CN109828919A - Test report automatic generation method, device, computer equipment and storage medium - Google Patents
Test report automatic generation method, device, computer equipment and storage medium Download PDFInfo
- Publication number
- CN109828919A CN109828919A CN201910047145.XA CN201910047145A CN109828919A CN 109828919 A CN109828919 A CN 109828919A CN 201910047145 A CN201910047145 A CN 201910047145A CN 109828919 A CN109828919 A CN 109828919A
- Authority
- CN
- China
- Prior art keywords
- target
- test
- score
- project
- target detection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 350
- 238000000034 method Methods 0.000 title claims abstract description 50
- 238000003860 storage Methods 0.000 title claims description 17
- 238000001514 detection method Methods 0.000 claims abstract description 183
- 230000007547 defect Effects 0.000 claims abstract description 130
- 238000004590 computer program Methods 0.000 claims description 17
- 230000000737 periodic effect Effects 0.000 claims description 11
- 238000004364 calculation method Methods 0.000 claims description 10
- 238000013507 mapping Methods 0.000 claims description 8
- 238000009825 accumulation Methods 0.000 claims description 7
- 235000013399 edible fruits Nutrition 0.000 claims description 4
- 230000000977 initiatory effect Effects 0.000 claims description 4
- 238000012790 confirmation Methods 0.000 claims description 2
- 230000006870 function Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 4
- 239000000284 extract Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 2
- 238000013139 quantization Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000001727 in vivo Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000012956 testing procedure Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of test report automatic generation methods, device, equipment and medium, it include: the implementing result for obtaining project name and each test case, according to implementing result, calculate target implementation rate, target percent of pass and target defect quantity, obtain preset target detection report template, if target implementation rate is greater than or equal to preset implementation rate threshold value, and target percent of pass is greater than or equal to preset percent of pass threshold value, and target defect quantity is less than preset amount threshold, then confirm that project testing result is devoid of risk, if target implementation rate is less than implementation rate threshold value, or target percent of pass is less than percent of pass threshold value, or target defect quantity is greater than or equal to amount threshold, the project testing result for then confirming target detection project is that there are risks, by project name, implementing result and project testing result filling target are surveyed It tries in report template, obtains target detection report, technical solution of the present invention improves the efficiency and automatization level for generating test report.
Description
Technical field
The present invention relates to software technology fields more particularly to a kind of test report automatic generation method, device, computer to set
Standby and storage medium.
Background technique
Currently, the test job amount with application program is continuously increased, the risk assessment workload of the application program and survey
The workload of writing of examination report is also continuously increased.
In conventional methods where, the Risk Results of the application program are usually first evaluated using manual type, then basis should
Risk Results write the test report of application program, because the process of " assess-write " is cumbersome and time-consuming long, and personal energy is not
The reasons such as foot, so causing the formation efficiency of test report low.
Therefore, a kind of more efficient test report generation method asking as those skilled in the art's urgent need to resolve is found
Topic.
Summary of the invention
The embodiment of the present invention provides a kind of test report automatic generation method, device, computer equipment and storage medium, with
Solve the problems, such as that the formation efficiency of test report is low.
A kind of test report automatic generation method, comprising:
If detecting, target detection project testing is completed, and the project name and the target for obtaining target detection project are surveyed
The implementing result of each test case in examination project;
According to the implementing result of each test case, target implementation rate, the target of the target detection project are calculated
Percent of pass and target defect quantity;
If the target implementation rate is greater than or equal to preset implementation rate threshold value, and the target percent of pass is greater than or waits
In preset percent of pass threshold value, and the target defect quantity is less than preset amount threshold, then confirms the target detection
The project testing result of project is devoid of risk;
If the target implementation rate is less than the implementation rate threshold value or the target percent of pass is less than the percent of pass threshold
Value or the target defect quantity are greater than or equal to the amount threshold, then confirm the item range estimation of the target detection project
Test result is that there are risks;
Obtain preset target detection report template;
By the project name, the project testing of the implementing result of each test case and the target detection project
As a result it inserts in the preset target detection report template, obtains the target detection report of the target detection project.
A kind of test report automatically generating device, comprising:
Data obtaining module, if obtaining the item of target detection project for detecting that target detection project testing is completed
The implementing result of each test case in mesh title and the target detection project;
Data computation module calculates the target detection project for the implementing result according to each test case
Target implementation rate, target percent of pass and target defect quantity;
First risk identification module, if it is greater than or equal to preset implementation rate threshold value for the target implementation rate, and
The target percent of pass is greater than or equal to preset percent of pass threshold value, and the target defect quantity is less than preset quantity threshold
Value then confirms that the project testing result of the target detection project is devoid of risk;
Second risk identification module, if being less than the implementation rate threshold value or the target for the target implementation rate
Percent of pass is less than the percent of pass threshold value or the target defect quantity is greater than or equal to the amount threshold, then confirms institute
The project testing result for stating target detection project is that there are risks;
Template obtains module, for obtaining preset target detection report template;
Module is filled in report, for by the implementing result and the target of the project name, each test case
The project testing result of test item is inserted in the preset target detection report template, and the target detection project is obtained
Target detection report.
A kind of computer equipment, including memory, processor and storage are in the memory and can be in the processing
The computer program run on device, the processor realize the above-mentioned test report side of automatically generating when executing the computer program
The step of method.
A kind of computer readable storage medium, the computer-readable recording medium storage have computer program, the meter
The step of calculation machine program realizes above-mentioned test report automatic generation method when being executed by processor.
Above-mentioned test report automatic generation method, device, computer equipment and storage medium, server-side is according to after tested
The implementing result of each test case in the target detection project of completion, target implementation rate, the target for calculating test case pass through
Rate and target defect quantity, and by comparing with respective threshold value target implementation rate, target percent of pass and target defect quantity
Compared with compared result is combined analysis, determines the project testing result of target detection project with the presence or absence of risk, realizes pair
The corresponding measured target of target detection project whether there is the automated analysis of risk, then use project name, each test
The implementing result of example and the project testing result of target detection project are inserted in preset target detection report template, are realized to mesh
The automation of the target detection report of mark test item is filled in, and without manpower intervention, improves oneself for generating test report
The formation efficiency of dynamicization level and test report.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by institute in the description to the embodiment of the present invention
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is an application environment schematic diagram of test report automatic generation method in one embodiment of the invention;
Fig. 2 is a flow chart of test report automatic generation method in one embodiment of the invention;
Fig. 3 is a flow chart of step S20 in test report automatic generation method in one embodiment of the invention;
Fig. 4 is the flow chart for determining risk class in one embodiment of the invention in test report automatic generation method;
Fig. 5 is the process for updating target risk score value in one embodiment of the invention in test report automatic generation method
Figure;
Fig. 6 is the flow chart for determining software defect in one embodiment of the invention in test report automatic generation method;
Fig. 7 is a schematic diagram of test report automatically generating device in one embodiment of the invention;
Fig. 8 is another schematic diagram of test report automatically generating device in one embodiment of the invention;
Fig. 9 is another schematic diagram of test report automatically generating device in one embodiment of the invention;
Figure 10 is a schematic diagram of computer equipment in one embodiment of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Test report automatic generation method provided by the present application, can be applicable in the application environment such as Fig. 1 of Software Industry,
Wherein, client is communicated by network with server-side.Client can be, but not limited to be various personal computers, notebook
Computer, smart phone, tablet computer and portable wearable device.Server-side can use independent server either multiple clothes
The server cluster of business device composition is realized.Client is used for performance objective test item, and server-side obtains target detection project
Each test case implementing result, implementing result is analyzed, and automatically generate the target detection of target detection project
Report.
In one embodiment, it as shown in Fig. 2, providing a kind of test report automatic generation method, is applied in this way in Fig. 1
In server-side for be illustrated, include the following steps:
If S10, detecting that target detection project testing is completed, the project name and target for obtaining target detection project are surveyed
The implementing result of each test case in examination project.
In the present embodiment, target detection project is specifically as follows the test item of software, for example target detection project is
" application compatibility test ", project name are the title of target detection project, if project name is that " account leads to application program
Compatibility test project ", project name is specially stored in name database, in the state that can be called at any time.Test is used
Example is the use-case for test target test item.Implementing result is the execution state and test result of test case, executes shape
State is that be exclusively used in distinguishing tests use-case be the state for having executed or being not carried out setting, and execution state includes the state that executed or not
Execution state, such as execution state represent test case for 1 and have executed, and execution state represents test case for 0 and is not carried out.Test
As a result obtained as a result, test result includes that test is not led to by result and test for implementation of test cases on the target device
It crosses as a result, such as test result is that A represents testing case and passes through, execution state is that B represents testing case and do not pass through.
Specifically, before step S10, whether the target detection project that server-side first detects client tests completion, when
When server-side detects that target detection project testing is completed, step S10 is executed, namely when server-side detects target detection project
When test is completed, the store path of the project name of target detection project is obtained first in name database, then basis should
Store path extracts the project name of the acquisition target detection project.For example name database is MySQL database, preset mesh
The store path for marking the project name of test item is " 5.0 of C: Program Files MySQL MySQL Server
Data ", first in MySQL database obtain " C: Program Files MySQL MySQL Server 5.0
Data ", then according to should " C: Program Files MySQL MySQL Server 5.0 data " to extract this preset
The project name of target detection project;When server-side detects that target detection project testing does not complete, target detection item is exported
The unfinished prompt information of purpose test.
It is understood that each test case in client executing target detection project, obtained each implementing result,
Simultaneously by implementing result storage into result database, server-side obtains each survey in target detection project in result database
The store path of the implementing result of example on probation, then extracts the implementing result according to the store path.
It should be noted that name database and result database can be SQL database or oracle database etc., item
The particular content for the prompt information that mesh title, name database, result database and test do not complete, can be according to practical application
It is set, herein with no restrictions.
S20, according to the implementing result of each test case, target implementation rate, the target for calculating target detection project pass through
Rate and target defect quantity.
In the present embodiment, target implementation rate is to have executed test case the accounting in all test cases of completion
Than target percent of pass is the accounting for testing the test case passed through in the test case for having executed completion, target defect quantity
For the quantity of software defect, it is not that target device is caused to exist by reason namely software defect that software defect, which is test result,
The defect that can not be executed during implementation of test cases.
Specifically, server-side first obtains the total quantity for the test case for including in target detection project, then according to test
The execution state of use-case, statistics has executed the number of executions of the test case of completion, next according to the use-case of test case
Test result, statistics use-case test result is the test case that test passes through by quantity, according to number of executions and total quantity
Target implementation rate is calculated, target percent of pass is calculated according to by quantity and number of executions, finally calculates target defect quantity.
If S30, target implementation rate are greater than or equal to preset implementation rate threshold value, and target percent of pass is greater than or equal in advance
If percent of pass threshold value, and target defect quantity be less than preset amount threshold, then confirm target detection project item range estimation
Test result is devoid of risk;
In the present embodiment, project testing result executes survey for identifying the corresponding test target of target detection project
The test object of example on probation whether there is risk, and project testing result includes risky and devoid of risk.
Specifically, server-side judges whether target implementation rate is greater than or equal to preset implementation rate threshold value, judges that target is logical
It crosses whether rate is greater than or equal to preset percent of pass threshold value, judges whether target defect quantity is greater than or equal to preset quantity threshold
Value if calculated target implementation rate is greater than or equal to preset implementation rate threshold value in step S20, and calculates in step S20
Target percent of pass out is greater than or equal to preset percent of pass threshold value, and calculated target defect quantity is small in step S20
In preset amount threshold, then confirm that the project testing result of target detection project is devoid of risk.
It should be noted that the particular content of implementation rate threshold value, percent of pass threshold value and preset amount threshold, it can basis
Practical application is set, herein with no restrictions.
If S40, target implementation rate are less than implementation rate threshold value, perhaps target percent of pass is less than percent of pass threshold value or target
Defects count is greater than or equal to amount threshold, then confirms that the project testing result of target detection project is that there are risks;
In the present embodiment, in the step S40 content of implementation rate threshold value, percent of pass threshold value and preset amount threshold with
Implementation rate threshold value, percent of pass threshold value are consistent with the content of preset amount threshold in step S30, no longer illustrate herein.
Specifically, if calculated target implementation rate is less than in implementation rate threshold value or step S20 and calculates in step S20
Target percent of pass out is greater than or equal to default less than calculated target defect quantity in percent of pass threshold value or step S20
Amount threshold, then confirm target detection project project testing result be there are risks.
S50, preset target detection report template is obtained.
In the present embodiment, preset target detection report template is the test report for generating the target detection project
Template, preset target detection report template is specially stored in template database, in the state that can be called at any time.
Specifically, preset target detection report template depositing in template database is obtained in template database first
Path is stored up, the preset target detection report template is then extracted according to the store path.
It should be noted that template database can be SQL database or oracle database etc., the tool of template database
Hold in vivo, can be set according to practical application, herein with no restrictions.
S60, the project testing result of project name, the implementing result of each test case and target detection project is inserted
In preset target detection report template, the target detection report of target detection project is obtained.
Specifically, by the implementing result of each test case in the project name got in step S10, step S20,
And the project testing result for the target detection project determined in step S30 or in step S40 is inserted preset target and is surveyed
Try the target detection report that target detection project is obtained in report template.
In the corresponding embodiment of Fig. 2, server-side is used according to test each in the target detection project for having tested completion
The implementing result of example, calculates target implementation rate, target percent of pass and the target defect quantity of test case, and by holding to target
Row rate, target percent of pass and target defect quantity are compared with respective threshold value, and compared result is combined analysis, if target
Implementation rate is greater than or equal to preset implementation rate threshold value, and target percent of pass is greater than or equal to preset percent of pass threshold value, and
And target defect quantity is less than preset amount threshold, then confirms that the project testing result of target detection project is devoid of risk, if
Target implementation rate be less than implementation rate threshold value perhaps target percent of pass be less than percent of pass threshold value or target defect quantity be greater than or
Equal to amount threshold, then confirms that the project testing result of target detection project is that there are risks, determine the item of target detection project
Estimating test result whether there is risk, realize the automation that whether there is risk to the corresponding measured target of target detection project
Then analysis is inserted the project testing result of project name, the implementing result of each test case and target detection project pre-
If target detection report template in, realize that the automation to the report of the target detection of target detection project is filled in, without
Manpower intervention improves the formation efficiency of the automatization level and test report that generate test report.
In one embodiment, step in a kind of test report automatic generation method in Fig. 2 corresponding embodiment as shown in Figure 3
Flow chart of the S20 under an application scenarios, specifically comprises the following steps:
S201, the total quantity for obtaining the test case for including in target detection project.
In the present embodiment, total quantity is the quantity for the test case for including in target detection project, and total quantity is specially deposited
It is stored in the first quantity database, in the state that can be called at any time.
Specifically, the mesh for the target detection project in testing procedure S10 is obtained first in the first quantity database
The store path for marking the total quantity of test case, then extracts the total quantity according to the store path.
S202, the execution state according to test case, statistics have executed the number of executions of the test case of completion.
In the present embodiment, the execution state of test case includes having executed to complete and be not carried out completion, number of executions
It is to have executed the quantity of the test case of completion for execution state, number of executions is specially stored in the second quantity database,
In the state that can be called at any time.
Specifically, according to the execution state of test case, statistics has executed the number of executions of the test case of completion.
S203, the use-case test result according to test case, statistics use-case test result are the test case that test passes through
Pass through quantity.
In the present embodiment, the use-case test result of test case includes testing to pass through and test not passing through, passes through quantity
It is the quantity for the test case that test passes through for use-case test result, is specially stored in third quantity database by quantity,
In the state that can be called at any time.
Specifically, according to the use-case test result of test case, counting use-case test result is that the test that test passes through is used
Example passes through quantity.
Ratio between S204, calculating number of executions and total quantity, obtains target implementation rate.
Specifically, it calculates in step S202 between the number of executions counted on and the total quantity got in step S201
Ratio obtains target implementation rate.
S205, it calculates through the ratio between quantity and number of executions, obtains target percent of pass.
Specifically, calculate counted in step S203 by between the number of executions that is counted in quantity and step S202
Ratio, obtain target percent of pass.
It S206, is to obtain not passing through for use-case test result in the unsanctioned test case of test from use-case test result
Reason is the quantity of the test case of software defect, and the quantity that will acquire is as target defect quantity.
It specifically, further include not passing through in the implementing result of test case when use-case test result is that test does not pass through
Reason is to test in unsanctioned test case from use-case test result, and obtain use-case test result is not soft by reason
The quantity of the test case of part defect, and the quantity that will acquire is as target defect quantity.
In the corresponding embodiment of Fig. 3, by obtaining the total quantity for the test case for including in target detection project, according to
The execution state of test case, statistics have executed the number of executions of the test case of completion, are surveyed according to the use-case of test case
Test result, statistics use-case test result be the test case that test passes through by quantity, calculate number of executions and total quantity it
Between ratio, obtain target implementation rate, calculate through the ratio between quantity and number of executions, obtain target percent of pass, from
Example test result is to test in unsanctioned test case, and obtain use-case test result is not the survey of software defect by reason
The quantity of example on probation, and the quantity that will acquire is as target defect quantity.Because rapidly being calculated automatically by computer
Target implementation rate, target percent of pass and target defect quantity, it is undoubtedly more logical than calculating target implementation rate, target using manual type
The high-efficient of rate and target defect quantity is crossed, so improving computational efficiency.
In one embodiment, it is determined in a kind of test report automatic generation method in Fig. 2 corresponding embodiment as shown in Figure 4
Flow chart of the risk class under an application scenarios, specifically comprises the following steps:
S70, according to implementation rate and preset corresponding relationship between score is executed, obtains the corresponding target of target implementation rate and holds
Row score.
In the present embodiment, it is the score for being dedicated for the setting of target implementation rate, different target implementation rate that target, which executes score,
Corresponding target executes score and is all different.
Specifically, preset corresponding relationship can be implementation rate and execute between score between implementation rate and execution score
Direct proportion linear relationship, the implementation rate the high, and it is higher to execute score, conversely, the implementation rate the low, it is lower to execute score, implementation rate
It can also be that corresponding between different implementation rate threshold regions and execution score is closed from preset corresponding relationship between score is executed
System pre-sets each implementation rate threshold interval, each implementation rate threshold interval corresponds to an execution score, and holds
The value of implementation rate in row rate threshold interval is bigger, then it is bigger to execute score.
It in one embodiment, is each different execution from preset corresponding relationship between score is executed when implementation rate
Rate threshold region and execute score between corresponding relationship when, select target from preset each implementation rate threshold interval and hold
The implementation rate threshold interval that row rate is fallen into, and according to each different implementation rate threshold region and execute default between score
Corresponding relationship, the corresponding execution score of the implementation rate threshold interval selected is determined as the corresponding target of target implementation rate
Execute score.
For example, implementation rate threshold interval includes [0,0.5] and [0.51,1], wherein [0,0.5] corresponding execution score is
5, [0.51,1] corresponding execution score is 7, when target implementation rate is 70%, is selected from [0,0.5] and [0.51,1]
70% [0.51,1] fallen into, and [0.51,1] that selects corresponding score 7 that executes is determined as the mesh of the target implementation rate
Mark executes score.
It should be noted that implementation rate and execute score between preset corresponding relationship specifically can according to the actual situation into
Row setting, herein with no restrictions.
S80, according to percent of pass and by preset corresponding relationship between score, it is logical to obtain the corresponding target of target percent of pass
Cross score.
In the present embodiment, target is the score for being dedicated for the setting of target percent of pass, each target percent of pass by score
Corresponding target is all different by score.
Specifically, percent of pass and percent of pass can be and by between score by corresponding relationship preset between score
Direct proportion linear relationship, the percent of pass the high then higher by score, conversely, the percent of pass the low then lower by score, percent of pass
It can also be different percent of pass threshold regions from by corresponding relationship preset between score and by the corresponding pass between score
System pre-sets each percent of pass threshold interval, each percent of pass threshold interval corresponding one passes through score, and leads to
The value for crossing the percent of pass in rate threshold interval is bigger, then bigger by score.
In one embodiment, when percent of pass passes through from by corresponding relationship preset between score to be each different
Rate threshold region and when by corresponding relationship between score, it is logical to select target from preset each percent of pass threshold interval
The percent of pass threshold interval that the rate of mistake is fallen into, and according to each different percent of pass threshold region and by being preset between score
Corresponding relationship, the corresponding target of target percent of pass is determined as by score by the percent of pass threshold interval selected is corresponding
Pass through score.
For example, percent of pass threshold interval be [0,0.6] and [0.61,1], [0,0.6] it is corresponding by score be 6,
[0.61,1] it is corresponding by score be 8, target percent of pass be 80%, then select 80% from [0,0.6] and [0.61,1]
[0.61,1] fallen into, and the corresponding mesh of target percent of pass is determined as by score 8 by [0.61,1] that selects is corresponding
Mark passes through score.
It should be noted that percent of pass and particular content by corresponding relationship preset between score can be according to reality
Situation is set, herein with no restrictions.
S90, according to corresponding relationship preset between defects count and defect score, obtain the corresponding mesh of target defect quantity
Mark defect score.
In the present embodiment, target defect score is the score for being dedicated for the setting of target defect quantity, each target defect
The corresponding target defect score of quantity is all different.
Specifically, between defects count and defect score preset corresponding relationship can be defects count and defect score it
Between inverse proportion linear relationship, the more high then defect score of defects count is lower, conversely, the more low then defect score of defects count more
Height, preset corresponding relationship is also possible between different defect threshold regions and defect score between defects count and defect score
Corresponding relationship, that is, pre-set each defect threshold interval, each defect threshold interval corresponds to a defect score, and
And the value of the defects of defect threshold interval quantity is bigger, then defect score is smaller.
In one embodiment, when corresponding relationship preset between defects count and defect score is each different lacks
When falling into the corresponding relationship between threshold region and defect score, target defect is selected from preset each defect threshold interval
The defect threshold interval that quantity is fallen into, and according to preset right between each different defect threshold region and defect score
It should be related to, the corresponding defect score of the defect threshold interval selected is determined as the corresponding target defect of target defect quantity
Score.
It should be noted that preset corresponding relationship specifically can be according to the actual situation between defects count and defect score
It is set, herein with no restrictions.
S100, according to preset calculation, score, target are executed to target and carried out by score and target defect score
Accumulation calculating obtains the target risk score value of target detection project;
Specifically, according to preset calculation, score is executed to the target got in step S70, is obtained in step S80
The target got carries out accumulation calculating by the target defect score got in score and step S90, obtains target detection item
Purpose target risk score value.
Preset calculation specifically can be arithmetic read group total, can also be that weighted sum calculates, specifically can root
Select according to practical application, herein with no restrictions.
When preset calculation is to count read group total, target is directly executed into score, target passes through score and mesh
It marks defect score and carries out arithmetic summation, obtain target risk score value.For example, if target executes, score is 3 points, target passes through score
It is 4 points and target defect score is 1 point, then target risk score value is 3+4+1=8 points.
When preset calculation is that weighted sum calculates, according to the default weight of implementation rate, the default power of percent of pass
The default weight of weight and software defect executes score, target to target and is weighted summation by score and target defect score,
Obtain target risk score value.For example, if target executes, score is 60 points, target is 80 points by score and target defect score is
70 points, and the default weight of implementation rate is 30%, the default weight of percent of pass is 40%, the default weight of software defect is
30%, then target risk score value is 60*30%+80*40%+70*40%=78 points.
S110, according to mapping relations preset between risk score value and risk class, it is corresponding to obtain target risk score value
Risk class, and project testing result of the risk class that will acquire as target detection project.
In the present embodiment, risk class is the grade for being dedicated for the risk setting of target detection project, wherein risk etc.
Grade is bigger, then the risk for representing target detection project is higher.
Specifically, between risk score value and risk class preset mapping relations can be risk score value and risk class it
Between inverse proportion linear relationship, the more big then risk class of risk score value is lower, conversely, risk score value is smaller, risk class is got over
Height, server-side obtain the corresponding risk class of target risk score value, and the risk that will acquire according to the preset mapping relations
Project testing result of the grade as target detection project, wherein target risk score value is bigger, then it is lower to represent risk class.
In the corresponding embodiment of Fig. 4, by obtaining mesh according to preset corresponding relationship between implementation rate and execution score
It marks the corresponding target of implementation rate and executes score, according to percent of pass and by preset corresponding relationship between score, it is logical to obtain target
It crosses rate corresponding target and target defect is obtained according to corresponding relationship preset between defects count and defect score by score
The corresponding target defect score of quantity executes score, target to target and is lacked by score and target according to preset calculation
It falls into score and carries out accumulation calculating, the target risk score value of target detection project is obtained, according between risk score value and risk class
Preset mapping relations obtain the corresponding risk class of target risk score value, and the risk class that will acquire is surveyed as target
The project testing result of examination project.Because the risk of target detection project to be carried out to a kind of quantization of mode by risk class,
The risk of each risk class of target detection project is obtained, risk class is bigger, then the risk for representing target detection project is got over
Height ensure that the rank that can be apparent from the risk of target detection project, therefore improve the accuracy of assessment risk.
In one embodiment, mesh is updated in a kind of test report automatic generation method in Fig. 2 corresponding embodiment as shown in Figure 5
Flow chart of the risk score value under an application scenarios is marked, is specifically comprised the following steps:
S120, the target detection project preset target detection period is obtained, and according to the execution time of target detection project
Calculate the actual test period of target detection project.
In the present embodiment, the preset target detection period is special pre-set for test target test item
The test period of plan, the test period are executed the duration that all test cases are spent by target device.Target detection week
Phase is specially stored in cycle data library, in the state that can be called at any time.The execution time of target detection project includes opening
Begin time and dwell time, and the time started is to start to start target detection item object time, and dwell time is to stop target detection
Item object time.Time started and dwell time are specially stored in temporal database, in the state that can be called at any time.It is real
Border test period is actual test target detection project obtained test period.
Specifically, the store path in the target detection period of target detection project is obtained first in cycle data library, so
In the target detection period for extracting the target detection project according to the store path afterwards, target is next obtained in temporal database
At the beginning of test item and the store path of dwell time, and opening for the target detection project is extracted according to the store path
Begin time and dwell time, and the duration of the period between time started and dwell time is finally determined as target detection project
The actual test period.
S130, using the absolute difference between target detection period and actual test period as target absolute value.
Specifically, the exhausted of the difference in step S120 between the target detection period got and actual test period is calculated
To value, which is target absolute value.
S140, according to corresponding relationship preset between periodic deviation and deviation score, obtain the corresponding mesh of target absolute value
Mark deviation score.
In the present embodiment, target deviation score is the score for being dedicated for the setting of target absolute value, each target absolute value
Corresponding target deviation score is all different.
Specifically, between periodic deviation and deviation score preset corresponding relationship can be periodic deviation and deviation score it
Between inverse proportion linear relationship, the more high then deviation score of periodic deviation is lower, conversely, the more low then deviation score of periodic deviation more
Height, preset corresponding relationship is also possible between different deviation threshold regions and deviation score between periodic deviation and deviation score
Corresponding relationship, that is, pre-set each deviation threshold section, each deviation threshold section corresponds to a deviation score, and
And the value of the deviation in deviation threshold section is bigger, then deviation score is bigger.
In one embodiment, when corresponding relationship preset between periodic deviation and deviation score is each different inclined
When corresponding relationship between poor threshold region and deviation score, it is absolute from preset each deviation threshold section to select target
The implementation rate threshold interval that value is fallen into, and according to preset right between each different deviation threshold region and deviation score
It should be related to, the corresponding deviation score in deviation threshold section selected is determined as the corresponding target deviation point of the target absolute value
Number.
It should be noted that preset corresponding relationship specifically can be according to the actual situation between periodic deviation and deviation score
It is set, herein with no restrictions.
S150, target deviation score is added in target risk score value, obtains updated target risk score value.
Specifically, the target deviation score got in step S140 is added to the target being calculated in step S100
In risk score value, updated target risk score value is obtained.
In the corresponding embodiment of Fig. 5, by obtaining the target detection project preset target detection period, and according to target
The actual test period for executing time calculating target detection project of test item, by target detection period and actual test period
Between absolute difference as target absolute value, according to corresponding relationship preset between periodic deviation and deviation score, obtain mesh
The corresponding target deviation score of absolute value is marked, target deviation score is added in target risk score value, updated mesh is obtained
Mark risk score value.Because the risk of target detection project to be carried out to the quantization of another way by risk class, target is obtained
The risk of each risk class of test item, risk class is bigger, then the risk for representing target detection project is higher, ensure that
It can be apparent from the rank of the risk of target detection project, therefore improve the accuracy of assessment risk.
In one embodiment, it is determined in a kind of test report automatic generation method in Fig. 2 corresponding embodiment as shown in Figure 6
Flow chart of the software defect under an application scenarios, specifically comprises the following steps:
If S160, detecting that target detection project initiation is tested, the target device hair of real-time reception implementation of test cases
The target information for the test case sent.
In the present embodiment, target device is for executing the target detection item purpose equipment, i.e. measured target.Target letter
Breath is the information that requirement of target device during implementation of test cases according to test case is sent to server-side, for example, mesh
Marking information is " aabb1212 " etc..
Specifically, server-side first detects whether target detection project starts test, if server-side detects target detection item
Mesh starting test, the then target information for the test case that the target device of real-time reception implementation of test cases is sent, if server-side
It detects the inactive test of target detection project, then exports the inactive prompt information of target detection project.
It should be noted that the particular content of target information and inactive prompt information, can carry out according to practical application
Setting, herein with no restrictions.
If S170, the target information for not receiving test case in preset time interval, exact p-value use-case
Test result is that test does not pass through, and test result is not software defect by reason.
Specifically, server-side is pre- in test case implementation procedure when detecting that each test case starts to execute
If time point starting duration is the timer of preset time interval, if receiving the survey in the time interval where timer
The target information of example on probation, then stop the timer, and export and receive successfully prompt information, if reaching or more than where timer
Time interval still do not receive the target information of the test case, then confirm the test result of the test case for test not
Pass through, and test result is not software defect by reason.
It should be noted that preset time interval and the particular content for receiving successfully prompt information, it can be according to reality
Using being set, herein with no restrictions.
In the corresponding embodiment of Fig. 6, if detecting that target detection project initiation is tested by server-side, real-time reception
The target information for the test case that the target device of implementation of test cases is sent, wherein target device is to survey for test target
Try item purpose equipment, if not receiving the target information of test case in preset time interval, exact p-value use-case
Test result is that test does not pass through, and test result is not software defect by reason, because being sentenced automatically using computer
Disconnected software defect out, undoubtedly more saves human cost.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
In one embodiment, a kind of test report automatically generating device is provided, the test report automatically generating device with it is upper
Test report automatic generation method in embodiment is stated to correspond.As shown in fig. 7, the test report automatically generating device includes letter
Breath obtains module 701, data computation module 702, the first risk identification module 703, the second risk identification module 704, template and obtains
Module 706 is filled in modulus block 705 and report.
Detailed description are as follows for each functional module:
Data obtaining module 701, if obtaining target detection project for detecting that target detection project testing is completed
The implementing result of each test case in project name and target detection project;
Data computation module 702 calculates the target of target detection project for the implementing result according to each test case
Implementation rate, target percent of pass and target defect quantity;
First risk identification module 703, if being greater than or equal to preset implementation rate threshold value, and mesh for target implementation rate
It marks percent of pass and is greater than or equal to preset percent of pass threshold value, and target defect quantity is less than preset amount threshold, then confirms
The project testing result of target detection project is devoid of risk;
Second risk identification module 704, if being less than for target implementation rate less than implementation rate threshold value or target percent of pass
Percent of pass threshold value or target defect quantity are greater than or equal to amount threshold, then confirm the project testing knot of target detection project
Fruit is that there are risks;
Template obtains module 705, for obtaining preset target detection report template;
Module 706 is filled in report, for by project name, the implementing result of each test case and target detection project
Project testing result is inserted in preset target detection report template, and the target detection report of target detection project is obtained.
Further, as shown in figure 8, the data computation module 702 includes:
Total quantity acquisition submodule 7021, for obtaining the total quantity for the test case for including in target detection project;
Number of executions submodule 7022, for the execution state according to test case, statistics has executed the test of completion
The number of executions of use-case;
By quantity submodule 7023, for the use-case test result according to test case, counting use-case test result is
That tests the test case passed through passes through quantity;
Implementation rate computational submodule 7024 obtains target execution for calculating the ratio between number of executions and total quantity
Rate;
It is logical to obtain target for calculating the ratio passed through between quantity and number of executions for percent of pass computational submodule 7025
Cross rate;
Defects count acquisition submodule 7026 is obtained for being to test in unsanctioned test case from use-case test result
The quantity not by reason for the test case of software defect of a test result is taken, and the quantity that will acquire is as target
Defects count.
Further, as shown in figure 9, test report automatically generating device further include:
Score determining module 707 is executed, for obtaining mesh according to preset corresponding relationship between implementation rate and execution score
It marks the corresponding target of implementation rate and executes score;
By score determining module 708, for obtaining mesh according to percent of pass and by preset corresponding relationship between score
The corresponding target of mark percent of pass passes through score;
Defect score determining module 709, for obtaining according to corresponding relationship preset between defects count and defect score
The corresponding target defect score of target defect quantity;
Risk score value computing module 710, for executing score, target by dividing to target according to preset calculation
Several and target defect score carries out accumulation calculating, obtains the target risk score value of target detection project;
Risk class determining module 711, for obtaining according to mapping relations preset between risk score value and risk class
The corresponding risk class of target risk score value, and project testing knot of the risk class that will acquire as target detection project
Fruit.
Further, test report automatically generating device further include:
Period obtains module 712, for obtaining the target detection project preset target detection period, and according to target detection
The actual test period for executing time calculating target detection project of project;
Absolute value determining module 713, for using the absolute difference between target detection period and actual test period as
Target absolute value;
Deviation score determining module 714, for obtaining according to corresponding relationship preset between periodic deviation and deviation score
The corresponding target deviation score of target absolute value;
Risk score value update module 715, for target deviation score to be added in target risk score value, after obtaining update
Target risk score value.
Further, test report automatically generating device further include:
Information receiving module 716, if real-time reception executes test and uses for detecting that target detection project initiation is tested
The target information for the test case that the target device of example is sent, wherein target device is setting for test target test item
It is standby;
Test result confirmation module 717, if the target for not receiving test case in preset time interval is believed
Breath, then the test result of exact p-value use-case is that test does not pass through, and test result is not software defect by reason.
Specific restriction about test report automatically generating device may refer to automatically generate above for test report
The restriction of method, details are not described herein.Modules in above-mentioned test report automatically generating device can be fully or partially through
Software, hardware and combinations thereof are realized.Above-mentioned each module can be embedded in the form of hardware or independently of the place in computer equipment
It manages in device, can also be stored in a software form in the memory in computer equipment, in order to which processor calls execution or more
The corresponding operation of modules.
In one embodiment, a kind of computer equipment is provided, which can be server-side, internal junction
Composition can be as shown in Figure 10.The computer equipment include by system bus connect processor, memory, network interface and
Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment
Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data
Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating
The database of machine equipment is used for the data that test report automatic generation method is related to.The network interface of the computer equipment is used for
It is communicated with external terminal by network connection.To realize that a kind of test report is automatic when the computer program is executed by processor
Generation method.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor realize above-described embodiment test report certainly when executing computer program
The step of dynamic generation method, such as step S10 shown in Fig. 2 to step S60.Alternatively, reality when processor executes computer program
The function of each module/unit of test report automatically generating device in existing above-described embodiment, for example, module shown in Fig. 7 701 to
The function of module 706.To avoid repeating, which is not described herein again.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Test report automatic generation method in above method embodiment is realized when machine program is executed by processor, alternatively, the computer journey
The function of each module/unit in test report automatically generating device in above-mentioned apparatus embodiment is realized when sequence is executed by processor.
To avoid repeating, which is not described herein again.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer
In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein,
To any reference of memory, storage, database or other media used in each embodiment provided herein,
Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing
Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (10)
1. a kind of test report automatic generation method, which is characterized in that the test report automatic generation method includes:
If detecting, target detection project testing is completed, and obtains the project name and the target detection item of target detection project
The implementing result of each test case in mesh;
According to the implementing result of each test case, target implementation rate, the target for calculating the target detection project pass through
Rate and target defect quantity;
If the target implementation rate is greater than or equal to preset implementation rate threshold value, and the target percent of pass is greater than or equal in advance
If percent of pass threshold value, and the target defect quantity be less than preset amount threshold, then confirm the target detection project
Project testing result be devoid of risk;
If the target implementation rate is less than the implementation rate threshold value or the target percent of pass is less than the percent of pass threshold value,
Or the target defect quantity is greater than or equal to the amount threshold, then confirms the project testing knot of the target detection project
Fruit is that there are risks;
Obtain preset target detection report template;
By the project name, the project testing result of the implementing result of each test case and the target detection project
It inserts in the preset target detection report template, obtains the target detection report of the target detection project.
2. test report automatic generation method as described in claim 1, which is characterized in that described to be used according to each test
The implementing result of example, target implementation rate, target percent of pass and the target defect quantity for calculating the target detection project include:
Obtain the total quantity for the test case for including in the target detection project;
According to the execution state of the test case, statistics has executed the number of executions of the test case of completion;
According to the use-case test result of the test case, counting the use-case test result is that the test that test passes through is used
Example passes through quantity;
The ratio between the number of executions and the total quantity is calculated, target implementation rate is obtained;
The ratio by between quantity and the number of executions is calculated, target percent of pass is obtained;
It is to test in the unsanctioned test case from the use-case test result, obtains not leading to for the use-case test result
The quantity for the test case that reason is software defect is crossed, and the quantity that will acquire is as the target defect quantity.
3. test report automatic generation method as claimed in claim 1 or 2, which is characterized in that in the confirmation target
The project testing result of test item be there are after risk, and it is described obtain preset target detection report template it
Before, the test report automatic generation method further include:
According to implementation rate and preset corresponding relationship between score is executed, the corresponding target of the target implementation rate is obtained and executes and divide
Number;
According to percent of pass and by preset corresponding relationship between score, the corresponding target of the target percent of pass is obtained by dividing
Number;
According to corresponding relationship preset between defects count and defect score, obtains the corresponding target of the target defect quantity and lack
Fall into score;
According to preset calculation, score is executed to the target, the target passes through score and the target defect score
Accumulation calculating is carried out, the target risk score value of the target detection project is obtained;
According to preset mapping relations between the risk score value and risk class, the corresponding wind of the target risk score value is obtained
Dangerous grade, and the project testing result of the risk class that will acquire as the target detection project.
4. test report automatic generation method as claimed in claim 3, which is characterized in that described according to preset calculating side
Formula executes score, the target to the target and carries out accumulation calculating by score and the target defect score, obtains described
After the target risk score value of target detection project, and described according to preset between the risk score value and risk class
Mapping relations obtain the corresponding risk class of the target risk score value, and described in the risk class conduct that will acquire
Before the project testing result of target detection project, the test report automatic generation method further include:
The target detection project preset target detection period is obtained, and is counted according to the execution time of the target detection project
Calculate the actual test period of the target detection project;
Using the absolute difference between the target detection period and the actual test period as target absolute value;
According to corresponding relationship preset between periodic deviation and deviation score, the corresponding target deviation of the target absolute value is obtained
Score;
The target deviation score is added in the target risk score value, the updated target risk score value is obtained.
5. test report automatic generation method as described in claim 1, which is characterized in that if detecting target detection described
Project testing is completed, then obtains holding for each test case in the project name and the target detection project of target detection project
Before row result, the test report automatic generation method further include:
If detecting the target detection project initiation test, the target device that real-time reception executes the test case is sent
The test case target information, wherein the target device be for testing the target detection item purpose equipment;
If not receiving the target information of the test case in preset time interval, the use of the test case is confirmed
Example test result is that test does not pass through, and the use-case test result is not the software defect by reason.
6. a kind of test report automatically generating device, which is characterized in that the test report automatically generating device includes:
Data obtaining module, if obtaining the entry name of target detection project for detecting that target detection project testing is completed
Claim the implementing result with each test case in the target detection project;
Data computation module calculates the mesh of the target detection project for the implementing result according to each test case
Mark implementation rate, target percent of pass and target defect quantity;
First risk identification module, if being greater than or equal to preset implementation rate threshold value for the target implementation rate, and described
Target percent of pass is greater than or equal to preset percent of pass threshold value, and the target defect quantity is less than preset amount threshold,
The project testing result for then confirming the target detection project is devoid of risk;
Second risk identification module, if passing through for the target implementation rate less than the implementation rate threshold value or the target
Rate is less than the percent of pass threshold value or the target defect quantity is greater than or equal to the amount threshold, then confirms the mesh
The project testing result for marking test item is that there are risks;
Template obtains module, for obtaining preset target detection report template;
Module is filled in report, for by the project name, the implementing result of each test case and the target detection
The project testing result of project is inserted in the preset target detection report template, and the target of the target detection project is obtained
Test report.
7. test report automatically generating device as claimed in claim 6, which is characterized in that the data computation module includes:
Total quantity acquisition submodule, for obtaining the total quantity for the test case for including in the target detection project;
Number of executions statistic submodule, for the execution state according to the test case, statistics has executed the described of completion
The number of executions of test case;
The use-case test knot is counted for the use-case test result according to the test case by quantity statistics submodule
Fruit is that the test case that test passes through passes through quantity;
Implementation rate computational submodule obtains target execution for calculating the ratio between the number of executions and the total quantity
Rate;
It is logical to obtain target for calculating the ratio by between quantity and the number of executions for percent of pass computational submodule
Cross rate;
Defects count acquisition submodule is obtained for being to test in the unsanctioned test case from the use-case test result
Take the quantity not by reason for the test case of software defect of the use-case test result, and the quantity that will acquire
As the target defect quantity.
8. test report automatically generating device as claimed in claims 6 or 7, which is characterized in that the test report is given birth to automatically
At device further include:
Score determining module is executed, for obtaining the target according to preset corresponding relationship between implementation rate and execution score
The corresponding target of implementation rate executes score;
By score determining module, for obtaining the target according to percent of pass and by preset corresponding relationship between score
The corresponding target of percent of pass passes through score;
Defect score determining module, for obtaining the mesh according to corresponding relationship preset between defects count and defect score
Mark the corresponding target defect score of defects count;
Risk score value computing module, for executing score, the target by dividing to the target according to preset calculation
The several and target defect score carries out accumulation calculating, obtains the target risk score value of the target detection project;
Risk class determining module, for obtaining institute according to preset mapping relations between the risk score value and risk class
Institute of the risk class stating the corresponding risk class of target risk score value, and will acquire as the target detection project
State project testing result.
9. a kind of computer equipment, including memory, processor and storage are in the memory and can be in the processor
The computer program of upper operation, which is characterized in that the processor realized when executing the computer program as claim 1 to
Described in any one of 5 the step of test report automatic generation method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists
In test report of the realization as described in any one of claims 1 to 5 is given birth to automatically when the computer program is executed by processor
The step of at method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910047145.XA CN109828919A (en) | 2019-01-18 | 2019-01-18 | Test report automatic generation method, device, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910047145.XA CN109828919A (en) | 2019-01-18 | 2019-01-18 | Test report automatic generation method, device, computer equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109828919A true CN109828919A (en) | 2019-05-31 |
Family
ID=66860380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910047145.XA Pending CN109828919A (en) | 2019-01-18 | 2019-01-18 | Test report automatic generation method, device, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109828919A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110413517A (en) * | 2019-07-17 | 2019-11-05 | 北京达佳互联信息技术有限公司 | A kind of test report generation method, device, electronic equipment and storage medium |
CN110865939A (en) * | 2019-11-11 | 2020-03-06 | 南方电网财务有限公司 | Application program quality monitoring method and device, computer equipment and storage medium |
CN110955591A (en) * | 2019-10-18 | 2020-04-03 | 文思海辉智科科技有限公司 | System performance evaluation method and device, computer equipment and storage medium |
CN111858354A (en) * | 2020-07-23 | 2020-10-30 | 远光软件股份有限公司 | Method and device for automatically generating test report, storage medium and electronic equipment |
CN112231237A (en) * | 2020-12-17 | 2021-01-15 | 鹏城实验室 | Test report obtaining method, device, terminal equipment and storage medium |
CN113127324A (en) * | 2019-12-30 | 2021-07-16 | 北京新能源汽车股份有限公司 | Test report automatic generation method and device, computer equipment and storage medium |
CN113643128A (en) * | 2021-08-31 | 2021-11-12 | 中国银行股份有限公司 | Automatic testing method and device for bank products |
CN114860618A (en) * | 2022-07-06 | 2022-08-05 | 湖南三湘银行股份有限公司 | RPA-based automatic function testing method and system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106446412A (en) * | 2016-09-26 | 2017-02-22 | 杭州杉石科技有限公司 | Model-based test method for avionics systems |
US9785541B1 (en) * | 2015-08-17 | 2017-10-10 | Amdocs Software Systems Limited | System, method, and computer program for generating test reports showing business activity results and statuses |
CN107622014A (en) * | 2017-09-22 | 2018-01-23 | 广州视源电子科技股份有限公司 | Test report generation method, device, readable storage medium storing program for executing and computer equipment |
CN107844424A (en) * | 2017-11-15 | 2018-03-27 | 杭州杉石科技有限公司 | Model-based testing system and method |
CN109062817A (en) * | 2018-10-15 | 2018-12-21 | 网宿科技股份有限公司 | Automated testing method and system |
-
2019
- 2019-01-18 CN CN201910047145.XA patent/CN109828919A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9785541B1 (en) * | 2015-08-17 | 2017-10-10 | Amdocs Software Systems Limited | System, method, and computer program for generating test reports showing business activity results and statuses |
CN106446412A (en) * | 2016-09-26 | 2017-02-22 | 杭州杉石科技有限公司 | Model-based test method for avionics systems |
CN107622014A (en) * | 2017-09-22 | 2018-01-23 | 广州视源电子科技股份有限公司 | Test report generation method, device, readable storage medium storing program for executing and computer equipment |
CN107844424A (en) * | 2017-11-15 | 2018-03-27 | 杭州杉石科技有限公司 | Model-based testing system and method |
CN109062817A (en) * | 2018-10-15 | 2018-12-21 | 网宿科技股份有限公司 | Automated testing method and system |
Non-Patent Citations (1)
Title |
---|
黄愉;: "基于QC软件的测试报告配置研究与应用", 信息与电脑(理论版), no. 12 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110413517A (en) * | 2019-07-17 | 2019-11-05 | 北京达佳互联信息技术有限公司 | A kind of test report generation method, device, electronic equipment and storage medium |
CN110955591A (en) * | 2019-10-18 | 2020-04-03 | 文思海辉智科科技有限公司 | System performance evaluation method and device, computer equipment and storage medium |
CN110865939A (en) * | 2019-11-11 | 2020-03-06 | 南方电网财务有限公司 | Application program quality monitoring method and device, computer equipment and storage medium |
CN110865939B (en) * | 2019-11-11 | 2023-11-03 | 南方电网财务有限公司 | Application program quality monitoring method, device, computer equipment and storage medium |
CN113127324A (en) * | 2019-12-30 | 2021-07-16 | 北京新能源汽车股份有限公司 | Test report automatic generation method and device, computer equipment and storage medium |
CN113127324B (en) * | 2019-12-30 | 2024-04-19 | 北京新能源汽车股份有限公司 | Automatic test report generation method and device, computer equipment and storage medium |
CN111858354A (en) * | 2020-07-23 | 2020-10-30 | 远光软件股份有限公司 | Method and device for automatically generating test report, storage medium and electronic equipment |
CN112231237A (en) * | 2020-12-17 | 2021-01-15 | 鹏城实验室 | Test report obtaining method, device, terminal equipment and storage medium |
CN113643128A (en) * | 2021-08-31 | 2021-11-12 | 中国银行股份有限公司 | Automatic testing method and device for bank products |
CN113643128B (en) * | 2021-08-31 | 2024-02-27 | 中国银行股份有限公司 | Automatic testing method and device for bank products |
CN114860618A (en) * | 2022-07-06 | 2022-08-05 | 湖南三湘银行股份有限公司 | RPA-based automatic function testing method and system |
CN114860618B (en) * | 2022-07-06 | 2022-09-23 | 湖南三湘银行股份有限公司 | RPA-based automatic function testing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109828919A (en) | Test report automatic generation method, device, computer equipment and storage medium | |
CN112465011B (en) | Project risk prediction method and system based on project research and development process | |
CN110929036A (en) | Electric power marketing inspection management method and device, computer equipment and storage medium | |
CN108519943A (en) | Testing and control and test execution device, method and computer storage media | |
CN109684211B (en) | Order scheduling system pressure testing method and device based on shop dimensions | |
CN107678972A (en) | The appraisal procedure and relevant apparatus of a kind of test case | |
CN111611172A (en) | Project test defect analysis method, device, equipment and storage medium | |
CN104951842A (en) | Novel method for predicting oil field output | |
CN110688168A (en) | Method, device and equipment for improving starting speed of application program and storage medium | |
CN108446224B (en) | Performance analysis method of application program on mobile terminal and storage medium | |
CN108874649A (en) | Generation method, device and its computer equipment of automatic test script | |
CN116841885A (en) | Test case library-based test method and device and electronic equipment | |
CN109032864A (en) | A kind of method and system of NVMe SSD hot plug test | |
CN108595312A (en) | A kind of automatic performance method and device of modelling customer behavior | |
CN104572103A (en) | Distribution function-based WCET (Worst Case Execution Time) quick estimation method | |
CN105989095B (en) | Take the correlation rule significance test method and device of data uncertainty into account | |
CN109189673B (en) | Software test scheme, and method and device for determining test cases | |
CN107402883B (en) | A kind of data test treating method and apparatus | |
CN115373929A (en) | Test method, device, equipment, readable storage medium and program product | |
CN114387110A (en) | Quantitative transaction strategy testing method and device | |
CN113918471A (en) | Test case processing method and device and computer readable storage medium | |
CN113791980A (en) | Test case conversion analysis method, device, equipment and storage medium | |
Bukhari et al. | Determining the factors affecting the accuracy of effort estimates for different application and task types | |
CN112214414A (en) | Coverage rate processing method, device, equipment and medium based on automatic test | |
CN112346994A (en) | Test information correlation method and device, computer equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |