CN109800938A - The assessment of bids data linkage processing method and system of technical bid and commercial bid - Google Patents

The assessment of bids data linkage processing method and system of technical bid and commercial bid Download PDF

Info

Publication number
CN109800938A
CN109800938A CN201811399990.5A CN201811399990A CN109800938A CN 109800938 A CN109800938 A CN 109800938A CN 201811399990 A CN201811399990 A CN 201811399990A CN 109800938 A CN109800938 A CN 109800938A
Authority
CN
China
Prior art keywords
data
bid
model
building information
information model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811399990.5A
Other languages
Chinese (zh)
Inventor
丁子彧
邓涌
凌健
朱雪花
丁英莺
王鹏翊
吕振
王浩宇
王和义
曹涛
白雷
段宝强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Glodon Polytron Technologies Inc
SHENZHEN CONSTRUCTION TRADING SERVICE CENTER
Glodon Co Ltd
Original Assignee
Glodon Polytron Technologies Inc
SHENZHEN CONSTRUCTION TRADING SERVICE CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Glodon Polytron Technologies Inc, SHENZHEN CONSTRUCTION TRADING SERVICE CENTER filed Critical Glodon Polytron Technologies Inc
Priority to CN201811399990.5A priority Critical patent/CN109800938A/en
Publication of CN109800938A publication Critical patent/CN109800938A/en
Pending legal-status Critical Current

Links

Abstract

This application involves assessment of bids data linkage processing method, system, computer equipment and the storage mediums of a kind of technical bid and commercial bid.This method comprises: obtaining progress data, resource data and the Building Information Model in building construction bid file;In the progress data, the resource data and the Building Information Model at least two are associated, then is integrated into Visualization Model Bid Documents;The Visualization Model Bid Documents are read, and the data of the Visualization Model Bid Documents are shown in terminal.Arrangement and method for construction can be associated with using this method with buildings and resources, so that review result is more acurrate, improve evaluation efficiency, save the evaluation time.

Description

The assessment of bids data linkage processing method and system of technical bid and commercial bid
Technical field
This application involves construction engineering technical fields, more particularly to the assessment of bids data linkage of a kind of technical bid and commercial bid Processing method, system, computer equipment and storage medium.
Background technique
With the development of architectural engineering technology, there is bidding business.In traditional technology, the construction class of construction project is recruited Mark bid project evaluation includes the evaluation to arrangement and method for construction and construction cost.Because the arrangement and method for construction and construction cost of offer are remembered respectively In different paper documents, bidding professor, which requires a great deal of time, to be checked for record, evaluates low efficiency, and inaccuracy.
Summary of the invention
Based on this, it is necessary to for building construction bid file evaluation low efficiency the technical issues of, providing one kind can Improve evaluation efficiency technical bid and commercial bid the assessment of bids data linkage processing data processing method, system, computer equipment and Storage medium.
A kind of assessment of bids data linkage processing method of technical bid and commercial bid, this method comprises: obtaining building construction bid Progress data, resource data and Building Information Model in file;By the progress data, the resource data and the architecture information mould At least two are associated in type, then are integrated into Visualization Model Bid Documents;The Visualization Model Bid Documents are read, and will The data of the Visualization Model Bid Documents are shown in terminal.
A kind of assessment of bids data linkage processing system of technical bid and commercial bid, which includes: acquisition building construction bid Progress data, resource data and Building Information Model in file;By the progress data, the resource data and the architecture information mould At least two are associated in type, then are integrated into Visualization Model Bid Documents;The Visualization Model Bid Documents are read, and will The data of the Visualization Model Bid Documents are shown in terminal.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing Device performs the steps of progress data, the resource data obtained in building construction bid file when executing the computer program And Building Information Model;In the progress data, the resource data and the Building Information Model at least two are associated, then whole Synthesize Visualization Model Bid Documents;Read the Visualization Model Bid Documents, and by the number of the Visualization Model Bid Documents According to displaying in terminal.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor Progress data, resource data and the Building Information Model obtained in building construction bid file is performed the steps of when row;It should At least two are associated in progress data, the resource data and the Building Information Model, then are integrated into Visualization Model bidding documents File;The Visualization Model Bid Documents are read, and the data of the Visualization Model Bid Documents are shown in terminal.
Assessment of bids data linkage processing method, system, computer equipment and the storage medium of above-mentioned technical bid and commercial bid, are obtained Take the progress data in building construction bid file, resource data and Building Information Model to be integrated, can by arrangement and method for construction with Buildings and resources association, i.e., link technical bid and commercial bid, so that review result is more acurrate;Again by Visualization Model bidding documents Document presentation can more intuitively show the information such as the resource data in each stage in building course in terminal, improve evaluation efficiency, Save the evaluation time.
Detailed description of the invention
Fig. 1 is the applied environment figure of the assessment of bids data linkage processing method of technical bid and commercial bid in one embodiment;
Fig. 2 is the flow diagram of the assessment of bids data linkage processing method of technical bid and commercial bid in one embodiment;
Fig. 3 is the flow diagram that bidding documents model integration is visualized in one embodiment;
Fig. 4 is the flow diagram that bidding documents model integration is visualized in another embodiment;
Fig. 5 is the schematic diagram of progress data table in one embodiment;
Fig. 6 is resource data and the associated flow diagram of Building Information Model in one embodiment;
Fig. 7 is the flow diagram of Visualization Model Bid Documents screening in one embodiment;
Fig. 8 is the surface chart that Visualization Model Bid Documents data are shown;
Fig. 9 is the structural block diagram of the assessment of bids data linkage processing system of technical bid and commercial bid in one embodiment;
Figure 10 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
The assessment of bids data linkage processing method of the technical bid and commercial bid provided in the embodiment of the present application, can be applied to as In application environment shown in FIG. 1.Wherein, first terminal 102, server 104 and second terminal 106 are communicated by network. Wherein, first terminal 102 and second terminal 106 can be, but not limited to be various personal computers, laptop, intelligent hand Machine, tablet computer and portable wearable device, server 104 can be formed with the either multiple servers of independent server Server cluster realize.
In one embodiment, as shown in Fig. 2, providing the assessment of bids data linkage processing side of a kind of technical bid and commercial bid Method is applied to be illustrated for the second terminal in Fig. 1 or server in this way, comprising the following steps:
Step 202, progress data, resource data and the Building Information Model in building construction bid file are obtained.
Wherein, progress data refers to the construction progress data of building, such as starting date is on September 1st, 2014, is completed day Phase is on October 31st, 2015, then the construction progress built during this period of time is to build progress data.Resource data, which refers to, to be built Build the resource data used in building course, such as structure attribute data, component usage amount data and funds data.Building Information model is BIM (Building Information Modeling, Building Information Model), is that one kind is integrated with building work The data model of the various relevant informations of journey project.Progress data and resource data are the content in commercial bid, architecture information Model is the content in technical bid.
Specifically, first terminal uploads building construction bid file to server, and second terminal is obtained from server and built Resource data and the building of the construction progress data, building of building in bidding for project file used in building course Building Information Model.
Step 204, in the progress data, the resource data and the Building Information Model at least two are associated, then It is integrated into Visualization Model Bid Documents.
Wherein, Visualization Model Bid Documents refer to using computer graphics and image processing techniques, and data are turned Figure or image displaying are changed into the Bid Documents of terminal.
Specifically, second terminal is associated in progress data, resource data and Building Information Model at least two, whole Synthesis can show the Bid Documents in terminal.Such as second terminal both progress data and Building Information Model are associated, Both resource data and Building Information Model are associated or by progress data, resource data and Building Information Model three It is associated, so that technical bid and commercial bid be linked.
In one embodiment, both progress data and Building Information Model can be associated, by resource by server Both data and Building Information Model are associated or close progress data, resource data and Building Information Model three Connection.Server can also send progress data, resource data and Building Information Model after association to second terminal.
Step 206, the Visualization Model Bid Documents are read, and the data of the Visualization Model Bid Documents are shown Terminal.
Wherein, it preloads and refers to before the page all load, the process that some main contents are loaded.
Specifically, second terminal reads the Visualization Model Bid Documents, carries out to the Visualization Model Bid Documents pre- Load shows the data of the Visualization Model Bid Documents in second terminal.
In one embodiment, server reads the Visualization Model Bid Documents, to the Visualization Model Bid Documents It is preloaded, the data of the Visualization Model Bid Documents is shown in second terminal.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, obtain building construction bid file in into Degree is integrated according to, resource data and Building Information Model, can be associated with arrangement and method for construction with resource data, i.e., by technical bid and Commercial bid links, so that review result is more acurrate;Visualization Model Bid Documents are shown in terminal again, it can be more intuitive Ground shows the information such as the resource data in each stage in building course, improves evaluation efficiency, saves the evaluation time.
In one embodiment, as shown in figure 3, by the progress data, the resource data and the Building Information Model extremely Few two are associated, then are integrated into Visualization Model Bid Documents, comprising:
Step 302, the time in the progress data and the time in the resource data are obtained.
Wherein, the time in progress data refers to the time in each stage during architecture construction.In resource data Time refers to the time that the resource is used.
Specifically, second terminal obtains progress data and resource data from building construction bid file, from progress data The time in each stage during middle acquisition architecture construction and the time that acquisition resource is used from resource data.
In one embodiment, server can obtain progress data and resource data from building construction bid file, Obtain what resource was used from the time in each stage during acquisition architecture construction in progress data and from resource data Time can also send the time in the time and resource data in progress data to second terminal.
Step 304, according to the forming process of the time simulation Building Information Model in progress data.
Specifically, second terminal is according to the formation of the time simulation in each stage Building Information Model in progress data Journey.
In the present embodiment, such as the plan starting date of building is on September 1st, 2014, and time of accomplishment is in October, 2015 31 days, then total construction period is 426 days.During this period of time, second terminal can simulate progress, whole building information mould according to duration Type is 1, then daily progress is 1/426.When having downtime within the time, such as downtime is total up to 30 days, So daily progress is then 1/396.Second terminal or server are according to daily average advance simulant building information model Forming process.
In the present embodiment, there is the time of different phase within this period on October 31st, 1 day 1 of September in 2014, Second terminal can be according to the forming process of the time simulation Building Information Model of different phase.For example, on October 1st, 2014 is extremely On November 30th, 2014 is builds to foundation engineering, then second terminal is according to the process of the time simulation builds to foundation engineering.
In one embodiment, server can be according to the time simulation in each stage in the progress data architecture information mould The forming process of type can also send the forming process of the Building Information Model to second terminal.
Step 306, the time in the resource data is corresponding with the time in the progress data.
Specifically, second terminal searches the time in progress data according to the time in the resource data, and when by two Between it is corresponding.For example, the time in resource data is in August, 2018, then this time of in August, 2018 is searched in progress data, The two is corresponding.
In the present embodiment, second terminal can also search the time in resource data according to the time in progress data, and The time of the two is corresponding.
In one embodiment, server is searched the time in progress data according to the time in the resource data, and will Two times are corresponding.Second terminal obtains the time in time and progress data in corresponding resource data from server.
Step 308, according to the time in the resource data and the time in the progress data by the progress data, the resource The forming process of data and the Building Information Model is integrated into Visualization Model Bid Documents.
Specifically, second terminal is according to time relationship by the formation of progress data, resource data and Building Information Model Journey corresponds, and being integrated into can be in the model Bid Documents of terminal display, and the progress data, resource data and building are believed Breath model can be shown at the same interface.
In one embodiment, server can be according to time relationship by progress data, resource data and architecture information mould The forming process of type corresponds, and is integrated into and can also send to second terminal in the model Bid Documents of terminal display Visualization Model Bid Documents.
It, can be same according to the corresponding relationship of time in the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid It shows progress data, resource data and Building Information Model to one objective interface, technical bid and commercial bid is linked, made It is easy to operate, evaluation efficiency is improved, the evaluation time is saved.
In one embodiment, as shown in figure 4, by the progress data, the resource data and the Building Information Model extremely Few two are associated, then are integrated into Visualization Model Bid Documents, further includes:
Step 402, the progress data is associated with the Building Information Model.
Specifically, second terminal, which obtains, builds mark in progress data, wherein building mark is for distinguishing architecture storey With the mark in region etc., such as Stall or first area etc., and by progress data building mark with Building Information Model in Building mark it is corresponding.Second terminal is established according to the forming process of the time simulation Building Information Model in progress data Incidence relation between progress data and Building Information Model.
In one embodiment, mark is built in the available progress data of server, by the building mark in progress data Knowledge is corresponding with the building mark in Building Information Model, and according to the shape of the time simulation Building Information Model in progress data At process, the incidence relation between progress data and Building Information Model is established.
Step 404, the resource data is associated with the Building Information Model.
Specifically, resource data may include the resource that uses of resource of whole building, also may include certain of the building The resource that a part uses.Second terminal can be associated with Building Information Model by resource data by building mark, for example, The resource data of first area is associated with the first area in Building Information Model, or obtain whole building information model Resource data, it is associated with whole building information model, that is, establish the incidence relation of resource data Yu the Building Information Model.
In the present embodiment, server can be associated with Building Information Model by resource data by building mark, and builds The incidence relation of vertical resource data and the Building Information Model.
Step 406, it is built according to the incidence relation and the resource data of the progress data and the Building Information Model with this The incidence relation for building information model is integrated into Visualization Model Bid Documents.
Specifically, second terminal by associated progress data and Building Information Model and associated resource data and Building Information Model is integrated into Visualization Model Bid Documents.
In one embodiment, server is by associated progress data and Building Information Model and associated resource Data and Building Information Model are integrated into Visualization Model Bid Documents.
In the assessment of bids data linkage processing method of technical bid and commercial bid, by by progress data and Building Information Model It is associated, resource data is associated with Building Information Model, i.e., technical bid and commercial bid are linked, is integrated into visualization Model Bid Documents, can be associated with buildings and resources by arrangement and method for construction, keeps review result more accurate.
In one embodiment, as shown in figure 5, Fig. 5 is the schematic diagram of progress data table.It include the time in progress data table Such as 2014 and 2015 etc. it is without being limited thereto.In Engineering Zone containing building mark, such as first area, second area, workshop, Workshop or foundation engineering etc..Under normal circumstances, since engineering is multithreading construction, therefore engineering includes multiple time serieses.With For second area, the solid line of second area indicates hot work in progress, and the dotted line of second area indicates to stop work, and different nodes indicates Point and end time point at the beginning of a certain engineering.It is applied to the assessment of bids of technical bid and commercial bid with the progress data table of Fig. 5 It is in data linkage processing method, the progress data is associated with the Building Information Model, comprising: to obtain the progress data In time series;According to the forming process of the time series simulant building information model.
Wherein, time series refers to made of the chronological order arrangement by the numerical value of same statistical indicator by its generation Ordered series of numbers.
It specifically, include different time serieses in progress data and different time sequence is corresponding to be built builds Certain a part built, such as foundation engineering in first area, workshop or first area etc..Second terminal obtains in progress data Each period and corresponding building certain a part, simulate the forming process of the Building Information Model of the part respectively, Again by the Building Information Model of each building part, the Building Information Model of entire engineering is constructed.
In one embodiment, server obtains each period in progress data and a certain portion of corresponding building Point, the forming process of the Building Information Model of the part is simulated respectively, then passes through the Building Information Model of each building part, structure Build the Building Information Model of entire engineering.
In the present embodiment, such as the plan starting date of building is on September 1st, 2014, and time of accomplishment is in October, 2015 31 days, then total construction period is 426 days.During this period of time, second terminal or server can simulate progress according to duration, entirely build Building information model is 1, then daily progress is 1/426.When having downtime within the time, such as downtime is in total It is 30 days, then daily progress is then 1/396.Second terminal or server are according to daily average advance simulant building information The forming process of model.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, the time series in progress data is obtained, According to the forming process of time series simulant building information model, the progress situation of work progress can be intuitively shown, saving is commented Examine the time;And time spent according to construction etc. carries out the assessment of bids, keeps review result more acurrate.
It is in one embodiment, as shown in fig. 6, the resource data is associated with the Building Information Model, comprising:
Step 602, the component in the Building Information Model is searched according to the component mark in the resource data, wherein should Resource data includes structure attribute data, component usage amount data and funds data.
Wherein, component includes concrete, reinforcing bar and ceramic tile etc., further includes wall, beam, plate, column, stake, stair, railing and door and window Deng but not limited to this, component mark is the unique identification of component, can be component name or the corresponding component number of component name Deng.Component usage amount data refer to the usage amount of the component used in the Building Information Model He the component.
Specifically, include component mark in structure attribute data, and also include component mark in Building Information Model.Second Terminal searches corresponding component mark according to the component mark in resource data from Building Information Model, then obtains corresponding structure Part.
In one embodiment, server can be searched from Building Information Model according to the component mark in resource data Corresponding component mark then obtains corresponding component.
Step 604, by the resource data the corresponding structure attribute data of component mark and component usage amount data with Component in the Building Information Model is associated.
Specifically, second terminal will be in the corresponding structure attribute data of component mark and buildings model in resource data Component is associated.For example, structure attribute data such as following table, when second terminal receives the instruction such as click or frame choosing, second The content of terminal display such as following table.Similarly, second terminal is by the corresponding component usage amount number of component mark in resource data According to associated with the component in buildings model.
In one embodiment, server can by resource data the corresponding structure attribute data of component mark with build The component built in model is associated.Similarly, server can be by the corresponding component usage amount of component mark in resource data Data are associated with the component in buildings model.Server can also be by associated structure attribute data and component usage amount number Terminal is sent to according to the Building Information Model.
Step 606, the funds data is associated with the Building Information Model.
Wherein, funds data includes component funds data and labour's funds data etc..Component funds data includes single The funds data that the funds data of component and the component of whole building information model are spent.
Specifically, second terminal is identified according to building by component funds data and labour's funds data and architecture information mould Type is associated.For example, second terminal will build component funds data and Building Information Model of first layer according to building mark First layer it is corresponding or the labour's funds data for building first layer is related to the first layer of the Building Information Model Connection, or the funds data of component component corresponding with the component mark in Building Information Model is associated.
In one embodiment, server by component funds data and labour's funds data and is built according to building mark Information model is associated.Such as server will build component funds data and architecture information mould of first layer according to building mark The first layer of type is corresponding, or the labour's funds data for building first layer is related to the first layer of the Building Information Model Connection, or the funds data of component component corresponding with the component mark in Building Information Model is associated.Server may be used also Associated funds data and Building Information Model are sent to second terminal.
In the present embodiment, component funds data can be obtained according to component usage amount data, such as the usage amount of concrete is 10000 cubic metres, then second terminal or server obtain the price of every cubic metre of concrete, and second terminal or server are according to every The calculation of price of cubic meter goes out total concrete funds data.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, by resource data structure attribute number, Component usage amount data and funds data are associated with architecture information, can intuitively exhibition building information model and resource use Situation improves evaluation efficiency, also makes review result more acurrate.
In one embodiment, as shown in fig. 7, showing the data of the Visualization Model Bid Documents in terminal, comprising:
Step 702, which is screened according to preset condition.
Wherein, preset condition refers to progress data, funds data or the pre-set rule condition of Building Information Model, Such as the funds data of whole building model is limited to less than or is equal to 50,000,000 yuan, then is higher than 50,000,000 yuan of Visualization Model Bid Documents are eliminated.
Specifically, second terminal obtains the selection instruction to Visualization Model Bid Documents, which includes to labor Power funds data, component funds data, the funds data of whole building information model, structure attribute data or component use Measure the selection instruction of at least one of data.Second terminal obtains preset condition according to selection instruction, screens the visualization mould Type Bid Documents.
In one embodiment, server can obtain selection instruction from second terminal, be obtained according to selection instruction default Condition screens the Visualization Model Bid Documents.
Step 704, when the Visualization Model Bid Documents meet the preset condition, by the Visualization Model Bid Documents Data show in terminal.
Specifically, when the Visualization Model Bid Documents meet preset condition, this is met preset condition by second terminal Visualization Model Bid Documents data show in terminal.
In one embodiment, when the Visualization Model Bid Documents meet preset condition, server can be by the symbol The data for closing the Visualization Model Bid Documents of preset condition are shown in second terminal.
Step 706, when the Visualization Model Bid Documents do not meet the preset condition, the Visualization Model Bid Documents Data do not show in terminal.
Specifically, when the Visualization Model Bid Documents do not meet preset condition, second terminal does not show the visualization The data of model Bid Documents.
In the present embodiment, when second terminal is obtained to superseded when checking instruction of Visualization Model Bid Documents, second Terminal can show the superseded Visualization Model bidding documents.
In one embodiment, when the Visualization Model Bid Documents do not meet preset condition, server is not to second Terminal sends the Visualization Model Bid Documents.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, pass through screening Visualization Model bidding documents text Part can reduce the Visualization Model Bid Documents for needing to show in second terminal, save the evaluation time.
In one embodiment, as shown in figure 8, for the surface chart that Visualization Model Bid Documents data are shown, wherein 802 For Building Information Model.It include embodiment in Fig. 8, model evaluation, schedule evaluation, fund resources, inventory is evaluated, flat cost is commented It examines and the interface controls such as review comment.It include the date in Fig. 8, second terminal can show progress data and fund according to selection instruction Data etc..It is applied to surface chart as shown in Figure 8 with the assessment of bids data linkage processing method of the technical bid and commercial bid, it can by this Data depending on changing model Bid Documents are shown in terminal, further includes: by the progress data, the resource data and the architecture information mould Type is corresponding in three-dimensional scenic to be shown, wherein the resource data is shown in the form of curve or inventory.
Specifically, progress data, resource data and Building Information Model are shown at same interface in second terminal.Such as figure Shown in 8, second terminal can obtain selection instruction, such as the selection instruction for selecting on July 1,1 day to 2016 June in 2016 The equal times but not limited to this.Second terminal shows that whole building during this period of time is believed according to progress data and the selection instruction Cease the forming process of model.Alternatively, second terminal shows the progress data of each different time sequence, then when receiving to this Between sequence when checking instruction of progress data, according to the time series show simulant building information model forming process.
The curve form of resource data includes labour force curve, concrete usage amount curve, reinforcing bar usage amount, other weeks Turn at least one of usage amount curve and the fund curve of material but not limited to this.Resource data curve is cross with the time Axis, expense is the longitudinal axis or use of funds amount is the longitudinal axis, and two kinds of patterns of current value curve and aggregate-value curve can be presented.Such as Shown in Fig. 8, Building Information Model is threedimensional model, second terminal Building Information Model lower section but be not limited to lower section and show work as Preceding value curve, abscissa are the time, and the overstriking black curve in figure is that worker works 8 hours and needs the fund that pays, in addition one Curve is the usage amount curve of concrete, and the two can be shown in the same coordinate system.When second terminal shows aggregate-value curve, Using the time as abscissa, such as the labour's fund spent in June, 2016 is that the labour's fund spent in July, 20,000,2016 is 1.8 ten thousand, then the curve values in July, 2016 shown are 3.8 ten thousand.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, progress data and Building Information Model are existed It is corresponding in three-dimensional scenic to show, it can more intuitively show mobilization;Second terminal shows that fund and component use Plan can intuitively show the information such as the resource data in each stage in building course, evaluation efficiency be improved, when saving evaluation Between.
In one embodiment, the data of the Visualization Model Bid Documents are shown in terminal, further includes: by the building Information model is shown in three-dimensional scenic;When detecting that the resource to the Building Information Model checks instruction, according to the resource Check that instruction shows the resource data corresponding with the Building Information Model in the three-dimensional scenic;When detecting to the building When the progress of information model checks instruction, check that instruction is believed according to the building of the time simulation in the progress data according to the progress The forming process of model is ceased, and is shown in the three-dimensional scenic.
Specifically, which is threedimensional model.Second terminal can obtain progress and check instruction, such as the progress Check instruction for checking the times such as on July 1st, 1 day 1 June in 2016 but not limited to this progress data.Second terminal Check that instruction shows the forming process of whole building information model during this period of time according to progress data and the progress.Or Person, second terminal show the progress data of each different time sequence, then when receiving to the progress data of the time series When checking instruction, the forming process of simulant building information model is shown according to the time series.
When second terminal is detected to resource data when checking instruction, by resource data with list, inventory or curve Form is shown in the three-dimensional scenic.When second terminal detects the hiding instruction to resource data, not showing resource data. It specifically, will be in structure attribute data and component usage amount data when second terminal is detected to component when checking instruction One or two are shown in the three-dimensional scenic in the form of curve after list, inventory.When second terminal is detected to a certain area The selection instruction of the Building Information Model in domain or when checking instruction, the corresponding resource data in the region is shown, such as labor Power funds data, component funds data and equipment funds data etc..
In the present embodiment, second terminal can also show the inventory of Visualization Model Bid Documents in " inventory is checked " interface Project amount, subitem bill of quantities, measure project, sundry item, talent's machine summary sheet and accounts summary etc..It should " inventory Check " the anti-function of looking into model of interface also support checklist, instruction is checked to inventory when second terminal receives, inventory is corresponding Model be highlighted.
In the present embodiment, second terminal can show funds data in " flat cost is checked " interface.Based on architecture information mould Type, by obtain choose, frame choosing, the instruction such as component inquiry, the corresponding flat cost of screening checks detailed bill, can to cost into Row auxiliary evaluation.Second terminal can also search window by component, quickly filter out the component item for needing to evaluate.In addition, second Terminal can also obtain the different screening items such as monomer, floor, element type, flowing water section, time by self-defined inquiry function Part shows the flat cost for meeting respective conditions model.
In the assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, opened up in three-dimensional scenic according to checking to instruct Show progress data or resource data, can intuitively exhibition building information model construction progress and resource service condition, improve Efficiency is evaluated, while saving the spacial flex at interface.
In one embodiment, the assessment of bids data linkage processing method of a kind of technical bid and commercial bid is provided, including with Lower step:
Step (a1) obtains progress data, resource data and Building Information Model in building construction bid file.
Step (a2) obtains the time in the progress data and the time in the resource data.
Step (a3), according to the forming process of the time simulation Building Information Model in the progress data.
Step (a4), the time in the resource data is corresponding with the time in the progress data.
Step (a5), according to the time in the resource data and the time in the progress data by the progress data, the money The forming process of source data and the Building Information Model is integrated into Visualization Model Bid Documents.
Following step (a6), step (a7) and step (a8) are not required execution, can be obtained according to selection instruction default Condition does not execute following step (a6), step (a7) and step (a8) when preset condition has not been obtained.
Step (a6) screens the Visualization Model Bid Documents according to preset condition.
Step (a7), when the Visualization Model Bid Documents meet the preset condition, by the Visualization Model bidding documents text The data of part are shown in terminal.
It when Visualization Model Bid Documents meet preset condition, executes step (a9), or works as Visualization Model bidding documents When file meets preset condition, step (a10), step (a11) and step (a12) are executed.
Step (a8), when the Visualization Model Bid Documents do not meet the preset condition, the Visualization Model bidding documents text The data of part are not shown in terminal.
When Visualization Model Bid Documents do not meet preset condition, step (a8) is final step.
There are two types of methods of exhibiting for the Visualization Model Bid Documents, and one of methods of exhibiting is step (a9), another Methods of exhibiting is step (a10), step (a11) and step (a12).
Step (a9), the corresponding displaying in three-dimensional scenic by the progress data, the resource data and the Building Information Model, Wherein, which is shown in the form of curve or inventory.
Step (a10), which is shown in three-dimensional scenic.
Step (a11) checks instruction according to the resource when detecting that the resource to the Building Information Model checks instruction The resource data corresponding with the Building Information Model is shown in the three-dimensional scenic.
Step (a12) checks instruction according to the progress when detecting that the progress to the Building Information Model checks instruction According to the forming process of the time simulation Building Information Model in the progress data, and shown in the three-dimensional scenic.
The assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, by obtaining in building construction bid file Progress data, resource data and Building Information Model are integrated, and can be associated with arrangement and method for construction with buildings and resources, i.e., by technical bid It links with commercial bid, so that review result is more acurrate;Visualization Model Bid Documents are shown in terminal again, it can be more straight It sees ground and shows the information such as the resource data in each stage in building course, improve evaluation efficiency, save the evaluation time.
In one embodiment, the assessment of bids data linkage processing method of a kind of technical bid and commercial bid is provided, including with Lower step:
Step (b1) obtains progress data, resource data and Building Information Model in building construction bid file.
Step (b2), obtains the time series in the progress data.
Step (b3), according to the forming process of the time series simulant building information model.
Step (b4) searches the component in the Building Information Model according to the component mark in the resource data, wherein should Resource data includes structure attribute data, component usage amount data and funds data.
Step (b5), by the resource data the corresponding structure attribute data of component mark and component usage amount data with Component in the Building Information Model is associated.
Step (b6), the funds data is associated with the Building Information Model.
Step (b7) is built according to the incidence relation and the resource data of the progress data and the Building Information Model with this The incidence relation for building information model is integrated into Visualization Model Bid Documents.
Following step (b8), step (b9) and step (b10) are not required execution, can be obtained according to selection instruction default Condition does not execute following step (b8), step (b9) and step (b10) when preset condition has not been obtained.
Step (b8) screens the Visualization Model Bid Documents according to preset condition.
Step (b9), when the Visualization Model Bid Documents meet the preset condition, by the Visualization Model bidding documents text The data of part are shown in terminal.
It when Visualization Model Bid Documents meet preset condition, executes step (a9), or works as Visualization Model bidding documents When file meets preset condition, step (a10), step (a11) and step (a12) are executed.
Step (b10), when the Visualization Model Bid Documents do not meet the preset condition, the Visualization Model bidding documents text The data of part are not shown in terminal.
When Visualization Model Bid Documents do not meet preset condition, step (a8) is final step.
There are two types of methods of exhibiting for the Visualization Model Bid Documents, and one of methods of exhibiting is step (b11), another Methods of exhibiting is step (b12), step (b13) and step (b14).
The progress data, the resource data and the Building Information Model are corresponded to exhibition by step (b11) in three-dimensional scenic Show, wherein the resource data is shown in the form of curve or inventory.
Step (b12), which is shown in three-dimensional scenic.
Step (b13) checks instruction according to the resource when detecting that the resource to the Building Information Model checks instruction The resource data corresponding with the Building Information Model is shown in the three-dimensional scenic.
Step (b14) checks instruction according to the progress when detecting that the progress to the Building Information Model checks instruction According to the forming process of the time simulation Building Information Model in the progress data, and shown in the three-dimensional scenic.
The assessment of bids data linkage processing method of above-mentioned technical bid and commercial bid, by obtaining in building construction bid file Progress data, resource data and Building Information Model are integrated, and can be associated with arrangement and method for construction with buildings and resources, i.e., by technical bid It links with commercial bid, so that review result is more acurrate;Visualization Model Bid Documents are shown in terminal again, it can be more straight It sees ground and shows the information such as the resource data in each stage in building course, improve evaluation efficiency, save the evaluation time.
It should be understood that although each step in the flow chart of Fig. 2-4 and Fig. 6-7 is successively shown according to the instruction of arrow Show, but these steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly state otherwise herein, this There is no stringent sequences to limit for the execution of a little steps, these steps can execute in other order.Moreover, Fig. 2-4 and figure At least part step in 6-7 may include that perhaps these sub-steps of multiple stages or stage be not necessarily for multiple sub-steps It is so to execute completion in synchronization, but can execute at different times, these sub-steps or stage execute sequence Also it is not necessarily and successively carries out, but can be at least part of the sub-step or stage of other steps or other steps It executes in turn or alternately.
In one embodiment, as shown in figure 9, providing the assessment of bids data linkage processing system of a kind of technical bid and commercial bid System, comprising: data acquisition module 902, bidding documents integrate module 904 and bidding documents display module 906, in which:
Data acquisition module 902, for obtaining the progress data in building construction bid file, resource data and building letter Cease model.
Specifically, data acquisition module 902 is used to obtain the building in building construction bid file from server and build Generated data, the Building Information Model of the building resource data used in building course and the building in the process.
Bidding documents integrates module 904, and being used for will be at least two in the progress data, the resource data and the Building Information Model It is associated, then is integrated into Visualization Model Bid Documents.
Specifically, bidding documents integrates module 904 for will be at least two in progress data, resource data and Building Information Model It is associated, is integrated into the Bid Documents that can be shown in terminal.Such as server progress data is associated with Building Information Model, Resource data is associated with Building Information Model or closes progress data, resource data and Building Information Model three Connection.
Bidding documents display module 906, for reading the Visualization Model Bid Documents, and by the Visualization Model Bid Documents Data show in terminal.
Specifically, bidding documents display module 906 is for reading the Visualization Model Bid Documents, to the Visualization Model bidding documents File is preloaded, and the data of the Visualization Model Bid Documents are shown in terminal.
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, obtain building construction bid file in into Degree is integrated according to, resource data and Building Information Model, can be associated with arrangement and method for construction with resource data, i.e., by technical bid and Commercial bid links, so that review result is more acurrate;Visualization Model Bid Documents are shown in terminal again, it can be more intuitive Ground shows the information such as the resource data in each stage in building course, improves evaluation efficiency, saves the evaluation time.
In one embodiment, bidding documents integrates module 904 for obtaining time and the resource data in the progress data In time;According to the forming process of the time simulation Building Information Model in progress data;By in the resource data when Between it is corresponding with the time in the progress data;It should be into according to the time in the resource data and the time in the progress data The forming process of degree evidence, the resource data and the Building Information Model is integrated into Visualization Model Bid Documents.
Specifically, bidding documents integrates module 904 and is used to obtain progress data and resource data from building construction bid file, From in progress data obtain architecture construction during each stage time and from resource data obtain resource use when Between;According to the forming process of the time simulation in each stage Building Information Model in progress data;According in the resource data Time search the time in progress data, and it is two times are corresponding;According to time relationship by progress data, resource data and The forming process of Building Information Model corresponds, and being integrated into can be in the model Bid Documents of terminal display, and the progress Data, resource data and Building Information Model can be shown at the same interface.
In the present embodiment, bidding documents integrate module 904 for according in progress data time search resource data in when Between, and the time of the two is corresponding.
In the present embodiment, such as the plan starting date of building is on September 1st, 2014, and time of accomplishment is in October, 2015 31 days, then total construction period is 426 days.During this period of time, bidding documents integrates module 904 for simulating progress according to duration, entirely Building Information Model is 1, then daily progress is 1/426.When having downtime within the time, such as downtime is total It is altogether 30 days, then daily progress is then 1/396.Bidding documents integrates module 904 for building according to daily average advance simulation Build the forming process of information model.
In the present embodiment, there is the time of different phase within this period on October 31st, 1 day 1 of September in 2014, Bidding documents integrates the forming process for the time simulation Building Information Model that module 904 is used for according to different phase.For example, 2014 10 On November 30th, 1 day 1 moon is builds to foundation engineering, then bidding documents integrates module 904 for according to the time simulation basis work The process of Cheng Jianshe.
It, can be same according to the corresponding relationship of time in the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid It shows progress data, resource data and Building Information Model to one objective interface, technical bid and commercial bid is linked, made It is easy to operate, evaluation efficiency is improved, the evaluation time is saved.
In one embodiment, bidding documents integrate module 904 be also used to the progress data is related to the Building Information Model Connection;The resource data is associated with the Building Information Model;It is closed according to the association of the progress data and the Building Information Model System and the resource data and the incidence relation of the Building Information Model are integrated into Visualization Model Bid Documents.
Specifically, bidding documents integrates module 904 and is also used to obtain building mark in progress data, wherein building mark is to use In the mark for distinguishing architecture storey and region etc., such as Stall or first area etc., and by progress data building mark with Building mark in Building Information Model is corresponding.Bidding documents is integrated module 904 and is also used to according to the time simulation in progress data The forming process of Building Information Model establishes the incidence relation between progress data and Building Information Model.
Bidding documents integrate module 904 be also used to by building mark resource data is associated with Building Information Model, for example, The resource data of first area is associated with the first area in Building Information Model, or obtain whole building information model Resource data, it is associated with whole building information model.Bidding documents integrate module 904 be also used to associated progress data and Building Information Model and associated resource data and Building Information Model are integrated into Visualization Model Bid Documents.
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, by by progress data and architecture information mould Type is associated, associated with Building Information Model by resource data, i.e., technical bid and commercial bid links, and is integrated into visual Change model Bid Documents, can be associated with buildings and resources by arrangement and method for construction, keep review result more accurate.
In one embodiment, bidding documents integrates module 904 and is also used to obtain time series in the progress data;According to this The forming process of time series simulant building information model.
It specifically, include that each different period and each different time sections are corresponding wait build in progress data Building certain a part, such as foundation engineering in first area, first area etc..Bidding documents integrates module 904 and is also used to obtain Certain a part for taking each period and corresponding building in progress data, simulates the Building Information Model of the part respectively Forming process, then by the Building Information Model of each building part, construct the Building Information Model of entire engineering.
In the present embodiment, such as the plan starting date of building is on September 1st, 2014, and time of accomplishment is in October, 2015 31 days, then total construction period is 426 days.During this period of time, bidding documents integrates module 904 and is also used to simulate progress according to duration, whole A Building Information Model is 1, then daily progress is 1/426.When having downtime within the time, such as downtime It is total up to 30 days, then daily progress is then 1/396.Bidding documents is integrated module 904 and is also used to according to daily average advance mould The forming process of quasi- Building Information Model.
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, the time series in progress data is obtained, According to the forming process of time series simulant building information model, the progress situation of work progress can be intuitively shown, saving is commented Examine the time;And time spent according to construction etc. carries out the assessment of bids, keeps review result more acurrate.
In one embodiment, bidding documents integrates module 904 and is also used to be somebody's turn to do according to the component mark lookup in the resource data Component in Building Information Model, wherein the resource data includes structure attribute data, component usage amount data and fund number According to;By the corresponding structure attribute data of component mark and component usage amount data and the Building Information Model in the resource data In component it is associated;The funds data is associated with the Building Information Model.
Specifically, include component mark in structure attribute data, and also include component mark in Building Information Model.Bidding documents Module 904 is integrated to be also used to search corresponding component mark from Building Information Model according to the component mark in resource data, Then obtain corresponding component.
Bidding documents is integrated module 904 and is also used to the corresponding structure attribute data of component mark and building mould in resource data Component in type is associated.Bidding documents integrates module 904 and is also used to show and belong to when receiving click or frame selects the component etc. to instruct Property title and attribute value.Similarly, bidding documents integrates module 904 and is also used to make the corresponding component of component mark in resource data Usage data is associated with the component in buildings model.
Bidding documents integrates module 904 and is also used to be identified according to building by component funds data and labour's funds data and building Information model is associated.For example, bidding documents integrates the component fund that module 904 is also used to build first layer according to building mark Data are corresponding with the first layer of Building Information Model, or labour's funds data and the architecture information that will build first layer The first layer of model is associated, or by the funds data of component component phase corresponding with the component mark in Building Information Model Association.
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, by resource data structure attribute number, Component usage amount data and funds data are associated with architecture information, can intuitively exhibition building information model and resource use Situation improves evaluation efficiency, also makes review result more acurrate.
In one embodiment, bidding documents display module 906 is used to screen the Visualization Model bidding documents text according to preset condition Part;When the Visualization Model Bid Documents meet the preset condition, the data of the Visualization Model Bid Documents are shown Terminal;When the Visualization Model Bid Documents do not meet the preset condition, the data of the Visualization Model Bid Documents are not opened up Show in terminal.
Specifically, bidding documents display module 906 is used to obtain the corresponding preset data of preset condition, screening according to selection instruction The Visualization Model Bid Documents.Such as the funds data of whole building model be limited to less than or be equal to 50,000,000 yuan, then it is high It is eliminated in 50,000,000 yuan of Visualization Model Bid Documents.When the Visualization Model Bid Documents meet preset condition, mark The data that book display module 906 is used to meet this Visualization Model Bid Documents of preset condition are shown in terminal.When this can When not meeting preset condition depending on changing model Bid Documents, bidding documents display module 906 is not for showing the Visualization Model bidding documents text The data of part.
In the present embodiment, bidding documents display module 906 is used for when acquisition checking to superseded Visualization Model Bid Documents When instruction, the superseded Visualization Model bidding documents is shown.
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, pass through screening Visualization Model bidding documents text Part can reduce the Visualization Model Bid Documents for needing to show, save the evaluation time.
In one embodiment, bidding documents display module 906 is used for the progress data, the resource data and the architecture information Model is corresponding in three-dimensional scenic to be shown, wherein the resource data is shown in the form of curve or inventory.
Specifically, bidding documents display module 906 is used to show progress data, resource data and Building Information Model same Interface.Bidding documents display module 906 is for obtaining selection instruction, such as the selection instruction for selecting 1 day to 2016 June in 2016 The times such as on July 1, but not limited to this progress data.Bidding documents display module 906 is used to be referred to according to progress data and the selection Enable the forming process for showing whole building information model during this period of time.Alternatively, bidding documents display module 906 is each for showing The progress data of a different time sequence, then when receiving to the progress data of the time series when checking instruction, according to this The forming process of time series displaying simulant building information model.
In one embodiment, bidding documents display module 906 is also used to detect and look into the resource of the Building Information Model When seeing instruction, check that instruction opens up the resource data corresponding with the Building Information Model in the three-dimensional scenic according to the resource Show;When detecting that the progress to the Building Information Model checks instruction, check instruction according to the progress data according to the progress In the time simulation Building Information Model forming process, and shown in the three-dimensional scenic.
Specifically, which is threedimensional model.Bidding documents display module 906 is also used to obtain progress and checks finger Enable, for example, the progress check instruction for checking the times such as on July 1st, 1 day 1 June in 2016 but not limited to this progress Data.Bidding documents display module 906 is also used to check that instruction shows during this period of time entire according to progress data and the progress The forming process of Building Information Model.Bidding documents display module 906 is also used to show the progress data of each different time sequence, then When receiving to the progress data of the time series when checking instruction, simulant building information model is shown according to the time series Forming process.
Specifically, bidding documents display module 906 is also used to when detecting to resource data when checking instruction, by resource data It is shown in the three-dimensional scenic in the form of list, inventory or curve.Bidding documents display module 906 is also used to work as and detect to resource When the hiding instruction of data, not showing resource data.Specifically, bidding documents display module 906 is also used to work as and detect to component When checking instruction, by one or both of structure attribute data and component usage amount data with the shape of curve after list, inventory Formula is shown in the three-dimensional scenic.Bidding documents display module 906 is also used to work as and detect to some region of Building Information Model Selection instruction or when checking instruction, the corresponding resource data in the region is shown, such as labour's funds data, component money Golden number evidence and equipment funds data etc..
In the assessment of bids data linkage processing system of above-mentioned technical bid and commercial bid, progress data and Building Information Model are existed It is corresponding in three-dimensional scenic to show, it can more intuitively show mobilization;Second terminal shows that fund and component use Plan can intuitively show the information such as the resource data in each stage in building course, evaluation efficiency be improved, when saving evaluation Between.
The specific restriction of assessment of bids data linkage processing system about technical bid and commercial bid may refer to above for The restriction of the assessment of bids data linkage processing method of technical bid and commercial bid, details are not described herein.Above-mentioned technical bid and commercial bid Modules in assessment of bids data linkage processing system can be realized fully or partially through software, hardware and combinations thereof.It is above-mentioned Each module can be embedded in the form of hardware or independently of in the processor in computer equipment, can also be stored in a software form In memory in computer equipment, the corresponding operation of the above modules is executed in order to which processor calls.
In one embodiment, a kind of computer equipment is provided, which can be terminal, internal structure Figure can be as shown in Figure 10.The computer equipment includes the processor connected by system bus, memory, network interface, shows Display screen and input system.Wherein, the processor of the computer equipment is for providing calculating and control ability.The computer equipment Memory includes non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system and computer Program.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The meter The network interface for calculating machine equipment is used to communicate with external terminal by network connection.When the computer program is executed by processor To realize the assessment of bids data linkage processing method of a kind of technical bid and commercial bid.The display screen of the computer equipment can be liquid crystal Display screen or electric ink display screen, the input system of the computer equipment can be the touch layer covered on display screen, It can be the key being arranged on computer equipment shell, trace ball or Trackpad, can also be external keyboard, Trackpad or mouse Mark etc..
It will be understood by those skilled in the art that structure shown in Figure 10, only part relevant to application scheme The block diagram of structure, does not constitute the restriction for the computer equipment being applied thereon to application scheme, and specific computer is set Standby may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, is stored in memory Computer program, the processor perform the steps of the progress obtained in building construction bid file when executing computer program Data, resource data and Building Information Model;It will be at least two in the progress data, the resource data and the Building Information Model It is associated, then is integrated into Visualization Model Bid Documents;Read the Visualization Model Bid Documents, and by the Visualization Model The data of Bid Documents are shown in terminal.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performed the steps of when being executed by processor obtain building construction bid file in progress data, resource data and Building Information Model;In the progress data, the resource data and the Building Information Model at least two are associated, then is integrated At Visualization Model Bid Documents;Read the Visualization Model Bid Documents, and by the data of the Visualization Model Bid Documents It shows in terminal.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.

Claims (10)

1. the assessment of bids data linkage processing method of a kind of technical bid and commercial bid, which comprises
Obtain progress data, resource data and the Building Information Model in building construction bid file;
In the progress data, the resource data and the Building Information Model at least two are associated, then is integrated into Visualization Model Bid Documents;
The Visualization Model Bid Documents are read, and the data of the Visualization Model Bid Documents are shown in terminal.
2. the method according to claim 1, wherein described by the progress data, the resource data and institute It states in Building Information Model at least two to be associated, then is integrated into Visualization Model Bid Documents, comprising:
Obtain the time in the time and the resource data in the progress data;
The forming process of the Building Information Model according to the time simulation in progress data;
Time in the resource data is corresponding with the time in the progress data;
According to the time in the time and the progress data in the resource data by the progress data, the resource data It is integrated into Visualization Model Bid Documents with the forming process of the Building Information Model.
3. the method according to claim 1, wherein described by the progress data, the resource data and institute It states in Building Information Model at least two to be associated, then is integrated into Visualization Model Bid Documents, further includes:
The progress data is associated with the Building Information Model;
The resource data is associated with the Building Information Model;
Believed according to the incidence relation and the resource data of the progress data and the Building Information Model and the building The incidence relation of breath model is integrated into Visualization Model Bid Documents.
4. according to the method described in claim 3, it is characterized in that, described by the progress data and the Building Information Model It is associated, comprising:
Obtain the time series in the progress data;
According to the forming process of the time series simulant building information model.
5. according to the method described in claim 3, it is characterized in that, described by the resource data and the Building Information Model It is associated, comprising:
The component in the Building Information Model is searched according to the component mark in the resource data, wherein the number of resources According to including structure attribute data, component usage amount data and funds data;
By the corresponding structure attribute data of component mark and component usage amount data and building letter in the resource data The component ceased in model is associated;
The funds data is associated with the Building Information Model.
6. the method according to claim 1, wherein the data exhibition by the Visualization Model Bid Documents Show in terminal, comprising:
The Visualization Model Bid Documents are screened according to preset condition;
When the Visualization Model Bid Documents meet the preset condition, by the data of the Visualization Model Bid Documents It shows in terminal;
When the Visualization Model Bid Documents do not meet the preset condition, the data of the Visualization Model Bid Documents It does not show in terminal.
7. the method according to claim 1, wherein the data exhibition by the Visualization Model Bid Documents Show in terminal, further includes:
The corresponding displaying in three-dimensional scenic by the progress data, the resource data and the Building Information Model, wherein institute Resource data is stated to show in the form of curve or inventory;
Alternatively, the Building Information Model is shown in three-dimensional scenic;
When detecting that the resource to the Building Information Model checks instruction, check that instruction will be built with described according to the resource The corresponding resource data of information model is built to show in the three-dimensional scenic;
When detecting that the progress to the Building Information Model checks instruction, according to the progress check instruction according to it is described into The forming process of Building Information Model described in time simulation of the degree in, and shown in the three-dimensional scenic.
8. the assessment of bids data linkage processing system of a kind of technical bid and commercial bid, which is characterized in that the system comprises:
Data acquisition module, for obtaining progress data, resource data and Building Information Model in building construction bid file;
Bidding documents integrates module, and being used for will be at least two in the progress data, the resource data and the Building Information Model It is associated, then is integrated into Visualization Model Bid Documents;
Bidding documents display module, reads the Visualization Model Bid Documents, and by the data of the Visualization Model Bid Documents It shows in terminal.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 7 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any one of claims 1 to 7 is realized when being executed by processor.
CN201811399990.5A 2018-11-22 2018-11-22 The assessment of bids data linkage processing method and system of technical bid and commercial bid Pending CN109800938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811399990.5A CN109800938A (en) 2018-11-22 2018-11-22 The assessment of bids data linkage processing method and system of technical bid and commercial bid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811399990.5A CN109800938A (en) 2018-11-22 2018-11-22 The assessment of bids data linkage processing method and system of technical bid and commercial bid

Publications (1)

Publication Number Publication Date
CN109800938A true CN109800938A (en) 2019-05-24

Family

ID=66556376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811399990.5A Pending CN109800938A (en) 2018-11-22 2018-11-22 The assessment of bids data linkage processing method and system of technical bid and commercial bid

Country Status (1)

Country Link
CN (1) CN109800938A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM
CN105912651A (en) * 2016-04-11 2016-08-31 中邮通建设咨询有限公司 IFC-based data interaction method and corresponding Web-BIM engineering information integration management system
CN107229697A (en) * 2017-05-24 2017-10-03 辽宁工程技术大学 A kind of building construction bid document generating method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM
CN105912651A (en) * 2016-04-11 2016-08-31 中邮通建设咨询有限公司 IFC-based data interaction method and corresponding Web-BIM engineering information integration management system
CN107229697A (en) * 2017-05-24 2017-10-03 辽宁工程技术大学 A kind of building construction bid document generating method

Similar Documents

Publication Publication Date Title
Lu et al. Design for manufacture and assembly (DfMA) in construction: The old and the new
Smith et al. Building information modeling: a strategic implementation guide for architects, engineers, constructors, and real estate asset managers
CN101258490A (en) Designating, setting and discovering parameters for spreadsheet documents
EP0725954A1 (en) A system and method for defining a process structure for performing a task
Ottaviano et al. Monopolistic competition, multiproduct firms and optimum product diversity
CN109800445A (en) The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN107958321A (en) Model verifies system and method
Staub-French et al. Linear scheduling and 4D visualization
Shodiyev et al. WAYS TO SOLVE ECONOMIC PROBLEMS IN ANALYSIS OF ENTERPRISES
Lee et al. Web-enabled system dynamics model for error and change management on concurrent design and construction projects
Allen et al. Promise and barriers to technology enabled and open project team collaboration
Žurić et al. Integrating HBIM and sustainability certification: A pilot study using GBC historic building certification
KR101071169B1 (en) Method and system on construction appraising data processing
Ergen et al. Formalization of the flow of component-related information in precast concrete supply chains
Wilson Mastering project time management, cost control, and quality management: Proven methods for controlling the three elements that define project deliverables
EP1527401A2 (en) Generation of summary costs and benefits of an enterprise portal
CN109800938A (en) The assessment of bids data linkage processing method and system of technical bid and commercial bid
Tolettini et al. Industry 4.0: New paradigms of value creation for the steel sector
Oleynikov et al. Factor Analysis of Basic Production
Rashidi Evaluation and ranking of discrete simulation tools
Browning et al. Incorporating Economic Decisions into Reservoir Simulation to Support Accurate and Efficient Optimization and Analysis of Field Development Strategies
Khan et al. A COMPARATIVE STUDY OF MULTISTORIED BUILDING USING THE BUILDING INFORMATION MODELLING (BIM) METHOD & CONVENTIONAL MODELING METHOD
Han There is value in operational flexibility: An intelligent well application
Meulengracht et al. An Optimum Cloud Based Approach to Timely and Secure After-Tax Economic Analysis and Decision Making
Ekeh et al. Optimality Test of Marginal Field Development Financing Arrangements in Nigeria

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190524