CN109813607A - The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test - Google Patents

The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test Download PDF

Info

Publication number
CN109813607A
CN109813607A CN201811619454.1A CN201811619454A CN109813607A CN 109813607 A CN109813607 A CN 109813607A CN 201811619454 A CN201811619454 A CN 201811619454A CN 109813607 A CN109813607 A CN 109813607A
Authority
CN
China
Prior art keywords
frame
snap
gauge
thin film
storage body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811619454.1A
Other languages
Chinese (zh)
Inventor
侯龙飞
邓鹏�
郭印同
王磊
周俊
张晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Chongqing University
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Chongqing University
Priority to CN201811619454.1A priority Critical patent/CN109813607A/en
Publication of CN109813607A publication Critical patent/CN109813607A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of devices of prefabricated hole in fracture-cavity type carbonate object mould crushing test.Soluble mediators are arranged in thin film storage body;The first end of connecting rope is connect with frame-type cover board, and the second end of connecting rope is connect with thin film storage body.When in use, first determine prefabricated hole height and orientation, thin film storage body is transferred by connecting rope.Then joints cement, after cement block solidification, soluble mediators in thin film storage body are dissolved discharge by sample drilling, to precast the hole of desired height and orientation and not with pressure in cement block, how desk study fracture hole is connected with good directive significance.

Description

The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test
Technical field
The present invention relates to petroleum works rock mechanics technical fields more particularly to a kind of molding of fracture-cavity type carbonate object to split The device of prefabricated hole in test.
Background technique
Deep carbonate reservoirs oil reservoir contains petroleum resources abundant, in the explored oil and gas reserves in the whole world, 60% is Marine Facies Carbonate Reservoir, has become the key areas of oil-gas exploration and development.Since carbonate reservoir has The features such as depth, superhigh temperature, super-pressure, heterogeneity are strong and hole fracture hole is developed is buried, thus is brought to the design of pressing crack construction A series of problem, most of well needs to carry out reservoir fracturing improvement can be only achieved the purpose of volume increase.Large and medium-sized solution cavity and molten Erosion crack is the major reservoir spaces of Karst-type carbonate reservoir, and has also developed along carbonate fracture a series of molten Borrosion hole hole, so as to form good oil and gas flow channel and reservoir space.Therefore, the key of Carbonate Reservoir description is exactly Carry out the research of reservoir communication.By the research of reservoir communication, come the direction of guiding reservoir fracturing reform, so as to more The development and utilization of Carbonate Reservoir are promoted well.
Currently, studying the connectivity or sky of Carbonate Reservoir reservoir fracture hole by the method for practical rock sample test It is white.A large amount of large-scale true triaxial experiment is carried out using practical rock sample come, reason infeasible instantly of studying the connectivity of fracture hole It specifically includes that first is that taking for rock sample is highly difficult, cannot support a large amount of experimental study;Second is that inside rock sample there are hole and not Rule can not carry out the research that basic crack extension is connected to rule with hole;Third is that most rock sample holes there's almost no, make Hole workload is very big and is not easy to implement.
It to sum up, is the most economic and efficient side by establishing large-scale physical simulation experiment to carry out the connection Journal of Sex Research of fracture hole Method.
Summary of the invention
The present invention by providing a kind of device of prefabricated hole in fracture-cavity type carbonate object mould crushing test, realize for The prefabricated technical effect of big Logistics automatic system Hole exploring carbonate rock fractured cave combination connected relation and carrying out.
The present invention provides a kind of devices of prefabricated hole in fracture-cavity type carbonate object mould crushing test, comprising: frame Formula cover board, connecting rope, thin film storage body and soluble mediators;The soluble mediators are arranged in the thin film storage body;Institute The first end for stating connecting rope is connect with the frame-type cover board, and the second end of the connecting rope is connect with the thin film storage body.
Further, the frame-type cover board includes: frame and circular arc ring;Along the diagonal line and/or opposite direction of the frame The line of centres of frame be provided with connecting rod;The center of circle of the circular arc ring is overlapped with the center of the frame, and with it is described Connecting rod connection;The first end of the connecting rope is connected to the intersection of the circular arc ring and the connecting rod.
Further, the intersection of the circular arc ring and the connecting rod is annulus;The first end of the connecting rope connects On the annulus.
Further, the circular arc ring is four/three-arc ring.
Further, further includes: hollow screw, card column, nut;The hollow screw and the nut are connected by screw thread It connects;The card column is connect with the hollow screw;The first end of the connecting rope passes through the hollow screw, and is arranged described Between hollow screw and the nut;The card column is stuck on the annulus.
Further, the frame is square frame.
Further, the frame-type cover board further include: the first snap-gauge, the second snap-gauge, third snap-gauge and the 4th snap-gauge;Institute State the first snap-gauge and second snap-gauge vertically on be arranged in the frame two opposite frames middle part;It is described Third snap-gauge and the 4th snap-gauge vertically on be arranged in the frame two other opposite direction frame middle part.
Further, the frame-type cover board further include: handle;The handle setting is on said frame.
Further, the material of the thin film storage body is polypropylene film, polyester film or nylon film.
Further, the material of the soluble mediators is salt, carbonate, bicarbonate or sugar.
One or more technical solution provided in the present invention, has at least the following technical effects or advantages:
Soluble mediators are arranged in thin film storage body;The first end of connecting rope is connect with frame-type cover board, connecting rope Second end connect with thin film storage body.When in use, the height and orientation of prefabricated hole are first determined, by connecting rope by film Store body decentralization.Then joints cement, after cement block solidification, the soluble mediators in thin film storage body are dissolved in sample drilling How discharge connects desk study fracture hole to precast the hole of desired height and orientation and not with pressure in cement block It connects with good directive significance.
Detailed description of the invention
Fig. 1 is the master of the device of prefabricated hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention View;
Fig. 2 is that the device of prefabricated hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention is bowed View;
Fig. 3 is that the device of prefabricated hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention makes Use schematic diagram;
Wherein, 1- connecting rope, 2- thin film storage body, 3- frame, 4- circular arc ring, 5- connecting rod, 6- hydraulic fracturing pipe, 7- circle Ring, 8- joints cement region, 9- card column, the first snap-gauge of 10-, 11- handle, 12- hollow screw, 13- nut, 14- third snap-gauge, The 4th snap-gauge of 15-.
Specific embodiment
The embodiment of the present invention is real by providing a kind of device of prefabricated hole in fracture-cavity type carbonate object mould crushing test The prefabricated technical effect of the big Logistics automatic system Hole carried out to explore carbonate rock fractured cave combination connected relation is showed.
In order to realize the above technical effect, general thought is as follows for technical solution in the embodiment of the present invention:
Soluble mediators are arranged in thin film storage body;The first end of connecting rope is connect with frame-type cover board, connecting rope Second end connect with thin film storage body.When in use, the height and orientation of prefabricated hole are first determined, by connecting rope by film Store body decentralization.Then joints cement, after cement block solidification, the soluble mediators in thin film storage body are dissolved in sample drilling How discharge connects desk study fracture hole to precast the hole of desired height and orientation and not with pressure in cement block It connects with good directive significance.
Above-mentioned technical proposal in order to better understand, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
Referring to figure 1, figure 2 and figure 3, pre-manufactured hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention The device in hole, comprising: frame-type cover board, connecting rope 1, thin film storage body 2 and soluble mediators;Soluble mediators are arranged in film It stores in body 2;The first end of connecting rope 1 is connect with frame-type cover board, and the second end of connecting rope 1 is connect with thin film storage body 2.
The structure of frame-type cover board is specifically described, frame-type cover board includes: frame 3 and circular arc ring 4;Along frame 3 Diagonal line and/or the line of centres of frame of opposite direction be provided with connecting rod 5;The center of circle of circular arc ring 4 and the center weight of frame 3 It closes, and is connect with connecting rod 5;The first end of connecting rope 1 is connected to the intersection of circular arc ring 4 Yu connecting rod 5.
It should be noted that multiple concentric and different radii circular arc rings 4 can be placed equidistant with according to actual needs.Often A circular arc ring 4 intersects with connecting rod 5.
In the present embodiment, the spacing of each circular arc ring 4 is 50 ㎜.
Further, the center arrangement hydraulic fracturing pipe 6 of frame 3, effect are that one end is connected with external hydraulic pump source It connects, the other end gos deep into carrying out fracturing experiments inside sample.Meanwhile the structure of 3 hollow out of frame can observe the process that cement pours, Obturator can be always controlled preferably to be poured.
The structure of frame-type cover board is further described, the intersection of circular arc ring 4 and connecting rod 5 is annulus 7;Connection The first end of rope 1 is connected on annulus 7.
In the present embodiment, circular arc ring 4 is four/three-arc ring.Remaining a quarter region is pre- in frame 3 The joints cement region 8 stayed, so as to guarantee that there are sufficiently large spaces to carry out joints cement.
It should be noted that circular arc ring 4 is also possible to semi arch or minor arc.It is of course also possible to be five/three-arc ring Or 2/3rds circular arc rings etc., it is not limited solely to four/three-arc ring.
To the structure of the device of prefabricated hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention It is further described, further includes: hollow screw 12, card column 9, nut 13;Hollow screw 12 is connected through a screw thread with nut 13; Card column 9 is connect with hollow screw 12;The first end of connecting rope passes through hollow screw 12, and is arranged in hollow screw 12 and nut 13 Between;Card column 9 is stuck on annulus.The length that connecting rope passes through hollow screw 12 can be adjusted according to desired height.
Specifically, card column 9 can vertically be connect with the side wall of hollow screw 12, can also tilt the side with hollow screw 12 Wall connection.
In the present embodiment, frame 3 is square frame.Further, frame 3 be by the welding of intensity higher iron wire and At the ㎜ of 300 ㎜ × 300 standard rectangular.
The structure of frame-type cover board is further explained, frame-type cover board further include: the first snap-gauge 10 and second Snap-gauge;First snap-gauge 10 and the second snap-gauge are separately positioned on the middle part of two opposite frames of frame 3.When frame 3 covers mould When tool, the first snap-gauge 10 and the second snap-gauge can just be embedded in mold, and be close to the boundary of mould inside, to play fixation The effect of frame 3.
In order to further function as fixed effect, there is third in the middle part of the frame of the two other opposite direction of frame 3 Snap-gauge 14 and the 4th snap-gauge 15.
Specifically, the first snap-gauge 10 and the second snap-gauge vertically on be welded on two opposite frames of frame 3 Middle part.Third snap-gauge 14 and the 4th snap-gauge 15 vertically on be welded on frame 3 two other opposite direction frame middle part.
In the present embodiment, the first snap-gauge 10, the second snap-gauge, third snap-gauge 14 and the 4th snap-gauge 15 are stalloy.
The structure of frame-type cover board is further explained, frame-type cover board further include: handle 11;Handle 11 is arranged On the frame 3, for transferring or being lifted frame 3.
Specifically, a handle 11 is respectively arranged horizontally outward on 3 boundary of frame.
In the present embodiment, the material of thin film storage body 2 is polypropylene film, polyester film or nylon film etc..It is solvable Property medium material be salt, carbonate, bicarbonate or sugar etc..
Use to the device of prefabricated hole in fracture-cavity type carbonate object mould crushing test provided in an embodiment of the present invention Process is illustrated:
Before joints cement, need first to arrange thin film storage body 2.Thin film storage body 2 can be balloon interior and fill out Salt is filled, or fills salt with the higher thin-film material of intensity, furthermore film package soluble material also can be used.No matter It is balloon or customized material, the condition for needing to meet is material to be poured and back hardening of cement during will not break in cement It splits, to guarantee the stability and integrality of prefabricated hole.It is higher by intensity after the material of thin film storage body 2 determines Connecting rope 1 be fixed on the annulus 7 of frame 3.Before transferring thin film storage body 2, the length of decentralization connecting rope 1 needed for measuring Degree, to control position height of the hole in sample.Hollow screw 12 and nut 13 clip connecting rope 1, to guarantee thin Film storage body 2 will not move during cement pours, and then guarantee that the height of prefabricated hole will not change, to protect Demonstrate,prove the accuracy of prefabricated hole.Card column 9 can cover the edge for lockking annulus 7, to play the role of fixed hollow screw 12.
Completion is poured in sample, after waiting thes cement solidifies, drills from side to thin film storage body 2, wears out balloon or envelope Film, then into hole, salt dissolution is discharged for water filling, to construct a cavity hole.
[technical effect]
1, soluble mediators are arranged in thin film storage body 2;The first end of connecting rope 1 is connect with frame-type cover board, even The second end of splicing 1 is connect with thin film storage body 2.When in use, first determine prefabricated hole height and orientation, pass through connecting rope 1 transfers thin film storage body 2.Then joints cement, after cement block solidification, sample drilling will be solvable in thin film storage body 2 Property medium dissolution discharge, so that the hole of desired height and orientation and not with pressure is precast in cement block, for desk study How fracture hole connects with good directive significance.
2, the line of centres along the diagonal line of frame 3 and/or the frame of opposite direction is provided with connecting rod 5;The center of circle of circular arc ring 4 It is overlapped with the center of frame 3, and is connect with connecting rod 5;The first end of connecting rope 1 is connected to the phase of circular arc ring 4 with connecting rod 5 At friendship, so as to facilitate the azimuth of control prefabricated hole.
3, circular arc ring 4 is four/three-arc ring, and remaining a quarter region is reserved joints cement in frame 3 Region 8, so as to guarantee that there are sufficiently large spaces to carry out joints cement.
4, by the use to two pairs of symmetrical snap-gauges two-by-two, the boundary of mould inside can be close to, to play fixation The effect of frame 3.
The embodiment of the present invention solves the problems, such as how to construct hole in big Logistics automatic system, others does not do before this is The experimental study crossed belongs to initiative.The structure of device provided in an embodiment of the present invention is simple, is easy to make, and has very Strong operability, it is easy to operate and more economical efficient.The method of the device construction hole provided through the embodiment of the present invention Simply, easily operated, there is very strong practical value.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. the device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test characterized by comprising frame-type lid Plate, connecting rope, thin film storage body and soluble mediators;The soluble mediators are arranged in the thin film storage body;The company The first end of splicing is connect with the frame-type cover board, and the second end of the connecting rope is connect with the thin film storage body.
2. device as described in claim 1, which is characterized in that the frame-type cover board includes: frame and circular arc ring;Described in The line of centres of the frame of the diagonal line and/or opposite direction of frame is provided with connecting rod;The center of circle of the circular arc ring and the frame Center be overlapped, and connect with the connecting rod;The first end of the connecting rope is connected to the circular arc ring and the connection The intersection of bar.
3. device as claimed in claim 2, which is characterized in that the intersection of the circular arc ring and the connecting rod is annulus; The first end of the connecting rope is connected on the annulus.
4. device as claimed in claim 2, which is characterized in that the circular arc ring is four/three-arc ring.
5. device as claimed in claim 3, which is characterized in that further include: hollow screw, card column, nut;The hollow screw It is connected through a screw thread with the nut;The card column is connect with the hollow screw;The first end of the connecting rope passes through described Hollow screw, and be arranged between the hollow screw and the nut;The card column is stuck on the annulus.
6. device as claimed in claim 2, which is characterized in that the frame is square frame.
7. device as claimed in claim 2, which is characterized in that the frame-type cover board further include: the first snap-gauge, the second card Plate, third snap-gauge and the 4th snap-gauge;First snap-gauge and second snap-gauge vertically on the frame is set The middle part of two opposite frames;The third snap-gauge and the 4th snap-gauge vertically on the another of the frame is set The middle part of outer two opposite frames.
8. device as claimed in claim 2, which is characterized in that the frame-type cover board further include: handle;The handle setting On said frame.
9. such as device of any of claims 1-8, which is characterized in that the material of the thin film storage body is polypropylene Film, polyester film or nylon film.
10. such as device of any of claims 1-8, which is characterized in that the material of the soluble mediators be salt, Carbonate, bicarbonate or sugar.
CN201811619454.1A 2018-12-28 2018-12-28 The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test Pending CN109813607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811619454.1A CN109813607A (en) 2018-12-28 2018-12-28 The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811619454.1A CN109813607A (en) 2018-12-28 2018-12-28 The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test

Publications (1)

Publication Number Publication Date
CN109813607A true CN109813607A (en) 2019-05-28

Family

ID=66602615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811619454.1A Pending CN109813607A (en) 2018-12-28 2018-12-28 The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test

Country Status (1)

Country Link
CN (1) CN109813607A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112683614A (en) * 2020-12-10 2021-04-20 重庆大学 Sample preparation device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201464277U (en) * 2009-08-05 2010-05-12 山东大学 Filling-free type cavern or karst pipeline system in similar model test
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN103773056A (en) * 2014-01-24 2014-05-07 山东大学 Preparation method of high-brittleness transparent rock material test piece
CN204731074U (en) * 2015-03-09 2015-10-28 绍兴文理学院 The sampling die of rock mass of fracture network sample
CN105628506A (en) * 2015-12-31 2016-06-01 中国科学院武汉岩土力学研究所 Rock fracture simulation sample and preparation method thereof, as well as simulation test device and simulation test method
CN105890998A (en) * 2016-04-22 2016-08-24 中国科学院武汉岩土力学研究所 Rock fracturing simulation test specimen with crack, preparation method for rock fracturing simulation test specimen, simulation test apparatus and simulation test method
CN108868753A (en) * 2018-04-19 2018-11-23 中国科学院武汉岩土力学研究所 A kind of hole type carbonate rock targeting acid fracturing physical simulating method and application

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201464277U (en) * 2009-08-05 2010-05-12 山东大学 Filling-free type cavern or karst pipeline system in similar model test
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN103773056A (en) * 2014-01-24 2014-05-07 山东大学 Preparation method of high-brittleness transparent rock material test piece
CN204731074U (en) * 2015-03-09 2015-10-28 绍兴文理学院 The sampling die of rock mass of fracture network sample
CN105628506A (en) * 2015-12-31 2016-06-01 中国科学院武汉岩土力学研究所 Rock fracture simulation sample and preparation method thereof, as well as simulation test device and simulation test method
CN105890998A (en) * 2016-04-22 2016-08-24 中国科学院武汉岩土力学研究所 Rock fracturing simulation test specimen with crack, preparation method for rock fracturing simulation test specimen, simulation test apparatus and simulation test method
CN108868753A (en) * 2018-04-19 2018-11-23 中国科学院武汉岩土力学研究所 A kind of hole type carbonate rock targeting acid fracturing physical simulating method and application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周大伟: "缝洞型岩石体积压裂试验模拟研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112683614A (en) * 2020-12-10 2021-04-20 重庆大学 Sample preparation device

Similar Documents

Publication Publication Date Title
CN104614497B (en) True triaxial stream pressure fracturing, slot, seepage flow, gas drive integrated experimental system
CN106285617B (en) Gas water horizontal well completion method
CN205530247U (en) Prebored hole bag slip casting stock structure
CN106481278A (en) A kind of rotary digging drill bit
CN108412477A (en) A kind of method that intermittent part blocks seam in seam in volume fracturing
CN204530661U (en) Deep water bedding compacting system
CN107869343A (en) A kind of experimental method of radial well hydraulic fracturing
CN203729330U (en) Positioning frame of subway station section steel column formed through cover and cut-top down method
CN106958244A (en) The installation and locating method of ultra-deep and large diameter steel pipe column
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN102776903A (en) Underwater concreting sampler of bored pile
CN109813607A (en) The device of prefabricated hole in a kind of fracture-cavity type carbonate object mould crushing test
CN207846495U (en) Large-scale well-sinking foundation construction real-time monitoring system based on long range radio transmissions technology
CN207176723U (en) A kind of embedding rock single pile of offshore wind farm and its construction system
CN106121640A (en) The rock sample processing method of tilted stratum true triaxial pressure break physical simulation experiment and device
CN206309353U (en) Positioning device for segmental gravel filling
CN104652406A (en) Deep-water foundation bed tamping system
CN206725560U (en) A kind of Carbonate Oil gas exploration diagnostic cast intends device
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN205384014U (en) Drilling bored concrete pile underwater concrete pours a height measurement system
CN107605488A (en) A kind of bored shaft and its filling reinforcement means that suspends
CN203881737U (en) Rack device for tunnel excavating and grouting model test
CN212154855U (en) Disposable simple grout stop plug for goaf grouting filling
CN105986775A (en) Sea quaternary system drilling combination coring method
CN203925545U (en) A kind of hollow powder stick for shutoff anchor pole bar tail hell

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528