CN109782125A - A kind of earth-free Single-phase Earth Fault of Power System identification and partition method - Google Patents

A kind of earth-free Single-phase Earth Fault of Power System identification and partition method Download PDF

Info

Publication number
CN109782125A
CN109782125A CN201811587303.2A CN201811587303A CN109782125A CN 109782125 A CN109782125 A CN 109782125A CN 201811587303 A CN201811587303 A CN 201811587303A CN 109782125 A CN109782125 A CN 109782125A
Authority
CN
China
Prior art keywords
low voltage
test function
voltage test
phase
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811587303.2A
Other languages
Chinese (zh)
Inventor
张瑞
甘战
陈慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qujing Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Qujing Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qujing Bureau of Extra High Voltage Power Transmission Co filed Critical Qujing Bureau of Extra High Voltage Power Transmission Co
Priority to CN201811587303.2A priority Critical patent/CN109782125A/en
Publication of CN109782125A publication Critical patent/CN109782125A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control Of Electrical Variables (AREA)

Abstract

The invention discloses a kind of earth-free Single-phase Earth Fault of Power System identification and partition methods, are embodied as increasing low voltage test function in corresponding control protective unit, specifically include: line switching, isolation switch are in closing position;By choosing 10kV route phase voltage virtual valueMinimum value again is compared with voltage definite value, if the former is less than the latter, ground fault occurs in judgement, is delayed by setting, and low voltage test function action tripping switchs;By choosing 10kV route phase voltage virtual valueMaximum value again, when the former is less than the latter, low voltage test function is latched compared with voltage definite value, is avoided exception in short-term and is caused function action.

Description

A kind of earth-free Single-phase Earth Fault of Power System identification and partition method
Technical field
The present invention relates to electric power system fault processing technology field more particularly to a kind of earth-free electric system single-phase earthings Fault identification and partition method.
Background technique
As high voltage dc transmission technology is using more and more extensive, the nationwide interior high voltage direct current transmission run It stands more and more, proportion is also increasing in the power system for DC transmission engineering, and operational reliability is to electric system Security and stability have vital effect.The auxiliary equipment such as valve cooling system are one for influencing converter station operational reliability Key factor, to the operational reliability of station power use system, more stringent requirements are proposed as a result,.
Some converter stations are limited by geographical conditions, stand in need to be evacuated to from farther away water source by multi-level water pump house with water Pond is stored in standing, this just needs to draw feeder line supply pump house in slave station.Length to outer pump house feeder line of standing is longer, operation Condition is also very severe, and the probability to break down is larger.Currently, prepared auto restart logic in the station power consumption control system of some converter stations It is directly to use phase voltage as criterion, and 10kV station power use system is often isolated neutral system, occurs when to the feeder line outside station When singlephase earth fault, the route overcurrent protection of configuration will not act excision failure, this will cause 10kV bus in joined station Voltage reduce, cause prepared auto restart act perseveration, and ultimately cause 10kV bus incoming switch, block switch simultaneously switches off Bus loss of pressure phenomenon.This causes great threat to the operation of the important loads such as converter station valve cooling system, may cause when serious Direct current is stopped transport, and consequence is serious.
Summary of the invention
The purpose of the present invention is overcoming above-mentioned the deficiencies in the prior art, a kind of earth-free electric system single-phase earthing event is provided Barrier identification and partition method.
The present invention is achieved through the following technical solutions: a kind of earth-free Single-phase Earth Fault of Power System identification with Partition method includes the following steps:
(1) 10kV route phase voltage is acquired, and calculates its virtual valueTimes;
(2) three-phase line phase voltage virtual value is takenMinimum value and maximum value again, is denoted as U_MIN, U_MAX respectively;
(3) voltage definite value U_SET is taken, which can matching relationship setting according to actual needs;
(4) U_MIN is compared with U_SET, as U_MIN < U_SET, then judges that route has singlephase earth fault;
(5) U_MAX is compared with U_SET, as U_MAX < U_SET, then judges that low voltage test function is closed Lock;
(6) " closing position " signal of line segregation switch, " closing position " signal of line segregation disconnecting link are obtained;
(7) low voltage test function action: when in U_MAX < U_SET in U_MIN < U_SET in (4), (5) and (6) " closing position " gets " closing position " signal of line segregation switch and " closing position " signal three of line segregation disconnecting link When a condition meets simultaneously, by the delay of time T, low voltage test function action;
(8) it low voltage test function action consequence: disconnects and is detected interval switch.
By above step, can be moved in earth-free circuit on power system singlephase earth fault by low voltage test function Make excision failure;In step (4), there is ground fault in judgement, is delayed by setting, and low voltage test function action tripping is opened It closes;Low voltage test function is latched as U_MAX < U_SET in step (5), malfunction can be caused to avoid abnormal in short-term.It is right Isolated neutral system, when detecting that route phase voltage reduces and lower than setting value in normal course of operation, other two-phase voltage liters It is high and when being higher than setting value, judge that singlephase earth fault occurs for the route, be delayed tripping line switching by setting, isolation therefore Barrier.
It is compared with the prior art, the present invention has the advantages that this method principle is simple, is easily achieved;Realize earth-free electricity The identification of Force system singlephase earth fault be isolated.
Detailed description of the invention
Fig. 1 is the logic chart of low voltage test of embodiment of the present invention function;
Fig. 2 is the Example logic that the embodiment of the present invention increases low voltage test function in Converter Station power consumption control system Figure.
Specific embodiment
The contents of the present invention are described in further details with reference to the accompanying drawings and detailed description.
Embodiment
Refering to fig. 1, it is a kind of earth-free Single-phase Earth Fault of Power System identification and partition method, in corresponding control or protects Low voltage test function is arranged in protection unit logic, and (this place " low voltage test function " is function title, low in specific logic Voltage criterion can be according to practical adjusting), include the following steps:
(1) 10kV route phase voltage is acquired, and calculates its virtual valueTimes;
(2) three-phase line phase voltage virtual value is takenMinimum value and maximum value again, is denoted as U_MIN, U_MAX respectively;
(3) voltage definite value U_SET is taken, which can matching relationship setting according to actual needs;
(4) U_MIN is compared with U_SET, as U_MIN < U_SET, then judges that route has singlephase earth fault;
(5) U_MAX is compared with U_SET, as U_MAX < U_SET, then judges that low voltage test function is closed Lock;
(6) " closing position " signal of line segregation switch, " closing position " signal of line segregation disconnecting link are obtained;
(7) low voltage test function action: when in U_MAX < U_SET in U_MIN < U_SET in (4), (5) and (6) " closing position " gets " closing position " signal of line segregation switch and " closing position " signal three of line segregation disconnecting link When a condition meets simultaneously, by the delay of time T, low voltage test function action;
(8) it low voltage test function action consequence: disconnects and is detected interval switch.
By above step, can be moved in earth-free circuit on power system singlephase earth fault by low voltage test function Make excision failure;In step (4), there is ground fault in judgement, is delayed by setting, and low voltage test function action tripping is opened It closes;Low voltage test function is latched as U_MAX < U_SET in step (5), malfunction can be caused to avoid abnormal in short-term.It is right Isolated neutral system, when detecting that route phase voltage reduces and lower than setting value in normal course of operation, other two-phase voltage liters It is high and when being higher than setting value, judge that singlephase earth fault occurs for the route, be delayed tripping line switching by setting, isolation therefore Barrier.
Referring to Fig.2, BUS101_U_RMS is 10kV#101M bus phase voltage virtual value in embodiment in figureTimes, it is The example that south electric network Converter Station power consumption control system specifically utilizes low voltage test function, the converter station is with water by station Outer three-level pump house from waterworks extract, stand in 10kV#101M, #102M pass through respectively 1106DL, 1206DL switch to stand The route of outer pump house provides power supply.It is the common-tower double-return metal bare conductor that cement pole is set up to outer route of standing, double loop is a length of 18.6km, harsh environmental conditions, line fault probability are high along the line.After singlephase earth fault occurs for route, the route of configuration Akinesia is protected to cut off failure, failure will cause to stand interior 10kV prepared auto restart perseveration and eventually lead to 10kV where feeder line Bus loss of pressure.
The present embodiment, which proposes, eliminates measure of the outer line fault to 10kV bus operation adverse effect in standing of standing: (1) energy It is enough that line fault is cut off by increased low voltage test function in the power consumption control system of station;(2) low voltage test function passes through Choosing suitable time definite value (in embodiment for 1000ms) can act that (prepared auto restart judges voltage in embodiment prior to prepared auto restart The time of decompression is 1800ms) come eliminate influence to the outer feeder fault of standing to station power use system operational reliability, in route phase Between short trouble when the route protection that configures first act (route operating time of protection is 0.8s in embodiment), while not influencing again Backup power automatic switching function;(3) by taking three-phase bus voltage effective valueTimes maximum value (be in embodiment with voltage definite value It 8.5kV) compares, when the former is less than the latter, low voltage test function is blocked, this is the mistake for being avoided normally switching station electricity consumption Feeder switch (switching in example for 1106DL) disconnects outside the near station of the function action in journey.
Present embodiment illustrates Converter Station electricity systems because leading to bus loss of pressure to outer Feeder of standing Solution.
Above-listed detailed description is illustrating for possible embodiments of the present invention, and the embodiment is not to limit this hair Bright the scope of the patents, all equivalence enforcements or change without departing from carried out by the present invention, is intended to be limited solely by the scope of the patents of this case.

Claims (1)

1. a kind of earth-free Single-phase Earth Fault of Power System identification and partition method, it is characterised in that include the following steps:
(1) 10kV route phase voltage is acquired, and calculates its virtual valueTimes;
(2) three-phase line phase voltage virtual value is takenMinimum value and maximum value again, is denoted as U_MIN, U_MAX respectively;
(3) voltage definite value U_SET is taken, which can matching relationship setting according to actual needs;
(4) U_MIN is compared with U_SET, as U_MIN < U_SET, then judges that route has singlephase earth fault;
(5) U_MAX is compared with U_SET, as U_MAX < U_SET, then judges that low voltage test function is blocked;
(6) " closing position " signal of line segregation switch, " closing position " signal of line segregation disconnecting link are obtained;
(7) it low voltage test function action: " closes a floodgate when in U_MAX < U_SET in U_MIN < U_SET in (4), (5) and (6) Position " gets " closing position " signal of line segregation switch and three conditions of " closing position " signal of line segregation disconnecting link When meeting simultaneously, by the delay of time T, low voltage test function action;
(8) it low voltage test function action consequence: disconnects and is detected interval switch.
CN201811587303.2A 2018-12-25 2018-12-25 A kind of earth-free Single-phase Earth Fault of Power System identification and partition method Pending CN109782125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811587303.2A CN109782125A (en) 2018-12-25 2018-12-25 A kind of earth-free Single-phase Earth Fault of Power System identification and partition method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811587303.2A CN109782125A (en) 2018-12-25 2018-12-25 A kind of earth-free Single-phase Earth Fault of Power System identification and partition method

Publications (1)

Publication Number Publication Date
CN109782125A true CN109782125A (en) 2019-05-21

Family

ID=66497570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811587303.2A Pending CN109782125A (en) 2018-12-25 2018-12-25 A kind of earth-free Single-phase Earth Fault of Power System identification and partition method

Country Status (1)

Country Link
CN (1) CN109782125A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110676823A (en) * 2019-11-28 2020-01-10 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method
CN110729709A (en) * 2019-11-28 2020-01-24 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method for measuring neutral point voltage of transformer
CN110829390A (en) * 2019-11-28 2020-02-21 国网江苏省电力有限公司镇江供电分公司 110kV wire break protection method for measuring load side voltage and matching with spare power automatic switching

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005741A (en) * 2010-10-29 2011-04-06 华北电力大学 Distribution network line single phase earthing fault diagnosis and isolation method and device
CN102148495A (en) * 2011-03-03 2011-08-10 清华大学 Single-phase earth fault self-healing device and system
CN102175951A (en) * 2011-01-18 2011-09-07 广州思泰信息技术有限公司 Distribution network fault detection system
CN203849359U (en) * 2014-03-11 2014-09-24 中国南方电网有限责任公司超高压输电公司曲靖局 Converter station-to-outside feed line single-phase earth fault detection control apparatus
CN104852361A (en) * 2015-04-20 2015-08-19 平高集团有限公司 Power distribution network failure removal accelerating method and relay protection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005741A (en) * 2010-10-29 2011-04-06 华北电力大学 Distribution network line single phase earthing fault diagnosis and isolation method and device
CN102175951A (en) * 2011-01-18 2011-09-07 广州思泰信息技术有限公司 Distribution network fault detection system
CN102148495A (en) * 2011-03-03 2011-08-10 清华大学 Single-phase earth fault self-healing device and system
CN203849359U (en) * 2014-03-11 2014-09-24 中国南方电网有限责任公司超高压输电公司曲靖局 Converter station-to-outside feed line single-phase earth fault detection control apparatus
CN104852361A (en) * 2015-04-20 2015-08-19 平高集团有限公司 Power distribution network failure removal accelerating method and relay protection device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110676823A (en) * 2019-11-28 2020-01-10 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method
CN110729709A (en) * 2019-11-28 2020-01-24 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method for measuring neutral point voltage of transformer
CN110829390A (en) * 2019-11-28 2020-02-21 国网江苏省电力有限公司镇江供电分公司 110kV wire break protection method for measuring load side voltage and matching with spare power automatic switching
CN110829390B (en) * 2019-11-28 2020-11-10 国网江苏省电力有限公司镇江供电分公司 110kV wire break protection method for measuring load side voltage and matching with spare power automatic switching
CN110729709B (en) * 2019-11-28 2020-12-15 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method for measuring neutral point voltage of transformer
CN110676823B (en) * 2019-11-28 2021-03-02 国网江苏省电力有限公司镇江供电分公司 110kV line disconnection relay protection method

Similar Documents

Publication Publication Date Title
US9054557B2 (en) Voltage balancing of symmetric HVDC monopole transmission lines after earth faults
CN103904626A (en) Method for automatically judging and controlling power distribution network failure in ring main unit power supply
CN109782125A (en) A kind of earth-free Single-phase Earth Fault of Power System identification and partition method
CN110350651B (en) Spare power automatic switching misoperation prevention method for 110kV single bus faults
CN103378583A (en) Feeder automation technical scheme based on intelligent rapid vacuum circuit breaker
CN102611082B (en) Self-adaptive feeder neighborhood interactive fault-tolerant relay protection method for power distribution network
CN109038475A (en) A kind of distribution network overhead line self-recovery method based on voltage time logic
CN105048487B (en) The method and its device of Ground return and metallic return rapid translating in a kind of pulsating direct current transmission system of list 12
CN105006810A (en) Fault processing method of neutral-point non-effective grounding system and corresponding processing system
RU168114U1 (en) CENTRALIZED RELAY PROTECTION AND CONTROL UNIT FOR SUBSTATION WITH HIGH-VOLTAGE DISTRIBUTION DEVICE PERFORMED BY BRIDGE CIRCUIT BREAKERS WITH LINE AND REPAIR CHAINS
CN107317308A (en) The adaptive locking prepared auto restart guard method of sectionalized single busbar connection 110kV bus differential protections
CN104993448A (en) Distribution substation low-voltage intelligent reclosing method
CN103986128A (en) Low-voltage side accelerated trip protection technology based on intelligent substation
CN109510192B (en) Power distribution network and self-healing method thereof
CN107230970A (en) A kind of singlephase earth fault processing method of the feeder automation of type on the spot
CN116780747B (en) Method for improving action accuracy rate during disconnection of sectional spare power automatic switching voltage
CN103915825B (en) Distribution network failure automatic decision that full load switch ring main unit is powered and control method
CN204947607U (en) The device of Ground return and metallic return rapid translating in a kind of list 12 pulsating direct current transmission system
CN103915826B (en) Distribution network failure automatic decision that full chopper ring main unit is powered and the method for control
CN103972865A (en) Control method for preventing motor from being switched into short-circuit fault
CN105119252A (en) Ground loop and metal loop fast conversion method and device thereof in double twelve-pulse direct current transmission system
CN105356585A (en) Breaker closing and blocking loop
CN105244858A (en) Method for preventing misoperation caused by voltage loss after starting distance protection of power grid
CN204349424U (en) Microcomputer transformer backup protection loop
CN110932244B (en) Relay protection method for no-switching of all-station protection outlet pressure plates of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521