CN109812128A CN201711164070.0A CN201711164070A CN109812128A CN 109812128 A CN109812128 A CN 109812128A CN 201711164070 A CN201711164070 A CN 201711164070A CN 109812128 A CN109812128 A CN 109812128A
Authority
CN
China
Prior art keywords
tube socket
plate
safety barrier
bridge construction
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711164070.0A
Other languages
Chinese (zh)
Other versions
CN109812128B (en
Inventor
俞想锋
韩玮
卢杭
张敏
冯建秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIYUE GROUP CO Ltd
Original Assignee
LIYUE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIYUE GROUP CO Ltd filed Critical LIYUE GROUP CO Ltd
Priority to CN201711164070.0A priority Critical patent/CN109812128B/en
Publication of CN109812128A publication Critical patent/CN109812128A/en
Application granted granted Critical
Publication of CN109812128B publication Critical patent/CN109812128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The present invention relates to a kind of safety barriers, it in particular is a kind of interim safety barrier of bridge construction, pedestal, column and protective net frame, the pedestal includes tube socket, lateral surface inclined plate, fixed latch hook and clamping sleeve inwardly from top to bottom, there are two the plate settings, two equal sliding plugs of plate are on tube socket, the fixed latch hook in each hinged one of the outside of two plates, one end of the clamping sleeve is connected through a screw thread with tube socket, and the other end of the clamping sleeve is socketed in the outer end of two plate lateral surfaces;The column is fixedly connected on the upper end of tube socket, and the pedestal and column are provided with multiple, and the protective net frame is connected by a snap between two adjacent columns;A kind of interim safety barrier of bridge construction, it has the advantage that: the Fast Installation and dismounting of safety barrier may be implemented, the interval error that can adapt to embedded bar realizes that Fast Installation is fixed, and dust when construction may be implemented and stop, reduce construction to the dust pollution of surrounding enviroment.

Description

A kind of interim safety barrier of bridge construction
Technical field
The present invention relates to a kind of safety barriers, are in particular a kind of interim safety barriers of bridge construction.
Background technique
Safety barrier is usually used in around the protection and engineering construction building site of road both sides, for carrying out isolating and protecting.Often The safety barrier seen passes through welded connecting mostly and buries on pre-buried reinforcing bar on the ground or by the column lower end of safety barrier Enter ground, for the ease of the movement of safety barrier, also has and realize safety by adding counter weight device in safety barrier column lower end Protect fixed scheme.But previous safety barrier, which can generate, can not adapt to embedded bar spacing, be not easy to installation and removal Problem.
Summary of the invention
The object of the present invention is to provide a kind of interim safety barriers of bridge construction, and the Fast Installation of safety barrier may be implemented And dismounting, the interval error that can adapt to embedded bar realize that Fast Installation is fixed, and when can be achieved as desired by construction Dust stop, reduce construction to the dust pollutions of surrounding enviroment.
The purpose of the present invention is achieved through the following technical solutions:
A kind of interim safety barrier of bridge construction, including pedestal, column and protective net frame, the pedestal includes tube socket, outer Side inclined plate, fixed latch hook and clamping sleeve inwardly from top to bottom, there are two the plate settings, and two plates are sliding Dynamic to be plugged on tube socket, the fixed latch hook in each hinged one of the outside of two plates, one end of the clamping sleeve and tube socket pass through spiral shell Line connection, the other end of the clamping sleeve are socketed in the outer end of two plate lateral surfaces;The column is fixedly connected on tube socket Upper end, the pedestal and column are provided with multiple, and the protective net frame is connected by a snap between two adjacent columns.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the tube socket packet Tube socket ontology, plugboard trough and guide through hole are included, the tube socket ontology is tubular structure, and the left and right ends of this body side surface of tube socket are respectively set A plugboard trough and a guide through hole are set, the guide through hole is located at the lower end of plugboard trough, the plugboard trough and guide through hole It is connected to tube socket body interior.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the tube socket sheet The lower end of body side surface is provided with rectangular straight slot, and the rectangular straight slot is connected to tube socket body interior, described this body side surface of tube socket Lower end is welded to connect voussoir socket, and the voussoir socket is located at the outer end of rectangular straight slot.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the invention, the plate Lower end is fixedly connected with guide rod, and spring is socketed on the guide rod, and the guide rod is plugged in guide through hole, guide rod it is interior Side has been bolted baffle, and the baffle is located at tube socket body interior, the spring compression plate and tube socket ontology it Between.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the column packet It includes support column, turn to attachment base and card adapter plate, the support column is tubular structure, two steerings of socket connection on the support column Attachment base is provided with multiple commutation through-holes and a clamping screw, the clamping screw and the company of steering on the steering attachment base Joint chair is connected through a screw thread, and rounded be evenly distributed on of the multiple commutation through-hole turns on attachment base, in the card adapter plate The even multiple clamping slots of setting, a steering attachment base connect two card adapter plates, and one end of the card adapter plate is bolted On commutation through-hole.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the support column On two turn to attachment bases and be separately positioned on the upper and lower ends of support column, the clamping slot of the card adapter plate on the attachment base of upper end is opened Mouth down is arranged, the opening up setting of clamping slot of the card adapter plate on the attachment base of lower end.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the protective net Frame includes rectangular frame, upper shackle member and lower shackle member, and connection one is respectively welded in the upper end of the rectangular frame left and right ends Upper shackle member, the lower end of the rectangular frame left and right ends are respectively welded one lower shackle member of connection, set in the upper shackle member It is equipped with opening up connection card slot I, downward opening connection card slot II is provided in the lower shackle member.
As advanced optimizing for the technical program, a kind of interim safety barrier of bridge construction of the present invention, the bridge is applied The interim safety barrier of work further includes storage roller component and dustcloth, the storage roller component include U-shaped axis, roller, upper gear Disk, upper lock pillar, lower block plate and lower lock pillar, one end plug connection of the U-shaped axis is on support column, the other end of the U-shaped axis It is rotatablely connected roller, block plate is bolted in the upper end of the roller, and the upper end of the upper block plate is welded to connect upper lock pillar, Lower block plate is bolted in the lower end of the roller, and the lower end of the lower block plate is welded to connect lower lock pillar, the dustcloth mountain It is wound on roller, one end of the dustcloth is fixedly connected on roller, and the upper and lower ends of the dustcloth other end pass through line Rope connection lock ring.
A kind of interim safety barrier of bridge construction of the invention has the beneficial effect that
A kind of interim safety barrier of bridge construction of the present invention is realized by plate, fixed latch hook and the clamping sleeve on pedestal The Fast Installation and dismounting of safety barrier, passes through plate and tube socket cooperates;Card adapter plate and upper shackle member and lower shackle member cooperate, The interval error that can adapt to embedded bar realizes that Fast Installation is fixed;It, can be with by setting storage roller component and dustcloth It is achieved as desired by dust when construction to stop, reduces construction to the dust pollution of surrounding enviroment.
Detailed description of the invention
The present invention will be further described in detail with specific implementation method with reference to the accompanying drawing.
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is schematic diagram of base structure of the invention;
Fig. 3 is base vertical view of the invention;
Fig. 4 is board plug structure schematic diagram of the invention;
Fig. 5 is tube socket structural schematic diagram of the invention;
Fig. 6 is pillar construction schematic diagram of the invention;
Fig. 7 is steering attachment base and card adapter plate structural schematic diagram of the invention;
Fig. 8 is protective net frame structural schematic diagram of the invention;
Fig. 9 is upper shackle member structural schematic diagram of the invention;
Figure 10 is lower shackle member structural schematic diagram of the invention;
Figure 11 is storage roller component structural schematic diagram of the invention;
Figure 12 is dustcloth structural schematic diagram of the invention.
In figure: pedestal 1;Tube socket 1-1;Tube socket ontology 1-1-1;Voussoir socket 1-1-2;Plugboard trough 1-1-3;Guide through hole 1- 1-4;Plate 1-2;Guide rod 1-2-1;Spring 1-2-2;Fixed latch hook 1-3;Clamping sleeve 1-4;Column 2;Support column 2-1;It turns to Attachment base 2-2;Commutate through-hole 2-2-1;Clamping screw 2-2-2;Card adapter plate 2-3;It is clamped slot 2-3-1;Protective net frame 3;Rectangle Frame 3-1;Upper shackle member 3-2;Connect I 3-2-1 of card slot;Lower shackle member 3-3;Connect II 3-3-1 of card slot;Store roller component 4; U-shaped axis 4-1;Roller 4-2;Upper block plate 4-3;Upper lock pillar 4-4;Lower block plate 4-5;Lower lock pillar 4-6;Dustcloth 5;Lock ring 5-1.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Specific embodiment 1:
Illustrate present embodiment, a kind of interim safety barrier of bridge construction, including pedestal 1, column 2 below with reference to Fig. 1-12 With protective net frame 3, the pedestal 1 includes tube socket 1-1, lateral surface inclined plate 1-2, fixed latch hook 1- inwardly from top to bottom 3 and clamping sleeve 1-4, there are two the plate 1-2 settings, and two equal sliding plugs of plate 1-2 are on tube socket 1-1, two plates The fixed latch hook 1-3 in each hinged one of the outside of 1-2, one end and the tube socket 1-1 of the clamping sleeve 1-4 is connected through a screw thread, described The other end of clamping sleeve 1-4 is socketed in the outer end of two plate 1-2 lateral surfaces;The column 2 is fixedly connected on the upper of tube socket 1-1 End, the pedestal 1 and column 2 be provided with it is multiple, the protective net frame 3 be connected by a snap two adjacent columns 2 it Between;Reinforcing bar is embedded on mattess, when needing that safety barrier is installed, two fixed latch hook 1-3 is made to be hooked on two respectively On root reinforcing bar, plate 1-2 and fixed latch hook 1-3, by rotatably compressing set 1-4, make to press hingedly with this convenient for adjusting connection angle Fixed 1-4 is moved down, to compress plate 1-2, is made two plate 1-2 to tube socket 1-1 internal slide, is tensed two locks with this Hook 1-3 clamps two reinforcing bars by two latch hook 1-3, realizes the fixation of tube socket 1-1, be easily installed, while can tie in construction It is quickly removed when beam.
Specific embodiment 2:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment one, described Tube socket 1-1 includes tube socket ontology 1-1-1, plugboard trough 1-1-3 and guide through hole 1-1-4, the tube socket ontology 1-1-1 are tubulose knot Structure, a plugboard trough 1-1-3 and a guide through hole 1-1-4 is respectively arranged in the left and right ends of the side tube socket ontology 1-1-1, described to lead Be located at the lower end of plugboard trough 1-1-3 to through-hole 1-1-4, the plugboard trough 1-1-3 and guide through hole 1-1-4 with tube socket ontology 1- Connection inside 1-1.
Specific embodiment 3:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment two, described The lower end of the side tube socket ontology 1-1-1 is provided with rectangular straight slot, is connected to inside the rectangular straight slot and tube socket ontology 1-1-1, institute The lower end for stating the side tube socket ontology 1-1-1 is welded to connect voussoir socket 1-1-2, and the voussoir socket 1-1-2 is located at rectangular straight slot Outer end;The tube socket ontology 1-1-1 can be socketed on pre-buried connection column on the ground, and by voussoir socket 1- Insertion voussoir realizes the fixation between the connection column on tube socket ontology 1-1-1 and ground in 1-2, by by tube socket ontology 1-1- 1 fixation may further ensure that tube socket 1-1 installation is firm.
Specific embodiment 4:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment two, described The lower end of plate 1-2 is fixedly connected with guide rod 1-2-1, is socketed spring 1-2-2, the guide rod 1- on the guide rod 1-2-1 2-1 is plugged in guide through hole 1-1-4, and baffle has been bolted on the inside of guide rod 1-2-1, and the baffle is located at tube socket Inside ontology 1-1-1, the spring 1-2-2 is pressed between plate 1-2 and tube socket ontology 1-1-1;When clamping sleeve 1-4 is to moving down When dynamic, plate 1-2 is to tube socket ontology 1-1-1 medial movement, thus compressed spring 1-2-2, when clamping sleeve 1-4 is moved up, Plate 1-2 is mobile to the outside of tube socket ontology 1-1-1 under the action of spring 1-2-2, to realize latch hook 1-3 and embedded bar Separation, realize tube socket 1-1 quick dismounting.
Specific embodiment 5:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment one, described Column 2 includes support column 2-1, steering attachment base 2-2 and card adapter plate 2-3, the support column 2-1 are tubular structure, the support On column 2-1 socket connection two steerings attachment bases 2-2, the steering attachment base 2-2 on be provided with multiple commutation through-hole 2-2-1 with One clamping screw 2-2-2, the clamping screw 2-2-2 are connected through a screw thread with attachment base 2-2 is turned to, and the multiple commutation is logical 2-2-1 rounded be evenly distributed in hole turns on attachment base 2-2, and multiple clamping slot 2- are uniformly arranged on the card adapter plate 2-3 3-1, two card adapter plate 2-3 of a steering attachment base 2-2 connection, one end of the card adapter plate 2-3, which is bolted, is commutating On through-hole 2-2-1;The angle between two card adapter plate 2-3 may be implemented in connection by turning to attachment base 2-2 and card adapter plate 2-3 Variation, the use needs of safety barrier corner are adapted to this.
Specific embodiment 6:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment five, described Two on support column 2-1 turn to the upper and lower ends that attachment base 2-2 are separately positioned on support column 2-1, on the attachment base 2-2 of upper end The opening down setting of clamping slot 2-3-1 of card adapter plate 2-3, the clamping slot 2- of the card adapter plate 2-3 on the attachment base 2-2 of lower end The opening up setting of 3-1;Protective net frame 3 can be clamped by upper and lower two attachment base 2-2 by moving towards;Conversely, can be real The dismounting of existing protective net frame 3, by being arranged between the adjustable support column 2-1 of multiple clamping slot 2-3-1 and protective net frame 3 Distance, since pedestal 1 and 2 position of column caused by the spacing of embedded bar is fixed are fixed, between two adjacent columns 2 between Away from fixation, pass through the adjustable practicability improved when the present invention installs of the spacing between support column 2-1 and protective net frame 3.
Specific embodiment 7:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment six, described Protective net frame 3 include rectangular frame 3-1, upper shackle member 3-2 and lower shackle member 3-3, the left and right ends the rectangular frame 3-1 it is upper Connection one upper shackle member 3-2 is respectively welded in end, and the lower end of the left and right ends the rectangular frame 3-1 is respectively welded under connection one It is provided on opening up connection card slot I 3-2-1, the lower shackle member 3-3 and sets on shackle member 3-3, the upper shackle member 3-2 It is equipped with downward opening connection card slot II
3-3-1;The clamping slot 2-3-1 of card adapter plate 2-3 on connection I 3-2-1 of the card slot and upper end attachment base 2-2 matches Connection is closed, the clamping slot 2-3-1 of the card adapter plate 2-3 on connection II 3-3-1 of card slot and even the attachment base 2-2 of lower end cooperates Connection;By being welded and connected with flexible metal mesh sheet on the rectangular frame 3-1, isolation is realized with this, while will not influence and apply Ventilation at work.
Specific embodiment 8:
Illustrate present embodiment below with reference to Fig. 1-12, present embodiment is described further embodiment five, described The interim safety barrier of bridge construction further includes storage roller component 4 and dustcloth 5, and the storage roller component 4 includes U-shaped axis 4- 1, roller 4-2, upper block plate 4-3, upper lock pillar 4-4, lower block plate 4-5 and lower lock pillar 4-6, one end plug connection of the U-shaped axis 4-1 On support column 2-1, roller 4-2 is rotatablely connected on the other end of the U-shaped axis 4-1, the upper end of the roller 4-2 passes through bolt The upper end of block plate 4-3 in connection, the upper block plate 4-3 are welded to connect upper lock pillar 4-4, and the lower end of the roller 4-2 passes through bolt Lower block plate 4-5 is connected, the lower end of the lower block plate 4-5 is welded to connect lower lock pillar 4-6, and 5 mountain of dustcloth is wound on roller 4-2 On, one end of the dustcloth 5 is fixedly connected on roller 4-2, and the upper and lower ends of 5 other end of dustcloth are connected by cotton rope Meet lock ring 5-1;It can solve usually generate a large amount of dust due to engineering construction by the way that dustcloth 5 is arranged, it is further perfect Function of the invention is realized dust isolation and is blocked;And dustcloth 5 can be accommodated on roller component 4 when not in use.
The interim safety barrier of a kind of bridge construction of the invention, its working principle is that: reinforcing bar is embedded in mattess On, when needing that safety barrier is installed, it is hooked on two fixed latch hook 1-3 respectively on two reinforcing bars, plate 1-2 and fixed latch hook 1-3, by rotatably compressing set 1-4, moves down clamping sleeve 1-4, inserts to compress hingedly with this convenient for adjusting connection angle Plate 1-2, makes two plate 1-2 to tube socket 1-1 internal slide, tenses two latch hook 1-3 with this, is clamped by two latch hook 1-3 Two reinforcing bars are realized the fixation of tube socket 1-1, are easily installed, while can quickly remove at the end of construction;The tube socket ontology 1-1-1 can be socketed on pre-buried connection column on the ground, and realize pipe by being inserted into voussoir into voussoir socket 1-1-2 The fixation between connection column on seat ontology 1-1-1 and ground, by may further ensure that tube socket ontology 1-1-1 fixation Tube socket 1-1 installation is firm;When clamping sleeve 1-4 is moved down, plate 1-2 is to tube socket ontology 1-1-1 medial movement, to compress Spring 1-2-2, when clamping sleeve 1-4 is moved up, plate 1-2 is under the action of spring 1-2-2 to the outer of tube socket ontology 1-1-1 Side is mobile, to realize the separation of latch hook 1-3 and embedded bar, realizes the quick dismounting of tube socket 1-1;Upper and lower two attachment base 2- 2 can be clamped protective net frame 3 by moving towards;Conversely, the dismounting of protective net frame 3 may be implemented, by the way that multiple cards are arranged The distance between the adjustable support column 2-1 of slot 2-3-1 and protective net frame 3 are patched, since the spacing fixation of embedded bar causes Pedestal 1 and 2 position of column fix, the spacing between two adjacent columns 2 is fixed, and support column 2-1 and protective net frame 3 are passed through Between spacing it is adjustable improve the present invention installation when practicability;It can have been solved by the way that dustcloth 5 is arranged since engineering construction is normal A large amount of dust can be often generated, function of the invention is further improved, realize dust isolation and is blocked;And dustcloth 5 is not It can be accommodated on roller component 4 when use.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, the art The variations, modifications, additions or substitutions that those of ordinary skill is made within the essential scope of the present invention also belong to guarantor of the invention Protect range.

Claims (8)

1. a kind of interim safety barrier of bridge construction, including pedestal (1), column (2) and protective net frame (3), it is characterised in that: institute Stating pedestal (1) includes that tube socket (1-1), lateral surface inclined plate (1-2), fixed latch hook (1-3) and are pressed inwardly from top to bottom Fixed (1-4), there are two plate (1-2) settings, and on tube socket (1-1), two are inserted for two plate (1-2) sliding plugs The fixed latch hook (1-3) in each hinged one of the outside of plate (1-2), one end of the clamping sleeve (1-4) and tube socket (1-1) pass through screw thread Connection, the other end of the clamping sleeve (1-4) are socketed in the outer end of two plate (1-2) lateral surfaces;The column (2) is fixed to be connected It connects in the upper end of tube socket (1-1), the pedestal (1) and column (2) are provided with multiple, and the protective net frame (3) passes through buckle It is connected between two adjacent columns (2).
2. the interim safety barrier of a kind of bridge construction according to claim 1, it is characterised in that: tube socket (1-1) packet Tube socket ontology (1-1-1), plugboard trough (1-1-3) and guide through hole (1-1-4) are included, the tube socket ontology (1-1-1) is tubulose knot A plugboard trough (1-1-3) and a guide through hole (1-1-4) is respectively arranged in structure, the left and right ends of the side tube socket ontology (1-1-1), The guide through hole (1-1-4) is located at the lower end of plugboard trough (1-1-3), the plugboard trough (1-1-3) and guide through hole (1-1-4) It is connected to tube socket ontology (1-1-1) inside.
3. the interim safety barrier of a kind of bridge construction according to claim 2, it is characterised in that: the tube socket ontology (1- 1-1) lower end of side is provided with rectangular straight slot, is connected to inside the rectangular straight slot and tube socket ontology (1-1-1), the tube socket sheet The lower end of the side body (1-1-1) is welded to connect voussoir socket (1-1-2), and the voussoir socket (1-1-2) is located at rectangular straight slot Outer end.
4. the interim safety barrier of a kind of bridge construction according to claim 2, it is characterised in that: the plate (1-2) Lower end is fixedly connected guide rod (1-2-1), is socketed spring (1-2-2) on the guide rod (1-2-1), the guide rod (1-2- 1) it is plugged in guide through hole (1-1-4), baffle has been bolted on the inside of guide rod (1-2-1), the baffle is located at Tube socket ontology (1-1-1) is internal, and the spring (1-2-2) is pressed between plate (1-2) and tube socket ontology (1-1-1).
5. the interim safety barrier of a kind of bridge construction according to claim 1, it is characterised in that: the column (2) includes Support column (2-1) turns to attachment base (2-2) and card adapter plate (2-3), and the support column (2-1) is tubular structure, the support column Socket connects two steering attachment bases (2-2) on (2-1), is provided with multiple commutation through-hole (2- on the steering attachment base (2-2) It 2-1) is connected through a screw thread with a clamping screw (2-2-2), the clamping screw (2-2-2) with attachment base (2-2) is turned to, institute It states rounded be evenly distributed on of multiple commutation through-holes (2-2-1) to turn on attachment base (2-2), on the card adapter plate (2-3) uniformly Multiple clamping slots (2-3-1) are set, and a steering attachment base (2-2) connects two card adapter plates (2-3), the card adapter plate (2- 3) one end is bolted in commutation through-hole (2-2-1).
6. the interim safety barrier of a kind of bridge construction according to claim 5, it is characterised in that: the support column (2-1) On two turn to attachment base (2-2) and be separately positioned on the upper and lower ends of support column (2-1), the card on upper end attachment base (2-2) Clamping slot (2-3-1) opening down setting of fishplate bar (2-3), the clamping of the card adapter plate (2-3) on the attachment base (2-2) of lower end Slot (2-3-1) opening up setting.
7. the interim safety barrier of a kind of bridge construction according to claim 6, it is characterised in that: the protective net frame (3) Including rectangular frame (3-1), upper shackle member (3-2) and lower shackle member (3-3), rectangular frame (3-1) left and right ends it is upper End is respectively welded connection one upper shackle member (3-2), and connection one is respectively welded in the lower end of rectangular frame (3-1) left and right ends A lower shackle member (3-3) is provided with opening up connection card slot I (3-2-1), the lower card on the upper shackle member (3-2) Downward opening connection card slot II (3-3-1) is provided on fitting (3-3).
8. the interim safety barrier of a kind of bridge construction according to claim 5, it is characterised in that: the bridge construction is interim Safety barrier further includes storage roller component (4) and dustcloth (5), the storage roller component (4) include U-shaped axis (4-1), roller Cylinder (4-2), upper block plate (4-3), upper lock pillar (4-4), lower block plate (4-5) and lower lock pillar (4-6), one end of the U-shaped axis (4-1) Plug connection is rotatablely connected roller (4-2) on the other end of the U-shaped axis (4-1), the roller (4- on support column (2-1) 2) upper end is bolted block plate (4-3), and the upper end of the upper block plate (4-3) is welded to connect upper lock pillar (4-4), described The lower end of roller (4-2) is bolted lower block plate (4-5), and the lower end of the lower block plate (4-5) is welded to connect lower lock pillar (4- 6), dustcloth (5) mountain is wound on roller (4-2), and one end of the dustcloth (5) is fixedly connected on roller (4-2), institute The upper and lower ends for stating dustcloth (5) other end connect lock ring (5-1) by cotton rope.
CN201711164070.0A 2017-11-21 2017-11-21 Interim safety barrier of bridge construction Active CN109812128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711164070.0A CN109812128B (en) 2017-11-21 2017-11-21 Interim safety barrier of bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711164070.0A CN109812128B (en) 2017-11-21 2017-11-21 Interim safety barrier of bridge construction

Publications (2)

Publication Number Publication Date
CN109812128A true CN109812128A (en) 2019-05-28
CN109812128B CN109812128B (en) 2021-02-12

Family

ID=66599611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711164070.0A Active CN109812128B (en) 2017-11-21 2017-11-21 Interim safety barrier of bridge construction

Country Status (1)

Country Link
CN (1) CN109812128B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456531A (en) * 2020-04-08 2020-07-28 苏州市华丽美登装饰装璜有限公司 Guard bar
CN111472504A (en) * 2020-04-21 2020-07-31 新疆苏中建设工程有限公司 Turnover type stair protection railing
CN113338705A (en) * 2021-06-17 2021-09-03 泰州市嘉德利金属制品有限公司 Steel wire protection net support
CN113668838A (en) * 2021-08-26 2021-11-19 浙江二十冶建设有限公司 Construction safety protection net convenient to replace
CN113957906A (en) * 2021-10-27 2022-01-21 福建省华舜水利水电工程有限公司 Pipeline anti-collapse supporting equipment for water conservancy construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266639A (en) * 1997-03-24 1998-10-06 Masahiro Okiya Assembled structure of fenece structural body
CN2813787Y (en) * 2006-01-19 2006-09-06 王春栋 Electrical fencing frame bar
CN206034345U (en) * 2016-08-11 2017-03-22 恒祥市政园林有限公司 Improved generation is steel cable cable guardrail for municipal garden
CN206503070U (en) * 2016-12-27 2017-09-19 浙江兴土桥梁专用装备制造有限公司 Piece for assembling type fence for Steel Bridge
CN206646918U (en) * 2017-03-30 2017-11-17 武晓亮 A kind of architectural engineering protective stent

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266639A (en) * 1997-03-24 1998-10-06 Masahiro Okiya Assembled structure of fenece structural body
CN2813787Y (en) * 2006-01-19 2006-09-06 王春栋 Electrical fencing frame bar
CN206034345U (en) * 2016-08-11 2017-03-22 恒祥市政园林有限公司 Improved generation is steel cable cable guardrail for municipal garden
CN206503070U (en) * 2016-12-27 2017-09-19 浙江兴土桥梁专用装备制造有限公司 Piece for assembling type fence for Steel Bridge
CN206646918U (en) * 2017-03-30 2017-11-17 武晓亮 A kind of architectural engineering protective stent

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456531A (en) * 2020-04-08 2020-07-28 苏州市华丽美登装饰装璜有限公司 Guard bar
CN111472504A (en) * 2020-04-21 2020-07-31 新疆苏中建设工程有限公司 Turnover type stair protection railing
CN113338705A (en) * 2021-06-17 2021-09-03 泰州市嘉德利金属制品有限公司 Steel wire protection net support
CN113668838A (en) * 2021-08-26 2021-11-19 浙江二十冶建设有限公司 Construction safety protection net convenient to replace
CN113957906A (en) * 2021-10-27 2022-01-21 福建省华舜水利水电工程有限公司 Pipeline anti-collapse supporting equipment for water conservancy construction

Also Published As

Publication number Publication date
CN109812128B (en) 2021-02-12

Similar Documents

Publication Publication Date Title
CN109812128A (en) A kind of interim safety barrier of bridge construction
KR200462319Y1 (en) Guardrail post for working on the block of a hull
CN204081453U (en) Can have enough to meet need use formula scaffold frame shaped steel fixing device that encorbelments
CN204754159U (en) Outer wall body is encorbelmented board and is built template and set up support
CN204144756U (en) A kind of power transformation overhaul platform of many mounting meanss
CN206917399U (en) It is a kind of that there is adjustable construction safety column
CN206928681U (en) A kind of easy-disassembling-assembling construction safety guide rail
CN204645696U (en) Building faces frontier defense protection unit
CN103520852A (en) Spacing-adjustable safety belt hanging device for disconnecting switch overhaul
CN208844881U (en) A kind of limit leg structure of construction tool rack
CN207438101U (en) A kind of communication apparatus fixed case
CN209954699U (en) Telescopic mechanical arm
CN213597533U (en) Elevator mouth guard flap convenient to assemble
CN104348100A (en) Substation maintenance platform with multiple installation modes and installation method thereof
CN213145749U (en) Anti-seismic steel structure support
CN219409197U (en) Aerial working vehicle protection platform
CN205421892U (en) Even wall scaffold for building
CN213797258U (en) Novel railway protective fence construction device
CN115110788B (en) Multifunctional combined type pre-buried pipe orifice protection device
CN213509908U (en) Safety protective guard for construction
CN217175866U (en) Safety engineering construction is with safety protection frame of dismouting of being convenient for
CN216587826U (en) Building construction safety device
CN218634522U (en) Intelligent security linkage control system
CN210976671U (en) Wall preformed hole protector for building engineering construction
CN215760601U (en) Suspension type limb protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A temporary safety guardrail for bridge construction

Effective date of registration: 20230924

Granted publication date: 20210212

Pledgee: Dongyang Branch of China Construction Bank Co.,Ltd.

Pledgor: LIYUE GROUP Co.,Ltd.

Registration number: Y2023980058656

PE01 Entry into force of the registration of the contract for pledge of patent right