device, reinforcement buckling device is criss-cross, and geotechnique is reinforced composite wood by prefabricated fastening hole (5) using bolt (8) are fastened Fast fastening is expected, so that bamboo reinforcement net (3) and composite earthwork cloth (4) are snapped device and closely fasten;Single geotechnique reinforces composite wood Material is having a size of 2m × 2m;
Adjacent geotechnique is reinforced composite material overlap joint when site operation by step 5;And lap-joint be arranged be coupled snap-gauge (6) and under It is coupled snap-gauge (7), and is aligned prefabricated connecting pore (8) all, the joint geotechnique of laying reinforces the same embankment of composite material overall size Area's area;
Step 6 is passed through pre- on identical two pieces upper connections snap-gauge (6) and lower connection snap-gauge (7) using connection bolt (9) Multiple geotechniques are reinforced composite material and are coupled by connecting pore (8) processed, and composition joint geotechnique reinforces composite material;By the joint made soil Work is reinforced composite material layering and is laid in remodeling stratum, and the differences in height that different geotechniques reinforce between composite materials are h, while h Every layer of thickness when being manipulated soil compaction in layers.
10. having both drainage as claimed in claim 9 and enhancing the production method of the composite construction of the heavy ability of bending resistance, feature Be in the step 1, moso bamboo is fabricated to thickness 2mm respectively, width is respectively 2mm, 20mm and 40mm, length is respectively The bamboo chip of 0.4m, 1.8m and 2m;In the step 3, bamboo reinforcement is subjected to the square bamboo reinforcement net that 2m × 2m is made in braiding;In soil Work reinforces composite inner and arranges a reinforcement buckling device every 500mm;Step 5 kind, adjacent geotechnique reinforce composite material The lap of splice be 200mm.
CN201910159291.1A 2019-03-04 2019-03-04 Composite structure with water filtering and deflection resistance enhancing functions and manufacturing method thereof Active CN109837884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910159291.1A CN109837884B (en) 2019-03-04 2019-03-04 Composite structure with water filtering and deflection resistance enhancing functions and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910159291.1A CN109837884B (en) 2019-03-04 2019-03-04 Composite structure with water filtering and deflection resistance enhancing functions and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN109837884A true CN109837884A (en) 2019-06-04
CN109837884B CN109837884B (en) 2020-11-03

Family

ID=66885358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910159291.1A Active CN109837884B (en) 2019-03-04 2019-03-04 Composite structure with water filtering and deflection resistance enhancing functions and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN109837884B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2846506Y (en) * 2005-12-07 2006-12-13 刘博远 Convenient combined earthwork grid
KR100932970B1 (en) * 2008-12-10 2009-12-21 주식회사 신아건설산업 Bamboo mat structure of blind type for soft clay surface reinforcement and the construction method of reinforcing soft clay surface with it
CN104099920A (en) * 2013-04-08 2014-10-15 同济大学 Reinforced foundation
CN204898638U (en) * 2015-06-05 2015-12-23 泰安现代塑料有限公司 Compound geotechnological cloth of grid based on keep earth
CN105421330A (en) * 2015-12-16 2016-03-23 肥城联谊工程塑料有限公司 Composite needle-punched cloth warp-knitted grid and production method thereof
CN205369206U (en) * 2015-12-31 2016-07-06 安徽中路工程材料有限公司 Geogrid convenient to fixed equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2846506Y (en) * 2005-12-07 2006-12-13 刘博远 Convenient combined earthwork grid
KR100932970B1 (en) * 2008-12-10 2009-12-21 주식회사 신아건설산업 Bamboo mat structure of blind type for soft clay surface reinforcement and the construction method of reinforcing soft clay surface with it
CN104099920A (en) * 2013-04-08 2014-10-15 同济大学 Reinforced foundation
CN204898638U (en) * 2015-06-05 2015-12-23 泰安现代塑料有限公司 Compound geotechnological cloth of grid based on keep earth
CN105421330A (en) * 2015-12-16 2016-03-23 肥城联谊工程塑料有限公司 Composite needle-punched cloth warp-knitted grid and production method thereof
CN205369206U (en) * 2015-12-31 2016-07-06 安徽中路工程材料有限公司 Geogrid convenient to fixed equipment

Also Published As

Publication number Publication date
CN109837884B (en) 2020-11-03

Similar Documents

Publication Publication Date Title
CN203212970U (en) Red clay roadbed structure
KR20160108299A (en) Pavement Systems with Geocell and Geogrid
CA2333952A1 (en) Method of forming a support structure using strings or stays
CN104790428B (en) Ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure and construction method thereof
CN202466341U (en) Expansive soil roadbed structure
KR20180097175A (en) A structural wall with a mesh frame with internal space connected to the interior of the longitudinal axis to allow the internal filling to be poured into the wall at the work site through an industrial procedure
CN109487641A (en) A kind of high-speed railway monoblock type cable slot structure and surface layer of subgrade bed construction method
CN106542769A (en) A kind of composite of laying porous pavement
CN109837884A (en) A kind of composite construction and preparation method thereof having both drainage and enhance the heavy ability of bending resistance
CN110145059B (en) Construction process of antique soil wall
CN1080010A (en) The construction method of the composite geo-membrane heart (tiltedly) wall earth dam
CN208857768U (en) A kind of protection slope structure being easily installed
CN109989474B (en) Construction method of rainwater collection system
CN207727719U (en) Ooze storage row's rainwater piping lane
CN110805047A (en) Soil slope protection landscape structure and construction method
CN204849819U (en) Environmental retaining wall
ATE316598T1 (en) METHOD FOR PRODUCING A GREENABLE OUTER SKIN OF AN EARTH SANKING
CN102561368B (en) Pre-compacted reinforced soil block flexible supporting structure
CN112359850B (en) Masonry protection structure of road engineering and construction method thereof
CN203049611U (en) Bar type gravity retaining wall
CN107326914B (en) Dead weight anchoring type geogrid reinforced soil structure and construction method thereof
CN107268379A (en) A kind of solid road and its construction technology
KR20050066726A (en) The mortar latticed block and method of construction with fiber reinforced mold for a slope
CN207062983U (en) A kind of prefabricated frame posture retaining wall
CN206256435U (en) A kind of reinforcement draining pad

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant