CN1098052A - Large flow liquid distributing pump vehicle - Google Patents

Large flow liquid distributing pump vehicle Download PDF

Info

Publication number
CN1098052A
CN1098052A CN 93109077 CN93109077A CN1098052A CN 1098052 A CN1098052 A CN 1098052A CN 93109077 CN93109077 CN 93109077 CN 93109077 A CN93109077 A CN 93109077A CN 1098052 A CN1098052 A CN 1098052A
Authority
CN
China
Prior art keywords
powder
jar
pipe
valve
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 93109077
Other languages
Chinese (zh)
Inventor
陈问湘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LANZHOU MINING MACHINERY INST
Original Assignee
LANZHOU MINING MACHINERY INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LANZHOU MINING MACHINERY INST filed Critical LANZHOU MINING MACHINERY INST
Priority to CN 93109077 priority Critical patent/CN1098052A/en
Publication of CN1098052A publication Critical patent/CN1098052A/en
Pending legal-status Critical Current

Links

Images

Abstract

Large flow liquid distributing pump vehicle is near a kind of its water source that utilizes, and directly prepares the special purpose vehicle of mixed liquor.Dosing pumparound, air feed powder feed system, driving system, monitoring and metering meter system etc. are housed on the car, the pumping of mixing plug-removing device, mechanical stepless speed-regulating flexible axle driving device, automobile-used self-sucking device and six parameter display instruments are particularly arranged in the system.This car is collection storing raw material, mixes dosing, is pumped into the vehicle that jar three is positioned at one, can realize powder, upward liquid, powder feeding, dosing pumping, change six flow processs such as powder, cleaning, and it is fast to have dosing speed, the mixing quality height, labour intensity is low, working parameter digitalisation, advantages such as non-environmental-pollution.

Description

Large flow liquid distributing pump vehicle
The present invention relates to the special purpose vehicle that a kind of dosing is used, it is to utilize near its water source, directly prepares the large flow liquid distributing pump vehicle of mixed liquor.
As the most oil fields of present China is to be mixed with glue at make-up station, transports to the well site with tank car then, is pumped in several receivers, uses during in order to pressing crack construction.
Powder content only is 0.5~1% in the glue owing to become, and annex solution also only is about 0.5%, and therefore a jar vehicle borne overwhelming majority is a clear water, and the well site at water source is arranged near particularly away from make-up station, more than its vehicle, the height of expense, causes construction cost to increase.
In order to reduce the pressing crack construction cost, if can utilize near water source, well site, directly be mixed with glue, then be the best way.China has two kinds of equipment can realize this method at present.
The one, some Oilfield using liquid distributing vehicle group of China is to the direct dosing in well site.This car group is made up of three car: one is that self-control liquid distributing vehicle, one are the self-control pump trucks, also have one to be to load the powder that dosing uses and the carrier of annex solution.Join several tank cars simultaneously fully.
The tank car function is near the water source La Shui well site.It will draw the clear water that comes to pour in the tank on the well site, till filling after, it is stand-by to pull on water.
The liquid distributing vehicle function is that tank of preparation becomes glue.It is by the diesel engine drives reciprocating pump on the ride, by the reciprocating pump suction ﹠ delivery water hose, clear water in the tank is pumped into funneling mixer, the operative employee pours one bag of bag powder in the funnel into and mixes with clear water, and annex solution is directly poured in the tank by the operative employee, and mixed liquor turns back to tank by mixer discharge opeing sebific duct, sucks and be pumped into mixer by the reciprocating pump water suction hose from tank again, the dosing that circulates so repeatedly is till a tank clear water is formulated as into glue.
The pump truck function is that the one-tenth glue in the tank is pumped in several receivers of well site.Diesel engine drives centrifugal pump on the ride, by centrifugal pump suction sol pipe, the one-tenth glue in the tank, through the well site manifold be connected sebific duct, be pumped in several receivers till.
Then tank car discharges water into groove, and the liquid distributing vehicle dosing becomes glue, and pump truck is pumped into jar, said process so repeatedly, and till the one-tenth glue total amount of preparation reached the construction requirement consumption, liquid distributing vehicle group and several tank cars all returned then.
The 2nd, patented product " liquid distributing pump vehicle that is used for the oilfield " (number of patent application: 89219711.0) direct dosing of employing applicant what in November, 1989 application to the well site.For distinguishing " large flow liquid distributing pump vehicle " patent of this application, this manuscript claims that the former is " 89 liquid distributing pump vehicle ".
89 liquid distributing pump vehicles are autotrucies, are equipped with on its chassis:
1. driving system.It is that automobile engine power is passed to two centrifugal pumps and a dry powder feeding roller.Drive path is:
Automotive engine-power takeoff-universal drive shaft-auxiliary gear box-two centrifugal pump, another output shaft-double-united oil pump of power takeoff-hydraulic tubing-governor valve, change-over valve-two HM Hydraulic Motor-two a dry powder feeding roller, the HM Hydraulic Motor rotating speed is regulated by governor valve, realizing dry powder feeding roller powder feeding flow regulating, every dry powder feeding roller is worked respectively to switch by change-over valve and is realized.
2. liquid mixing system.It is the working portion that is mixed with glue, and it comprises:
The self-sucking device that centrifugal pump of using for clear water, starting pump priming are used, jet mixer (have on it three inlets: clear water, powder, annex solution, a mixed liquor discharge orifice), and suction water (liquid, powder) pipeline and various valve.
3. pumparound.It is that mixture pump is delivered in the receiver of well site, and it comprises:
A fluid storage tank, the centrifugal pump that the pumping mixed liquor is used, and suction liquid pipeline and various valve.
4. powder feed system.It is that it comprises with powder supply jet mixer:
Two powder jars, two dry powder feeding rollers, two cover powder jar taperings link to each other with the compressed air units in cars system blows the loose powder materials device.Only use a powder jar and a dry powder feeding roller during dosing, all the other are stand-by, wait a powder jar powder to use up after, switch to another powder jar and another dry powder feeding roller by hydraulic directional control valve.
5. monitoring and metering meter system.It is to monitor each relative section working parameter of metering in dosing work, and it comprises:
Clear water turbine flowmeter and its electromagnetic signal sensor, dry powder feeding roller and its electromagnetic signal sensor, four parameters such as dosing gauge-combine can numeric display centrifugal pump clear water instant flow rate, clear water cumulant, powder weight, powder water compare, the delivery gauge of centrifugal pump speed gage and automobile engine oil temperature table, oil pressure indicator and two centrifugal pumps.
6. maneuver control device.
The dosing of 89 liquid distributing pump vehicles and pumping flow process are worked in the following order:
The dosing flow process: it is to be bled by the self-sucking device on the suction line between well site tank and this centrifugal pump to realize that a centrifugal pump prestart is poured water.Centrifugal pump starting back clear water enters the delivery piping between pump and the jet mixer, is pumped in the jet mixer through turbine flowmeter, because the clear water jet action is entered powder mouth place at mixer and produced vacuum.Powder in the powder jar falls into powder inlet pipe inflow point via the dry powder feeding roller of fluid motor-driven, powder flows into mixer through powder inlet pipe under vacuum action mixes with clear water, annex solution also flows into mixer under jet action mixes with clear water, the fluid storage tank of mixed liquor on mixer drain pipe inflow ride.
The pumping flow process: another centrifugal pump sucks the mixed liquor in the fluid storage tank by the imbibition pipeline between fluid storage tank and the pump, and centrifugal pump enters the manifold on the well site by drain pipe, delivers in several receivers of well site by connecting rubber pipe pump.
After the powder dosing in first powder jar uses up, exchange above-mentioned two centrifugal pump functions, be that the centrifugal pump that the dosing flow process is used becomes pumping usefulness, the centrifugal pump that the pumping flow process is used becomes dosing and uses, close simultaneously and open respective valves and conversion water suction hose, switch change-over valve then, make second the dry powder feeding roller work below the powder jar, mix with clear water for powder to another jet mixer, the dosing of back and pumping flow process are ditto described.
Above diagram of circuit can see 89 liquid distributing pump vehicles for details, and (number of patent application: 89219711.0) the patent application specification accompanying drawing 3.
The liquid distributing vehicle group is compared with make-up station, and for away near the well site that the water source is arranged the make-up station, it can reduce the pressing crack construction cost greatly, but also there are many shortcomings in it.
1. dosing speed is slow, and receiver is gone in dosing continuously.
Because liquid distributing vehicle is to use the reciprocating pump dosing, its dosing speed is 0.5m 3/ min is so dosing speed is slow.Because dosing is a tank circulation dosing, and pumps into receiver by pump truck, so receiver is gone in dosing continuously in batches.
2. dosing quality is low, and powder consumes high.
Because liquid distributing vehicle adopts open type manually intermittently to add powder, thereby mix inhomogeneously, water bag powder phenomenon often occurs, so the dosing quality is low, the weather effect of being blown is simultaneously often blown away the part powder, the powder that in addition manually falls is easily overflowed and is scattered in the well site, so powder consumes height.
3. many expenses of the many people of car height.
The liquid distributing vehicle group is made up of respectively three car and is realized the transportation raw material, joins aqueous liquid, is pumped into jar three kinds of difference in functionalitys, but needs driver 3 people, pump worker 2 people, operative employee 2 people altogether, amounts to 7 people.
4. labour intensity height, environment easily pollutes.
Liquid distributing vehicle adopts open type manually to add powder liquid feeding mode, and labour intensity height, dust easily suck in the human body lung, and powder easily is scattered in the well site, the weather of blowing especially, the easier pollution of environment.
5. metering is by manually inaccurate.
89 liquid distributing pump vehicles are compared with the liquid distributing vehicle group, and it can overcome latter's shortcoming, but still have many weak points through using:
1. because of flow setting is that two pumps is respectively applied for dosing and two flow processs of pumping, because mixed liquor contains gas, so dosing speed is difficult to reach designing requirement.
Two centrifugal pumps are arranged on the ride, and pump and mixer are used for the dosing flow process, and another pump is used for the pumping flow process.Because powder delivers into mixer by the negative pressure strength, institute is the mixed liquor that contains gas through the liquid that mixer enters fluid storage tank, and it is pumped the centrifugal pump suction that flow process is used.Because of centrifugal pump sucks the mixed liquor that contains gas, its flow must descend, though the centrifugal pump that dosing is used can reach 1.5m 3/ min, but the centrifugal pump that pumping is used can only arrive 1m 3/ min.Excessive for fear of the fluid storage tank mixed liquor, the centrifugal pump flow that dosing is used has to be transferred to 1m 3/ min is so dosing speed is from being difficult to reach requirement.
2. the jet mixer annular is dusted, and mouth is easy to be stopped up, and is difficult to remove.
Jet mixer center nozzle is to have to press the clear water injection orifice, with the concentric annulus area of center nozzle be the powder mouth that dusts.Because clear water drops in water smoke on the mouth that dusts when spraying unavoidably, powder is made moist slowly be bonded in the mouth that dusts, result's mouth that dusts that results in blockage that is in operation, simultaneously because of structural relation, being in operation is difficult to tamper mouthful is disposed from dusting.
3. because of compression tolerance is too little, powder is difficult to flow in the dry powder feeding roller in the powder jar.
Because of the big viscosity height of powder internal friction of mixing usefulness, be difficult for dirty jar of end from the jar tapering, compressed air units in cars tolerance is too little simultaneously, and the crosswind that gives jar tapering is difficult to blow powder to be made it to suspend, so a powder is difficult to flow in the dry powder feeding roller in the jar.
4. a powder tankage size is little, and its powder does not satisfy finishes the requirement of a bite well dosing amount.
Two powder jars are arranged on the ride, and when the powder in the powder jar does not satisfy when finishing a bite well dosing amount demand, 89 liquid distributing pump vehicles need termination of pumping, exchange the dosing and the pumping flow process of two centrifugal pumps, switch change-over valve then, use the dry powder feeding roller below another powder jar, make its powder participation dosing down
5. do not contain the liquid case of annex solution on the ride, need one fortune to add the carrier of liquid feeding.
89 liquid distributing pump vehicles have the transportation powder, and water distribution becomes glue, are pumped into functions such as basin, but do not transport the annex solution function, so during to the well site dosing, also need the carrier of one roping annex solution.
6. hydrostatic drive drives the dry powder feeding roller, its complex structure, and element is many, and Hydraulic Adjustable Speed changes dry powder feeding roller rotating speed, and its fault is many.
7. digital display dosing gauge has only four parameters, does not have annex solution cumulant and liquid water than two parameters, measures incompletely, uses inconvenience.
The purpose of this invention is to provide a kind of large flow liquid distributing pump vehicle that overcomes above-mentioned two kinds of prior art deficiencies, to satisfy the dosing needs.
The summary of the invention of large flow liquid distributing pump vehicle and technical characterictic describe in detail in conjunction with the accompanying drawings and embodiments.
Fig. 1 is the large flow liquid distributing pump vehicle front elevation.
Fig. 2 is the large flow liquid distributing pump vehicle birds-eye view.
An autotruck is equipped with on its chassis: dosing pumparound 1, air feed powder feed system 2, driving system 3, monitoring and metering meter system 4 and maneuver control device etc.
There is a liquid case 5 that holds annex solution in the place ahead, chassis, and it is shaped as cuboid, can contain 3m 3Annex solution;
There are two vertical powder jars of vertically arranging at the rear, chassis, and the former is that preceding powder jar 73(is called for short preceding jar), the latter is positioned at the chassis backmost, is referred to as back powder jar 55(and is called for short the back jar), each powder jar can be adorned 5m 3Powder;
The operation A that walks on stage is arranged in the middle of the chassis, and promptly between liquid case and preceding jar, on the platform there be central authorities: clear water turbine flowmeter 37, mix pumping plug-removing device 11 and pipeline and valve; Side has in the operating console B(instrument and operating valve is arranged on the platform); Water service pump 21, clear water suction line and mixed liquor exhaust tube are arranged under the platform;
Walk on stage in top, chassis, liquid case, operation and there is driving system 3 below of preceding jar and back jar.
The liquid case that holds annex solution and preceding jar and back jar that powder is housed are arranged owing to this car, and capacity is big, these raw materials can be prepared the one-tenth glue that two mouthfuls of wells of pressing crack construction are used, this car has continuous dosing pump function simultaneously, so three kinds of functions of large flow liquid distributing pump vehicle collection liquid distributing vehicle group: transportation, dosing, be pumped to one, compare with 89 liquid distributing pump vehicles, can save the transport vehicle of one roping annex solution.
Fig. 3 is a large flow liquid distributing pump vehicle dosing pumparound scheme drawing.
In order to overcome 89 liquid distributing pump vehicles in the pumping flow process, because of pump sucks the mixed liquor that contains gas, the delivery flow of pump is descended, thus the technological deficiency of dosing speed out of reach designing requirement, the technical characterictic of this car dosing pumping flow process is:
1. this handlebar 89 liquid distributing pump vehicles are distinguished dosing and two independent flow processs of pumping, merge into flow process of dosing pumping, be that this car cancellation comes pumping to become glue to go into well site receiver independence pumping flow process with centrifugal pump, its pump function is mixed pumping plug-removing device 11(by this car and is seen Fig. 4) in mixer 11.1 bear;
2. when designing this mixer 11.1, it not only has the function that clear water mixes with powder, and has a mixed liquor function that pumping contains gas, the gas mixed liquor that has that is mixer outlet still has certain pressure, it can overcome drain pipe 23,25 and be connected the sebific duct hydraulic loss with receiver with manifold 26 and manifold, also has receiver height lift;
3. an annex solution inlet is arranged below the discharge-service valve 9 of mixer 11.1, so that mix to becoming glue with mixed liquor, this annex solution pumps into the annex solution in the liquid case 5 by adding liquid pump 33;
4. mixer drain pipe 23 is not held non-return butterfly valve 41 is housed.When water service pump 21 is shut down; SELF CL immediately under the high-order fluid pressure of non-return butterfly valve in receiver; prevent to become in the receiver glue to pour in down a chimney mixer; particularly do not close mixer powder entering valve 12 before the termination of pumping; this moment as no non-return butterfly valve; one-tenth glue in jar will pour in down a chimney into the back jar, cause serious accident.
This car water service pump 21 is big flow centrifugal pumps, and its flow is 3m 3/ min, and 89 liquid distributing pump vehicle water supply centrifugal pump flows are 1.5m 3/ min, the centrifugal pump because of discharge opeing in its pumping flow process sucks the one-tenth glue that contains gas, and its draining flow can only be 1m 3/ min, excessive at fluid storage tank in order not make into glue, water supply centrifugal pump flow has to transfer 1m 3/ min, i.e. dosing speed is 1m 3/ min, and large flow liquid distributing pump vehicle does not have this problem, so this car dosing speed is 3 times of 89 liquid distributing pump vehicles, is 6 times of liquid distributing vehicle group.
Large flow liquid distributing pump vehicle dosing pumparound is made up of the equipment and the parts of following tape label, and this system can realize dosing pumping flow process, go up liquid flow process and cleaning process.
Large flow liquid distributing pump vehicle has dosing pumping flow process, and its route is as follows:
The mixer that mixes in the pumping plug-removing device 11 has two inlets: clear water inlet a and powder inlet b, a discharge orifice: mixed liquor discharge orifice c(sees Fig. 3 and Fig. 4).
1. clear water enters mixer entrance a by following route:
The fast rotary joint 34-of the fast rotary joint 42-suction steel pipe 47-water service pump 21-discharge-service valve 43-draining steel pipe 39-turbine flowmeter 37-of clear water in the pick trough 20-water suction hose 22-mixer entrance a:
2. powder sucks mixer entrance b by following route:
Powder-rotary feeder 57-advances the fast rotary joint 15-of arogel pipe 16-current indicator 14-for the fast rotary joint 59-of powder steel pipe 82-and advances a powder steel pipe 13-powder entering valve 12-mixing mouthful inlet b in the jar 55 of back;
3. annex solution flows into the annex solutions inlet d below the discharge-service valve 9 of mixer discharge orifice c back by following route:
Annex solution in the liquid case 5-liquid sucting valve 31-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 8-annex solution inlet d;
4. become glue to be pumped into the receiver in well site by following route:
The mixed liquor of mixer discharge orifice c-fast rotary joint 10-discharge-service valve 9(enters annex solution under it, becomes into glue)-the fast rotary joint 46-of discharge opeing steel pipe 23-non-return butterfly valve 41-discharge opeing sebific duct 25-well site manifold 26-connects sebific duct-well site receiver.
Water service pump 21 prestart pump primings are realized its algorithm by automobile-used self-sucking device 18:
1. check that whether discharge-service valve 43 closes sternly, opens extraction valve 19, air inlet valve 17 then;
2. because the work source of the gas before the air inlet valve is that blowdown fan 70 provides on the car, self-sucking device is under the jet current principle effect, air in suction water service pump 21 and water suction hose 22 and the suction steel pipe 47, make and form vacuum in pump and the pipeline, under barometric pressure effect on pick trough 20 waters surface, water is poured in pump and the pipeline, till self-sucking device 18 atomized water sprays;
3. close extraction valve 19 earlier, make the water in pump and the pipeline not flow into pick trough, close air inlet valve 17 then;
4. starting water service pump 21 is slowly opened discharge-service valve 43, and this moment, clear water just can enter among the mixer entrance a.
After dosing is intact, glue is arranged into stay in the discharge opeing steel pipe 23, dispersing valve 24 is for the usefulness of remaining liquid in the gargle pipe.
Large flow liquid distributing pump vehicle also has the last liquid flow process that 89 liquid distributing pump vehicles do not have.
There is a 3m in Yin Benche ride the place ahead 3 Annex solution case 5, for the liquid in the ground interpolation fluid cylinder 27 are sent in the liquid feeding tank, liquid flow line is as follows on it:
Annex solution in the fluid cylinder 27-its front end of imbibition sebific duct 28(has a steel pipe that can insert in the tube)-fast rotary joint 29-liquid sucting valve 30-imbibition steel pipe 32-interpolation liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 7-annex solution case 5;
When liquid in the fluid cylinder 27 has aspirated soon, close discharge-service valve 7, adding liquid pump 33 remains in operation, propose to insert the steel pipe in the fluid cylinder, insert rapidly in the fluid cylinder of another filled with fluid, open discharge-service valve 7 then, continue the annex solution in the fluid cylinder is pumped in the liquid case 5, said process just can be pumped into several annex solutions in the liquid case, till meeting the demands repeatedly.
Add liquid pump 33 prestart pump primings and realize that by automobile-used self-sucking device 45 its algorithm is with water service pump 21.
Large flow liquid distributing pump vehicle also has this car of cleaning that 89 liquid distributing pump vehicles do not have and the cleaning process of Ta Che, and its route is as follows:
1. the surface pond clear water-fast rotary joint 29-of imbibition sebific duct 28-liquid sucting valve 30-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 35-cleaning sebific duct 36;
2. also can earlier the clarified water pump of surface pond be filled with annex solution case 5, then car be reached on the place of suitable cleaning Vehicle, this car of recleaning or his car, its route is as follows:
Clear water in the liquid case 5-liquid sucting valve 31-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 35-and cleans sebific duct 36.
Fig. 4 is the mixing pumping plug-removing device scheme drawing of large flow liquid distributing pump vehicle.
Mouth is easy to be stopped up for the jet mixer annular that solves 89 liquid distributing pump vehicles is dusted, and be difficult to the defective in dosing work, removed, these driving skills art scheme implementation example is the mixing pumping plug-removing device among Fig. 4, it comprises two parts: the one, mixer 11.1, its by water inlet bend pipe 11.1.1, advance powder compound tube 11.1.2, dust and chew 11.1.3, mix pumping line 11.1.4 and form; The 2nd, broken down device 11.2, it is made up of drift 11.2.1 and cylinder 11.2.2.This device is vertical installation.
This apparatus function is: mixer has and mixes and pump function, and broken down device has to dust and chews when blocked, at work the function that can remove rapidly immediately.It is compared with 89 liquid distributing pump vehicle jet mixers, and its technical characterictic is:
1. dusting of mixer 11.1 chewed 11.1.3 and is in central authorities, be loaded under the straight length of powder compound tube 11.1.2 into, with the spout of chewing mouthful concentric annulus area that dusts that dusts be that the water injector of pressing clear water is arranged, and the jet mixer of 89 liquid distributing pump vehicles dust mouthful and the water injector position with above-mentioned just in time opposite;
2. the cylinder 11.2.2 of broken down device 11.2 is positioned at device topmost, and it is located on the bend loss of powder compound tube into, and drift 11.2.1 is equipped with in the cylinder piston rod lower end, and it is on the same axis with dusting to chew.
Just because above-mentioned technical characterictic, just can be by the de-plugging valve 112(change-over valve on the operating console), make the drift of cylinder piston rod lower end move down into to dust and chew mouthful place of dusting, in time removing tamper rapidly.After the commutation of de-plugging valve, move on to original position on the drift, thereby make the mouth that dusts unblocked, continue to dust and mix with clear water.
Whether dust mouthful unimpeded or stop up, the powder mobility status that can observe in current indicator 14 transparent tube decides.
This car is owing to know about stifled device, and the de-plugging valve and the current indicator of serving it, so improved the reliability that mixes dosing.
Fig. 5 is the automobile-used self-sucking device scheme drawing of large flow liquid distributing pump vehicle.
Automobile-used self-sucking device 18 and 45, its structure is the same with size, is respectively applied for water service pump 21 and adds liquid pump 33 prestart pump primings.
It is a T shape three-port structure, is made up of threeway 18.2, nozzle 18.3, joint 18.4 and freeing pipe 18.1.The threeway right side connects nozzle, and nozzle links to each other with joint, and the threeway left side connects freeing pipe.Connection extraction valve 19(or 38 below the threeway) joint hangnail pipe is by flexible pipe and air inlet valve 17(or 40) be connected, freeing pipe communicates with atmosphere.Steel pipe between extraction valve and pump discharge and the discharge-service valve, and continuous near the discharge-service valve place, air inlet valve links to each other with the gas transmission pipe 69e place of blowdown fan by flexible pipe.
In order to accelerate the speed of evacuation, improve self-priming degree of vacuum, the nozzle of this automobile-used self-sucking device and the self-sucking device nozzle of 89 liquid distributing pump vehicles have essential distinction, and this nozzle is a Taper Pipe that shrinks earlier and a bit of pipe and back flaring Taper Pipe fabricate block.When designing this nozzle, make the pipe place gas speed of nozzle reach velocity of sound, flaring Taper Pipe exit gas speed reaches hyprsonic.The self-sucking device of 89 liquid distributing pump vehicles sees " liquid truck that is used for oilfield " (number of patent application: self-sucking device 88221294) for details.
Fig. 6 is the air feed powder feed system scheme drawing of large flow liquid distributing pump vehicle.
Though 89 liquid distributing pump vehicles also have pressurized air to provide crosswind to powder jar tapering, pressurized air source is the gas bag of vehicle compressor, because of its tolerance is too little, is difficult to make powder to flow to the dry powder feeding roller under loosening, thereby influences the dosing normal operation.
This car has two self-sucking devices, and a self-sucking device 18 is to be used for water service pump 21 startings to pour water, and another self-sucking device 45 is to be used to add liquid pump 33 startings to irritate liquid, and the both needs pressurized air as self-sucking device work source of the gas.
This car has two powder jars, and one is back jar 55, divides into rotary feeder 57, it is the work jar, is used for to mixing pumping plug-removing device 11 feed, and another is preceding jar 73, bottom sides is provided with the commentaries on classics powder steel pipe 76 of jar powder feeding backward, and it is a slack tank, and being used for backward, jar changes powder.Every jar powder can satisfy preparation a bite well required powder, and after the back jar required powder of preparation a bite well used up, preceding jar powder was when jar passes on backward, also needs forward jar to provide pressurized air.During jar outside emptying of residue powder of back, also needing backward, jar provides pressurized air in addition.
After the powder in two jars uses up,, powder is sent into preceding jar and back jar by strength conveying powder storehouse or pneumatic cementing truck.
In order to solve the required big discharge capacity pressurized air of above-mentioned first three part, realize down powder flow path, change powder flow path and last powder flow path, these driving skills art scheme implementation example is the air feed powder feed system of Fig. 6, it is made up of the equipment of tape label in the following flow process and parts and container.
Large flow liquid distributing pump vehicle has the powder feeding flow process, and details are as follows for its control step and route:
After this car reaches the well site, at first open back jar steam supply valve 80, back jar blow off valve 62, start blowdown fan 70 runnings then.
Pressurized air enters back jar by following route, is used for looseningly because of automobile the powder by the pier reality of jolting that travels on the way, and waste gas enters well site pick trough, anti-air-pollution in jar.
The fast rotary joint 58-of jar blow off valve 62-total exhaust steel pipe 61-exhaust hose 60-well site pick trough 20 behind powder-back jar exhaust steel pipe 56-in jars 55 behind jar shunting tube 53-sebific duct 51-ball-and-seat 50-nozzle 49-behind jar steam supply valve 80-behind air-fil 71-blowdown fan 70-gas transmission pipe 69-.
Behind the loosening back jar powder number minute, open pressure-relief valve 67, make blowdown fan be in the no-load running state, open air inlet valve 81 then, make rotary feeder 57 bottom f be in atmospheric pressure state.
In the dosing process, back jar powder flows in the rotary feeder by deadweight, is in barometric pressure by mixer at vacuum and the rotary feeder bottom f that chews generation that dust, and its pressure reduction will be fallen the powder for powder steel pipe 82, enter mixer by advancing arogel pipe 16.
In the dosing process, as it is thin to find that powder flows in the transparent tube of current indicator 14, the de-plugging valve 112 of manipulation platform at first, getting rid of dusts chews the blocked fault of 11.1.3, flow still thin as powder, then an explanation back jar powder forms funnel-form greatly because of internal friction, that does not close pressure-relief valve 67, and pressurized air just by above-mentioned route, is blown the powder on the tapering, make that forming funnelform powder stays, and the inflow rotary feeder, it is normal to flow in the transparent tube of current indicator as powder, then loosening after one minute, open pressure-relief valve 67, make blowdown fan be in the no-load running state.
By the time close pressure-relief valve when opening method overcome 89 liquid distributing pump vehicle weak points, flow into the rotary feeder requirement to satisfy back jar powder.
Large flow liquid distributing pump vehicle also has the commentaries on classics powder flow path that 89 liquid distributing pump vehicles do not have: preceding jar powder is transferred to back jar, or back jar residue powder is discharged to the storage powder jar in powder storehouse outward, and details are as follows for its flow operations step and route:
At first to preceding jar or back jar inflation, make tank pressure reach setting value after, change powder flow path again.
Preceding jar of inflation route is as follows: jar 73 before preceding jar of shunting tube of jar steam supply valve 66-77-sebific duct 51-ball-and-seat 50-nozzle 49-before air-fil 71-blowdown fan 70-gas transmission pipe 69-;
Back jar inflation route is as follows: behind air-fil 71-blowdown fan 70-gas transmission pipe 69-behind jar steam supply valve 80-behind jar shunting tube 53-sebific duct 51-ball-and-seat 50-nozzle 49-jars 55.
After current jar tank pressure reaches setting value, open back jar blow off valve 62 and commentaries on classics powder valve 75, a jar powder just can be transferred to the back jar before this moment, and its route is as follows:
Before jar 73 powders-commentariess on classics powder steel pipe 76-change behind the powder valve 75-jar and advance behind the powder steel pipe 52-jars 55, the fast rotary joint 58-of jar blow off valve 62-total exhaust steel pipe 61-exhaust hose 60-well site pick trough 20 behind gas in the powder-back jar exhaust steel pipe 56-;
When after after a jar tank pressure reaches setting value, open back jar row's powder valve 83, a residue powder just can enter powder storehouse storage powder jar in this moment back jar, it is as follows that a jar powder effluxes route thereafter:
Powder steel pipe-storage powder jar-freeing pipe-dust collector is advanced in jar row ready-packaged joint-powder storehouse that the internal powder conveying sebific duct-the powder storehouse is advanced on the powder steel pipe, powder valve 83-ready-packaged joint 84-powder storehouse, back jar 55 powders-back.
Large flow liquid distributing pump vehicle also has the last powder flow path that 89 liquid distributing pump vehicles do not have: by powder storehouse or pneumatic cementing truck, powder is sent into preceding jar and back jar, details are as follows for its flow operations step and route:
The last ready-packaged joint 65-of ready-packaged joint-powder feeding sebific duct-Che on powder storehouse or the unloading vehicle row powder steel pipe always advances powder steel pipe 64.
To preceding jar 73, then press following route as powder on the need:
Before opening before jar powder entering valve 78-jar advance before the powder steel pipe 72-jars 73, gas jar blow off valve 63(before preceding jar of exhaust steel pipe 74-opens in the powder)-the total fast rotary joint 58-of exhaust steel pipe 61-exhaust hose 60-well site pick trough 20 or powder storehouse freeing pipe.
To back jar 55, then connect following route as powder on the need:
Open behind jar powder entering valve 79-of back jar and advance behind the powder steel pipe 52-jars 55, gas jar blow off valve 62(behind jar exhaust steel pipe 56-of back opens in the powder)-the always fast rotary joint 58-of exhaust steel pipe 61-exhaust hose 60-well site pick trough 20 or powder storehouse freeing pipe.
Among Fig. 6 48,54,68 is respectively the safety valve of preceding jar, back jar, blowdown fan, and e is the interface of the sources of the gas of working towards self-sucking device 18 and 45.
Fig. 7 is a large flow liquid distributing pump vehicle driving system schematic diagram.
This driving system is that automobile engine power is passed to water service pump 21, added liquid pump 33, blowdown fan 70 and rotary feeder 57.
It by automotive engine by power takeoff 85, universal drive shaft 86, power is all passed to auxiliary gear box 88.Auxiliary gear box mainly is made up of three parallel output shafts of input shaft in bottom and top, and this auxiliary gear box is positioned at below the liquid case 5.
Output shaft in the left side (A is to seeing auxiliary gear box, down together), its front end is passed to blowdown fan 70 by universal drive shaft 87 with part power; Its rear end is by friction clutch 89 and clutch operating lever 90, and the retarder 93(91,92 of Bowden cable 91, mechanical stepless speed regulator 92 and high reduction ratio, 93 threes combination is called mechanical stepless speed-regulating flexible axle driving device), minimum power is passed to rotary feeder 57.
The output shaft in the right side, its front end can link to each other with water service pump tachogen 97, and its rear end is passed to water service pump 21 by universal drive shaft 95 and gears to engage and disengage control lever 96 with most of power.
Middle output shaft, its front end links to each other with belt pulley, by belt-driving 98 and this shaft rear end gears to engage and disengage control lever 96, fraction power is passed to interpolation liquid pump 33.
This car driving system and 89 liquid distributing pump vehicle driving systems have that following some is different:
1.89 the auxiliary gear box of liquid distributing pump vehicle has two output shafts, pass to the pump that pump that dosing uses and pumping are used respectively, and the auxiliary gear box of this car has three output shafts, passes to water service pump respectively, add liquid pump, rotary feeder and blowdown fan;
2. this car adopts mechanical stepless speed-regulating flexible axle driving device car the place ahead auxiliary gear box power to be driven the rotary feeder at car rear, realize remote transmission, and 89 liquid distributing pump vehicles adopt the hydrostatic drive with governor valve to drive the dry powder feeding roller, therefore these driving skills art feature is to replace hydrostatic drive with the flexible axle transmission, replaces Hydraulic Adjustable Speed with mechanical stepless speed-regulating.
Therefore this car driving system has the advantage of one case transmission multimachine, particularly flexible axle transmission substitute structure complexity, hydrostatic drive that element is many, and mechanical stepless speed-regulating replaces the more Hydraulic Adjustable Speed of fault, and this driving device has advantages such as transmission is simple, reliable.
Fig. 8 is the arrangement plan of monitoring and metering instrument and executive component on the large flow liquid distributing pump vehicle operating console.
The monitoring and metering instrument is that this car monitors at work and measures each relative section service condition and working parameter, and it comprises:
Water service pump speed gage 99, diesel engine oil thermometer 100, oil pressure indicator 101, automobile gas bag air-pressure gauge 102, blowdown fan air-pressure gauge 103, preceding jar of air-pressure gauge 104, back jar air-pressure gauge 105, water service pump self-sucking device operating air pressure table 106, annex solution self-sucking device operating air pressure table 107, liquid distributing pump vehicle six parameter display instruments 108, annex solution pump discharge pressure table 109, water service pump delivery gauge 110 mixer clear water inlet pressure table 111(wherein 109~110 see Fig. 3).
Six parameter display instruments 108 particularly, but its numeric display: six parameter amounts such as clear water flow, clear water cumulant, powder water ratio, powder cumulant, liquid water ratio, annex solution cumulant.It is than 89 liquid distributing pump vehicle dosing gauge too many by two parameters: liquid water than and the annex solution cumulant, thereby use more convenient.
Fig. 9 is large flow liquid distributing pump vehicle six parameter display instrument functional-block diagrams.
The feeder house beater rotating speed of rotary feeder 57 is by electromagnetic sensor A1 output pulse signal, through amplifying shaping A2 to gate circuit A3, simultaneously oscillator D produces the standard time through sampler A4 and removes control gate circuit A3, then through counting machine A5, switch circuit A6 to counting machine A7, demonstration powder cumulant.
The turbine speed of water service pump turbine flowmeter 37 is by electromagnetic sensor B1 output pulse signal, through amplifying shaping B2 to gate circuit B3, simultaneously oscillator D produces another standard time through sampler B4 and removes control gate circuit B3, then through counting machine B5, one the tunnel through switch circuit B6 to counting machine B7, show the clear water cumulant, another road is to decoding monitor F2, show clear water flow, the two-way pulse letter that comes out from the counting machine B5 of the counting machine A5 of rotary feeder and water service pump turbine flowmeter is named and all imports divider E1 in addition, arrive decoding monitor F1 then, show powder water ratio.
The turbine speed that adds liquid pump turbine flowmeter 6 is by electromagnetic sensor C1 output pulse signal, through amplifying shaping C2 to gate circuit C3, simultaneously oscillator D produces another standard time through sampler C4 and removes control gate circuit C3, then through counting machine C5, one the tunnel through switch circuit C6 to counting machine C7, show the annex solution cumulant, the impulse singla that the counting machine B5 of another road impulse singla and water service pump turbine flowmeter comes out is imported divider E2 simultaneously, arrive decoding monitor F3 then, show liquid water ratio.
Three kinds of signals are converted into six parameters number by said integrated circuit and are shown on the instrument.
Comprehensively above-mentioned, large flow liquid distributing pump vehicle is compared with the liquid distributing vehicle group, and its advantage is:
1. its collects storing, dosing, is pumped to the trinity, and one is pushed up three, and three people substitute seven people, reduce preparation of construction and labour cost greatly;
2. dosing speed is fast, the production efficiency height, and receiver is gone in dosing continuously;
3. dosing quality height, powder is not wasted, and labour intensity is low, non-environmental-pollution, work keeps healthy;
It has a ratio range big, regulate easy, accurate measurement, numeric display, characteristics such as straightforward.
Compare with 89 liquid distributing pump vehicles, the advantage of this car is:
1. this car not only has main flow process such as dosing pumping and powder feeding, and also has the powder of going up, changes powder, goes up assisting workflows such as liquid, cleaning, thereby multiple functional, easy to use;
2. the difference dosing of this handlebar 89 liquid distributing pump vehicles and two independent flow processs of pumping are merged into flow process of dosing pumping, have simplified flow process, have reduced equipment, have improved dosing speed;
3. this car has " four is big ": the water service pump flow is big, the powder tankage size is big, annex solution liquid case is big, the blowdown fan air quantity is big, thereby it is fast to have dosing speed, the production efficiency height; Dress powder Sheng liquid ability is big, and the well site dosing often; Advantages such as the powder function is complete, and self-priming pump priming speed is fast are changeed in powder feeding;
4. the mixing plug-removing device that can remove rapidly immediately when this car has the mouth that dusts blocked in hybrid working has improved the reliability that mixes dosing;
5. this car driving system has the advantage of one case transmission multimachine, and particularly the flexible axle transmission has replaced complex structure, the hydrostatic drive that element is many, and mechanical stepless speed-regulating replaces the more Hydraulic Adjustable Speed of fault, and it is simple to have a transmission, the advantage of good reliability;
6. this car has six parameters metering integrated display, thereby measures complete, easy to use.

Claims (6)

1, large flow liquid distributing pump vehicle is the special purpose vehicle that a kind of dosing is used, and particularly utilizes near its water source, directly prepares the special purpose vehicle of mixed liquor, and it comprises: an autotruck, be equipped with on its chassis:
Dosing pumparound 1, air feed powder feed system 2, driving system 3 monitoring and metering meter systems 4 and maneuver control device and accessory equipment thereof.
It is characterized in that:
(a). large flow liquid distributing pump vehicle has two groundwork flow processs: dosing pumping flow process and powder feeding flow process, four assisting workflows: go up liquid flow process, cleaning process, commentaries on classics powder flow path and last powder flow path, amount to six flow processs.
(b). the mixing pumping plug-removing device in the dosing pumparound.
(c). the automobile-used self-sucking device of water service pump and interpolation liquid pump starting pump priming.
(d). the mechanical stepless speed-regulating flexible axle driving device in the driving system.
(e). six parameter display instruments in the monitoring and metering meter system.
2, large flow liquid distributing pump vehicle according to claim 1 is characterized in that six flow processs, and it is via the unit of following tape label, container, parts etc., and is undertaken by following route and order.
(a). dosing pumping flow process:
The mixer 11.1 that mixes in the pumping plug-removing device 11 has two inlets: among clear water inlet a and the powder inlet b, and discharge orifice: mixed liquor discharge orifice c.
Clear water enters mixer entrance a by following route and order:
The fast rotary joint 34-of the fast rotary joint 42-suction steel pipe 47-water service pump 21-discharge-service valve 43-draining steel pipe 39-turbine flowmeter 37-of clear water in the pick trough 20-water suction hose 22-mixer entrance a;
Powder enters mixer entrance b by following route and order:
Powder-rotary feeder 57-advances the fast rotary joint 15-of arogel pipe 16-current indicator 14-for the fast rotary joint 59-of powder steel pipe 82-and advances powder steel pipe 13-powder entering valve 12-mixer entrance b in the jar 55 of back.
After clear water and powder mix in mixer, discharge the gassiness mixed liquor with pressure from discharge orifice c, it is mixed into into the glue mixed liquor by fast rotary joint 10, discharge-service valve 9 with the annex solution at annex solution inlet d place;
Annex solution flows into annex solution inlet d by following route and order:
Annex solution in the liquid case 5-liquid sucting valve 31-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 8-annex solution inlet d;
Become the glue mixed liquor by following route and the receiver that is pumped in proper order on the dosing field;
Become the manifold 26-on the glue-fast rotary joint 46-of discharge opeing steel pipe 23-non-return butterfly valve 41-discharge opeing sebific duct 25-dosing field to connect sebific duct-dosing field receiver.
(b). go up the liquid flow process:
Annex solution in the fluid cylinder 27 on the ground-its front end of imbibition sebific duct 28(has an imbibition steel pipe that can insert in the tube)-fast rotary joint 29-liquid sucting valve 30-imbibition steel pipe 32-interpolation liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 7-liquid case 5;
When having aspirated soon, annex solution in the fluid cylinder 27 (can not find time, otherwise aspirated air), close discharge-service valve 7, add liquid pump 33 and still remain in operation, propose to insert the steel pipe in the fluid cylinder, inserting another rapidly fills with in the fluid cylinder of annex solution, open discharge-service valve 7 then, continue the annex solution in the fluid cylinder is pumped in the liquid case 5, repeatedly said process, just can be pumped into several annex solutions in the liquid case 5, till meeting the demands.
(c). cleaning process:
(1). the surface pond clear water-fast rotary joint 29-of imbibition sebific duct 28-liquid sucting valve 30-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flowmeter 6-discharge-service valve 35-cleaning sebific duct 36-and cleans this vehicle device or his vehicle device.
(2). also can by last liquid flow process the liquid case be filled with, then this car is reached on the place of suitable cleaning Vehicle this car of recleaning or his vehicle device earlier with the surface pond clear water.
Clear water in the liquid case 5-liquid sucting valve 31-imbibition steel pipe 32-adds liquid pump 33-discharge opeing steel pipe 44-turbine flow 6-discharge-service valve 35-cleaning sebific duct 36-and cleans this car or his vehicle device.
(d). the powder feeding flow process:
(1). become flexible because of car on the way travels with pressurized air and to jolt, and by the powder of pier reality, so that powder flows in the rotary feeder.
After this car reaches the dosing place, at first open back jar steam supply valve 80, back jar blow off valve 62, start blowdown fan 70 runnings then, at this moment:
Behind air-fil 71-blowdown fan 70-gas transmission pipe 69-behind jar steam supply valve 80-behind jar shunting tube 53-sebific duct 51-ball-and-seat 50-nozzle 49-in jars 55 powders be compressed air blow afloat loosening, the pick trough 20 of waste gas on the fast rotary joint 58-of jar blow off valve 62-total exhaust steel pipe 61-exhaust hose 60-dosing field behind jar exhaust steel pipe 56-of back.
Loosening after several minutes, open pressure-relief valve 67, make blowdown fan be in the no-load running state, open air inlet valve 81 then, make rotary feeder 57 bottom f be in atmospheric pressure state.
(2). the step and the method for the powder feeding flow process in dosing work.
In the dosing process, back jar powder flows in the rotary feeder by deadweight, by mixer at the vacuum and f place, the rotary feeder bottom barometric pressure that dust and chew formation, this pressure reduction will be fallen the powder for powder steel pipe 82, under the negative pressure strength is carried by fast rotary joint 59, advance arogel pipe 16 and enter mixer.
As it is thin to find that powder flows in the transparent tube of current indicator 14, the de-plugging valve 112 of manipulation platform at first, and getting rid of dusts chews the blocked fault of 11.1.3; Flow still thin as powder, then an explanation back jar powder has formed the funnel shaped cave, powder can't flow in the rotary feeder greatly because of internal friction, need close pressure-relief valve 67 this moment, pressurized air will be by the route of loosening jar of interior powder, blow afloat the powder on jar tapering, loosening back, make funnel-form cave powder stay, flow in the rotary feeder; In the transparent tube of current indicator, flow recovery normally as powder, then become flexible after 1 minute, just can open pressure-relief valve 67, make blowdown fan be in the no-load running state.
The method of pass pressure-relief valve 67 when opening during use flows in the rotary feeder back jar powder, under the negative pressure strength is carried, rotary feeder is fallen the powder that supplies the powder steel pipe, is transported in the mixer.
(e). change powder flow path:
At first to preceding jar or back jar inflation, make tank pressure reach setting value after, change powder flow path again.
Preceding jar of inflation route: jar 73 before preceding jar of shunting tube of jar steam supply valve 66-77-sebific duct 51-ball-and-seat 50-nozzle 49-before air-fil 71-blowdown fan 70-gas transmission pipe 69-;
Back jar inflation route: behind air-fil 71-blowdown fan 70-gas transmission pipe 69-behind jar steam supply valve 80-behind jar shunting tube 53-sebific duct 51-ball-and-seat 50-nozzle 49-jars 55;
After current jar tank pressure reaches setting value, open back jar blow off valve 62, open then and change powder valve 75, a jar powder just can be transferred to the back jar before this moment, and it passes on route:
Before jar 73 powders-commentariess on classics powder steel pipe 76-change behind the powder valve 75-jar and advance behind the powder steel pipe 52-jars 55, the fast rotary joint 58-of jar blow off valve 62-total exhaust steel pipe 61-exhaust hose 60-dosing field pick trough 20 behind gas in the powder-back jar exhaust steel pipe 56-;
When after after a jar tank pressure reaches setting value, open back jar row's powder valve 83, a residue powder just can enter the powder storehouse and store the powder jar in this moment back jar, it effluxes route:
Jar row's powder valve 83-ready-packaged joint 84-powder storehouse powder feeding sebific duct-powder storehouse, back jar 55 powders-back is entered ready-packaged joint-powder storehouse on the powder steel pipe and is entered powder steel pipe-powder storehouse and store dust collector in powder jar-powder storehouse freeing pipe-powder storehouse.
(f). go up powder flow path:
At first, be connected on this car ready-packaged joint 65, promptly be connected to and always advance on the powder steel pipe 64 sebific duct of band ready-packaged joint on powder storehouse or the unloading vehicle.
Arrive preceding jar 73 as powder on the need, by following route: before opening before jar powder entering valve 78-jar advance before the powder steel pipe 72-jars 73, gas jar blow off valve 63(before preceding jar of exhaust steel pipe 74-opens in the powder)-the total fast rotary joint 58-of exhaust steel pipe 61-exhaust hose 60-dosing field pick trough 20 or powder storehouse freeing pipe.
Arrive back jar 55 as powder on the need, by following route: open behind jar powder entering valve 79-of back jar and advance behind the powder steel pipe 52-jars 55, gas jar blow off valve 62(behind jar exhaust steel pipe 56-of back opens in the powder)-the always fast rotary joint 58-of exhaust steel pipe 61-exhaust hose 60-dosing field pick trough 20 or powder storehouse freeing pipe.
3, large flow liquid distributing pump vehicle according to claim 1 is characterized in that mixing pumping plug-removing device 11.It comprises two parts: mixer 11.1 and broken down device 11.2.Mixer advances powder compound tube 11.1.2 by water inlet bend pipe 11.1.1 and dusts and chew 11.1.3, mix pumping line 11.1.4 and form.Broken down device is made up of drift 11.2.1 and cylinder 11.2.2.This device is vertical installation.
The dusting of mixer chewed under the straight length that 11.1.3 is loaded on powder compound tube 11.1.2 into, is in mixer central authorities.Mouthful spout of chewing of concentric annulus area that dusts is that the water injector of pressing clear water is arranged with dusting.The clear water inlet is water inlet bend pipe 11.1.1 import a, and powder enters the mouth to advancing the powder compound tube 11.1.2 b of inflow point.Dusting, to chew be the fabricate block of a gradually closing Taper Pipe and short pipe.Mixing pumping line 11.1.4 is the fabricate block of several pipes and Taper Pipe, it comprises: short pipe 1., short gradually closing Taper Pipe 2., short pipe 3., short gradually closing Taper Pipe 4., oval pipe 5., long flaring Taper Pipe 6., short pipe 7., have the mixed liquor of pressure gassiness to discharge from this pipe exit c.This pipe is on the same axis with straight length, the water inlet winding pipe exit of chewing, advance the powder compound tube that dust.2. short gradually closing Taper Pipe partly forms gradually closing clear water runner with the gradually closing Taper Pipe of chewing that dusts.3. short pipe partly forms annular water injector with the short pipe of chewing that dusts.5. 4. short gradually closing Taper Pipe form the mixing tube of clear water and powder with oval pipe.6. long flaring Taper Pipe is the pumping line of gassiness mixed liquor.The outlet of chewing of dusting is being lacked between the 3. upper and lower plane of pipe.
The cylinder 11.2.2 of broken down device is positioned at the device topmost, and it is located on the bend loss of powder compound tube into, and drift 11.2.1 is equipped with in the cylinder piston rod lower end.
The drift 11.2.1 that chews 11.1.3 and broken down device that dusts of mixer is in same axis.By the de-plugging valve 112 on the operating console, can make the drift of cylinder piston rod lower end move on to mouthful place of dusting of dusting and chewing rapidly, can in time dispose mouthful tamper that dusts, after the commutation of de-plugging valve, move on to original position on the drift, the mouth that dusts is unblocked, and powder and clear water continue to mix.
4, large flow liquid distributing pump vehicle according to claim 1 is characterized in that automobile-used self-sucking device.It is a T shape structure, is made up of threeway 18.2, nozzle 18.3, joint 18.4 and freeing pipe 18.1.The threeway right side connects nozzle, and nozzle links to each other with joint, and the threeway left side connects freeing pipe.Connect extraction valve 19(or 38 below the threeway), joint hangnail tube portion is by flexible pipe and air inlet valve 17(or 40) be connected, freeing pipe communicates with atmosphere.Steel pipe between extraction valve and pump discharge and the discharge-service valve, and continuous near the discharge-service valve place, air inlet valve links to each other with the gas transmission pipe 69e place of blowdown fan by flexible pipe.Nozzle is the Taper Pipe of contraction earlier and the fabricate block of a bit of pipe and back flaring Taper Pipe.Freeing pipe is with the same fabricate block of nozzle, and different is that the pipe part is longer than nozzle.Distance between nozzle outlet and the freeing pipe import has certain requirement.During the design nozzle, make the pipe place gas speed of nozzle reach velocity of sound, flaring Taper Pipe exit gas speed reaches hyprsonic.
5, large flow liquid distributing pump vehicle according to claim 1 is characterized in that mechanical stepless speed-regulating flexible axle driving device.It is made up of the retarder 93 of Bowden cable 91, mechanical stepless speed regulator 92 and high reduction ratio.Bowden cable one end links to each other with friction clutch 89, and the other end links to each other with mechanical stepless speed regulator.Retarder one end of high reduction ratio links to each other with mechanical stepless speed regulator 89, and the other end links to each other with mechanical stepless speed regulator.Retarder one end of high reduction ratio links to each other with mechanical stepless speed regulator, and the other end links to each other with rotary feeder 57.Mechanical stepless speed regulator has a speed handwheel 92.1, and in running condition changes the rotary feeder rotating speed by speed handwheel, thereby changes powder and clear water blending ratio.
6, large flow liquid distributing pump vehicle according to claim 1 is characterized in that six parameter display instruments.Six working parameters but its this car of numeric display is in operation: clear water flow, clear water cumulant, powder water ratio, powder cumulant, liquid water ratio, annex solution cumulant.It is via electromagnetic sensor and the integrated circuit component and the digital display of following tape label, and shows six parameters by following route and order.
The feeder house beater rotating speed of rotary feeder 57 is by electromagnetic sensor A1 output pulse signal, through amplifying shaping A2 to gate circuit A3, oscillator D removes control gate circuit A3 through the sampler A4 generation standard time simultaneously, then through counting machine A5, switch circuit A6, to counting A7, show powder cumulant parameter.
The turbine speed of water service pump turbine flowmeter 37 is by electromagnetic sensor B1 output pulse signal, through amplifying shaping B2 to gate circuit B3, simultaneously oscillator D produces another standard time through sampler B4 and removes control gate circuit B3, then through counting machine B5, one the tunnel through switch circuit B6 to counting machine B7, show clear water cumulant parameter, another road is to decoding monitor F2, show the clear water flow parameter, the impulse singla that also has the counting machine A5 of one road impulse singla and rotary feeder to come out, import divider E1 simultaneously, arrive decoding monitor F1 then, show that powder water compares parameter.
The turbine speed that adds liquid pump turbine flowmeter 6 is by electromagnetic sensor C1 output pulse signal, through amplifying shaping C2 to gate circuit C3, simultaneously oscillator D produces another standard time through sampler C4 and removes control gate circuit C3, then through counting machine C5, one the tunnel through switch circuit C6 to counting machine C7, show annex solution cumulant parameter, the impulse singla that the counting machine B5 of another road impulse singla and water service pump turbine flowmeter comes out is imported divider E2 simultaneously, arrive decoding monitor F3 then, show that liquid water compares parameter.
Three kinds of electromagnetic sensor impulse singlas transfer six working parameters to by the said integrated circuit element, and numeric display is on instrument.
CN 93109077 1992-07-23 1992-07-23 Large flow liquid distributing pump vehicle Pending CN1098052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93109077 CN1098052A (en) 1992-07-23 1992-07-23 Large flow liquid distributing pump vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93109077 CN1098052A (en) 1992-07-23 1992-07-23 Large flow liquid distributing pump vehicle

Publications (1)

Publication Number Publication Date
CN1098052A true CN1098052A (en) 1995-02-01

Family

ID=4987442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93109077 Pending CN1098052A (en) 1992-07-23 1992-07-23 Large flow liquid distributing pump vehicle

Country Status (1)

Country Link
CN (1) CN1098052A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100338334C (en) * 2003-03-07 2007-09-19 里群 Oil field oil-water well unblocking and injection increasing method and the apparatus for implementing the same method
CN101875325A (en) * 2010-04-12 2010-11-03 中国民航大学 Mobile high-flow airplane deicing liquid supply station
CN101780779B (en) * 2009-10-28 2012-06-06 山东胜油固井工程技术有限公司 Multi-functional liquid supply vehicle for well cementation of oil field
CN104340682A (en) * 2014-10-17 2015-02-11 烟台杰瑞石油装备技术有限公司 Positive-pressure pneumatic conveying skid for oilfield fracturing propping agent
CN104563994A (en) * 2013-10-23 2015-04-29 烟台杰瑞石油服务集团股份有限公司 Fracturing blender truck
CN108425498A (en) * 2018-03-06 2018-08-21 北汽福田汽车股份有限公司 Pumping system, the control method of pumping system and pump truck
CN116575898A (en) * 2023-07-13 2023-08-11 华信唐山石油装备有限公司 Fracturing pump truck

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100338334C (en) * 2003-03-07 2007-09-19 里群 Oil field oil-water well unblocking and injection increasing method and the apparatus for implementing the same method
CN101780779B (en) * 2009-10-28 2012-06-06 山东胜油固井工程技术有限公司 Multi-functional liquid supply vehicle for well cementation of oil field
CN101875325A (en) * 2010-04-12 2010-11-03 中国民航大学 Mobile high-flow airplane deicing liquid supply station
CN101875325B (en) * 2010-04-12 2011-07-06 中国民航大学 Mobile high-flow airplane deicing liquid supply station
CN104563994A (en) * 2013-10-23 2015-04-29 烟台杰瑞石油服务集团股份有限公司 Fracturing blender truck
CN104563994B (en) * 2013-10-23 2017-03-15 烟台杰瑞石油服务集团股份有限公司 A kind of pressure break fracturing blender truck
CN104340682A (en) * 2014-10-17 2015-02-11 烟台杰瑞石油装备技术有限公司 Positive-pressure pneumatic conveying skid for oilfield fracturing propping agent
CN104340682B (en) * 2014-10-17 2016-06-08 烟台杰瑞石油装备技术有限公司 A kind of oil-filed fracturing propping agent positive pneumatic transport sledge
CN108425498A (en) * 2018-03-06 2018-08-21 北汽福田汽车股份有限公司 Pumping system, the control method of pumping system and pump truck
CN116575898A (en) * 2023-07-13 2023-08-11 华信唐山石油装备有限公司 Fracturing pump truck
CN116575898B (en) * 2023-07-13 2023-09-01 华信唐山石油装备有限公司 Fracturing pump truck

Similar Documents

Publication Publication Date Title
CN210097596U (en) Air-assisted powder conveying system
CN1098052A (en) Large flow liquid distributing pump vehicle
CN1231316C (en) Method and device for the preparation of foundry sand
CN1548701A (en) Fracturing fluid preparing truck used for petroleum mining field and method for preparing fracturing fluid
CN206730970U (en) A kind of food additives materials safety mixed organization
CN208305396U (en) A kind of concrete stirring system of urban construction construction site
CN220280035U (en) Dust collecting device for stirring concrete raw materials
CN212758085U (en) Throw material stirring filtration system
CN210527922U (en) Powder conveyor is used in concrete production
CN209348564U (en) A kind of integral type puddles equipment
CN112372828A (en) A raw material mixing device for baked brick
CN2617752Y (en) Liquid dosing supply vehicle
CN216971389U (en) High-efficient dustless defeated material conveyer belt of concrete processing
CN208341117U (en) Sandstone transmission device with cleaner
CN2632318Y (en) Vehicle for preparing elementary fracturing fluid for oil mine
CN205462665U (en) Powder coating grinds pan feeding device
CN1962365A (en) Fluorite powder unwrapping delivery system and method
CN205886869U (en) High performance instant adhesive powder's automated production equipment
CN209049567U (en) A kind of progressive traditional vacuum system
CN219885172U (en) Sand and stone powder bulk machine with humidification stirring function
CN216630489U (en) Drawing fluid blending equipment for enameled wire production
CN209772048U (en) Polyether macromonomer powder feeding system
CN217777366U (en) Novel environment-friendly dust removal device for concrete mixing plant
CN220548458U (en) Stirring device for concrete
CN210635352U (en) Masterbatch production line material loading mouth dust keeper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication