CN109814841A - A kind of resource information acquisition method and device - Google Patents
A kind of resource information acquisition method and device Download PDFInfo
- Publication number
- CN109814841A CN109814841A CN201811557406.4A CN201811557406A CN109814841A CN 109814841 A CN109814841 A CN 109814841A CN 201811557406 A CN201811557406 A CN 201811557406A CN 109814841 A CN109814841 A CN 109814841A
- Authority
- CN
- China
- Prior art keywords
- module
- acquisition
- resource information
- intelligent
- target resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Stored Programmes (AREA)
Abstract
The invention discloses a kind of resource information acquisition method and devices, described device includes SHELL Script controlling module and intelligent acquisition module, the SHELL Script controlling module is the control instruction collection using SHELL script edit, and the intelligent acquisition module is the program block including one or more functions function write using JAVA language;The described method includes: the SHELL Script controlling module judges whether data gathering project meets preset acquisition condition by predetermined period, the data gathering project is the principal function for acquiring target resource information;When the data gathering project meets preset acquisition condition, the SHELL Script controlling module calls the intelligent acquisition module to acquire the target resource information.The present invention realizes the automatic collection to data, reduces the manpower consumption in the collection process to the target resource information.
Description
Technical field
The present invention relates to technical field of data processing, and in particular to a kind of resource information acquisition method and device.
Background technique
Today's society, all resource informations are all scarce resources, in order to preferably provide the phase of resource information to public
Service is closed, operator increasingly payes attention in terms of the acquisition of resource information.
In the related technology, operator requires to get off for a long time, can expend by manpower during acquiring resource information
A large amount of human resources.Therefore, the consumption that human resources how are reduced during acquiring resource information, becomes a urgent need
It solves the problems, such as.
Summary of the invention
The present invention provides a kind of resource information acquisition method and device, it is intended to realize the automatic collection of resource information.
In order to solve the problems in the relevant technologies, the present invention provides a kind of technical solutions: a kind of resource information acquisition side
Method realizes that the intelligent acquisition device includes SHELL Script controlling module and intelligent acquisition module based on intelligent acquisition device,
The SHELL Script controlling module is the control instruction collection using SHELL script edit;The intelligent acquisition module is to use
The program block including one or more functions function that JAVA language is write;The described method includes:
The SHELL Script controlling module judges whether data gathering project meets preset pick-up slip by predetermined period
Part, the data gathering project are the principal function for acquiring target resource information;
When the data gathering project meets preset acquisition condition, described in the SHELL Script controlling module calling
Intelligent acquisition module;
The intelligent acquisition module acquires the target resource information.
Optionally, the intelligent acquisition device further includes newly-built gathering project module, and the newly-built gathering project module is
The program block for being used to define the principal function for acquiring the target resource information write using JAVA language;
Judge whether data gathering project meets preset pick-up slip by predetermined period in the SHELL Script controlling module
Before part, the method also includes:
The newly-built gathering project module creates the data gathering project, the resource management in resource management system
System is for storing the target resource information.
The SHELL Script controlling module judges whether data gathering project meets preset pick-up slip by predetermined period
Part, comprising:
The SHELL Script controlling module obtains the preset acquisition condition of the single data gathering project, described pre-
If acquisition condition include external acquisition condition and internal acquisition condition, the external acquisition condition includes at least target money
Whether source information supports the state of acquisition, and the internal acquisition condition includes at least preset to the target resource information
Collection period;
The SHELL Script controlling module judge the single data gathering project the target resource information whether be
It can support the state of acquisition;
The SHELL Script controlling module judges whether current time meets the acquisition week of the single data gathering project
The condition of phase;
When the target resource information of the single data gathering project is that can support the state and current time of acquisition
Meet the condition of the collection period of the single data gathering project, then the SHELL Script controlling module determines single described
Data gathering project meets preset acquisition condition.
Optionally, when the data gathering project meets preset acquisition condition, the SHELL Script controlling module tune
With the intelligent acquisition module, comprising:
When the single data gathering project meets preset acquisition condition, the SHELL Script controlling module is to institute
It states intelligent acquisition module and sends acquisition instructions, the acquisition instructions are for notifying the intelligent acquisition module to acquire the target money
Source information.
Optionally, the intelligent acquisition module acquires the target resource information, comprising:
The corba interface of the intelligent acquisition module and target network element management system, which is established, to be communicated to connect;
The intelligent acquisition module acquires the target resource information from the target network element management system.
Optionally, the intelligent acquisition module acquires the target resource information, comprising:
The intelligent acquisition module is linked to the database of the target network element management system using Database Link;
The intelligent acquisition module executes Oracle function and acquires the mesh from the database of the Element management system
Mark resource information.
Optionally, the intelligent acquisition module acquires the target resource information, comprising:
The intelligent acquisition module and the destination server foundation communication connection for supporting File Transfer Protocol;
The intelligent acquisition module acquires the target resource information from the destination server.
Optionally, described device further includes intelligent analysis module, and the intelligent analysis module is to be write using JAVA language
The program block comprising one or more functions function;
After the intelligent acquisition module acquires the target resource information, the method also includes:
The SHELL Script controlling module judge the intelligent acquisition module to the acquisition of the target resource information whether
It is finished;
The SHELL Script controlling module is determining that the intelligent acquisition module holds the acquisition of the target resource information
After row, the intelligent analysis module is called;
The intelligent analysis module carries out data processing to the target resource information.
Optionally, comprising:
SHELL Script controlling module, for judging whether the data gathering project meets preset adopt by predetermined period
Collection condition, when the data gathering project meets preset acquisition condition, the SHELL Script controlling module calls the intelligence
It can acquisition module;
Intelligent acquisition module, for acquiring the target resource information;
Newly-built gathering project module, for creating the data gathering project in the resource management system;
Intelligent analysis module, for carrying out data processing to the target resource information.
Optionally, the SHELL Script controlling module includes:
Module is obtained, for obtaining the preset acquisition condition of the single data gathering project;
First judgment module, for judging whether the target resource information of the single data gathering project is that can prop up
Hold the state of acquisition;
Second judgment module, for judging whether current time meets the collection period of the single data gathering project
Condition;
First calling module, for when the single data gathering project meets preset acquisition condition, the SHELL
Script controlling module sends acquisition instructions to the intelligent acquisition module;
Third judgment module, for judging whether the intelligent acquisition module executes the acquisition of the target resource information
It finishes;
Second calling module, for being finished in the intelligent acquisition module to the acquisition of the target resource information
Afterwards, the intelligent analysis module is called.
The present invention uses the control instruction collection of SHELL scripting language, judges that data gathering project is by predetermined period
It is no to meet preset acquisition condition, it is automatic to call intelligent acquisition module to target when meeting the preset acquisition condition
Resource information is acquired.The present invention does not need manually to be acquired, and user is only needed to set the acquisition of the target resource information
Period can be automatically performed the acquisition to the target resource information, effectively reduce adopting in the target resource information
Manpower consumption during collection.
Detailed description of the invention
Fig. 1 is a kind of flow chart of resource information acquisition method shown in an exemplary embodiment;
Fig. 2 is the flow chart of another resource information acquisition method shown in an exemplary embodiment;
Fig. 3 is that the SHELL Script controlling module shown in an exemplary embodiment judges that data acquire by predetermined period
Whether engineering meets the flow chart of preset acquisition condition;
Fig. 4 is that the intelligent acquisition module shown in an exemplary embodiment acquires target resource letter using first method
The schematic illustration of breath;
Fig. 5 is that the intelligent acquisition module shown in an exemplary embodiment acquires target resource letter using second method
The schematic illustration of breath;
Fig. 6 is that the intelligent acquisition module shown in an exemplary embodiment acquires target resource letter using the third method
The schematic illustration of breath;
Fig. 7 is a kind of overall flow figure of resource information acquisition method shown in an exemplary embodiment;
Fig. 8 is process of the intelligent analysis module shown in an exemplary embodiment to the progress data processing of target resource information
Figure;
Fig. 9 is a kind of block diagram of resource information acquisition device shown in an exemplary embodiment.
Specific embodiment
A specific embodiment of the invention is described below, which is schematical, it is intended to disclose of the invention
Specific work process should not be understood as further limiting scope of protection of the claims.
A kind of resource information acquisition method realizes that the intelligent acquisition device includes SHELL foot based on intelligent acquisition device
This control module and intelligent acquisition module, the SHELL Script controlling module are the control instruction using SHELL script edit
Collection;The intelligent acquisition module is the program block including one or more functions function write using JAVA language.
Fig. 1 is a kind of flow chart of resource information acquisition method shown according to an exemplary embodiment, referring to Fig.1, packet
Include following steps.
In step s 11, it is pre- by predetermined period to judge whether data gathering project meets for the SHELL Script controlling module
If acquisition condition, the data gathering project be acquire target resource information principal function.
In step s 12, when the data gathering project meets preset acquisition condition, the SHELL Script controlling
Module calls the intelligent acquisition module.
In step s 13, the intelligent acquisition module acquires the target resource information.
In the disclosure, SHELL Script controlling module is the control instruction collection using SHELL script edit, and SHELL script is logical
The function of crossing the command interpretation using SHELL, parses the file of a plain text, then executes these functions, can also
It include that multiple control target resources are believed to say that SHELL script is exactly the set of series of orders, i.e., in SHELL Script controlling module
The instruction of the acquisition of breath;Such as the specific time of acquisition is executed, execute the target database of acquisition, the storage of target resource information
Address etc..The intelligent acquisition module is the program block including one or more functions function write using JAVA language, institute
The effect for stating intelligent acquisition module is to utilize one or more when receiving the instruction in SHELL Script controlling module
Power function specifically executes each step of the acquisition to target resource information.
First in step s 11, the SHELL Script controlling module judges whether data gathering project is full by predetermined period
The preset acquisition condition of foot, the data gathering project are the principal function for acquiring target resource information.The SHELL Script controlling
Module has been in operating status, and all data gathering projects, example can be scanned according to the pre-set scan period
Such as it is scanned every one second or one minute.The SHELL Script controlling module obtains data first during the scanning process and adopts
Collect engineering, then judges whether the data gathering project meets preset acquisition condition.For example, the Central Bank in order to acquire branch
Information in the data management system of A creates the data gathering project of an acquisition branch A, then the SHELL Script controlling
Module judges it and whether meets user and create the data and adopt when getting the data gathering project of the acquisition branch A
The acquisition condition being arranged when collecting engineering.
In step s 12, when the data gathering project meets preset acquisition condition, the SHELL Script controlling
Module calls the intelligent acquisition module.For example, when the SHELL Script controlling module obtains the acquisition point by judgement
The data gathering project of row A meets preset acquisition condition, then calls the intelligent acquisition module.
In step s 13, the intelligent acquisition module acquires the target resource information.For example, for the acquisition
The data gathering project of branch A, the intelligent acquisition module is by analyzing preset acquisition condition in the data gathering project, meeting
Necessary parameter information in collection process is obtained, establishes and communicates to connect for example, by using which kind of agreement and target resource information, acquisition
Which data file etc..
In the disclosure, the intelligent acquisition device further includes newly-built gathering project module, the newly-built gathering project module
For the program block for being used to define the principal function for acquiring the target resource information write using JAVA language.
Fig. 2 is the flow chart of another resource information acquisition method shown according to an exemplary embodiment, referring to Fig. 2,
Before the SHELL Script controlling module judges whether data gathering project meets preset acquisition condition by predetermined period,
The method also includes following steps.
In step slo, the newly-built gathering project module creates the data gathering project in resource management system,
The resource management system is for storing the target resource information.
For step S10, the newly-built gathering project module is for creating the data gathering project, for example, center silver
Row will create the data gathering project of the acquisition branch A, need to only be used in the newly-built gathering project module definition one
The principal function of branch A is acquired, while defining preset acquisition condition, there are one or more numbers in the resource management system
According to gathering project, for example, there are also the data gathering projects for acquiring branch B in addition to the data gathering project of the acquisition bank A
Deng.
Fig. 3 is that the SHELL Script controlling module shown according to an exemplary embodiment by predetermined period judges data
Whether gathering project meets the flow chart of preset acquisition condition, includes the following steps referring to Fig. 3, the step S11.
In step s 110, the SHELL Script controlling module obtains single the preset of data gathering project and adopts
Collection condition, the preset acquisition condition include external acquisition condition and internal acquisition condition, and the external acquisition condition is at least
The state of acquisition whether is supported including the target resource information, the internal acquisition condition is included at least to the target resource
The preset collection period of information.
In step S111, the SHELL Script controlling module judges the target of the single data gathering project
Whether resource information is the state that can support acquisition.
In step S112, the SHELL Script controlling module judges whether current time meets the single data and adopt
Collect the condition of the collection period of engineering.
In step S113, when the target resource information of the single data gathering project is the shape that can support acquisition
State and current time meet the condition of the collection period of the single data gathering project, then the SHELL Script controlling module
Determine that the single data gathering project meets preset acquisition condition.
In the step S110, the SHELL Script controlling module obtains the default of the single data gathering project
Acquisition condition, due to the resource management system usually be no less than a data gathering project, the SHELL script control
Molding block can obtain one by one the preset acquisition condition of each data gathering project according to predetermined period;For example, center silver
The data gathering project that row obtains the information of the acquisition branch A first is analyzed, and the acquisition branch B is then obtained
Data gathering project analyzed.
The preset acquisition condition includes external acquisition condition and internal acquisition condition, and the external acquisition condition is extremely
It less include the state whether the target resource information supports acquisition, such as the data management system of branch A is being safeguarded, is not propped up
External acquisition is held, so the target resource information is not support the state of acquisition at this time, in addition, the external acquisition condition is also
Whether it is built into including the communications conduit between other conditions, such as the resource management system and the data management system of bank
Function etc..The internal acquisition condition is included at least to the preset collection period of target resource information, i.e. user can be with
It presets every how long executing the acquisitions of data, in addition, the internal acquisition condition further includes other conditions, for example,
Whether the resource management system is ready to receive external data etc..
In the step S111, the SHELL Script controlling module judges the described of the single data gathering project
Whether target resource information is the state that can support acquisition.For example, what is run in the resource management system of the Central Bank is described
SHELL Script controlling module judges the target of the data gathering project when getting the data gathering project of the branch A
Whether resource information is the state that can support acquisition, for example, the cash flow for this month that target resource information herein is branch A
Enter situation and customer information, if this partial information is being safeguarded, the Central Bank determines the data gathering project of the branch A
Target resource information be do not support acquisition state.
In the step S112, the SHELL Script controlling module judges whether current time meets the single number
According to the condition of the collection period of gathering project.For example, data management system of Central Bank's setting every 24 hours acquisition branch A
Information, the SHELL Script controlling module gets acquisition time last in the data gathering project of the branch A
For 10 minutes 10 points of January 1, then acquisition time was 10 minutes 10 points of January 2 next time, then was next time 10 minutes 10 points of January 3, with
This analogizes.
In the step S113, when the target resource information of the single data gathering project is that can support to acquire
State and current time meet the single data gathering project collection period condition, then the SHELL Script controlling
Module determines that the single data gathering project meets preset acquisition condition.For example, the money in the data management system of branch A
Source information can be supported to acquire, and the resource management system of the Central Bank has also reached the time point of acquisition, then SHELL Script controlling
Module determines that the data gathering project of the branch A meets preset acquisition condition.
In the disclosure, the step S12 includes the following steps.
In step S121, when the single data gathering project meets preset acquisition condition, the SHELL script
Control module sends acquisition instructions to the intelligent acquisition module, and the acquisition instructions are for notifying the intelligent acquisition module to adopt
Collect the target resource information.
In step S121, for example, if the SHELL Script controlling module of the Central Bank judges to obtain described point
The data gathering project of row A meets preset acquisition condition, then to the intelligent acquisition module of the data gathering project of the branch A
Acquisition instructions are sent, the acquisition instructions are for ordering the intelligent acquisition module to start to execute the data management system to branch A
The acquisition of target resource information in system.
Fig. 4 is the intelligent acquisition module shown according to an exemplary embodiment using the first method acquisition mesh
Mark the schematic illustration of resource information, wherein the intelligent acquisition module executes following steps when called.
In step S131a, the corba interface of the intelligent acquisition module and target network element management system establishes communication link
It connects.
In step S132a, the intelligent acquisition module acquires the target money from the target network element management system
Source information.
In the disclosure, if the intelligent acquisition module is by the step S131a and the step S132a to the target
Resource information is acquired, then when presetting acquisition condition in step S10, other than including this parameter of collection period, is also wrapped
Other multiple parameters are included, such as: the IP of target network element management system and port, CORBA usemame/password, target network element management
The mark and model of system, the type of target resource and data analyze entrance.The type of the target resource, for example, equipment,
Frame, frame, plate, mouth, channel, virtual connections, performance event, warning information etc., be technical field personnel very known to
Concept, therefore this will not be repeated here.
In the disclosure, the collection period of the target resource information is all made of the setting of cron expression formula, and cron expression formula is logical
It is usually used in configuring the triggered time of plan target, a cron expression formula is one by six or seven subexpressions (field)
The character string of composition.The specific value of the pre-set collection period of cron expression formula, the SHELL Script controlling
Specific value is passed to the collection period that the data gathering project is defined in creation at runtime by module.
In step S131a, the corba interface of the intelligent acquisition module and target network element management system establishes communication link
It connects.Element management system (Element Management System) is the certain types of one or more telecommunication networks of management
Unit (Network Element) is professional network management system, it lays particular emphasis on region, network, the NE management inside sub-network.
Element management system is the bridge between network unit and Network Management System (Network Management System), it
It is connect by northbound interface (such as corba interface) with Network Management System.
In step S132a, the intelligent acquisition module acquires the target money from the target network element management system
Source information, i.e., the described intelligent acquisition module acquire under one or more network units of the target network element management system management
The specific target resource information.Specific operating process is the prior art, therefore this will not be repeated here.
Fig. 5 is the intelligent acquisition module shown according to an exemplary embodiment using the second method acquisition mesh
Mark the schematic illustration of resource information, wherein the intelligent acquisition module executes following steps when called.
In step S131b, the intelligent acquisition module is linked to the target network element management using Database Link
The database of system.
In step S132b, the intelligent acquisition module executes data of the Oracle function from the Element management system
The target resource information is acquired in library.
In the disclosure, if the intelligent acquisition module is by the step S131b and the step S132b to the target
Resource information is acquired, then when presetting acquisition condition in step S10, other than including this parameter of collection period, is also wrapped
Other multiple parameters are included, such as: IP, port, Service name, user name, password and the acquisition function of target database.
In step S131b, the intelligent acquisition module is linked to the target network element management using Database Link
The database of system.In Oracle, the effect of Database Link is in local area network, above a server
The function of database above the other server of database access, such as now with two databases A and B, if certain user steps on
Land data A thinks access data B, then user can directly go in database A in the case where creating Database Link
Access database B.In practical applications, target network element management system can not pass through service the part target resource information
Mode externally provides, but resource management system and the target network element management system at this time may be used in same LAN environment
Data are directly acquired by Database Link mode.
In step S132b, the intelligent acquisition module executes data of the Oracle function from the Element management system
The target resource information is acquired in library, specific operating process is the prior art, therefore this will not be repeated here.
Fig. 6 is the intelligent acquisition module shown according to an exemplary embodiment using the third method acquisition mesh
Mark the schematic illustration of resource information, wherein the intelligent acquisition module executes following steps when called.
In step S131c, the intelligent acquisition module is communicated with the destination server foundation of File Transfer Protocol is supported
Connection.
In step S132c, the intelligent acquisition module acquires the target resource information from the destination server.
In the disclosure, if the intelligent acquisition module is by the step S131c and the step S132c to the target
Resource information is acquired, then when presetting acquisition condition in step S10, other than including this parameter of collection period, is also wrapped
Other multiple parameters are included, such as: IP, port, login username/password, file destination path and the target of destination server
File name (may specify format).
In step S131c, the intelligent acquisition module is communicated with the destination server foundation of File Transfer Protocol is supported
Connection.Support the destination server of File Transfer Protocol, i.e. ftp server (File Transfer Protocol Server)
It is the computer that file is provided on the internet and stores and accesses service, they provide service according to File Transfer Protocol.In practical application
In, target network element management system can not externally provide the part resource information by way of service, and resource management
The database of system and Element management system may be selected directly not in same LAN environment through access ftp server
Obtain the target resource information.
In step S132c, the intelligent acquisition module acquires the target resource information from the destination server.
The i.e. described intelligent acquisition module downloads target data file from the destination server, parses target data file and obtains described
Target resource information.Specific operating process is the prior art, therefore this will not be repeated here.
In the disclosure, described device further includes intelligent analysis module, and the intelligent analysis module is to be compiled using JAVA language
The program block comprising one or more functions function write.
Fig. 7 is a kind of overall flow figure of resource information acquisition method shown according to an exemplary embodiment, described
It is further comprising the steps of after step S13.
In step S14, the SHELL Script controlling module judges that the intelligent acquisition module believes the target resource
Whether the acquisition of breath is finished.
In step S15, the SHELL Script controlling module is determining the intelligent acquisition module to the target resource
After the acquisition of information is finished, the intelligent analysis module is called.
In step s 16, the intelligent analysis module carries out data processing to the target resource information.
Firstly, the SHELL Script controlling module judges the intelligent acquisition module to described in the step S14
Whether the acquisition of target resource information is finished.It, can Xiang Suoshu after the intelligent acquisition mould acquisition target resource information
SHELL Script controlling module, which is sent, terminates acquisition instructions, refers to when the SHELL Script controlling module receives the end acquisition
When enabling, determine that the intelligent acquisition module is finished to the acquisition of the target resource information.
Then in step S15, the SHELL Script controlling module is determining the intelligent acquisition module to the target
After the acquisition of resource information is finished, the intelligent analysis module is called.For example, the Central Bank determines the intelligent acquisition mould
After block is to the target resource information collection in the data management system of branch A, Xiang Suoshu intelligent analysis module sends request
Call instruction, the request call instruction is for the target resource information in the data management system to the branch A of acquisition
It is arranged.
Then in step s 16, the intelligent analysis module carries out data processing to the target resource information.Fig. 8 is
The intelligent analysis module shown in one exemplary embodiment carries out the flow chart of data processing, ginseng to the target resource information
According to Fig. 8, include the following steps.
In step S161, the intelligent analysis module compares target resource information with resource information, and
It is classified as new network Resource information, in net resource information and logout resource information;Described is being described with resource information
Already existing resource information in the called foregoing description resource management system of intelligent acquisition module.
In step S162, the intelligent analysis module provides artificial attribute to the new network Resource information and safeguards function
Energy.
In step S163, the intelligent analysis module deletes the logout resource information.
First in step S161, for example, the Central Bank acquired January 1 from the data management system of branch A
All customer information and the resource management system for being stored in the Central Bank, then this portions of client information is referred to as to believe with resource
Breath, when January 2, the Central Bank acquires all customer informations again from the data management system of branch A, then claiming this portion
Dividing customer information is target resource information;By all customer informations of all customer informations of acquisition on January 2 and acquisition on January 1
It compares, if discovery has newly increased a collection of client, then this batch of customer information newly increased is known as new network Resource information;
If all customer informations that all customer informations that January 2 acquired were acquired with January 1 compared, discovery has a collection of phase
Same customer information, then identical this batch of customer information is known as in net resource information;If the institute that January 2 was acquired
All customer informations for having customer information to acquire with January 1 compare, and have in all customer informations of discovery acquisition on January 1
A collection of customer information is not in all customer informations of acquisition on January 2, then this batch of customer information of reduction is known as logout
Resource information.
Then in step S162, the intelligent analysis module provides artificial attribute to the new network Resource information and safeguards
Function.For example, if all customer informations of acquisition on January 2 increase compared with all customer informations that January 1 acquired
A collection of client, then the intelligent analysis module is additionally provided artificial attribute maintenance function for this portions of client information, i.e., in
Centre bank, which can according to need, to be decided whether to handle this batch of customer information.
Then in step S163, the intelligent analysis module deletes the logout resource information.For example, if
January 2, all customer informations of acquisition lacked a collection of client compared with all customer informations that January 1 acquired, then the intelligence
Energy analysis module deletes this portions of client information, while also reminding this crowd of client of the Central Bank not in the client of branch A
List.
The intelligent analysis module can be acquired target resource information in real time and be updated by the step S161 to S163
To resource management system, when the collection period of setting is shorter, it is more able to maintain the data and the target of the resource management system
Resource information is synchronous.For example, the Central Bank acquires target resource information from the data management system of branch A daily, and leads to
This batch of target resource information is crossed to carry out the resource information for the branch A of the previous day being stored in Central Bank's resource management system
It updates, keeps the information in the resource management system of the Central Bank consistent with actual conditions.Similarly, pass through the intellectual analysis
Module, the Central Bank can also be updated the resource information of the branch B in resource management system, believe the resource of branch C
Breath is updated etc..
In addition, the target resource information is after being analyzed and being improved by the intelligent analysis module, also in the disclosure
Can be stored in a data warehouse, the data warehouse externally provides shared channel, other platforms can by interface or
The modes such as person Database Link obtain the resource information respectively needed from the data warehouse, guarantee that external platform obtains
Data be data after real-time update, reduce the otherness between the data that each external platform obtains.
Fig. 9 is a kind of block diagram of resource information acquisition device shown according to an exemplary embodiment, described referring to Fig. 9
Device includes:
SHELL Script controlling module 101, it is preset for judging whether the data gathering project meets by predetermined period
Acquisition condition, when the data gathering project meets preset acquisition condition, described in the SHELL Script controlling module calling
Intelligent acquisition module;
Intelligent acquisition module 102, for acquiring the target resource information;
Newly-built gathering project module 103, for creating the data gathering project in the resource management system;
Intelligent analysis module 104, for carrying out data processing to the target resource information.
In the disclosure, the SHELL Script controlling module 101 includes:
Module 1011 is obtained, for obtaining the preset acquisition condition of the single data gathering project;
First judgment module 1012, for judge the single data gathering project the target resource information whether be
It can support the state of acquisition;
Second judgment module 1013, for judging whether current time meets the acquisition week of the single data gathering project
The condition of phase;
First calling module 1014, it is described for when the single data gathering project meets preset acquisition condition
SHELL Script controlling module sends acquisition instructions to the intelligent acquisition module;
Third judgment module 1015, for judge the intelligent acquisition module to the acquisition of the target resource information whether
It is finished;
Second calling module 1016, for having been executed in the intelligent acquisition module to the acquisition of the target resource information
Bi Hou calls the intelligent analysis module.
The present invention uses the control instruction collection of SHELL scripting language, judges that data gathering project is by predetermined period
It is no to meet preset acquisition condition, it is automatic that intelligent acquisition module is called to believe target resource when meeting preset acquisition condition
Breath is acquired.The present invention possesses following advantage: first is that not needing manually to be acquired, user only being needed to set acquisition week
Phase can be automatically performed the acquisition to target resource information, in the collection process for effectively reducing the target resource information
Manpower consumption;Second is that being avoided a large amount of while manpower consumption in the collection process for reducing the target resource information
Mistake;Third is that establishing data warehouse for the data in the intelligent analysis module, can be mentioned for other platforms of periphery
For data sharing, and guarantee from the data obtained in the data warehouse and is the data after real-time update.
In the instructions provided here, numerous specific details are set forth.It is to be appreciated, however, that implementation of the invention
Example can be practiced without these specific details.In some instances, well known method, structure is not been shown in detail
And technology, so as not to obscure the understanding of this specification.
Claims (10)
1. a kind of resource information acquisition method, which is characterized in that realized based on intelligent acquisition device, the intelligent acquisition device packet
SHELL Script controlling module and intelligent acquisition module are included, the SHELL Script controlling module is using SHELL script edit
Control instruction collection;The intelligent acquisition module is the program including one or more functions function write using JAVA language
Block;The described method includes:
The SHELL Script controlling module judges whether data gathering project meets preset acquisition condition, institute by predetermined period
Stating data gathering project is the principal function for acquiring target resource information;
When the data gathering project meets preset acquisition condition, the SHELL Script controlling module calls the intelligence
Acquisition module;
The intelligent acquisition module acquires the target resource information.
2. the method according to claim 1, wherein the intelligent acquisition device further includes newly-built gathering project mould
Block, the newly-built gathering project module are to be write using JAVA language for defining the main letter for acquiring the target resource information
Several program blocks;
The SHELL Script controlling module by predetermined period judge data gathering project whether meet preset acquisition condition it
Before, the method also includes:
The newly-built gathering project module creates the data gathering project, the resource management system in resource management system
For storing the target resource information.
3. method according to claim 1 or 2, which is characterized in that the SHELL Script controlling module is sentenced by predetermined period
Whether disconnected data gathering project meets preset acquisition condition, comprising:
The SHELL Script controlling module obtains the preset acquisition condition of the single data gathering project, described preset
Acquisition condition includes external acquisition condition and internal acquisition condition, and the external acquisition condition is believed including at least the target resource
Whether breath supports the state of acquisition, and the internal acquisition condition is included at least to the preset acquisition of target resource information
Period;
The SHELL Script controlling module judges whether the target resource information of the single data gathering project is that can prop up
Hold the state of acquisition;
The SHELL Script controlling module judges whether current time meets the collection period of the single data gathering project
Condition;
When the target resource information of the single data gathering project is that can support the state and current time satisfaction of acquisition
The condition of the collection period of the single data gathering project, then the SHELL Script controlling module determines the single data
Gathering project meets preset acquisition condition.
4. according to the method described in claim 3, it is characterized in that, when the data gathering project meets preset acquisition condition
When, the SHELL Script controlling module calls the intelligent acquisition module, comprising:
When the single data gathering project meets preset acquisition condition, the SHELL Script controlling module is to the intelligence
Energy acquisition module sends acquisition instructions, and the acquisition instructions are for notifying the intelligent acquisition module to acquire the target resource letter
Breath.
5. the method according to claim 1, wherein the intelligent acquisition module acquires the target resource letter
Breath, comprising:
The corba interface of the intelligent acquisition module and target network element management system, which is established, to be communicated to connect;
The intelligent acquisition module acquires the target resource information from the target network element management system.
6. the method according to claim 1, wherein the intelligent acquisition module acquires the target resource letter
Breath, comprising:
The intelligent acquisition module creation Database Link is linked to the database of the target network element management system;
The intelligent acquisition module executes Oracle function and acquires the target money from the database of the Element management system
Source information.
7. the method according to claim 1, wherein the intelligent acquisition module acquires the target resource letter
Breath, comprising:
The intelligent acquisition module and the destination server foundation communication connection for supporting File Transfer Protocol;
The intelligent acquisition module acquires the target resource information from the destination server.
8. the method according to claim 1, wherein described device further includes intelligent analysis module, the intelligence
Analysis module is the program block comprising one or more functions function write using JAVA language;
After the intelligent acquisition module acquires the target resource information, the method also includes:
The SHELL Script controlling module judges whether the intelligent acquisition module executes the acquisition of the target resource information
It finishes;
The SHELL Script controlling module is determining that the intelligent acquisition module executed the acquisition of the target resource information
Bi Hou calls the intelligent analysis module;
The intelligent analysis module carries out data processing to the target resource information.
9. a kind of intelligent acquisition device characterized by comprising
SHELL Script controlling module, for judging whether the data gathering project meets preset pick-up slip by predetermined period
Part, when the data gathering project meets preset acquisition condition, the SHELL Script controlling module calls the intelligence to adopt
Collect module;
Intelligent acquisition module, for acquiring the target resource information;
Newly-built gathering project module, for creating the data gathering project in the resource management system;
Intelligent analysis module, for carrying out data processing to the target resource information.
10. device according to claim 9, which is characterized in that the SHELL Script controlling module includes:
Module is obtained, for obtaining the preset acquisition condition of the single data gathering project;
First judgment module, for judging whether the target resource information of the single data gathering project is that can support to adopt
The state of collection;
Second judgment module, for judging whether current time meets the item of the collection period of the single data gathering project
Part;
First calling module, for when the single data gathering project meets preset acquisition condition, the SHELL script
Control module sends acquisition instructions to the intelligent acquisition module;
Third judgment module, for judging whether the intelligent acquisition module has executed the acquisition of the target resource information
Finish;
Second calling module, for adjusting after the intelligent acquisition module is finished to the acquisition of the target resource information
With the intelligent analysis module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811557406.4A CN109814841A (en) | 2018-12-19 | 2018-12-19 | A kind of resource information acquisition method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811557406.4A CN109814841A (en) | 2018-12-19 | 2018-12-19 | A kind of resource information acquisition method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109814841A true CN109814841A (en) | 2019-05-28 |
Family
ID=66602161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811557406.4A Pending CN109814841A (en) | 2018-12-19 | 2018-12-19 | A kind of resource information acquisition method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109814841A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113312419A (en) * | 2021-06-01 | 2021-08-27 | 北京思特奇信息技术股份有限公司 | Timing scheduling method and system for subscription service |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231676A (en) * | 2011-06-23 | 2011-11-02 | 中兴通讯股份有限公司 | Network management data collecting method and device |
JP2014532244A (en) * | 2011-10-11 | 2014-12-04 | インテル・コーポレーション | Automatic code generation for crowdsourced data collection |
CN104216943A (en) * | 2014-06-24 | 2014-12-17 | 用友优普信息技术有限公司 | Method and device for automatically collecting blockage information to facilitate post analysis on database blockage |
CN104243185A (en) * | 2013-06-06 | 2014-12-24 | 神州数码系统集成服务有限公司 | Experiential service monitoring system and method |
CN109034947A (en) * | 2018-06-21 | 2018-12-18 | 无锡天脉聚源传媒科技有限公司 | A kind of order data acquisition methods, system and the device of electric business platform |
-
2018
- 2018-12-19 CN CN201811557406.4A patent/CN109814841A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102231676A (en) * | 2011-06-23 | 2011-11-02 | 中兴通讯股份有限公司 | Network management data collecting method and device |
JP2014532244A (en) * | 2011-10-11 | 2014-12-04 | インテル・コーポレーション | Automatic code generation for crowdsourced data collection |
CN104243185A (en) * | 2013-06-06 | 2014-12-24 | 神州数码系统集成服务有限公司 | Experiential service monitoring system and method |
CN104216943A (en) * | 2014-06-24 | 2014-12-17 | 用友优普信息技术有限公司 | Method and device for automatically collecting blockage information to facilitate post analysis on database blockage |
CN109034947A (en) * | 2018-06-21 | 2018-12-18 | 无锡天脉聚源传媒科技有限公司 | A kind of order data acquisition methods, system and the device of electric business platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113312419A (en) * | 2021-06-01 | 2021-08-27 | 北京思特奇信息技术股份有限公司 | Timing scheduling method and system for subscription service |
CN113312419B (en) * | 2021-06-01 | 2024-07-12 | 北京思特奇信息技术股份有限公司 | Timing scheduling method and system for subscription service |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110535777A (en) | Access request control method, device, electronic equipment and readable storage medium storing program for executing | |
CN108965381A (en) | Implementation of load balancing, device, computer equipment and medium based on Nginx | |
CN101217400B (en) | An integrated intelligent polling method and system | |
CN110351436A (en) | FreeSWITCH monitoring method, equipment, storage medium and device | |
CN108334370A (en) | A kind of software auto-increment update upgrade method of distributed test system | |
EP2863579A1 (en) | Scheduling a device batch reconfiguration event in a network | |
CN112099844A (en) | Multi-kernel compatible intelligent browsing system for state network service system | |
CN107179977A (en) | Database Full-automatic monitoring system based on mpm models | |
CN114301818A (en) | Service flow detection method, device, system, terminal and storage medium | |
CN109814841A (en) | A kind of resource information acquisition method and device | |
CN117709077B (en) | Simulation deduction method and system based on network target range, electronic equipment and medium | |
CN110187895A (en) | Allocating operating system method, apparatus, equipment and computer readable storage medium | |
CN105391566B (en) | A kind of method and device that dynamic network equipments configuration compares | |
CN109376527A (en) | A kind of management method and system based on receipts and trustship in account | |
CN109450716A (en) | A kind of method and system for writing frequency to intercom by IP network | |
CN113065801A (en) | Organization architecture management method, device, equipment and storage medium | |
CN115865617B (en) | VPN remote diagnosis and maintenance system | |
CN112147962A (en) | Communication system and communication method between intelligent casting system and equipment | |
CN105204892B (en) | War packet configuration modification system and methods | |
CN117149895A (en) | Industrial data dynamic display method and device, computer equipment and storage medium | |
CN111897843A (en) | Configuration method and device of data transfer strategy of Internet of things and computer equipment | |
CN102857939B (en) | The collocation method and device of cell parameter | |
CN110362309A (en) | Front end project development method, apparatus, equipment and computer readable storage medium | |
CN109408314A (en) | A kind of catalogue quota automated testing method based on mass memory | |
CN112420019B (en) | Equipment testing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190528 |