CN109784682A - A kind of online new high-tech enterprise's planning of enterprise and cultivate platform - Google Patents
A kind of online new high-tech enterprise's planning of enterprise and cultivate platform Download PDFInfo
- Publication number
- CN109784682A CN109784682A CN201811608447.1A CN201811608447A CN109784682A CN 109784682 A CN109784682 A CN 109784682A CN 201811608447 A CN201811608447 A CN 201811608447A CN 109784682 A CN109784682 A CN 109784682A
- Authority
- CN
- China
- Prior art keywords
- enterprise
- data
- project
- unit
- new high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention provides a kind of online new high-tech enterprise's planning of enterprise and cultivate platform, the platform mainly includes cloud database, the cloud database includes the database that foreign enterprises data repository, government declare new high-tech enterprise and run, project data matching unit, matching scoring unit and data analysis management unit;It is equipped with data storage cell and data transmission unit in the cloud database, project data matching unit, matching scoring unit and data analysis management unit, and is equipped with data analysis unit in the project data matching unit and matching scoring unit.The present invention has rational design, it is easy to operate, when enterprise needs to declare national new high-tech enterprise as required after logging data, it can quickly learn whether the current traffic-operating period of enterprise matches the requirement of national new high-tech enterprise, it is directly entered to declare subsystem online or enter and mismatches item improvement system, effectively enterprise is helped to be declared or cultivated national new high-tech enterprise.
Description
Technical field
The invention mainly relates to the technical fields of science and technology item evaluation system, and in particular to Enterprise Application new high-tech enterprise
The scoring system and cultivation and guidance of project.
Background technique
Technological project management is the Whole Course Management to the scientific research activity carried out in the form of project, is a kind of typical
High-level knowledge management practice activity.The task of technological project management is: requiring according to plan of science and technology, using administrative means
And management skills, tissue and coordination science and technology strength go to complete the research and development task of science and technology plan item.
During technological project management, it is desirable that manager grasps country to the principles and policies of scientific and technical research, and in project
It is carried out in implementation;It is required that understanding related technology and economic law regulation, Sci-tech Management is made to standardize;It is required that understanding
Related professional knowledge and career development dynamic, propose the goal in research with advanced level, and guidance project (or project) is ground
Study carefully direction;Stronger administrative organization's coordination ability is required, the enthusiasm and creativeness of researcher are given full play to;It is required that understanding
The self-law and feature for obtaining Technological research, make technological project management meet the self-law of development in science and technology;It is required that understanding and item
The related industrial structure of mesh and Industry Development Policy, in favor of the implementation and conversion of scientific and technological achievement.
During science and technology item is declared, declaring for new high-tech enterprise's project always is that over the years weight is mostly scientific and technological
One of mainstream science and technology item of project.But the requirement of national new high-tech enterprise involves a wide range of knowledge, and annual requirement is all slightly finely tuned,
This is a great problem for the strong-willed enterprise for applying for national new high-tech enterprise.
Summary of the invention
Invention broadly provides a kind of online new high-tech enterprise's planning of enterprise, enterprise and platform is cultivated, on solving
State the technical issues of proposing in background technique.
The present invention solves the technical solution that above-mentioned technical problem uses are as follows: the matching of Enterprise Application new high-tech enterprise project
System, the system mainly include cloud database, which is characterized in that the cloud database includes company data repository, item number
According to matching unit, matching scoring unit and data analysis management unit;
It is equipped in the cloud database, project data matching unit, matching scoring unit and data analysis management unit
Data storage cell and data transmission unit, and be equipped with data in the project data matching unit and matching scoring unit and analyze
Unit.
Preferably, in the cloud database, including data storage cell and data transmission unit, in data storage cell
In, the company data that company is used required for high enterprise is entered into data storage cell one by one.
Preferably, in the project data matching unit, including data storage cell and data transmission unit, it is deposited in data
In storage unit, by the condition of new high-tech enterprise's project application, according to necessary project condition and inessential project condition, classification record
Enter into data storage cell.
Preferably, the necessary project condition is as follows:
1) it must be registered 1 year or more when enterprise's application is assert;
2) enterprise is obtained to its major product (service) by independent research, the modes such as assign, given, merged in technology
The ownership of the upper intellectual property for playing core supporting function;
3) technology for playing core supporting function to enterprise's major product (service) belongs to " the high-new skill that state key is supported
Art field " prescribed limit;
4) enterprise is engaged in scientific and technical personnel's Zhan Qiye current year personnel Zhan Qiye current year duty of research and development and the relevant technologies innovation activity
The ratio of work sum is not less than 10%;
5) ratio that the research and development fee to develop of enterprise's nearly three fiscal years accounts for same period gross income meets the requirements;
6) nearly 1 year new high-tech product (service) income accounts for the ratio of enterprise's same period total income not less than 60%;
7) enterprise's application was assert in 1 year, and considerable safety, great quality accident or severe environments illegal activities do not occur.
It preferably, include that data storage cell, data analysis unit and data transmission are single in matching scoring unit
Member, in the data store, the standards of grading of typing new high-tech enterprise project can be compared and be commented by data analysis unit
Minute mark is quasi-, obtains the project score of enterprise, also, by data analysis management unit, analyzes the score feelings of enterprise's each single item
Condition and score content compare.
Preferably, the concrete operations process of the system is as follows:
S1: the first data storage cell in cloud database is needed by the newest new high-tech enterprise's project application of country
The condition wanted, the data storage cell being entered into project data matching unit one by one;
S2: when foreign enterprises need to declare national new high-tech enterprise, by the operation data of enterprise, typing is extremely as required
Data storage cell;
S3: enterprise's data of typing by data transmission unit, is transmitted in project data matching unit by cloud database
Data analysis unit in, data analysis unit can compare enterprise's data of typing and new high-tech enterprise's project demand
It is right;
S4: when comparing result is shown in step S3, the condition of Enterprise Application meets necessary project condition, just will do it project
Scoring and data analysis management;When comparing result is shown in step S3, the condition of Enterprise Application does not meet project necessity item
Part can be directly entered and mismatch item improvement system program, and produces mismatch item improvement report feedback enterprise and guide enterprise past
National new high-tech enterprise's standard is cultivated;
S5: after necessary project condition all meets, system will enter matching scoring unit, can be according to new high-tech enterprise
The code of points of project is independently scored according to enterprise qualification, and by data analysis management unit, to the items of enterprise
Scoring content scores one by one and generates report, and pop-up is on-line automatic, and to declare subsystem for business choice.
The thermos have the advantages that the present invention has rational design, and it is easy to operate, when enterprise needs to declare national new high-tech enterprise
When as required after logging data, can quickly learn whether the current traffic-operating period of enterprise matches the requirement of national new high-tech enterprise,
It is directly entered to declare subsystem online or enter and mismatches item improvement system, enterprise is effectively helped to be declared or cultivated national height
Technology Enterprises.
Detailed explanation is carried out to the present invention below with reference to attached drawing and specific embodiment.
Detailed description of the invention
Fig. 1 is system flow schematic diagram of the invention.
Specific embodiment
Embodiment 1
First by the requirement of new high-tech enterprise's project application, point necessary project demand and inessential project demand are entered into
Data storage cell in project conditions correlation unit.
It is declared needed for new high-tech enterprise's project by the business license for the enterprise for needing to declare, Audit Report of finance etc.
Necessary project material is wanted, is entered into the data storage cell in cloud database, and by way of filling up a form, by project
The business data for declaring needs fills, and completes to submit.
After data storage cell of enterprise's data in cloud database completes typing, system starts to work normally, project
Data analysis unit in conditions correlation unit can want the necessary project of business data and new high-tech enterprise's project of typing
It sums inessential project demand, compares one by one.
When the company information of typing, enterprise's necessity project demand can not be fully met, then system determines that the enterprise cannot
Enough apply for new high-tech enterprise, can be directly entered and mismatch item improvement system program, and it is anti-to produce mismatch item improvement report
Guidance enterprise, feedback enterprise is cultivated toward national new high-tech enterprise standard.
After the data of system detection to enterprise meets necessary project demand, matching scoring unit can be looked forward to according to new and high technology
The requirement of industry project, gives a mark to enterprise, also, is analyzed one by one by data management analysis unit score data,
After scoring, appraisal result can be shown on computers.
By the specific scoring content of Computer display, modification appropriate and supplement can be carried out to enterprise's material, to make
The requirement that can reach new high-tech enterprise's project application.
Further, on-line automatic subsystem of declaring may be selected for declaring process system into online in satisfactory enterprise
System.
Embodiment 2
During the project application, need according to the requirement of project, to bind enterprise qualification, in sorted material into book form
In the process, often the testimonial material of some necessary project demands can be caused not to be placed into material, led due to the carelessness of staff
Cause the Enterprise Application project that can not pass through.
For client's drawbacks described above, by the project material electronics shelves of completion, by being input in cloud database, cloud database
The material received can be transported in project data matching unit, project comparison unit can automatically grab in material, declare height
The necessary project demand of Technology Enterprises project, also, material verification can be carried out according to the mode of operation of embodiment 1, thus,
It can avoid the technical problem for occurring set forth above.
Above embodiment be only preferred embodiments of the present invention will be described, not to the scope of the present invention into
Row limits, and without departing from the spirit of the design of the present invention, this field ordinary engineering and technical personnel is to technical side of the invention
The various changes and improvements that case is made, should fall within the scope of protection determined by the claims of the present invention.
Part that the present invention does not relate to is the same as those in the prior art or can be realized by using the prior art.
Claims (5)
1. a kind of online new high-tech enterprise's planning of enterprise, enterprise and cultivation platform, which mainly includes cloud database,
It is characterized in that, the cloud database include company data repository, project data matching unit, matching scoring unit and
Data analysis management unit.
2. according to claim 1, a kind of online new high-tech enterprise, enterprise, enterprise plans and cultivates platform, and feature exists
In, in the cloud database, including data storage cell and data transmission unit, and the project data matching unit and matching
The unit that scores is interior to be equipped with data analysis unit.In the data store, the country comprising foreign enterprises about typing as required
The annual newest new high-tech enterprise's requirements of customs declaration of new high-tech enterprise's operation data and country and service requirement.
3. according to claim 1, a kind of online new high-tech enterprise, enterprise, enterprise plans and cultivates platform, and feature exists
In in the project data matching unit, including data storage cell and data transmission unit in the data store will
The condition of new high-tech enterprise's project application, according to necessary project condition and inessential project condition, classification is entered into data and deposits
In storage unit.
4. according to claim 1, a kind of online new high-tech enterprise, enterprise, enterprise plans and cultivates platform, and feature exists
In, it include data storage cell, data analysis unit and data transmission unit in project matching scoring unit,
In data storage cell, the standards of grading of typing new high-tech enterprise project can compare scoring mark by data analysis unit
Standard obtains the project score of enterprise, and by data analysis management unit, analyzes the scoring event of enterprise's each single item and obtain
Divide content comparison.
5. according to claim 1, a kind of online new high-tech enterprise, enterprise, enterprise plans and cultivates platform, and feature exists
In the concrete operations process of the system is as follows:
S1: the first data storage cell in cloud database, what the newest new high-tech enterprise's project application of country was needed
Condition, the data storage cell being entered into project data matching unit one by one;
S2: when foreign enterprises need to declare national new high-tech enterprise, by the operation data of enterprise as required typing to data
Storage unit;
S3: enterprise's data of typing is passed through data transmission unit, the number being transmitted in project data matching unit by cloud database
According in analytical unit, enterprise's data of typing and new high-tech enterprise's project demand can be compared for data analysis unit;
S4: when comparing result is shown in step S3, the condition of Enterprise Application meets necessary project condition, just will do it project scoring
Mechanism and data analysis management;When comparing result is shown in step S3, the condition of Enterprise Application does not meet project necessary condition, meeting
It is directly entered and mismatches item improvement system program, and produce mismatch item improvement report feedback enterprise and guide enterprise past national high
Technology Enterprises standard is cultivated;
S5: after necessary project condition all meets, system will enter matching scoring unit, can be according to new high-tech enterprise's project
Code of points, independently scored according to enterprise qualification, and by data analysis management unit, to each item rating of enterprise
Content scores one by one and generates report, pops up that on-line automatic to declare subsystem for business choice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811608447.1A CN109784682A (en) | 2018-12-27 | 2018-12-27 | A kind of online new high-tech enterprise's planning of enterprise and cultivate platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811608447.1A CN109784682A (en) | 2018-12-27 | 2018-12-27 | A kind of online new high-tech enterprise's planning of enterprise and cultivate platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109784682A true CN109784682A (en) | 2019-05-21 |
Family
ID=66497763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811608447.1A Pending CN109784682A (en) | 2018-12-27 | 2018-12-27 | A kind of online new high-tech enterprise's planning of enterprise and cultivate platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109784682A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110532385A (en) * | 2019-08-06 | 2019-12-03 | 镇江方略科技咨询有限公司 | Science and technology item feature sentence extraction system and its recommended method based on big data |
CN111126829A (en) * | 2019-12-20 | 2020-05-08 | 郑州众扶网络科技有限公司 | Scientific and technological enterprise planning and cultivating method |
CN111311120A (en) * | 2020-03-21 | 2020-06-19 | 宁波梦创信息科技有限公司 | Self-evaluation method and system for enterprise declared science and technology project |
CN112418599A (en) * | 2020-10-15 | 2021-02-26 | 重庆市科学技术研究院 | Enterprise growth path planning method and system based on index set |
CN113034041A (en) * | 2021-04-16 | 2021-06-25 | 合肥新青罗数字技术有限公司 | Method and system for mining potential growth enterprises, cultivating and intelligently rewarding potential growth enterprises |
CN113112162A (en) * | 2021-04-16 | 2021-07-13 | 合肥新青罗数字技术有限公司 | Method and system for mining and cultivating potential high-tech enterprises |
-
2018
- 2018-12-27 CN CN201811608447.1A patent/CN109784682A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110532385A (en) * | 2019-08-06 | 2019-12-03 | 镇江方略科技咨询有限公司 | Science and technology item feature sentence extraction system and its recommended method based on big data |
CN111126829A (en) * | 2019-12-20 | 2020-05-08 | 郑州众扶网络科技有限公司 | Scientific and technological enterprise planning and cultivating method |
CN111311120A (en) * | 2020-03-21 | 2020-06-19 | 宁波梦创信息科技有限公司 | Self-evaluation method and system for enterprise declared science and technology project |
CN112418599A (en) * | 2020-10-15 | 2021-02-26 | 重庆市科学技术研究院 | Enterprise growth path planning method and system based on index set |
CN112418599B (en) * | 2020-10-15 | 2023-02-10 | 重庆市科学技术研究院 | Enterprise growth path planning method and system based on index set |
CN113034041A (en) * | 2021-04-16 | 2021-06-25 | 合肥新青罗数字技术有限公司 | Method and system for mining potential growth enterprises, cultivating and intelligently rewarding potential growth enterprises |
CN113112162A (en) * | 2021-04-16 | 2021-07-13 | 合肥新青罗数字技术有限公司 | Method and system for mining and cultivating potential high-tech enterprises |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109784682A (en) | A kind of online new high-tech enterprise's planning of enterprise and cultivate platform | |
CN108629479A (en) | The self-evaluation system of Enterprise Application new high-tech enterprise project | |
Abbaszadeh et al. | Association of information technology and internal controls of Iranian state agencies | |
Riku et al. | Strategic plan with enterprise architecture planning for applying information system at PT. Bestonindo Central Lestari | |
Adamyk | Audit of Accounting Staff in Computer-Based Environment | |
Lewis et al. | DIGITAL AUDITING: Modernizing the Government Financial Statement Audit Approach. | |
CN103279833A (en) | Finance and taxation integrity resource planning system | |
Fürstenau et al. | Why do Shadow Systems Fail? An Expert Study on Determinants of Discontinuation. | |
Zyznarska-Dworczak | The impact of the accountability on accounting development as the essence of sustainability accounting | |
Maurizio et al. | EAI and SOA: factors and methods influencing the integration of multiple ERP systems (in an SAP environment) to comply with the Sarbanes‐Oxley Act | |
Mehmeti | Common Characteristics and Differences in External and Internal Auditing | |
Iazzolino et al. | Relational Capital and financial performance: an empirical analysis on a sample of Italian firms | |
kumar Choudhary et al. | Designing the Process of Stores Management for Implementing ERP in Manufacturing Organization: Case Study | |
Gladkov et al. | Development of Requirements for AIS Aimed at Controlling High Turnover | |
Yao | Design of English Teaching Postcompetency Evaluation System Based on Data Mining and IoT | |
Kusumasari et al. | Analysis and Design of Data Warehousing and Business Intelligence Guidelines Using DAMA-DMBOKv2 | |
Sequeira et al. | Financial Management Information System | |
Guo et al. | Human Resource Allocation Management Based on Network Data Quality | |
Ogalo | Towards Managing Firm Performance through Enterprise Risk Management Practices and Staff Competence: An Empirical Study from the Banking Sector | |
Anderson et al. | Operationalizing the Army's Universe of Transactions. | |
Quanga et al. | Research on Factors Affecting the Quality of Internal Control in Small and Medium Enterprises in Nam Dinh Province | |
Heritage | Annex to the Statement of Management Responsibility Including Internal Control Over Financial Management–Fiscal year 2020-21 | |
Munteanu et al. | The influence of corporative governance upon the public interest entities in Romania | |
Raval et al. | Disclosure of Corporate Governance Practices in Annual Reports-A Comparative Study of INFOSYS and TCS | |
Mutong’wa et al. | Enterprise resource planning systems and integrated financial management information system in Kenyan public sector: an assessment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190521 |
|
WD01 | Invention patent application deemed withdrawn after publication |