CN109815472A - Change project templet generation method and electronic equipment - Google Patents
Change project templet generation method and electronic equipment Download PDFInfo
- Publication number
- CN109815472A CN109815472A CN201910027048.4A CN201910027048A CN109815472A CN 109815472 A CN109815472 A CN 109815472A CN 201910027048 A CN201910027048 A CN 201910027048A CN 109815472 A CN109815472 A CN 109815472A
- Authority
- CN
- China
- Prior art keywords
- change
- project
- target
- templet
- project templet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000008859 change Effects 0.000 title claims abstract description 341
- 238000000034 method Methods 0.000 title claims abstract description 64
- 238000011835 investigation Methods 0.000 claims description 92
- 230000015654 memory Effects 0.000 claims description 18
- 238000004458 analytical method Methods 0.000 claims description 14
- 238000004891 communication Methods 0.000 claims description 8
- 239000000284 extract Substances 0.000 claims description 6
- 238000004422 calculation algorithm Methods 0.000 claims description 5
- 244000061408 Eugenia caryophyllata Species 0.000 claims 1
- 235000016639 Syzygium aromaticum Nutrition 0.000 claims 1
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 7
- 238000007726 management method Methods 0.000 description 26
- 238000010586 diagram Methods 0.000 description 22
- 238000012827 research and development Methods 0.000 description 15
- 238000005457 optimization Methods 0.000 description 9
- 238000011160 research Methods 0.000 description 9
- 238000004590 computer program Methods 0.000 description 8
- 238000013070 change management Methods 0.000 description 5
- 238000011161 development Methods 0.000 description 5
- 239000010985 leather Substances 0.000 description 5
- 230000008520 organization Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 230000001052 transient effect Effects 0.000 description 4
- 230000007306 turnover Effects 0.000 description 4
- 238000013439 planning Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000013515 script Methods 0.000 description 3
- 238000012384 transportation and delivery Methods 0.000 description 3
- 238000003339 best practice Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000004556 brain Anatomy 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to project templet generation technique fields, more particularly to a kind of change project templet generation method and electronic equipment.Wherein, changing project templet generation method includes: to obtain questionnaire result;According to questionnaire as a result, determining that target changes object;Object is changed according to target, target is generated and changes project templet.Changing object due to target is that questionnaire result obtains by inquiry, it is different from traditional technology and is merely able to provide fixed change object, and, the generation that target changes project templet is changed object by target and is determined, it avoids generating the target change project templet comprising extra non-targeted change object, therefore, it can flexibly be dynamically generated target and change project templet.
Description
Technical field
The present invention relates to project templet generation technique fields, more particularly to a kind of change project templet generation method and electricity
Sub- equipment.
Background technique
During management, enterprise often will start management change project, to enhance the core competitiveness of enterprises, solution
The certainly short slab of enterprise development.
Currently, enterprise is according to own situation, selection classics and satisfactory change project templet, then in project templet
It is upper to create corresponding change project.
However, the selected classical change content changed project templet and be pre-configured with multinomial fixation, the multinomial fixation
Change content be not necessarily that enterprise all needs, also that is, a part change content meet the requirements, another part change in
Appearance is extra.Therefore, tradition change project templet has not been able to effectively meet the needs of enterprise.
Summary of the invention
One purpose of the embodiment of the present invention is intended to provide a kind of change project templet generation method and electronic equipment, can
It is flexibly dynamically generated target and changes project templet.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
In a first aspect, the embodiment of the present invention provides a kind of change project templet generation method, applied to electronic equipment, institute
The method of stating includes:
Obtain questionnaire result;
According to the questionnaire as a result, determining that target changes object;
Object is changed according to the target, target is generated and changes project templet.
Optionally, it includes destination item unit that the target, which changes project templet, and each destination item unit is all right
The target is answered to change object and configured with default change task.
Optionally, described that object is changed according to the target, it generates target and changes project templet, comprising:
Access project cell library, the project cell library prestore several preset term units, each preset term list
Member all corresponds to a change object;
It is traversed out from the project cell library and changes the corresponding preset term unit conduct of object with each target
Destination item unit;
Several destination item units are combined, change project templet to generate target.
Optionally, described that object is changed according to the target, it generates target and changes project templet, comprising:
Access project template library, the project templet library prestore several default change project templets;
Default change project templet conduct corresponding with target change object is traversed out from the project templet library
Target changes project templet.
Optionally, described that default change item corresponding with target change object is traversed out from the project templet library
Mesh template changes project templet as target, comprising:
Judge whether each default project unit for changing project templet matches the destination item unit;
If so, the statistics default project element number changed in project templet with the destination item units match,
Also, according to the quantity of the project element number and the destination item unit, selection target changes project templet;
If it is not, continuing judgement, in addition whether the default project unit for changing project templet matches the destination item list
Member.
Optionally, the quantity according to the project element number and the destination item unit, selection target are changed
Project templet, comprising:
Judge whether the difference of both quantity of the project element number and the destination item unit is less than default threshold
Value;
If so, the default change project templet is selected to change project templet as target;
If it is not, continuing judgement, in addition whether each default project unit for changing project templet matches the target item
Mesh unit.
Optionally, the questionnaire result includes structuring investigation option and/or unstructured investigation option, the knot
Structureization investigation option is pointing directly at change object, and the unstructured investigation option refers indirectly to change object;
It is described according to the questionnaire as a result, determine target change object, comprising:
The change object for selecting each structuring investigation option to be directed toward changes object as target;
And/or
According to semantic analysis algorithm, the unstructured investigation option is analyzed, the unstructured investigation option is obtained and refers to
To change object;
The change object for selecting the unstructured investigation option to be directed toward changes object as target.
Optionally, the method also includes:
Obtain the investigation content configured with fixed investigation option;
Generate the questionnaire page comprising the investigation content;
Alternatively,
Obtain at least one destination item unit or target change project that temperature is greater than or equal to preset heat threshold value
Template, the temperature are used to indicate that each destination item unit to be combined into the frequency that target changes project templet, alternatively,
The temperature is used to indicate that each target to change the frequency that project templet is generated;
It generates corresponding comprising at least one described destination item unit or at least one described target change project templet
Investigation option the questionnaire page.
Optionally, the acquisition questionnaire result, comprising:
Using user's selection result that each investigation option inputs in the questionnaire page or result is filled in as tune
Look into questionnaire result;
Alternatively,
Receive the voice messaging for each investigation option of correspondence that user inputs in the questionnaire page;
The voice messaging is converted into text information;
By the text information after semantic analysis, extracts target and change object as questionnaire result.
Optionally, the method also includes:
Obtain edit instruction;
According to the edit instruction, edits the target and change project templet.
Optionally, the method also includes:
Determine that the target changes the service condition of project templet;
According to the service condition, the target is recommended to change target in project templet or target change project templet
Project unit.
In second aspect, the embodiment of the present invention provides a kind of change project templet generating means, is applied to electronic equipment, institute
Stating device includes:
First obtains module, for obtaining questionnaire result;
First determining module is used for according to the questionnaire as a result, determining that target changes object;
First generation module generates target and changes project templet for changing object according to the target.
Optionally, it includes destination item unit that the target, which changes project templet, and each destination item unit is all right
The target is answered to change object and configured with default change task.
Optionally, first generation module includes:
First access unit, for accessing project cell library, the project cell library prestores several preset term units, often
A preset term unit all corresponds to a change object;
First Traversal Unit, it is corresponding with each target change object for being traversed out from the project cell library
Preset term unit is as destination item unit;
Assembled unit changes project templet for combining several destination item units to generate target.
Optionally, first generation module includes:
Second access unit, for accessing project template library, the project templet library prestores several default change projects
Template;
Second Traversal Unit, it is corresponding with target change object default for being traversed out from the project templet library
Project templet, which is changed, as target changes project templet.
Optionally, the second Traversal Unit is specifically used for:
Judge whether each default project unit for changing project templet matches the destination item unit;
If so, the statistics default project element number changed in project templet with the destination item units match,
Also, according to the quantity of the project element number and the destination item unit, selection target changes project templet;
If it is not, continuing judgement, in addition whether the default project unit for changing project templet matches the destination item list
Member.
Optionally, the second Traversal Unit also particularly useful for: judge the project element number and the destination item unit
The difference of both quantity whether be less than preset threshold;
If so, the default change project templet is selected to change project templet as target;
If it is not, continuing to judge in addition to judge whether each default project unit for changing project templet matches the mesh
Mark project unit.
Optionally, the questionnaire result includes structuring investigation option and/or unstructured investigation option, the knot
Structureization investigation option is pointing directly at change object, and the unstructured investigation option refers indirectly to change object;
First determining module includes:
First selecting unit, the change object for selecting each structuring investigation option to be directed toward are changed as target
Object;
And/or
Analytical unit, for analyzing the unstructured investigation option, obtaining described non-structural according to semantic analysis algorithm
Change the change object that investigation option is directed toward;
Second selecting unit, the change object for selecting the unstructured investigation option to be directed toward is as target change pair
As.
Optionally, described device further include:
Second obtains module, for obtaining the investigation content for being configured with fixed investigation option;
Second generation module, for generating the questionnaire page comprising the investigation content;
Alternatively,
Second obtains module, at least one the destination item unit for being greater than or equal to preset heat threshold value for obtaining temperature
Or target changes project templet, the temperature changes project for indicating that each destination item unit is combined into target
The frequency of template, alternatively, the temperature is used to indicate that each target to change the frequency that project templet is generated;
Third generation module, for generating comprising at least one described destination item unit or at least one described target
Change the questionnaire page of the corresponding investigation option of project templet.
Optionally, the first acquisition module is specifically used for:
Using user's selection result that each investigation option inputs in the questionnaire page or result is filled in as tune
Look into questionnaire result;
Alternatively,
Receive the voice messaging for each investigation option of correspondence that user inputs in the questionnaire page;
The voice messaging is converted into text information;
By the text information after semantic analysis, extracts target and change object as questionnaire result.
Optionally, described device further include:
Third obtains module, for obtaining edit instruction;
Editor module, for editing the target and changing project templet according to the edit instruction.
Optionally, described device further include:
Second determining module, for determining that the target changes the service condition of project templet;
Recommending module, for recommending according to the service condition, the target changes project templet or the target is changed
Destination item unit in project templet.
In the third aspect, the embodiment of the present invention provides a kind of electronic equipment, comprising:
At least one processor;And
The memory being connect at least one described processor communication;Wherein, the memory be stored with can by it is described extremely
The instruction that a few processor executes, described instruction are executed by least one described processor, so that at least one described processing
Device can be used in executing the change project templet generation method.
In fourth aspect, the embodiment of the present invention provides a kind of non-transient computer readable storage medium, the non-transient meter
Calculation machine readable storage medium storing program for executing is stored with computer executable instructions, and the computer executable instructions are for executing electronic equipment
Described in any item change project templet generation methods.
At the 5th aspect, the embodiment of the present invention provides a kind of computer program product, and the computer program product includes
The computer program being stored on non-volatile computer readable storage medium storing program for executing, the computer program include program instruction, when
When described program instruction is executed by electronic equipment, the electronic equipment is made to execute described in any item change project templet generation sides
Method.
In the change project templet generation method that each embodiment of the present invention provides, firstly, obtain questionnaire as a result,
According to questionnaire as a result, determining that target changes object, object is changed according to target, target is generated and changes project templet.Due to
It is that questionnaire result obtains by inquiry that target, which changes object, is different from traditional technology and is merely able to provide fixed change object,
Also, the generation that target changes project templet is changed object by target and is determined, avoids generating comprising extra non-targeted change
The target of object changes project templet, therefore, can flexibly be dynamically generated target and change project templet.
Detailed description of the invention
One or more embodiments are illustrated by the picture in corresponding attached drawing, these exemplary theorys
The bright restriction not constituted to embodiment, the element in attached drawing with same reference numbers label are expressed as similar element, remove
Non- to have special statement, composition does not limit the figure in attached drawing.
Fig. 1 is a kind of configuration diagram of company organization provided in an embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram of management change system provided in an embodiment of the present invention;
Fig. 3 a is a kind of flow diagram for changing project templet generation method provided in an embodiment of the present invention;
Fig. 3 b is the first flow diagram of S33 in Fig. 3 a;
Fig. 3 c be another embodiment of the present invention provides a kind of change project templet generation method flow diagram;
Fig. 3 d is a kind of flow diagram for change project templet generation method that still another embodiment of the present invention provides;
Fig. 3 e is a kind of flow diagram for change project templet generation method that still another embodiment of the present invention provides;
Fig. 4 is a kind of flow diagram for change project templet generation method that still another embodiment of the present invention provides;
Fig. 5 a is second of flow diagram of S33 in Fig. 3 a;
Fig. 5 b is a kind of flow diagram for change project templet generation method that still another embodiment of the present invention provides;
Fig. 5 c is the flow diagram of S43 in Fig. 5 b;
Fig. 5 d is the flow diagram of S432 in Fig. 5 c;
Fig. 5 e is the flow diagram of S433 in Fig. 5 c;
Fig. 6 a is a kind of structural schematic diagram for changing project templet generating means provided in an embodiment of the present invention;
Fig. 6 b is the first structural schematic diagram of the first generation module in Fig. 6 a;
Fig. 6 c is second of structural schematic diagram of the first generation module in Fig. 6 a;
Fig. 6 d is the structural schematic diagram of the first determining module in Fig. 6 a;
Fig. 6 e be another embodiment of the present invention provides a kind of change project templet generating means structural schematic diagram;
Fig. 6 f is a kind of structural schematic diagram for change project templet generating means that still another embodiment of the present invention provides;
Fig. 6 g is a kind of structural schematic diagram for change project templet generating means that still another embodiment of the present invention provides;
Fig. 7 is a kind of structural schematic diagram for change project templet generating means that still another embodiment of the present invention provides;
Fig. 8 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not
For limiting the present invention.
Relational language involved in this paper is understood in order to facilitate reader, is made explanations herein to the term below related to,
It is understood that term herein is only intended to supplementary explanation herein, other technical staff can be to same for different angle
Term makes other extensions understandings or different understanding, still, specific to understand and make explanations in conjunction with the context of sentence, Suo Youshu
Language is not intended to restrict the invention the protection scope of embodiment.
Change Management (Change Management) refers to that enterprise or organizational growth are slow, and internal problem is prominent, must make group
Change strategy is knitted, by intra-level, workflow and corporate culture, necessary adjustment is carried out and improves management, to reach enterprise
Clean transformation.
For example, referring to Fig. 1, company organization's framework includes administrative department, research and development department, sales department, purchasing department
Door, Finance Department and legal department.Personnel's redundancy of administrative department, evades affairs.The efficiency of research and development of research and development department is low, research and development
Product lags behind the needs in market.The rate of signing a bill of sales department is low, and marketing dynamics is inadequate.The buying link of purchasing department is many
More, procurement efficiency is low ....In this regard, the development long-term for enterprise, it is necessary to Change Management is made to relevant departments, in the hope of
Change.
Management change refers to realize strategic objective, invests to the management improvement of company, with the change of science
Management method management change project, planning change project, exploitation change project and the overall process for carrying out the landing of change project, with
This therefrom obtains commercial return, improves the success rate of change project.
Change project success element: mainly including the following: 1, whether change direction is accurate, e.g. progress manpower money
Source control is changed or Financial Management Reform;2, the whether firm support of enterprise top leader is changed;3, throwing of the enterprise to change
Whether in place to enter;4, whether transformation solution has industry best practice reference, and best practices need mutually to tie with the business of enterprise
It closes;5, the degree of participation of core roles, participation time etc.;6, changing process management needs management review point and Technical Review
Point checks the performance of task, guarantees delivery quality.
Set of tasks: the corresponding change project of each task and each task including completion required for change project
Role.
Task: the included content needed to be implemented in change project includes one or more in one change project
Task.Each task includes following essential information: executing the responsible party of task, job start time, job end time, appoints
Progress etc. that business executes.Task is to change the minimum unit of the project implementation, tracking and measurement.
Task owner: it is responsible for pushing the role of completion task, different tasks needs different responsibilities in change project
People.Such as: the person liable that human resources change task is manpower resources supervisor.
ERP:Enterprise Resource Planning, Enterprise Resources Planning.
The embodiment of the present invention provides a kind of management change system.Referring to Fig. 2, management change system 20 includes client 21
With server 22, client 21 and server 22 are communicated, wherein the communication modes can be wire communication, can also be wireless
Communication.
Client 21 is for showing that the questionnaire page, change project templet etc. change project management interaction page.It adjusts
The scrolling face of interrogating includes several investigation options, corresponding investigation option can be inputted in the questionnaire page by questionnaire person
Questionnaire information.It changes project templet to be used to provide the carrying page of change task for management change, user can change
The corresponding execution data of each change task are inputted on project templet.
The quantity of client 21 can be one or more, and client 21 includes tablet computer, mobile phone, pocket pc
And stationary personal computers.
When user is after the questionnaire page of client 21 inputs questionnaire information, client 21 is sent out to server 22
Questionnaire information is sent, then, server 22 obtains questionnaire result.Server 22 selects to correspond to according to questionnaire result
Change project templet, and corresponding change project templet to corresponding client 21 is sent by network.
User fills in the execution data of corresponding change task on changing project templet 21, alternatively, client 21 is grabbed automatically
The execution data of corresponding change task are taken, client 21 will execute data and be sent to server 22, and server 22 is according to execution number
According to change Measure Indexes, tracking with anticipation change project successful, early warning is made in advance to the change project for risk occur.
In some embodiments, client 21 can also prestore different types of change project templet, for selection by the user.
In some embodiments, server 22 can be a physical server or multiple physical servers virtually form
A logical server.Server 22 be also possible to it is multiple can interconnected communication server composition server zone, and it is each
Functional module can be respectively distributed on each server in server zone.
The embodiment of the present invention provides a kind of change project templet generation method.Change project mould provided in an embodiment of the present invention
Plate generation method can execute in the electronic equipment of any suitable type, such as server, smart phone, computer, palm electricity
Brain (Personal Digital Assistant, PDA), tablet computer or smartwatch etc..Wherein, electronic equipment can be by structure
Any suitable shape is caused to meet different business scene.
Fig. 3 a is please referred to, changing project templet generation method 300 includes:
S31, questionnaire result is obtained;
Questionnaire result is questionnaire information of the user for each investigation option input, wherein in some implementations
, can be in several investigation options of questionnaire page setup in example, by user, each investigation option is inputted in the questionnaire page
Selection result or fill in result as questionnaire result, wherein selection result be in multiple-choice question form, for example, investigation problem
For " your enterprise wants to improve efficiency of research and development from which aspect ", option A: research staff's performance appraisal;Option B: R&D organization structure
Optimization;Option C: processes of research & development optimization;Option D: software developer's capability improving.Selection result can be single choice or final election.
Result is filled in text input form, text information is being filled in wait fill in by questionnaire person on column.
In some embodiments, it can be collected by the voice messaging of questionnaire person using speech form as questionnaire knot
Structure, for example, when questionnaire, the voice for each investigation option of correspondence that client acquisition user inputs in the questionnaire page
Information, and voice messaging is sent to server, server converts speech information into text information, and text information is passed through
After semantic analysis, extracts target and change object as questionnaire result.If voice messaging be dialect, server according to
The voice messaging is translated into standard language by the sound-type of voice messaging, for example, server will when voice messaging is English
The translator of English is at Chinese.
In some embodiments, it can also be using the case that user specifies as questionnaire as a result, for example, specified learn certain
The good practice case of mark post enterprise or certain technical field.
S32, according to questionnaire as a result, determine target change object;
In the present embodiment, the change demand that object is user is changed, which can be the tissue of change company
Framework, corporate culture or workflow etc. can also be organizational structure, department cultural or the workflow for changing some department
Etc., it might even be possible to change the working link in some project.Herein, the present embodiment does not make any limit to change object
System also exists as long as user has the demand changed and changes object.
In the present embodiment, firstly, questionnaire specific group or most users by inquiry, so that above-mentioned each user
The answer of oneself is fed back on the questionnaire page, the change that server extracts each user from above-mentioned each answer needs
It asks, also that is, extracting the change object of each user.
Secondly, server, according to preset rules, in changeable leather object of comforming, selection target changes object, and is the mesh
Mark change object configures default change task, to promote related personnel to execute default change task, changes target change to reach
Remove from office object.For example, each selection number for changing object of server statistics, and therefrom traverse out and select often and ranking
One or more objects of changing in default ranking are as target change object.
For example, investigation problem is " your enterprise wants to improve efficiency of research and development from which aspect ", option A: research staff's achievement
Effect examination;Option B: R&D organization structure optimization;Option C: processes of research & development optimization;Option D: software developer's capability improving.
When user S1 selects " option A ", then the change object of user S1 is to change " research staff's performance appraisal ".With this
Analogize, when user S2 selects " option B ", then the change object of user S1 is to change " R&D organization structure optimization ".
In some embodiments, when the number that selects of " option A " is 100 times, the number that selects of " option B " is 90 times, " choosing
The number that selects of C " is 60 times, and the number that selects of " option D " is 30 times, then server select " research staff's performance appraisal " for
Target changes object.
Certainly, in some embodiments, as long as there is a user to make a choice, server can also be corresponding by the selection
Option changes object as target, for example, user's first selection " option D ", then server is by " software developer's capability improving "
Object is changed as target.
Again for example, investigation problem is " your enterprise wants to improve Marketing Level from which aspect ", option A: sale process
Optimization;Option B: marketing team's structure optimization;Option C: item sale managerial ability.
When user S2 selects " option A ", then the change object of user S1 is to change " sale process optimization ".With such
It pushes away, when user S2 selects " option B ", then the change object of user S2 is to change " marketing team's structure optimization ".
S33, object is changed according to target, generates target and changes project templet.
In some embodiments, it changes project templet to be made of one or more menu member, the project of specifying is wanted
The content of execution, project unit refer to that numerous tasks of the management change project by different field and type are split as suitable grain
Degree, each project unit have the change task of specific purpose and clear boundary.
When server has determined that target changes object, selection and target are changed pair in the entry unit that can then comform
As corresponding destination item unit, and target is generated according to destination item unit and changes project templet, wherein target changes item
Mesh template includes destination item unit, and all corresponding target of each destination item unit is changed object and become configured with default
Leather task.
In some embodiments, server can also change object according to target, and selection is corresponding with target change object
Default change task, and each target is changed into the corresponding default change task of object and is combined, item is changed to generate target
Mesh template.
To sum up, changing object due to target is that questionnaire result obtains by inquiry, is different from traditional technology and is merely able to mention
For fixed change object, also, target changes the generation of project templet and changes object by target and determines, avoids the generation from including
The target of extra non-targeted change object changes project templet, therefore, can flexibly be dynamically generated target and change project
Template, target change project templet and are more in line with user demand, and the target created, which changes project templet, does not have extra content,
Also the content not lacked is bonded user's problem to be solved completely.
Target change project templet is generated in order to facilitate high efficiency and please refers to Fig. 3 b in some embodiments, and S33 includes:
S331, access project cell library, project cell library prestore several preset term units, and each preset term unit is all
A corresponding change object;
S333, preset term unit corresponding with each target change object is traversed out from project cell library as target
Project unit;
S335, several destination item units of combination change project templet to generate target.
In the present embodiment, the generating mode of target change project templet is more various, for example, being with Web application and development
Example, each project unit can be JavaScript script and data, then be still JavaScript script sum number after merging
It is shown according to the client that, these scripts and data can be sent.
In some embodiments, questionnaire result includes structuring investigation option and/or unstructured investigation option, knot
Structureization investigation option be pointing directly at change object, for example, investigation option " research staff's performance appraisal " can directly, be illustrated
Ground, without conversion show to make change to " research staff's performance appraisal ", be pointing directly at change object " research staff's achievement
Effect examination ".
Unstructured investigation option refers indirectly to change object.For example, how investigation problem " improves the work of the staff
Efficiency ", investigation option A are " increasing lunch break ", and investigation option B is " providing employee welfare ", and investigation option C is " clearly to appoint
The business division of labor ".When user's second selects investigation option A, for server according to investigation option A " increasing lunch break ", analysis obtains change
Removing from office object is " corporate culture ", also that is, investigation option A needs to analyze, refers indirectly to change object " corporate culture ".
It in some embodiments, can be with during server determines that target changes object according to questionnaire result
Using first way: the change object for selecting each structuring investigation option to be directed toward changes object as target.Therefore, it services
Device can expeditiously determine that target changes object.
Alternatively, the second way can also be used: according to semantic analysis algorithm, analyzing unstructured investigation option, obtain
The change object that unstructured investigation option is directed toward, the change object for selecting unstructured investigation option to be directed toward are changed as target
Object.More flexibly and arbitrarily due to unstructured investigation option, the people of multiple types view can be covered, are made it possible to
The target for comprehensively obtaining each user changes object.
Alternatively, server combines above two mode together determines that each target changes object.
In some embodiments, when change feedback of the user using questionnaire page mode acquisition people, item is changed
Mesh template generation method 300 further includes the generation of the questionnaire page.For example, in some embodiments, please referring to Fig. 3 c, change
Project templet generation method 300 further include:
S34, the investigation content configured with fixed investigation option is obtained;
S35, the questionnaire page comprising investigation content is generated;
In the present embodiment, the investigation option that fixed investigation option is prestored in the server in advance by user, tune to be generated
When the scrolling face of interrogating, server therefrom transfers the investigation option prestored as fixed investigation option, then by each fixed investigation
Option combination together, forms investigation content.Finally, investigation content is encapsulated on the questionnaire page again.
Using such mode, the questionnaire page can be efficiently generated.
In some embodiments, point unlike the embodiments above is, when generating the questionnaire page, please refers to Fig. 3 d,
Change project templet generation method 300 further include:
S36, at least one destination item unit or target change that temperature is greater than or equal to preset heat threshold value are obtained
Project templet;
S37, it generates and changes the corresponding tune of project templet comprising at least one destination item unit or at least one target
Look into the questionnaire page of option.
In the present embodiment, temperature is used to indicate that each destination item unit to be combined into the frequency that target changes project templet
Rate, alternatively, temperature is used to indicate that each target to change the frequency that project templet is generated.
In this example, it is assumed that within a preset period of time, destination item unit M1 is combined into target and changes project mould
The number of plate is 5000 times, that is, temperature is 5000, and destination item unit M2 is 4500 times, and destination item unit M3 is
4000 times, destination item unit M4 is 3600 times, and destination item unit M5 is 3500 times, and destination item unit M6 is
3400 times.So, according to temperature ranking sequence, M1 > M2 > M3 > M4 > M5 > M6.Another preset heat threshold value is 4000, then
Since M1, M2, M3 are greater than or equal to 4000, corresponding investigation option generates in selection target project unit M1, M2, M3
The questionnaire page.
It can similarly obtain, also be produced according to such method and change the corresponding investigation choosing of project templet comprising at least one target
The questionnaire page of item.
Therefore, by the above-mentioned means, it can aid in user by the strength of group, finding industry, other people are being closed
Which is infused and changes content, so that management change becomes more scientific and comprehensive.
In some embodiments, as user be unsatisfied with target change project templet in each destination item unit, alternatively,
When also needing to increase destination item unit, Fig. 3 e is please referred to, changes project templet generation method 300 further include:
S38, edit instruction is obtained;
S39, according to edit instruction, edit target and change project templet.
In the present embodiment, edit instruction includes increasing to instruct to instruct with deletion, and server is according to instruction is increased, to target
It changes project templet and increases destination item unit newly.For example, user distributes increases instruction out, then, server just jumps to project
Cell library, user select corresponding project unit as destination item unit in project cell library, and then, server just will choosing
In project unit add target and change project templet, then refresh client, so that client shows the mesh of new projects unit
Mark changes project templet.Alternatively, server changes the destination item being selected in project templet according to instruction, delete target is deleted
Unit.
In this manner, user neatly can change project templet using target, so that final target changes item
The demand of the properer user of mesh template.
In some embodiments, server can also utilize big data analysis, recommend personalized target to change to user
Project templet or destination item unit.For example, referring to Fig. 4, changing project templet generation method 300 further include:
S40, determine that target changes the service condition of project templet;
S41, according to service condition, recommend that target changes project templet or target changes destination item list in project templet
Member.
In the present embodiment, service condition can change the frequency of project templet for user using target, can also be use
Family uses the number of target change project templet within a preset period of time, it might even be possible to change project templet using target for user
Other habits.When the frequency of use of target change project templet is excessively high or number is excessively high or other habits are than more prominent, service
Target can be changed project templet or target by device to be changed destination item unit in project templet and recommend other users, also that is,
Entire target can be changed into project templet and recommend other users, target can also be changed destination item list in project templet
Member recommends other users.
As user is increased using the quantity that each target changes project templet, server can accumulate more change project
Template.Therefore, after determining that target changes object, server can not be retrieved from project cell library, but be accumulated from previous
Change project templet in retrieve.Therefore, in some embodiments, Fig. 5 a is please referred to, S33 includes:
S332, access project template library, project templet library prestores several default change project templets;
S334, default change project templet corresponding with target change object is traversed out from project templet library as target
Change project templet.
After determining that target changes object, matched default change project templet is retrieved from project templet library, it is matched
Principle can be accurate matching, be also possible to fuzzy matching, and therefore, such mode can promote to be likely to occur default change project mould
Situation of the content of plate more than user demand, the change content having more is just for reference, inspires new change demand.
It in some embodiments, is multiple, service by the quantity that the target that the questionnaire result determines changes object
Device traverses out default change project templet corresponding with target change object as target from project templet library and changes project mould
During plate, firstly, whether each default project unit for changing project templet of server judgement matches destination item unit;
If so, the default project element number changed in project templet with destination item units match of statistics, also, according to project unit
The quantity of quantity and destination item unit, selection target changes project templet, for example, server judges project element number and mesh
Whether the difference of both the quantity of mark project unit is less than preset threshold, if so, selecting default project templet of changing as target
Change project templet;If it is not, continuing judgement, in addition whether each default project unit for changing project templet matches destination item
Unit.
If each default project unit for changing project templet does not match destination item unit, continue to judge in addition default become
Whether the project unit of leather project templet matches destination item unit.
It for example, is 6 by the quantity that the target that questionnaire result determines changes object, herein, referred to as " by investigating
The target that questionnaire result determines changes object " it is that first object changes object.In project templet library, presets and change project templet
A includes 10 change objects, wherein in this 10 change objects, there are 3 change objects and first object to change object phase
Together.The default project templet B that changes includes 8 changes objects, wherein in this 8 change objects, there are 4 change objects and
It is identical that first object changes object.The default project templet C that changes includes 12 change objects, wherein in this 12 change objects
In, it is identical as first object change object that there are 1 change objects.Herein, enabling preset threshold is 3, presets and changes project templet A
Corresponding difference is 6-3=3, and the default corresponding difference of project templet B of changing is 6-4=2, and the default project templet C that changes is corresponded to
Difference be 6-1=5, since the default corresponding difference of project templet B of changing is less than preset threshold 3, server selection is pre-
If changing project templet B as target changes project templet.
Using such mode, on the one hand, its target selected changes situation of the content of project templet more than user demand,
Extra content is just for reference, inspires new change demand.On the other hand, the life that target changes project templet is improved
At efficiency.
After user's performance objective changes change task in project templet, execution data are just produced.In order to become
Early warning is provided during the leather project implementation, in some embodiments, please refers to Fig. 5 b, changes project templet generation method 300 also
Include:
S42, the execution data for obtaining change task, each is changed, and task is all at least one of corresponding to change Measure Indexes;
Each change task all includes following essential information: executing responsible party, the job start time, task knot of task
Beam time, progress of task execution etc..Change task corresponding for different change objects, may be configured with the spy for belonging to itself
Different information.
The executive condition that data are used to indicate change task is executed, executive condition includes the implementation progress of change task, ginseng
Feelings are audited with personnel's mated condition, project yield, landing degree, the efficiency of decision-making, delivery part output situation, communication publicity or task
Condition etc..
After change task is performed, just generates and execute data.When user's trigger the server execution management change project is pre-
Alarm method 300, then, server, which just obtains, executes data, wherein triggering mode includes manual triggering mode, clocked flip side
Formula or event triggered fashion etc..Executing data can be obtained by manual maintenance, for example, in change task, project team's backbone
Personnel exit project team, and then user needs exiting for the backbone cabal making label in the server.
In some embodiments, executing data can also obtain from other enterprise management systems, and enterprise management system is all
Such as ERP system or office system.In general, usually there are exterior I T system abundant, such as ERP system, office system in enterprise
System, research and development management system, market management system etc., the execution data for changing task can be obtained from above-mentioned each system, example
Such as: after being managed change to market department, server within a preset period of time from market management system grabs, close by enterprise
With signing amount and turnover, and using within a preset period of time enterprise's contract signing amount and turnover as execute number
According to.When server analysis is substantially improved to enterprise's contract signing amount or turnover, then to the management change of market department's progress
It is successful.
For another example server is ground from research and development management system crawl product A's after being managed change to research and development department
Period, personnel's investment, capital investment etc. are sent out, and using the R&D cycle of product A, personnel's investment, capital investment as execution number
According to.When server analysis to R&D cycle or personnel's investment or capital investment are substantially reduced, then to the management of research and development department's progress
Change is successful.
Therefore, by grabbing the execution data of other exterior I T systems, the work of the manual typing in Change Management is reduced
It measures, expands the source of warning information, improve and judge the whether successful ability of change project.
It changes Measure Indexes and is used to measure the successful that this changes task, each change task can correspond to a change degree
Figureofmerit can also correspond to two or more change Measure Indexes.
In some embodiments, server can execute data according to required for changing Measure Indexes, pointedly mention
Show that user acquires such execution data, or actively access all kinds of exterior I T systems, grabs such execution data.Such as: it changes
The change Measure Indexes of task A include " the firm change of company top leader ", and Measure Indexes " company supreme officer is changed in description
The content of the firm change of people " are as follows: need company top leader to examine related procedure, can be examined within the ticket reserving time.
User designs top leader role in the change task A for changing project templet, and server passes through crawl such as supreme officer
People can check that relevant data, the relevant process of examination & approval as data are executed, are analyzed most polo-neck by the execution data
People is led to the attitude of the project of change.
In the following, understanding for convenience, table 1 is please referred to, the embodiment of the present invention provides the related example for changing Measure Indexes, can
With understanding, which is a part of change task or the corresponding change Measure Indexes of change project, those skilled in the art
Member can understand according to the industry of itself, increase other change Measure Indexes newly, alternatively, changing or existing change measurement being replaced to refer to
Mark.
Table 1
Table 1 provides 5 kinds of change Measure Indexes, and the criterion of acceptability of every kind of change Measure Indexes has corresponding qualified description.
Meet the corresponding qualified description for changing Measure Indexes when executing data,
S43, according to execute data and change Measure Indexes, generate warning information.
In the present embodiment, when execution data, which have not been able to meet, changes Measure Indexes, server generates warning information.When
When execution data can satisfy change Measure Indexes, server does not generate warning information.For example, server clearly analyzes highest
Leader has not been able to examine relevant item in time, alternatively, top leader is not concerned with the progress of relevant item, then changes task A
Execution data have not been able to meet change Measure Indexes, then server generate warning information.Alternatively, server clearly analyzes most
High leader can examine relevant item in time, alternatively, top leader pays special attention to the progress of relevant item, then change task
The execution data of A can satisfy change Measure Indexes, then server does not generate warning information.
For another example it is 80,000,000 that server, which obtains executing the change investment in data, however, qualified change puts into become
Leather investment is more than the 90% of default investment standard, also, default investment standard is 100,000,000, due to executing the change investment in data
It has not been able to meet and changes Measure Indexes, therefore, server generates warning information.
In the present embodiment, warning information faces failure or has lost for prompting user to change task or change project
It loses.The form of expression of warning information is more various, the display reminding information such as on client end interface, alternatively, server selects
Preset alarm number sends short message, mail or instant messaging information etc. to the terminal of preset alarm number binding.
To sum up, during changing task execution, the success rate with anticipation change task can be traced, to provide in time
Warning information, and then improve the success rate of change project and reduce the wasting of resources.
In some embodiments, each change object all corresponds at least one change Measure Indexes, for example, with sales department
When door is as object is changed, the corresponding change Measure Indexes of sales department can sign threshold value for contract signing amount satisfaction is default,
It can also be that both contract signing amount and turnover all meet corresponding preset threshold simultaneously.In some embodiments, it services
Device can generate warning information according to object is changed, and please refer to Fig. 5 c, S43 includes:
S431, according to execute data, determine the change object of change task;
S432, selection change Measure Indexes corresponding with object is changed;
S433, according to execute data and change Measure Indexes, generate warning information.
Server grabs during manual maintenance executes data, alternatively, executing data from exterior I T system grabs, passes through
Analysis executes data, determines the change object of change task.For example, server is from exterior I T system grabs contract signing amount 80
Part, then, it is to change object " sales department " that it is corresponding, which can to analyze the contract signing amount, wherein changes object " marketing
The corresponding change Measure Indexes of department " are that contract signing amount is greater than 100.Due to contract signing amount 80 have not been able to meet change
Measure Indexes, then, server generate warning information.
In some embodiments, Fig. 5 d is please referred to, S432 includes:
S4321, access preset change success factor library;
S4322, change Measure Indexes corresponding with object is changed are traversed out from default change success factor library.
In the present embodiment, success factor library can be changed shown in table 1 to be default, server by access preset change at
Function element library can traverse out change Measure Indexes corresponding with object is changed, so that early warning efficiency be greatly improved.
In some embodiments, the condition for generating warning information is more various, for example, please referring to Fig. 5 e, S433 includes:
S4331, judge to execute whether data meet change Measure Indexes;
S4332, if it is not, generate warning information;
S4333, if so, not generating warning information.
In some embodiments, during server judges whether execute data meets change Measure Indexes, can sentence
Whether the disconnected deviation for executing both data and change Measure Indexes is greater than preset threshold, when less than preset threshold, then it is assumed that change
Project is being normally carried out.When greater than preset threshold, then it is assumed that relatively large deviation occurs in change project, will form risk, may
Project success is influenced, early warning is needed.
In some embodiments, when server generates warning information, first according to executing data and changing Measure Indexes, really
Determine risk information.Risk information is used to indicate the risk classifications of change task, risk level and risk class.Degree of risk can be with
It is the risk that task is changed in individual event, can also is the constitution's risk of multinomial change task, can also be the whole wind of change project
Danger.
Table 2 is please referred to, table 2 is a kind of sample table that risk defines provided in an embodiment of the present invention.It is as shown in table 2:
Table 2
As shown in Table 2, when execution data, which do not meet, changes Measure Indexes, server just determines risk information, for example, working as
When execution data are " project team's backbone cabal exits project team ", server determines that risk classifications are personnel risk.It can similarly obtain,
When executing data is " project team exports related delivery part in time ", server determines risk classifications to deliver part risk.
Secondly, server generates the warning information comprising risk information.Therefore, in the present embodiment, server is to client
It, can also be to client push risk information, so that user knows the wind that change project faces at present when the push warning information of end
Dangerous type, risk level and risk class, to make more accurately decision.
In some embodiments, server generate warning information during, judge risk information risk class whether
Higher than default risk class, if being higher than, the warning level that warning information is arranged is the first severity level.If being lower than, early warning is set
The warning level of information is the second severity level, wherein the first severity level is higher than the second severity level.
In this manner, the severity level that each warning information can be intuitively shown to user, promotees to enable users to
Enough enhance sense of risk, to make accurate decision, to improve the probability of success of Change Management.
In some embodiments, server acquires each execution data for changing task, according to predeterminated frequency so as to timely
Track whether each state of progress for changing task executes on time in reality, hold for example, acting specified in change task
Capable result how etc..
It should be noted that not necessarily there is centainly successive between above steps in above-mentioned each embodiment
Sequentially, those of ordinary skill in the art, according to an embodiment of the present invention to describe to be appreciated that in different embodiments, above-mentioned each step
Suddenly there can be the different sequences that executes, also i.e., it is possible to execute parallel, execution etc. can also be exchanged.
As the another aspect of the embodiment of the present invention, the embodiment of the present invention provides a kind of change project templet generating means,
Applied to electronic equipment.The change project templet generating means of the embodiment of the present invention can be used as one of software function list
Member, changing project templet generating means includes some instructions, which is stored in memory, and processor is accessible should
Memory, call instruction are executed, to complete above-mentioned change project templet generation method.
Fig. 6 a is please referred to, changing project templet generating means 600 includes: the first acquisition module 61, the first determining module 62
And first generation module 63.
First acquisition module 61 is for obtaining questionnaire result;
First determining module 62 is used for according to questionnaire as a result, determining that target changes object;
First generation module 63 is used to change object according to target, generates target and changes project templet.
Changing object due to target is that questionnaire result obtains by inquiry, is different from traditional technology and is merely able to provide fixation
Change object, also, target change project templet generation by target change object determines, avoid generate include it is extra
The non-targeted target for changing object changes project templet, therefore, can flexibly be dynamically generated target and change project templet.
In some embodiments, it includes destination item unit that target, which changes project templet, and each destination item unit is all right
A target is answered to change object and configured with default change task.
In some embodiments, Fig. 6 b is please referred to, the first generation module 63 includes: the first access unit 631, first traversal
Unit 632 and assembled unit 633.
First access unit 631 is for accessing project cell library, and project cell library prestores several preset term units, each
Preset term unit all corresponds to a change object;
First Traversal Unit 632 from project cell library for traversing out default item corresponding with each target change object
Mesh unit is as destination item unit;
Assembled unit 633 changes project templet for combining several destination item units, to generate target.
In some embodiments, Fig. 6 c is please referred to, the first generation module 63 includes: the second access unit 634 and second time
Go through unit 635.
For second access unit 634 for accessing project template library, project templet library prestores several default change project moulds
Plate;
Second Traversal Unit 635 from project templet library for traversing out default change corresponding with each target change object
Project templet is removed from office as target and changes project templet.
It in some embodiments, is multiple by the quantity that the target that questionnaire result determines changes object;Second traversal
Unit 635 is specifically used for: judging that each default target for including in project templet of changing changes the quantity of object and by institute
Whether the quantity for stating the target change object that questionnaire result determines meets preset condition;If so, the selection default change
Project templet changes project templet as target;If it is not, continuing the mesh for including in the other default change project templet of judgement
Whether the quantity that the quantity that mark changes object changes object with the target determined by the questionnaire result meets preset condition.
Optionally, the second Traversal Unit also particularly useful for: judge it is each it is described it is default change project templet in include mesh
Whether the difference that mark changes the quantity and both the quantity of the target determined by the questionnaire result change object of object is small
In preset threshold.
In some embodiments, questionnaire result includes structuring investigation option and/or unstructured investigation option, knot
Structureization investigation option is pointing directly at change object, and unstructured investigation option refers indirectly to change object.
In some embodiments, Fig. 6 d is please referred to, the first determining module 62 includes: first selecting unit 621, analytical unit
622 and second selecting unit 623.
The change object that first selecting unit 621 is used to that each structuring investigation option to be selected to be directed toward is as target change pair
As.
And/or
Analytical unit 622 is used to analyze unstructured investigation option according to semantic analysis algorithm, obtain unstructured investigation
The change object that option is directed toward;
The change object that second selecting unit 623 is used to that unstructured investigation option to be selected to be directed toward is as target change pair
As.
In some embodiments, Fig. 6 e is please referred to, project templet generating means 600 are changed further include: second obtains module
64 and second generation module 65.
Second acquisition module 64 is used to obtain the investigation content configured with fixed investigation option;
Second generation module 65 is for generating the questionnaire page comprising investigation content.
In some embodiments, Fig. 6 f is please referred to, project templet generating means 600 are changed further include: second obtains module
66 with third generation module 67.
Second acquisition module 66 is used to obtain at least one destination item list that temperature is greater than or equal to preset heat threshold value
Member or target change project templet, and temperature is used to indicate that each destination item unit to be combined into target and changes project templet
Frequency, alternatively, temperature is used to indicate that each target to change the frequency that project templet is generated.
Third generation module 67 changes item comprising at least one destination item unit or at least one target for generating
The questionnaire page of the corresponding investigation option of mesh template.
In some embodiments, the first acquisition module 61 is specifically used for: each investigation in the questionnaire page by user
The selection result of option input fills in result as questionnaire result;Alternatively, it is defeated in the questionnaire page to receive user
The voice messaging of each investigation option of the correspondence entered;Convert speech information into text information;The text information is passed through into language
After justice analysis, extracts target and change object as questionnaire result.
In some embodiments, Fig. 6 g is please referred to, project templet generating means 600 are changed further include: third obtains module
68 with editor module 69.
Third obtains module 68 for obtaining edit instruction;
Editor module 69 is used to edit target according to edit instruction and change project templet.
In some embodiments, referring to Fig. 7, changing project templet generating means 600 further include: the second determining module 70
With recommending module 71.
Second determining module 70 is used to determine the service condition that target changes project templet;
Recommending module 71 is used to recommend target to change project templet or target change project templet according to service condition
Middle destination item unit.
It should be noted that above-mentioned change project templet generating means, which can be performed, changes item provided by the embodiment of the present invention
Mesh template generation method has the corresponding functional module of execution method and beneficial effect.Project templet generating means are not being changed
The technical detail of detailed description in embodiment, reference can be made to changing project templet generation method provided by the embodiment of the present invention.
As the another aspect of the embodiment of the present invention, the embodiment of the present invention provides a kind of electronic equipment.Referring to Fig. 8, should
Electronic equipment 800 includes: one or more processors 81 and memory 82.Wherein, in Fig. 8 by taking a processor 81 as an example.
Processor 81 can be connected with memory 82 by bus or other modes, to be connected as by bus in Fig. 8
Example.
Memory 82 is used as a kind of non-volatile computer readable storage medium storing program for executing, can be used for storing non-volatile software journey
Sequence, non-volatile computer executable program and module, such as the change project templet generation method pair in the embodiment of the present invention
Program instruction/the module answered.Processor 81 by operation be stored in memory 82 non-volatile software program, instruction and
Module, thereby executing the change project templet generation method of above-mentioned each embodiment or the change item of above-mentioned each embodiment
The various function application and data processing of mesh template generation device.
Memory 82 may include high-speed random access memory, can also include nonvolatile memory, for example, at least
One disk memory, flush memory device or other non-volatile solid state memory parts.In some embodiments, memory 82
Optional includes the memory remotely located relative to processor 81, these remote memories can pass through network connection to processor
81.The example of above-mentioned network includes but is not limited to internet, intranet, local area network, mobile radio communication and combinations thereof.
Described program instruction/module is stored in the memory 82, is held when by one or more of processors 81
When row, the change project templet generation method in above-mentioned any means embodiment is executed, for example, thereby executing above-mentioned each implementation
The various functions of the change project templet generating means of the change project templet generation method or above-mentioned each embodiment of example are answered
With and data processing.
The embodiment of the invention also provides a kind of non-transient computer readable storage medium, the non-transient computer is readable
Storage medium is stored with computer executable instructions, and the computer executable instructions are as above any for executing electronic equipment
Change project templet generation method described in.
The embodiment of the invention provides a kind of computer program product, the computer program product is non-easy including being stored in
Computer program on the property lost computer readable storage medium, the computer program includes program instruction, when described program refers to
When order is executed by electronic equipment, the electronic equipment is made to execute described in any item change project templet generation methods.
To sum up, changing object due to target is that questionnaire result obtains by inquiry, is different from traditional technology and is merely able to mention
For fixed change object, also, target changes the generation of project templet and changes object by target and determines, avoids the generation from including
The target of extra non-targeted change object changes project templet, therefore, can flexibly be dynamically generated target and change project
Template.
Device or apparatus embodiments described above is only schematical, wherein it is described as illustrated by the separation member
Unit module may or may not be physically separated, and the component shown as modular unit can be or can also
Not to be physical unit, it can it is in one place, or may be distributed on multiple network module units.It can basis
It is actual to need that some or all of the modules therein is selected to achieve the purpose of the solution of this embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can
It is realized by the mode of software plus general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, above-mentioned technology
Scheme substantially in other words can be embodied in the form of software products the part that the relevant technologies contribute, the computer
Software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions to
So that computer equipment (can be personal computer, server or the network equipment etc.) execute each embodiment or
Method described in certain parts of embodiment.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;At this
It under the thinking of invention, can also be combined between the technical characteristic in above embodiments or different embodiment, step can be with
It is realized with random order, and there are many other variations of different aspect present invention as described above, for simplicity, they do not have
Have and is provided in details;Although the present invention is described in detail referring to the foregoing embodiments, the ordinary skill people of this field
Member is it is understood that it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of skill
Art feature is equivalently replaced;And these are modified or replaceed, each reality of the application that it does not separate the essence of the corresponding technical solution
Apply the range of a technical solution.
Claims (10)
1. a kind of change project templet generation method is applied to electronic equipment, which is characterized in that the described method includes:
Obtain questionnaire result;
According to the questionnaire as a result, determining that target changes object;
Object is changed according to the target, target is generated and changes project templet.
2. the method according to claim 1, wherein it includes destination item list that the target, which changes project templet,
Member, each destination item unit all correspond at least one described target and change object and configured with default change task.
3. according to the method described in claim 2, generation target becomes it is characterized in that, described change object according to the target
Remove from office project templet, comprising:
Access project cell library, the project cell library prestore several preset term units, and each preset term unit is all
A corresponding change object;
It is traversed out from the project cell library and changes the corresponding preset term unit of object as target with each target
Project unit;
Several destination item units are combined, change project templet to generate target.
4. according to the method described in claim 2, generation target becomes it is characterized in that, described change object according to the target
Remove from office project templet, comprising:
Access project template library, the project templet library prestore several default change project templets;
Default change project templet corresponding with target change object is traversed out from the project templet library as target
Change project templet.
5. according to the method described in claim 4, it is characterized in that, described traverse out and the mesh from the project templet library
Mark changes the corresponding default change project templet of object as target and changes project templet, comprising:
Judge whether each default project unit for changing project templet matches the destination item unit;
If so, the statistics default project element number changed in project templet with the destination item units match, also,
According to the quantity of the project element number and the destination item unit, selection target changes project templet;
If it is not, continuing judgement, in addition whether the default project unit for changing project templet matches the destination item unit.
6. according to the method described in claim 5, it is characterized in that, described according to the project element number and the target item
The quantity of mesh unit, selection target change project templet, comprising:
Judge whether the difference of both quantity of the project element number and the destination item unit is less than preset threshold;
If so, the default change project templet is selected to change project templet as target;
If it is not, continuing judgement, in addition whether each default project unit for changing project templet matches the destination item list
Member.
7. method according to any one of claims 1 to 6, which is characterized in that the questionnaire result includes structuring
Option and/or unstructured investigation option are investigated, the structuring investigation option is pointing directly at change object, described unstructured
Investigation option refers indirectly to change object;
It is described according to the questionnaire as a result, determine target change object, comprising:
The change object for selecting each structuring investigation option to be directed toward changes object as target;
And/or
According to semantic analysis algorithm, the unstructured investigation option is analyzed, obtains what the unstructured investigation option was directed toward
Change object;
The change object for selecting the unstructured investigation option to be directed toward changes object as target.
8. method according to any one of claims 1 to 6, which is characterized in that the method also includes:
Obtain the investigation content configured with fixed investigation option;
Generate the questionnaire page comprising the investigation content;
Alternatively,
At least one destination item unit or target change project templet that temperature is greater than or equal to preset heat threshold value are obtained,
The temperature is used to indicate that each destination item unit to be combined into the frequency that target changes project templet, alternatively, described
Temperature is used to indicate that each target to change the frequency that project templet is generated;
It generates and changes the corresponding tune of project templet comprising at least one described destination item unit or at least one described target
Look into the questionnaire page of option.
9. according to the method described in claim 8, it is characterized in that, the acquisition questionnaire result, comprising:
Using user in the questionnaire page it is each investigation option input selection result or fill in result as investigate ask
Clove hitch fruit;
Alternatively,
Receive the voice messaging for each investigation option of correspondence that user inputs in the questionnaire page;
The voice messaging is converted into text information;
By the text information after semantic analysis, extracts target and change object as questionnaire result.
10. a kind of electronic equipment characterized by comprising
At least one processor;And
The memory being connect at least one described processor communication;Wherein, be stored with can be by described at least one for the memory
The instruction that a processor executes, described instruction is executed by least one described processor, so that at least one described processor energy
It is enough in perform claim and requires 1 to 9 described in any item change project templet generation methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910027048.4A CN109815472A (en) | 2019-01-11 | 2019-01-11 | Change project templet generation method and electronic equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910027048.4A CN109815472A (en) | 2019-01-11 | 2019-01-11 | Change project templet generation method and electronic equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109815472A true CN109815472A (en) | 2019-05-28 |
Family
ID=66603481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910027048.4A Pending CN109815472A (en) | 2019-01-11 | 2019-01-11 | Change project templet generation method and electronic equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109815472A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116579806A (en) * | 2023-05-30 | 2023-08-11 | 广州快决测信息科技有限公司 | System and method for analyzing market research data based on AI model |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003162606A (en) * | 2001-11-26 | 2003-06-06 | Ricoh Co Ltd | Questionnaire item creating apparatus, method and medium |
CN106126965A (en) * | 2016-08-26 | 2016-11-16 | 董碧蓉 | A kind of health check-up examination project method for building up and examination project set up system |
CN108364691A (en) * | 2018-02-25 | 2018-08-03 | 心触动(武汉)科技有限公司 | A kind of sports events intelligent recommendation method and system |
-
2019
- 2019-01-11 CN CN201910027048.4A patent/CN109815472A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003162606A (en) * | 2001-11-26 | 2003-06-06 | Ricoh Co Ltd | Questionnaire item creating apparatus, method and medium |
CN106126965A (en) * | 2016-08-26 | 2016-11-16 | 董碧蓉 | A kind of health check-up examination project method for building up and examination project set up system |
CN108364691A (en) * | 2018-02-25 | 2018-08-03 | 心触动(武汉)科技有限公司 | A kind of sports events intelligent recommendation method and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116579806A (en) * | 2023-05-30 | 2023-08-11 | 广州快决测信息科技有限公司 | System and method for analyzing market research data based on AI model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
de Lima Fontao et al. | Mobile software ecosystem (mseco): a systematic mapping study | |
US20160148157A1 (en) | Managing activities in an organization | |
Margherita et al. | A conceptual framework of strategy, action and performance dimensions of organisational agility development | |
Baškarada et al. | A critical success factor framework for information quality management | |
Spruit et al. | DWCMM: The Data Warehouse Capability Maturity Model. | |
CN109740960A (en) | Management change project method for early warning, server and management change system | |
US20180293525A1 (en) | Store service workbench | |
Delias | A positive deviance approach to eliminate wastes in business processes: The case of a public organization | |
Almeida et al. | A knowledge management architecture for information technology services delivery | |
CN113065698A (en) | Service processing method and device | |
Morrisson | Best practice models for enterprise resource planning implementation and security challenges | |
CN109815472A (en) | Change project templet generation method and electronic equipment | |
De Brito et al. | Knowledge transfer in a management process for outsourced agile software development | |
Muniz et al. | A customer knowledge management framework | |
CN110276593A (en) | Object recommendation method, apparatus, server and storage medium | |
Shi et al. | Knowledge management platforms and intelligent knowledge beyond data mining | |
Arruda et al. | The Role of Big Data Analytics in Corporate Decision-making. | |
Skyrius | The relations of maturity and dimensions of business intelligence | |
Gupta | Making big data something more than the “next big thing” | |
Yao | [Retracted] Design of English Teaching Postcompetency Evaluation System Based on Data Mining and IoT | |
Mendez et al. | Software Quality: Higher Software Quality Through Zero Waste Development: 15th International Conference, SWQD 2023, Munich, Germany, May 23-25, 2023, Proceedings | |
Rigopoulos | A group decision support system for collaborative decisions within business intelligence context | |
Saldana | Exploring the Strategies of Decision-Makers to Improve Business Decisions Using Business Intelligence and Analytics Tools | |
Twardowski et al. | A Decision Support System based on DDMCC paradigm for strategic management of capital groups | |
Prasetyo | Knowledge management system development at PT Bussan Auto Finance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190528 |