Summary of the invention
It is an object of the invention to, method of operation complexity relatively weak for area power grid structure, easily cause regional electricity
Net unstability and the case where lead to the risk of large-area power-cuts, propose based on analyzed with integrated area power grid on-line intelligence
Decision-making technique realizes that power grid hidden danger is checked in real time, eliminates and artificially judges blind spot, more comprehensively promotes the reliable of operation of power networks
Property.
In order to solve the above technical problems, the present invention provides one kind to divide with integrated area power grid on-line intelligence with being based on
Analyse decision-making technique, characterized in that the following steps are included:
S1 monitors that the power flow changing of each equipment in power grid judges whether each equipment can get over according to the trend limit value of each equipment
Limit or heavy duty;
S2 carries out fault simulation to power grid according to preset fault set, judges whether that grid disconnection, Loss of power failure can occur, together
When calculate the power flow changing of each equipment, it is out-of-limit or heavily loaded to judge whether each equipment can occur;
S3 carries out power supply point follow-up analysis to the distribution responsible consumer of setting, power supply point in major network 220kV plant stand is obtained, to master
It nets power supply point in 220kV plant stand and carries out N-1 analysis, whether will lead to Loss of power failure after checking power supply point failure and equipment is out-of-limit
Or heavy duty;
S4 provides the aid decision suggestion for reducing current electric grid risk when judging to occur Loss of power failure, out-of-limit, when overloaded:
For out-of-limit, the sensitivity information of out-of-limit equipment is calculated, is adjusted according to sensitivity information out-of-limit to eliminate or alleviate;
For power loss, available turn of power supply source point is found.
Further, Loss of power failure includes responsible consumer power failure, load power loss and plant stand power loss.
Further, include: to the detailed process of the distribution responsible consumer progress power supply point follow-up analysis of setting
Line segment end point analysis is exchanged from plant stand highest voltage level where the responsible consumer of setting, is obtained by exchange line segment endpoint
Opposite side power plant and substation's information continues through opposite side plant stand and repeats the above process, until finding major network 220kV above high pressure ring.
Further, during exchanging line segment end point analysis, the exchange line segment endpoint being negative only is flowed into active power
Continue to traverse.
Further, finding the available detailed process for turning power supply source point includes:
It searches for nearest stand-by heat to the periphery from power loss and switchs the spare turn of power supply source point restored as power loss area;Then it simulates
The stand-by heat switch searched closes, and carries out topological analysis;If can originally restore to supply at power loss after stand-by heat switch closes
Electricity, then it is assumed that this stand-by heat switch turns power supply source point to be available.
Further, search out available when turning power supply source point, also progress trend verification, calculate turn whether to will cause after supplying it is new
Equipment it is out-of-limit or heavily loaded, it is out-of-limit or heavily loaded if there is new equipment, then reselect turn power supply a source point.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being: monitoring operation of power networks in real time can be achieved in the present invention
Security and stability in the process provides aid decision suggestion to existing safety and stability problem, effectively promotes area power grid operation
The perception and prevention and control ability of risk.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention
Technical solution, and not intended to limit the protection scope of the present invention.
As shown in Figure 1, one kind of the invention, which is based on ground, matches integrated area power grid on-line intelligence analysis decision method,
Including following procedure:
S1 monitors that the power flow changing of each equipment in power grid judges whether each equipment can get over according to the trend limit value of each equipment
Limit or heavy duty.
Current electric grid model and real-time digital & analog signal data are obtained, monitor the power flow changing feelings of each equipment in power grid
Condition provides that equipment is out-of-limit or heavily loaded prompt according to the limit value of each equipment.
Out-of-limit i.e. the active and reactive of equipment, voltage, electric current are more than the limit value of equipment.Heavy duty be equipment it is active and reactive,
Voltage, electric current reach equipment limit value certain percentage.These limit values are inputted in Dispatching monitor and control system database, are not required to
In addition it to provide.
