CN109813996A - A kind of station operation state of earth wire monitoring device and monitoring method - Google Patents

A kind of station operation state of earth wire monitoring device and monitoring method Download PDF

Info

Publication number
CN109813996A
CN109813996A CN201910209073.4A CN201910209073A CN109813996A CN 109813996 A CN109813996 A CN 109813996A CN 201910209073 A CN201910209073 A CN 201910209073A CN 109813996 A CN109813996 A CN 109813996A
Authority
CN
China
Prior art keywords
ground line
stake
line
ground
portable mobile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910209073.4A
Other languages
Chinese (zh)
Inventor
付渊
邹文强
韦佳钰
田月炜
徐一蝶
方芳
徐伟杰
鲁守银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201910209073.4A priority Critical patent/CN109813996A/en
Publication of CN109813996A publication Critical patent/CN109813996A/en
Pending legal-status Critical Current

Links

Abstract

The present invention provides a kind of station operation state of earth wire monitoring device and monitoring methods, it includes RFID electronic label and smart grounding line stake, RFID electronic label is fixed on ground line, RFID electronic label and the stake of smart grounding line are wirelessly connected, the stake of smart grounding line and portable mobile termianl are wirelessly connected, and portable mobile termianl and monitor supervision platform are wirelessly connected;The prior art is solved in interruption maintenance operation process, quantity is more sometimes for the temporary ground wire used, and institute's attaching place disperses, pole is not easy to manage, intensive work is easy to make operator that leakage occurs when removing ground line to tear open, leads to occur the pernicious misoperation faults such as line conjunction breaker with ground, disconnecting switch.

Description

A kind of station operation state of earth wire monitoring device and monitoring method
Technical field
The invention belongs to station technology more particularly to a kind of station operation state of earth wire monitoring devices And monitoring method.
Background technique
Temporary ground wire is substation management key points and difficulties, and earth wire standardized management prevents manual operation from making mistakes, Improve transformer substation grounding wire management level.Ground line should complete following functions when electric system carries out line construction and maintenance: Ground line should carry out reliable ground to guarantee the safety of controller switching equipment and construction personnel;Ground line should be connected with determining ground stud It connects, it is ensured that corresponding relationship;Ground line is the safety guard for guaranteeing on-site personnel personal safety, assembly and disassembly ground line operation There are larger risk, if occurring omitting or mistake, may cause to seriously endanger to grid equipment and personal safety.And existing skill Art is in interruption maintenance operation process, and quantity is more sometimes for the temporary ground wire used, and institute's attaching place disperses, and pole is not easy to Management, intensive work are easy to that operator is made, there is a situation where leaking to tear open, to lead to that line with ground occurs when removing ground line Close the pernicious misoperation faults such as breaker, disconnecting switch.
Summary of the invention
The technical problem to be solved by the present invention is providing a kind of station operation state of earth wire monitoring device and prison Survey method, to solve the prior art in interruption maintenance operation process, quantity is more sometimes for the temporary ground wire used, and is filled Grounding point dispersion, pole are not easy to manage, and intensive work is easy to make operator that the feelings that leakage is torn open occur when removing ground line Condition leads to occur line with ground and closes the pernicious misoperation faults such as breaker, disconnecting switch.
The technical scheme is that
A kind of station operation state of earth wire monitoring device, it includes RFID electronic label and smart grounding line stake, RFID electronic label is fixed on ground line, and RFID electronic label and the stake of smart grounding line are wirelessly connected, the stake of smart grounding line with Portable mobile termianl is wirelessly connected, and portable mobile termianl and monitor supervision platform are wirelessly connected.
The smart grounding line stake includes ground line stake and controlling terminal, controlling terminal include RFID reader and first ZigBee communication module, RFID reader, the first ZigBee communication module and the first power module connect with first processor respectively It connects;Controlling terminal is fixed in ground line stake.
Portable mobile termianl includes second processor, second processor respectively with the second ZigBee communication module, GPRS Locating module, voice module, display module are connected with second power supply module.
A kind of monitoring method of station operation state of earth wire monitoring device, it includes:
When step 1, mounting ground line, repair apparatus or route are first selected, closest ground is selected by portable mobile termianl Line stake;
Ground line with electronic tag is installed in smart grounding line stake by step 2, is started by portable mobile termianl RFID reader identifies current ground line number, takes formula mobile terminal and send the information currently read to monitor supervision platform;
If the prompt maintenance of step 3, portable mobile termianl starts, shows that ground line is correct, start upkeep operation;Otherwise, it mentions Show error message, service personnel answers debug, then this repeats step 2, until prompt maintenance starts upkeep operation after starting;
After step 4, upkeep operation, the ground line to be removed is selected, corresponding ground line stake is inquired by ground line number;
The location information of smart grounding line stake is issued to Portable movable by ZigBee communication module by step 5, monitor supervision platform In terminal;
Step 6, service personnel start the RFID reader of smart grounding line stake by portable mobile termianl, identify ground line Number information is compared with the information of monitor supervision platform;
After the completion of step 7, information comparison, monitor supervision platform by ZigBee communication module to photos and sending messages under portable mobile termianl, If portable mobile termianl prompts " please remove ground line ", show currently to be grounded, maintenance consistent with the ground line to be removed Personnel remove ground line, and otherwise prompt " please check whether ground line is consistent ", shows currently to be grounded the ground connection for being not meant to remove Line should check again for, and repeat step 6, carry out dismantling operation again after consistent.
The invention has the advantages that:
The present invention carries out unified management and running operation to each ground connection point, provides real-time state of earth wire letter for staff Current work information is uploaded to monitor supervision platform by breath, and administrative staff can check the working condition of each ground line stake and grounding point, And adjust operation power route and the allotment of personnel in real time according to state of earth wire;Realize earth wire anti-misoperation and storage Unified management solves the long-standing problem of management of ground line, effectively improves the control ability of substation's earth wire With person works' efficiency, reduce the generation of maloperation, mistuning degree accident.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is monitor supervision platform functional schematic of the present invention;
Fig. 3 is monitoring method flow diagram of the present invention.
Specific embodiment
The present invention is made of monitor supervision platform, portable mobile termianl, the stake of smart grounding line and ground line.
Monitor supervision platform is located at supervisory control of substation center, supervises in monitor supervision platform configured with station operation state of earth wire Survey software, the software central system setting, data management, equipment management, personal management, line information, record are checked and in real time Display function.Software can show temporary ground wire use and situation in place, and show its installing detailed location information.
Station operation state of earth wire monitoring of software main functional modules have system setting, data management, equipment Management, personal management, line information, record is checked and real-time display.System setting includes the time for date-time to be arranged The communication configuration module of configuration module and setting communication IP address information.Data management includes for storing ground line ID data Ground line data module, the line stake data for storing ground line stake ID data are torn open for storing the extension of extension dismounting ground wire data Data module and for storing user's logon data, authority information and the user data module of operation note.Equipment management includes For counting and showing that current ground line stake uses the line stake management module with remaining information, and current ground line to use and remain The ground line management module of remaining information.Personal management includes staff's configuration module for managerial staff member's task With administrative staff's module for personal scheduling.Line information includes for counting and showing current working line letter in substation The working line module of breath, and the maintenance line module for counting display maintenance line information, are additionally integrated with power transformation Power circuit in standing dispatches system, which is only served in the Senior Administrator for possessing power circuit scheduling permission.Record is looked into It sees including being grounded stake usage record for checking for checking the ground line outbound logging modle for being grounded out storage information Line stake usage record module, for checking the staff redeployment logging modle of staff's scheduling information, for checking ground connection The record of examination module of record of examination.Real-time display includes the route operating status for showing substation, road, interior lines operating status Module is currently overhauled for showing the equipment running status module of equipment running status in substation for showing in substation Point position, personal information maintenance point module.
The smart grounding line stake includes ground line stake and controlling terminal, controlling terminal include RFID reader and first ZigBee communication module, RFID reader, the first ZigBee communication module and the first power module connect with first processor respectively It connects;Controlling terminal is fixed in ground line stake.Each electronic tag has the identification number uniquely determined, the RFID when mounting ground line Reader identifies electronic tag, by the first ZigBee communication module transfer to portable mobile termianl, by Portable movable end Monitor supervision platform is issued at end again, and monitor supervision platform retains mark data, again identifies that electronic tag when removing ground line, it is ensured that twice Identification number is consistent.
When removing ground line, the RFID that service personnel can be started on corresponding earth wire pile by portable mobile termianl is read Device identifies current ground line number information, is compared with the mounting information on monitor supervision platform, information is unanimously afterwards by portable Formula mobile terminal notifies service personnel that can remove ground line, otherwise alert.
Portable mobile termianl can be carried by service work personnel, and portable mobile termianl includes second processor, and second Processor connects with the second ZigBee communication module, GPRS locating module, voice module, display module and second power supply module respectively It connects.
Wherein GPRS locating module is used to determine the location information of current service work personnel, and location information is sent to Second ZigBee communication module.Second ZigBee communication module is used to carry out data exchange with monitor supervision platform, keeps the reality of data Shi Gengxin, and the data communication with smart grounding line stake.Voice module is used for the processing of warning message, is grounded removing When, if ground line ID and database in hanging earthing conductor ID mismatch if can alert, remind service personnel should be again Confirm whether the ground line to be removed is currently to be grounded, and warning message is transferred to the second ZigBee communication module, then lead to It crosses the second ZigBee communication module and alert data is uploaded into monitor supervision platform.Display module is made of one piece of liquid crystal display, On can show the notification information etc. that the id information of ground line and monitor supervision platform issue.
Mounting ground line workflow:
(1) selectes repair apparatus or route, and neighbouring earth wire pile is selected by portable mobile termianl.
(2) ground line with electronic tag is installed in smart grounding line stake by, is started by portable mobile termianl RFID reader identifies current ground line number.
(3) if the prompt maintenance of portable mobile termianl starts, show that ground line is correct, upkeep operation can be started;It is no Then, error message is prompted, service personnel answers debug, then this repeats step 2, until prompt maintenance can just overhaul after starting Operation.
Remove ground line workflow:
(1) after the operation of Awaiting Overhaul, the ground line to be removed is selected, corresponding ground line stake is inquired by ground line number.
(2) location information of smart grounding line stake is issued to portable shifting by ZigBee communication module by monitor supervision platform In dynamic terminal, service personnel is notified to go to specific location.
(3) service personnel starts the RFID reader of smart grounding line stake, identification ground line by portable mobile termianl Number information, be compared with the information in database, it is ensured that number the ground line of dismounting correct.
After the completion of comparing, monitor supervision platform by ZigBee communication module to photos and sending messages under portable mobile termianl, If portable mobile termianl prompts " please remove ground line ", show currently to be grounded, maintenance consistent with the ground line to be removed Personnel can remove ground line, otherwise prompt " please check whether ground line is consistent ", show that currently ground line is not meant to dismounting Ground line, should check again for, and repeat step 3, carry out dismantling operation again after consistent.

Claims (4)

1. a kind of station operation state of earth wire monitoring device, it includes RFID electronic label and smart grounding line stake, It is characterized by: RFID electronic label is fixed on ground line, RFID electronic label and the stake of smart grounding line are wirelessly connected, intelligence Stake can be grounded and portable mobile termianl is wirelessly connected, portable mobile termianl and monitor supervision platform are wirelessly connected.
2. a kind of station operation state of earth wire monitoring device according to claim 1, it is characterised in that: described Smart grounding line stake includes ground line stake and controlling terminal, controlling terminal include RFID reader and the first ZigBee communication mould Block, RFID reader, the first ZigBee communication module and the first power module are connect with first processor respectively;Controlling terminal is solid It is scheduled in ground line stake.
3. a kind of station operation state of earth wire monitoring device according to claim 1, it is characterised in that: portable Formula mobile terminal includes second processor, second processor respectively with the second ZigBee communication module, GPRS locating module, voice Module, display module are connected with second power supply module.
4. a kind of monitoring method of station operation state of earth wire monitoring device as described in claim 1, it includes:
When step 1, mounting ground line, repair apparatus or route are first selected, closest ground is selected by portable mobile termianl Line stake;
Ground line with electronic tag is installed in smart grounding line stake by step 2, is started by portable mobile termianl RFID reader identifies current ground line number, takes formula mobile terminal and send the information currently read to monitor supervision platform;
If the prompt maintenance of step 3, portable mobile termianl starts, shows that ground line is correct, start upkeep operation;Otherwise, it mentions Show error message, service personnel answers debug, then this repeats step 2, until prompt maintenance starts upkeep operation after starting;
After step 4, upkeep operation, the ground line to be removed is selected, corresponding ground line stake is inquired by ground line number;
The location information of smart grounding line stake is issued to Portable movable by ZigBee communication module by step 5, monitor supervision platform In terminal;
Step 6, service personnel start the RFID reader of smart grounding line stake by portable mobile termianl, identify ground line Number information is compared with the information of monitor supervision platform;
After the completion of step 7, information comparison, monitor supervision platform by ZigBee communication module to photos and sending messages under portable mobile termianl, If portable mobile termianl prompts " please remove ground line ", show currently to be grounded, maintenance consistent with the ground line to be removed Personnel remove ground line, and otherwise prompt " please check whether ground line is consistent ", shows currently to be grounded the ground connection for being not meant to remove Line should check again for, and repeat step 6, carry out dismantling operation again after consistent.
CN201910209073.4A 2019-03-19 2019-03-19 A kind of station operation state of earth wire monitoring device and monitoring method Pending CN109813996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910209073.4A CN109813996A (en) 2019-03-19 2019-03-19 A kind of station operation state of earth wire monitoring device and monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910209073.4A CN109813996A (en) 2019-03-19 2019-03-19 A kind of station operation state of earth wire monitoring device and monitoring method

Publications (1)

Publication Number Publication Date
CN109813996A true CN109813996A (en) 2019-05-28

Family

ID=66609573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910209073.4A Pending CN109813996A (en) 2019-03-19 2019-03-19 A kind of station operation state of earth wire monitoring device and monitoring method

Country Status (1)

Country Link
CN (1) CN109813996A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110957811A (en) * 2019-12-03 2020-04-03 深圳市航天新源科技有限公司 Full-flow intelligent monitoring method and system for temporary grounding wire
CN111582814A (en) * 2020-04-10 2020-08-25 国网河南省电力公司郑州供电公司 Novel grounding tool with grounding wire misoperation prevention and missing disassembly prompt intelligent management and control functions
CN112051594A (en) * 2020-08-18 2020-12-08 广东电网有限责任公司 System and method for monitoring real-time position state of ground wire
CN113723218A (en) * 2021-08-10 2021-11-30 国网湖北省电力有限公司检修公司 Active defense system and method for mistaken hanging and missing dismounting of power transmission grounding wire
CN113759281A (en) * 2021-09-09 2021-12-07 四川省东宇信息技术有限责任公司 Ground identification monitoring system based on RFID
CN114336105A (en) * 2021-12-06 2022-04-12 国网山东省电力公司潍坊供电公司 Intelligent grounding wire for distribution line
CN114784526A (en) * 2022-03-16 2022-07-22 贵州乌江水电开发有限责任公司 Grounding system is kept apart in operation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101888118A (en) * 2010-06-07 2010-11-17 南京工程学院 Intelligent management system of electric power grounding wire based on RFID (Radio Frequency Identification Device)
CN202150043U (en) * 2011-07-08 2012-02-22 杜长军 Monitoring system for hanging and dismounting ground wire of power line
CN104318300A (en) * 2014-10-27 2015-01-28 国网冀北电力有限公司张家口供电公司 Three-card-in-one based transformer substation tool management system and method
CN105652143A (en) * 2016-03-24 2016-06-08 国网山东省电力公司济南供电公司 Power ground wire monitor and a mixed positioning method for ground stud through power ground wire monitor
CN206711139U (en) * 2017-05-23 2017-12-05 国网江西省电力公司萍乡供电分公司 Transformer station's temporary ground wire positioning and management system
CN109459649A (en) * 2018-12-10 2019-03-12 华北电力大学 A kind of ground line on-line monitoring system based on RFID and ZigBee
CN209728093U (en) * 2019-03-19 2019-12-03 贵州电网有限责任公司 A kind of station operation state of earth wire monitoring device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101888118A (en) * 2010-06-07 2010-11-17 南京工程学院 Intelligent management system of electric power grounding wire based on RFID (Radio Frequency Identification Device)
CN202150043U (en) * 2011-07-08 2012-02-22 杜长军 Monitoring system for hanging and dismounting ground wire of power line
CN104318300A (en) * 2014-10-27 2015-01-28 国网冀北电力有限公司张家口供电公司 Three-card-in-one based transformer substation tool management system and method
CN105652143A (en) * 2016-03-24 2016-06-08 国网山东省电力公司济南供电公司 Power ground wire monitor and a mixed positioning method for ground stud through power ground wire monitor
CN206711139U (en) * 2017-05-23 2017-12-05 国网江西省电力公司萍乡供电分公司 Transformer station's temporary ground wire positioning and management system
CN109459649A (en) * 2018-12-10 2019-03-12 华北电力大学 A kind of ground line on-line monitoring system based on RFID and ZigBee
CN209728093U (en) * 2019-03-19 2019-12-03 贵州电网有限责任公司 A kind of station operation state of earth wire monitoring device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈贵;张剑;史勤峰;: "接地线智能管理系统的设计与实现", 电源技术应用, no. 06, pages 44 - 45 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110957811A (en) * 2019-12-03 2020-04-03 深圳市航天新源科技有限公司 Full-flow intelligent monitoring method and system for temporary grounding wire
CN110957811B (en) * 2019-12-03 2023-05-12 深圳市航天新源科技有限公司 Full-flow intelligent monitoring method and system for temporary grounding wire
CN111582814A (en) * 2020-04-10 2020-08-25 国网河南省电力公司郑州供电公司 Novel grounding tool with grounding wire misoperation prevention and missing disassembly prompt intelligent management and control functions
CN112051594A (en) * 2020-08-18 2020-12-08 广东电网有限责任公司 System and method for monitoring real-time position state of ground wire
CN112051594B (en) * 2020-08-18 2023-08-29 广东电网有限责任公司 System and method for monitoring real-time position state of grounding wire
CN113723218A (en) * 2021-08-10 2021-11-30 国网湖北省电力有限公司检修公司 Active defense system and method for mistaken hanging and missing dismounting of power transmission grounding wire
CN113759281A (en) * 2021-09-09 2021-12-07 四川省东宇信息技术有限责任公司 Ground identification monitoring system based on RFID
CN114336105A (en) * 2021-12-06 2022-04-12 国网山东省电力公司潍坊供电公司 Intelligent grounding wire for distribution line
CN114784526A (en) * 2022-03-16 2022-07-22 贵州乌江水电开发有限责任公司 Grounding system is kept apart in operation
CN114784526B (en) * 2022-03-16 2023-11-28 贵州乌江水电开发有限责任公司 Operation isolation grounding system

Similar Documents

Publication Publication Date Title
CN109813996A (en) A kind of station operation state of earth wire monitoring device and monitoring method
CN105785201B (en) A kind of power distribution network fault analysis method and study and judge system
CN102509245B (en) Temporary grounding wire management method and system
CN107181319B (en) Intelligent inspection method for state of hard pressing plate of transformer substation
CN102255393B (en) Ground wire hanging anti-error blocking system and method thereof
CN102332690B (en) Electric power netting safe running temporary ground wire Tracking monitoring system
CN101826757A (en) Method and device for managing earth wire
CN205176598U (en) A intelligent monitoring system for floodgate station
CN108769901B (en) Laboratory equipment management system and method based on UWB technology
CN110086251B (en) Monitoring method and system for improving operation safety of power grid
CN104535877A (en) Visualized detecting, reporting and positioning method for hanging ground wires in maintenance of overhead contact line equipment
CN101651293A (en) Real-time monitoring and management system of digital grounding wire
CN102116823A (en) System for automatically judging and positioning faults of automatic blocking and continuous railway power lines in railway distribution network
CN105242626A (en) Line safety intelligent auxiliary monitoring system
CN108249329A (en) A kind of electrical remote failure diagnosis system of derrick crane
CN112598814A (en) Method for checking positions of power distribution network patrolmen
CN108490316A (en) Intelligent network distribution grounding wire device and intelligent network distribution ground connection measuring system
CN209728093U (en) A kind of station operation state of earth wire monitoring device
CN202150043U (en) Monitoring system for hanging and dismounting ground wire of power line
CN111371180B (en) Substation patrol supervision and data analysis system
CN205139664U (en) Monitor platform
CN112736760A (en) Power equipment grounding wire operation system
CN110110868A (en) A kind of ground wire management system of combination ZigBee technology and GPRS global-positioning technology
CN207571783U (en) A kind of LNG filling machines fault diagnosis removal system
CN105279537A (en) System and method for detecting hanging of ground wires for transformer station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination