CN109798803A - A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator - Google Patents

A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator Download PDF

Info

Publication number
CN109798803A
CN109798803A CN201811545585.XA CN201811545585A CN109798803A CN 109798803 A CN109798803 A CN 109798803A CN 201811545585 A CN201811545585 A CN 201811545585A CN 109798803 A CN109798803 A CN 109798803A
Authority
CN
China
Prior art keywords
coating
metal pipe
pipe material
preparation
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811545585.XA
Other languages
Chinese (zh)
Inventor
李小红
王跃河
杨献伟
周盼盼
冯向伟
冯铁良
张琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Kelong Group Co Ltd
Original Assignee
Henan Kelong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Kelong Group Co Ltd filed Critical Henan Kelong Group Co Ltd
Priority to CN201811545585.XA priority Critical patent/CN109798803A/en
Publication of CN109798803A publication Critical patent/CN109798803A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator, metal pipe material outer surface is coated with hot melt conductive adhesive film.The metal tube material includes aluminum pipe, iron pipe and copper pipe, and metal pipe material surface is being formed by curing one layer of corrosion protective covering after coating.The metal pipe material surface coating is by spraying, dip-coating, Extrusion Coating, the one of which for squeezing out cladding, longitudinal cladding, winding cladding.The preparation method and equipment of evaporator metal pipe appearance coating provided by the present invention; it does not need to carry out preservative treatment again for solving tubing; a complete protective case is formed after heating by a kind of hot melt glue film; globality firmly coats tubing, not only plays the role of corrosion protective covering and is not readily separated, and the glue film on tubing and sheet metal pass through hot melting cohesion; junction is without small gaps; it is not likely to produce crevice corrosion, has bonding firm, and anti-corrosion can also be reached.

Description

A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator
Technical field
The present invention relates to the coatings of metal tube surface, and the metal tube surface after coating is applied to both metal plates and passes through hot melt Bonding constitutes plate pipe evaporator.
Background technique
Currently, plate pipe evaporator is widely used in refrigeration industry, especially household electrical appliances refrigeration industry, plate pipe evaporator is mostly used Metal tube and bonded by the complete rotten plate of preservative treatment, and metal pipe material will also carry out preservative treatment first, such as steel pipe copper facing or Zinc-plated, aluminum pipe need to carry out anodized or spraying dress corrosion ring resin, tubing ability and metal after preservative treatment Plate bonding;Another kind is to carry out preservative treatment again with after sheet metal bonding.
Above-mentioned problem is that the tubing after preservative treatment protective layer removing easily occurs, so that tubing protective layer It is insecure with plate bonding, cause tubing and plate to disengage;Another way is easily gone out between gap between plate and tubing , there is poroid leak point, etc. so as to cause the two contact position, the above problem eventually leads to production cost in existing chemistry crevice corrosion Especially cost of labor dramatically increases.
Summary of the invention
The task of the present invention is the heat exchange tubing appearances for proposing a kind of metal to coat one layer of hot melt conductive adhesive film, can be whole Property metal pipe material is firmly coated, the metal pipe material after cladding and sheet metal are firmly bonded by hot melting cohesion, the two, Increase the reliability and stability of tubing use process.
The task of the present invention is what is completed in this way, metal pipe material outer surface is coated with hot melt conductive adhesive film.The metal tube Material includes aluminum pipe, iron pipe and copper pipe, and metal pipe material surface is being formed by curing one layer of corrosion protective covering after coating.It is described The coating of metal pipe material surface be by spraying, dip-coating, Extrusion Coating, squeeze out cladding, longitudinal cladding, winding cladding wherein one Kind.Using the metal pipe material of above method acquisition and pass through hot melt conductive adhesive film bonding with evaporation plate.The device includes that material extrusion applies Coating device, coating unit, winding coating unit and immersion coating.The Extrusion Coating device includes that feed inlet, screw rod, fluid layer are logical Road, metal pipe material, internal model, external mold, cavity, the top on the feeding coating device are provided with feed inlet and internally positioned spiral shell Bar, the inside screw are provided with heater strip, and extrusion die is arranged, the extrusion die includes internal model far from feed inlet in the other side And external mold, and sizing material flow pass is constituted between internal model and external mold, and flow pass end constitutes the sky that can accommodate glue Chamber.The longitudinal direction coating unit includes preheating device, coating unit, solidification equipment, metal pipe material, traction device, coiled strip wheel, leads To positioning to wheel, cladding sheave, conductive adhesive film, it is equipped with heating element in the preheating device and solidification equipment, in coating unit Coiled strip wheel, guide-localization are provided with to wheel and along the cladding sheave that coating unit horizontal direction is set gradually, the cladding sheave At least three pairs, and the radius of each pair of cladding sheave is gradually reduced, and hot melt conductive adhesive film, pairs of packet are wound on the coiled strip wheel It covers the groove on sheave and constitutes the outer diameter that can accommodate metal pipe material.The winding coating unit includes preheating device, winding Device, solidification equipment, metal pipe material, traction device, coiled strip wheel, motor, rotating frame, conductive adhesive film, the winding device packet The rotating frame that can be rotated around metal pipe material axis is included, driving rotating frame rotation is motor, and is installed on rotating frame There is rotary coiled strip roller, conductive adhesive film is wrapped on coiled strip roller, and the preheating device is mounted on winding device and traction dress The middle set.The immersion coating be by metal pipe material immerse hot melt import glue coated when can by a rotary shaft from It is passed through among metal pipe, rotating shaft terminal is supported by bearing bracket stand and fixed on the support, wherein rotary shaft one end and motor Axis connection, motor drive rotary shaft rotation, and metal pipe material outer surface can uniformly immerse one layer of hot melt heat conducting film.
The present invention has the following effects that, the preparation method of evaporator metal pipe appearance coating provided by the present invention and sets It is standby, it does not need to carry out preservative treatment again for solving tubing, forms one after heating completely by a kind of hot melt glue film Protective case, globality firmly coat tubing, not only play the role of corrosion protective covering and are not readily separated, and on tubing Glue film and sheet metal are by hot melting cohesion, first is that can have the function that bonding, second is that melted in the two junction, junction without Small gaps are not likely to produce crevice corrosion, have bonding firm, and can also reach anti-corrosion.
Detailed description of the invention
Fig. 1 is the horizontal cross-section structure diagram of precoated metal tubing;Fig. 2 is the longitudinal profile structural representation of metal pipe material Figure;Fig. 3 is that the first equipment is implemented to squeeze the structural schematic diagram of mould;Fig. 4 is the main view of Fig. 3;Fig. 5 is second of equipment film Structural schematic diagram;Fig. 6 is positive structure schematic of the guide-localization wheel with cladding slot to wheel in Fig. 5;Fig. 7 is overlay film of the invention Tube-in-sheet evaporator schematic diagram obtained by metal pipe material.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
Preparation method of the invention: metal pipe material outer surface is coated with hot melt conductive adhesive film;
The metal tube material includes aluminium, iron, copper;
The hot melt conductive adhesive film of the pipe outer surface is coated using equipment;
The metal pipe material surface is formed by curing one layer of corrosion protective covering after coating;
The coating is by spraying, dip-coating, Extrusion Coating, the one of which for squeezing out cladding, longitudinal cladding, winding cladding, institute Heat-conducting glue, hot melt adhesive can be selected in the hot melt conductive adhesive film for stating the coating of metal pipe material surface.
Using the metal pipe material of above method acquisition and pass through hot melt conductive adhesive film bonding with evaporation plate.
The coating equipment of designed, designed used in the present invention is shown in attached drawing 3-7;Fig. 1 and Fig. 2 coats the metal tube after solidifying Son, 4 be pipe, and 4-1 is coating, and the coating is to coat heat one layer of hot melt hot glue of cladding by equipment in pipe outer surface Film.
Embodiment one
The coating of metal pipe outer surface is by Extrusion Coating, and then solidification obtains, and material extrusion coating unit include feed inlet 1, Screw rod 2, fluid layer channel 3, metal pipe material 4, internal model 5, external mold 6, cavity 7, as shown in Figure 3, Figure 4, on the feeding coating device Top be provided with feed inlet 1 and internally positioned screw rod 2, the inside screw is provided with heater strip, and extrusion die is far from charging Mouthful, it is arranged in the other side, the extrusion die includes internal model 5 and external mold 6, and sizing material flow pass 3 is constituted between internal model and external mold, And flow pass end constitutes the cavity 7 that can accommodate glue.
When work, hot melt heat-conducting glue enters in material extrusion coating unit from feed inlet 1, the glue under heater strip effect in screw rod Material dissolves, and sizing material is sent into the channel of extrusion die by sizing material under the rotation of screw rod, the glue accommodating cavity 7 of flow channel end Middle formation glue area, the metal pipe material 4 across above-mentioned glue area is advanced under external force, and is uniformly coated with glue, through subsequent Solidification, that is, make is coated with hot melt conductive adhesive film tubing.
Embodiment two
The coating of metal pipe outer surface is coated by longitudinal coating unit, and then solidification obtains, and longitudinal coating unit includes Preheating device 2-1, coating unit 2-2, solidification equipment 2-3, metal pipe material 2-4, traction device 2-5, coiled strip wheel 2-6, guiding are fixed Position is to wheel 2-7, cladding sheave 2-8, conductive adhesive film 2-9, as shown in Figure 5 and Figure 6, the preheating device 2-1 and solidification equipment 2-3 In be equipped with heating element, coiled strip wheel 2-6, guide-localization are provided in coating unit 2-2 to wheel 2-7 and along coating unit level side To the cladding sheave 2-8 set gradually, at least three pairs of the cladding sheave, and the radius of each pair of cladding sheave 2-8-1 gradually contracts It is small, hot melt conductive adhesive film 2-9 is wound on the coiled strip wheel, the groove on pairs of cladding sheave 8-1, which constitutes one, to accommodate The outer diameter of metal pipe material 4.
When carrying out longitudinal cladding, metal pipe material is under the traction of traction device 5 from pairs of guide-localization wheel 7 and cladding slot Wheel 8 is passed through between wheel, is heated the hot melt conductive adhesive film wound on coiled strip wheel and is delivered to cladding sheave through guide-localization guiding, Metal pipe material is advanced, (direction from left to right shown in Fig. 4), hot melt is led after preheating device heating under the traction of traction device Hot melt adhesive film overlays on the outer surface of metal pipe material in contact processing thermometal tubing after-tack and being close to, and with metal pipe material to Fig. 4 Shown direction is advanced to the right, is gradually reduced by the race on pairs of cladding sheave, so that being coated on metal pipe material outer surface Hot melt conductive adhesive film further solidify, obtain be coated with hot melt conductive adhesive film metal pipe material.
Embodiment three
The coating of metal pipe outer surface is coated by winding coating unit, and then solidification obtains, and is wound coating unit and included Preheating device 2-1, winding device 3-2, solidification equipment 3-3, metal pipe material 4, traction device 2-5, coiled strip wheel 2-6, motor 3-7, Rotating frame 3-8, conductive adhesive film 2-9, as shown in fig. 7, the winding device 3-2 includes that can rotate around 4 axis of metal pipe material Rotating frame 8, driving rotating frame rotation is motor 3-7, and rotary coiled strip roller 2- is equipped on rotating frame 6, conductive adhesive film 2-9 is wrapped on coiled strip roller, and the preheating device 2-1 is mounted in winding device 3-2 and traction device 2-5 Between, metal pipe material under the action of traction device 2-5, advance by right direction as shown in the figure, the rotation installed in winding device 3-2 Turn to rotate under the drive of frame motor 3-7 around metal pipe material, the conductive adhesive film rotation layer wound on coiled strip wheel 2-6 is wound on by pre- The metal pipe material surface advanced to the right after thermal preheating, then enters back into solidification equipment 3-3, the metal after solidifying Pipe outer surface winds one layer of hot melt conductive adhesive film.
Example IV
The metal pipe material can also complete coating by immersion method, and metal pipe material is immersed can when hot melt importing glue is coated To pass through a rotary shaft among metal pipe, rotating shaft terminal is supported by bearing bracket stand and is fixed on the support, wherein Rotary shaft one end and motor axis connection, motor drive rotary shaft rotation, and metal pipe material outer surface can uniformly immerse one layer of hot melt Heat conducting film.
The Tube for Evaporator 4 of hot melt conductive adhesive film is coated with using this metal tube appearance and metal plate 10 passes through the heat The hot melt conductive adhesive film of molten conductive adhesive film tube surfaces is bonded in heating condition, is simultaneously being pressed with sheet metal in glue film by thermal softening Both when bonding under power, the gap position that the two is in contact forms hot melt micelle colloid and is filled at the gap of the two, reduce Micro gap also just reduces the chloride ion crevice corrosion easily occurred between gap in this way.Therefore, this thermally conductive coated with heating The Tube for Evaporator and plate of glue film tubing are firmly bonded, and not easy to crack, thermal resistance is small;And corrosion resistance is strong.

Claims (9)

1. a kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator, including metal pipe material, feature Be: metal pipe material outer surface is coated with hot melt conductive adhesive film.
2. a kind of precoated metal tubing according to claim 1 and preparation facilities, preparation method and its manufactured evaporator, It is characterized by: the metal tube material includes aluminum pipe, iron pipe and copper pipe, and metal pipe material surface is solidifying shape after coating At one layer of corrosion protective covering.
3. a kind of precoated metal tubing according to claim 1 and preparation facilities, preparation method and its manufactured evaporator, It is characterized by: the metal pipe material surface coating is by spraying, dip-coating, Extrusion Coating, squeezes out cladding, longitudinal cladding, volume Around the one of which of cladding.
4. a kind of precoated metal tubing according to claim 1 or 4 and preparation facilities, preparation method and its manufactured evaporation Device, it is characterised in that: using the metal pipe material of above method acquisition and pass through hot melt conductive adhesive film bonding with evaporation plate.
5. preparation facilities employed in the preparation of evaporator metal tube outer surface overlay film, it is characterised in that: the device includes material extrusion Coating unit, coating unit, winding coating unit and immersion coating.
6. preparation facilities employed in evaporator metal tube outer surface overlay film preparation according to claim 5, feature Be: the Extrusion Coating device includes feed inlet, screw rod, fluid layer channel, metal pipe material, internal model, external mold, cavity, it is described into Top on material coating unit is provided with feed inlet and internally positioned screw rod, and the inside screw is provided with heater strip, squeezes out Mould is arranged far from feed inlet in the other side, and the extrusion die includes internal model and external mold, and sizing material stream is constituted between internal model and external mold Channel out, and flow pass end constitutes the cavity that can accommodate glue.
7. preparation facilities employed in evaporator metal tube outer surface overlay film preparation according to claim 5, feature Be: it is described longitudinal direction coating unit include preheating device, coating unit, solidification equipment, metal pipe material, traction device, coiled strip wheel, Guide-localization is equipped with heating element, coating unit in the preheating device and solidification equipment to taking turns, coating sheave, conductive adhesive film In be provided with coiled strip wheel, guide-localization to wheel and along the cladding sheave that coating unit horizontal direction is set gradually, the cladding slot At least three pairs of wheel, and the radius of each pair of cladding sheave is gradually reduced, and is wound with hot melt conductive adhesive film on the coiled strip wheel, pairs of Groove on cladding sheave constitutes the outer diameter that can accommodate metal pipe material.
8. preparation facilities employed in evaporator metal tube outer surface overlay film preparation according to claim 5, feature Be: the winding coating unit include preheating device, winding device, solidification equipment, metal pipe material, traction device, coiled strip wheel, Motor, rotating frame, conductive adhesive film, the winding device include the rotating frame that can be rotated around metal pipe material axis, driving rotation Turn frame member is motor, and rotary coiled strip roller is equipped on rotating frame, and conductive adhesive film is wrapped in coiled strip roller On, the preheating device is mounted on the middle of winding device and traction device.
9. preparation facilities employed in evaporator metal tube outer surface overlay film preparation according to claim 5, feature Be: the immersion coating be metal pipe material immerses to hot melt imports can be by a rotary shaft from metal tube when glue is coated It being passed through among sub, rotating shaft terminal is supported by bearing bracket stand and is fixed on the support, wherein rotary shaft one end and motor axis connection, Motor drives rotary shaft rotation, and metal pipe material outer surface can uniformly immerse one layer of hot melt heat conducting film.
CN201811545585.XA 2018-12-18 2018-12-18 A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator Pending CN109798803A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811545585.XA CN109798803A (en) 2018-12-18 2018-12-18 A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811545585.XA CN109798803A (en) 2018-12-18 2018-12-18 A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator

Publications (1)

Publication Number Publication Date
CN109798803A true CN109798803A (en) 2019-05-24

Family

ID=66556989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811545585.XA Pending CN109798803A (en) 2018-12-18 2018-12-18 A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator

Country Status (1)

Country Link
CN (1) CN109798803A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687005A (en) * 2020-07-07 2020-09-22 浙江山蒲照明电器有限公司 FPC trigger is gone into to integrative many specifications intelligence of LED two sides
CN114056714A (en) * 2021-11-05 2022-02-18 安徽菲雷克斯物流装备制造有限公司 Composite tray and manufacturing method thereof
CN114056715A (en) * 2021-11-05 2022-02-18 安徽菲雷克斯物流装备制造有限公司 Reinforced tray structure suitable for wet and cold environment and manufacturing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101623687A (en) * 2009-07-31 2010-01-13 徐为尔 Electroplating process for metal surface and metal tube produced thereby
CN202826363U (en) * 2012-10-16 2013-03-27 刘太恒 3PE (Poly Ethylene) pipeline anticorrosion and co-extrusion lamination extruding coating machine
CN203766013U (en) * 2014-03-28 2014-08-13 富阳科威钢业有限公司 Device for producing bubble-free glass fiber reinforced epoxy resin winding pipe
CN205090666U (en) * 2015-10-20 2016-03-16 河南新科隆电器有限公司 Around anticorrosive evaporimeter of membrane on aluminum pipe
CN207388243U (en) * 2017-10-16 2018-05-22 江苏舒欣扬电工设备有限公司 Copper bar coating assembly line
CN207690572U (en) * 2017-10-26 2018-08-03 苏州金弘峰电子有限公司 A kind of conductor coating unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101623687A (en) * 2009-07-31 2010-01-13 徐为尔 Electroplating process for metal surface and metal tube produced thereby
CN202826363U (en) * 2012-10-16 2013-03-27 刘太恒 3PE (Poly Ethylene) pipeline anticorrosion and co-extrusion lamination extruding coating machine
CN203766013U (en) * 2014-03-28 2014-08-13 富阳科威钢业有限公司 Device for producing bubble-free glass fiber reinforced epoxy resin winding pipe
CN205090666U (en) * 2015-10-20 2016-03-16 河南新科隆电器有限公司 Around anticorrosive evaporimeter of membrane on aluminum pipe
CN207388243U (en) * 2017-10-16 2018-05-22 江苏舒欣扬电工设备有限公司 Copper bar coating assembly line
CN207690572U (en) * 2017-10-26 2018-08-03 苏州金弘峰电子有限公司 A kind of conductor coating unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于红军等: "《建筑用塑料制品与加工》", 28 February 2003, 科学技术文献出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687005A (en) * 2020-07-07 2020-09-22 浙江山蒲照明电器有限公司 FPC trigger is gone into to integrative many specifications intelligence of LED two sides
CN114056714A (en) * 2021-11-05 2022-02-18 安徽菲雷克斯物流装备制造有限公司 Composite tray and manufacturing method thereof
CN114056715A (en) * 2021-11-05 2022-02-18 安徽菲雷克斯物流装备制造有限公司 Reinforced tray structure suitable for wet and cold environment and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN109798803A (en) A kind of precoated metal tubing and preparation facilities, preparation method and its manufactured evaporator
CN201149780Y (en) Varnished wire
CN105666843B (en) A kind of hot-extrudable circumferentially wound forming methods of steel bend pipe 3PE
RU2644391C2 (en) Rotor with insert part
CN103629452A (en) Method for forming reinforced ultra-high molecular weight polyethylene pipe core and steel wires
CN107785127A (en) Kapton covered insulating wire device for painting
CN100576698C (en) Insulating treatment method for motorcycle starting motor rotor
CN106670257A (en) Production equipment for zinc-aluminum composite wires and production method thereof
WO2013140944A1 (en) Method for producing composite member
CN2832881Y (en) Production line for steel strand with composite epoxy resin coating
CN208501086U (en) A kind of rotary target material bonded
CN214300303U (en) Brazing filler metal surface hot dip tinning device
EP0009312A1 (en) Method and apparatus for manufacturing magnet wire and a magnet wire made thereby
CN103318578B (en) Forming method of large-scale metal storage tank with high bonding strength inner wall anticorrosive layer
CN208180022U (en) A kind of can effectively improve wraps up in the tire of the glue uniformity and covers adhesive dispenser with steel wire
CN103121045A (en) Method and equipment for producing double-metal composite material by lapping metal strip
CN104210055B (en) Plastic-lined steel pipeline external plastic-coating method
CN108656399A (en) A kind of can effectively improve wraps up in the tire of the glue uniformity and covers adhesive dispenser with steel wire
CN108518898A (en) A kind of organic coating capillary and its processing method
CN111276307B (en) Resistor manufacturing method and resistor
CN102592728B (en) Film-coated metal cable and manufacturing method thereof
CN205146905U (en) Metal wire does not have die drawing system device
CN205185469U (en) Production line is rolled up to thermal -insulated anticorrosive various aluminium
CN209287610U (en) A kind of enameled wire hot wax coating unit
CN209338636U (en) A kind of system of processing of galvanized wire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190524

WD01 Invention patent application deemed withdrawn after publication