S2 carries out fault simulation to power grid according to preset fault set, judges whether that Loss of power failure can occur, calculate simultaneously
It is out-of-limit or heavily loaded to judge whether each equipment can occur for the power flow changing of each equipment.
The fault set that static security analysis application settings are good in major network advanced applied software is read in, forecast failure mould is carried out
It is quasi-, obtain which specific failure causes grid disconnection, responsible consumer power failure, load power loss, plant stand power loss by topological analysis.
Power failure responsible consumer, power loss load caused by corresponding failure, power loss plant stand are provided simultaneously.Then Load flow calculation is carried out, checks event
Whether will cause after barrier out-of-limit or heavily loaded.
S3 carries out power supply point follow-up analysis to the distribution responsible consumer of setting, obtains power supply point in major network 220kV plant stand,
N-1 analysis is carried out to power supply point in major network 220kV plant stand, whether will lead to Loss of power failure and equipment after checking power supply point failure
It is out-of-limit or heavily loaded.
Power supply point follow-up analysis is carried out to the distribution responsible consumer of setting, higher level's power supply point is traced step by step, from setting
Plant stand highest voltage level exchanges line segment end point analysis where responsible consumer, obtains opposite side plant stand letter by exchange line segment endpoint
Breath, continues through opposite side plant stand and repeats the above process, until finding major network 220kV above high pressure ring.In exchange line segment
During end point analysis, the exchange line segment endpoint being negative only is flowed into active power and continues to traverse.
N-1 is carried out to the route (i.e. power supply line) that line segment endpoint active power is negative is exchanged in the 220kV plant stand found
Analysis, check after the line fault of power supply whether will lead to grid disconnection, responsible consumer has a power failure, load subtracts confession, plant stand power loss with
And equipment is out-of-limit or heavily loaded.
S4 reduces the aid decision suggestion of current electric grid risk according to equipment is out-of-limit and Loss of power failure provides.
(1) for out-of-limit equipment, advanced applied software medium sensitivity computing module is called, provides the correlation spirit of out-of-limit equipment
Sensitivity information, regulation personnel can be adjusted according to sensitivity information, to eliminate or alleviate out-of-limit.
(2) it for power loss, including responsible consumer power failure, load power loss, entire plant stand power loss, is sought using rapid topology technology
Look for it is available turn a power supply source point, while carrying out trend verification, calculate that turn whether to will cause new equipment after supplying out-of-limit or heavily loaded, if
It is out-of-limit or heavily loaded that there are new equipment, then reselects and turn power supply source point, and final determine turns power supply source point.
Turning power supply source point search, steps are as follows: it is extensive as power loss area to search for nearest stand-by heat switch to the periphery from power loss
Spare turn of multiple power supply source point.The stand-by heat that simulation search arrives, which switchs, to be closed, and carries out topological analysis.If stand-by heat switch closes
Later, it can restore electricity originally at power loss, then it is assumed that this stand-by heat switch turns power supply source point to be available.
Trend verification step is as follows: simulating after available stand-by heat switch closes, carries out Load flow calculation, calculate and turn to supply it
Afterwards, if having before relatively simulating it is new out-of-limit perhaps heavily loaded if there is new out-of-limit or heavily loaded, then reselect can be used it is hot standby
It is calculated with switch simulation.
It is that the present invention reaches the utility model has the advantages that
Power grid Real-time Power Flow state, forecast failure are directed to integrated area power grid on-line intelligence analysis and decision system based on ground
Collection and distribution responsible consumer power supply point have carried out power grid risk scanning, and provide the risks such as out-of-limit, the heavily loaded and power loss of equipment
Then prompt provides the aid decision suggestion for reducing current electric grid risk for out-of-limit and power loss.Prison in real time can be achieved in the present invention
Aid decision suggestion is provided to existing safety and stability problem depending on the security and stability during operation of power networks, effectively promotes ground
The perception and prevention and control ability of area's power networks risk.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations
Also it should be regarded as protection scope of the present invention.