CN109779680A - 一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺 - Google Patents

一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺 Download PDF

Info

Publication number
CN109779680A
CN109779680A CN201910058893.8A CN201910058893A CN109779680A CN 109779680 A CN109779680 A CN 109779680A CN 201910058893 A CN201910058893 A CN 201910058893A CN 109779680 A CN109779680 A CN 109779680A
Authority
CN
China
Prior art keywords
slip casting
hole
grouting pipe
strong
artesian aquifer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910058893.8A
Other languages
English (en)
Inventor
刘小平
李宁
刘新星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Technology
Original Assignee
Xian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Technology filed Critical Xian University of Technology
Priority to CN201910058893.8A priority Critical patent/CN109779680A/zh
Publication of CN109779680A publication Critical patent/CN109779680A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,具体为:首先,成孔,钻孔开孔孔径为Φ130mm,松散覆盖层采用泥浆护壁,基岩段采用清水钻进,钻至穿过含水层以下10m位置变径至终孔;成孔后,迅速下入注浆管,注浆管管外壁绑扎导管,下完注浆管,焊接孔口法兰盘包扎待注浆;最后,通过孔口法兰盘接注浆管道注浆,注浆开始前及每次注浆倒孔时用清水洗孔15min,注浆结束时达到终孔标准,注浆结束。该方法可有效避免承压水通过钻孔大量流入矿井,影响井下安全生产,同时可避免承压水稀释、冲散浆液。

Description

一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺
技术领域
本发明属于采空区注浆技术领域,具体涉及一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺。
背景技术
随着我国经济的快速发展,基础设施建设不断完善,土地资源加速紧缺。与此同时,能源需求越来越大,井田开发由点到面、由浅到深,采空区面积不断加大。两者的冲突导致越来越多的工程建设不可避免的遇到采空区地基,严重危害上部建(构)筑物的建设与安全运营。随着矿井的深层次开发,由此产生的采空区越来越复杂,治理难度越来越大。
目前,在采空区治理过程中,白垩系下统洛河组全段含水,该层平均厚度为280m,采空区平均埋深超过500m。强承压含水层被打穿后,承压水通过钻孔大量流向矿井,严重影响井下安全生产,同时承压水对浆液具有稀释、冲散作用,严重影响采空区充填注浆质量。
发明内容
本发明的目的是提供一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,避免了承压水通过钻孔大量流入矿井,影响井下安全生产,同时可避免承压水稀释、冲散浆液。
本发明所采用的技术方案是,一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,具体按照以下步骤实施:
步骤1,成孔,钻孔开孔孔径为Φ130mm,松散覆盖层采用泥浆护壁,基岩段采用清水钻进,钻至穿过含水层以下10m位置变径至终孔,变径孔径不小于Φ91mm;
步骤2,成孔后,迅速下入注浆管,注浆管外壁绑扎导管,注浆管对应钻孔变径位置双面焊接钢托盘,在钢托盘与导管底口之间浇入水泥净浆固定,下完注浆管,焊接孔口法兰盘包扎待注浆;
步骤3:通过孔口法兰盘接注浆管道注浆,注浆开始前及每次注浆倒孔时用清水洗孔15min,注浆结束时达到终孔标准,注浆结束。
本发明的特点还在于,
步骤1中,终孔孔底以上50m范围内采取岩芯。
步骤2中,煤层底板以上50m焊接花管。
注浆管为DN40焊接钢管。
步骤2中,导管底口与钢托盘的距离为15~20m。
本发明的有益效果是:
本发明可有效避免承压水通过钻孔大量流入矿井,影响井下安全生产,同时可避免承压水稀释、冲散浆液;孔底采取岩芯可以防止岩粉沉淀阻塞注浆通道;花管可防止钻孔下部受注层坍塌,提高注浆充填效果。
附图说明
图1是本发明一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺中成孔的结构示意图。
图中,1.松散覆盖层,2.上隔水层,3.透水层,4.下隔水层,5.采空影响层,6.采空区,7.煤柱,8.煤层底板;9.法兰盘,10.注浆管,11.导管,12.水泥浆,13.钢托盘,14.导水裂隙带,15.花管,16.垮落带。
具体实施方式
下面结合附图和具体实施方式对本发明进行详细说明。
本发明一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,如图1所示,该孔结构由上至下包括松散覆盖层(1)、上隔水层(2)、透水层(3)、下隔水层(4)以及采空影响层(5);
具体按照以下步骤实施:
步骤1,成孔,钻孔开孔孔径为Φ130mm,松散覆盖层(1)采用泥浆护壁,基岩段采用清水钻进,钻至穿过含水层以下10m位置变径至终孔,变径孔径不小于Φ91mm,终孔孔底以上50m范围内采取岩芯;
步骤2:成孔后,迅速下入注浆管(10),注浆管(10)管外壁绑扎导管(11),注浆管(10)对应钻孔变径位置双面焊接钢托盘(13),煤层底板(8)以上50m焊接花管(15),钢托盘(13)上部15m~20m通过导管(11)浇入1:1水泥净浆(12)固定,即钢托盘(13)与导管(11)底口之间浇注有水泥净浆;下完注浆管(10),焊接孔口法兰盘(9)包扎待注浆;
注浆管(10)为DN40焊接钢管(外径为48.3mm,壁厚为3.5mm),钢托盘(13)的外径120mm,内径49mm,厚度20mm;
导管(11)底口与钢托盘(13)的距离为15~20m;
花管(15)的管长为50m;
导管(11)的直径为20mm;
步骤3:通过孔口法兰盘(9)接注浆管道注浆,注浆开始前及每次注浆倒孔时用清水洗孔15min,注浆结束时达到终孔标准,注浆结束。
本发明的煤矿采空区灌浆孔止浆工艺中,在终孔孔底以上50m范围内取芯,采取岩芯的目的是避免岩粉沉淀堵塞注浆通道、揭露关键地层及评价前序次钻孔注浆效果。同时,在煤层底板以上50m采用花管,可有效防止钻孔底部关键受注层位塌孔对注浆的影响,提高深孔利用率。
实施例
某水库库区下伏采空区治理工程,采空区由综采形成,采4-2煤一层,顶板管理方式为自由垮落式,采空区平均埋深510m,煤层厚度为7.1m,采空区上覆基岩中存在一层白垩系下统洛河组透水层。注浆钻孔分为全孔取芯先导性钻孔及一般注浆孔两类。采用“一次成孔、自下而上、间歇式全部充填”工艺,具体实施步骤如下:
(1)钻孔施工:其包括孔位测量、钻机安装、钻进成孔、浇筑注浆管四个步骤;
①孔位测量:注浆钻孔应采用RTK或全站仪等测量仪器按照工程设计孔位坐标进行逐点实地放样,钻孔实际位置偏差不应超过设计位置0.5m;
②安装钻机:平整场地,安装钻机,调平机架、机体,准备钻具,备好套管、钻头以及钻杆、岩芯管、钻孔报表等;
③钻进成孔:采用Φ130mm开孔,松散覆盖层(1)中采用泥浆护壁,基岩段采用清水钻进,钻至穿过透水层(3)到达下隔水层(4)10m位置,变径为不小于Φ91mm至终孔,最后50m采取岩芯;
(2)浇筑注浆管;
成孔后,下入注浆管(10),注浆管(10)管外绑扎塑料导管(11),注浆管(10)对应钻孔变径位置安装钢托盘(13),煤层底板(8)以上50m焊接花管(15),钢托盘(13)上部15m通过导管(11)浇入1:1水泥净浆(12)封孔,下完注浆管(10),焊接注浆管(10)的法兰盘(9)包扎待注浆;
(3)注浆施工:注浆浆液为水泥粉煤灰浆,水泥粉煤灰浆由质量比为2:8的水泥与粉煤灰混合而成;注浆结束标准为达到0.5MPa,泵量小于50L/min,超过15min;
注浆开始前及每次注浆倒孔时用清水洗孔15min,确保孔内注浆管路畅通;
采用钢托盘及水泥浆将注浆管固定在下隔水层,避免承压水从孔内大量流入矿井,从而影响矿井安全生产;浆液从注浆管压入受注层,与承压水分离,保证注浆充填质量。孔底以上50m采取岩芯,可避免岩粉沉淀堵塞注浆通道、揭露关键地层及评价先序钻孔注浆效果。煤层底板以上50m采用花管,可有效避免塌孔对注浆的影响,提高钻孔利用效率,增强注浆均匀性。

Claims (5)

1.一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,其特征在于,具体按照以下步骤实施:
步骤1,成孔,钻孔开孔孔径为Φ130mm,松散覆盖层采用泥浆护壁,基岩段采用清水钻进,钻至穿过含水层以下10m位置变径至终孔,变径孔径不小于Φ91mm;
步骤2,成孔后,迅速下入注浆管,注浆管管外壁绑扎导管,注浆管对应钻孔变径位置双面焊接钢托盘,在钢托盘与导管底口之间浇入水泥净浆固定,下完注浆管,焊接孔口法兰盘包扎待注浆;
步骤3:通过孔口法兰盘接注浆管道注浆,注浆开始前及每次注浆倒孔时用清水洗孔15min,注浆结束时达到终孔标准,注浆结束。
2.根据权利要求1所述的一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,其特征在于,所述步骤1中,终孔孔底以上50m范围内采取岩芯。
3.根据权利要求1所述的一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,其特征在于,所述步骤2中,煤层底板以上50m焊接花管。
4.根据权利要求1所述的一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,其特征在于,所述注浆管为DN40焊接钢管。
5.根据权利要求1所述的一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺,其特征在于,所述步骤2中,导管底口与钢托盘的距离为15~20m。
CN201910058893.8A 2019-01-22 2019-01-22 一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺 Pending CN109779680A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910058893.8A CN109779680A (zh) 2019-01-22 2019-01-22 一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910058893.8A CN109779680A (zh) 2019-01-22 2019-01-22 一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺

Publications (1)

Publication Number Publication Date
CN109779680A true CN109779680A (zh) 2019-05-21

Family

ID=66502005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910058893.8A Pending CN109779680A (zh) 2019-01-22 2019-01-22 一种强承压含水层深埋条件下煤矿采空区灌浆孔止浆工艺

Country Status (1)

Country Link
CN (1) CN109779680A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833519A (zh) * 2021-07-30 2021-12-24 北京中煤矿山工程有限公司 金属矿山采空区充填方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2541518Y (zh) * 2002-04-12 2003-03-26 中交通力公路勘察设计工程有限公司 法兰盘式止浆装置
CN203008966U (zh) * 2013-01-08 2013-06-19 葛洲坝集团基础工程有限公司 一种灌浆阻塞器
CN103924945A (zh) * 2014-05-08 2014-07-16 中煤科工集团西安研究院有限公司 煤矿用厚松散层下富水风化裂隙岩层的高压注浆工艺
CN204783050U (zh) * 2015-05-11 2015-11-18 中煤科工集团西安研究院有限公司 用于裂隙发育地层高压注浆的密封保压装置
CN106320354A (zh) * 2016-08-23 2017-01-11 中国水利水电第八工程局有限公司 覆盖层下溶洞发育地层的防渗施工方法
CN108868776A (zh) * 2018-07-06 2018-11-23 中钢集团马鞍山矿山研究院有限公司 深井高承压破碎岩层超前诱导预注浆加固方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2541518Y (zh) * 2002-04-12 2003-03-26 中交通力公路勘察设计工程有限公司 法兰盘式止浆装置
CN203008966U (zh) * 2013-01-08 2013-06-19 葛洲坝集团基础工程有限公司 一种灌浆阻塞器
CN103924945A (zh) * 2014-05-08 2014-07-16 中煤科工集团西安研究院有限公司 煤矿用厚松散层下富水风化裂隙岩层的高压注浆工艺
CN204783050U (zh) * 2015-05-11 2015-11-18 中煤科工集团西安研究院有限公司 用于裂隙发育地层高压注浆的密封保压装置
CN106320354A (zh) * 2016-08-23 2017-01-11 中国水利水电第八工程局有限公司 覆盖层下溶洞发育地层的防渗施工方法
CN108868776A (zh) * 2018-07-06 2018-11-23 中钢集团马鞍山矿山研究院有限公司 深井高承压破碎岩层超前诱导预注浆加固方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833519A (zh) * 2021-07-30 2021-12-24 北京中煤矿山工程有限公司 金属矿山采空区充填方法
CN113833519B (zh) * 2021-07-30 2024-03-26 北京中煤矿山工程有限公司 金属矿山采空区充填方法

Similar Documents

Publication Publication Date Title
CN108060908B (zh) 建筑群下富水砂层长距离水平定向钻孔注浆加固工艺
CN104694746B (zh) 一种离子吸附型稀土原地浸矿的方法及其浸矿系统
CN105952475B (zh) 一种煤矿残采区冒落废巷注浆加固工艺与方法
CN109899089A (zh) 基于羽状水平分支定向钻探工艺的采空区注浆方法
CN108915736B (zh) 强富水弱胶结含水层下掘进巷道的水害防治方法
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN103835651B (zh) 一种单孔定向钻进局部注浆反井钻井工艺
CN109763483A (zh) 一种厚第四系深埋采空塌陷破碎地层上行式分段注浆工艺
CN111206933A (zh) 一种穿越岩溶富水地段的隧道施工方法
CN101709651A (zh) 海底隧道的注浆堵水方法
CN103334770A (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN107762533A (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN104500082A (zh) 矿山法隧道内盾构接收施工方法
CN110735653A (zh) 一种针对火成岩富水断层的深孔后退式注浆堵水施工方法
CN105155563A (zh) 一种基坑软流塑地层涌水加固治理方法
CN103835648A (zh) 一种通过地面注浆改善岩层性能反井钻井工艺
CN111075478A (zh) 采掘工作面构造破碎带地面施工预注浆加固工艺
CN101793154A (zh) 利用隧道围岩地质参数和设置分流孔的注浆堵水方法
CN108590706A (zh) 一种用于特长单线铁路隧道多臂凿岩台车帷幕注浆施工技术
CN106837382B (zh) 一种地铁隧道围岩地面预注浆加固工艺
CN109488370B (zh) 一种井下灰岩探放水钻孔施工方法
CN110173301A (zh) 基于集束式多分支井定向钻探的综采采空区注浆方法
CN109026010A (zh) 一种矿山渗井注浆型凿井施工方法
CN114837663A (zh) 一种地面预注浆提高断层防水煤柱回收率的施工方法
CN111287769A (zh) 一种隧道围岩超前注浆加固结构及其施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20211116

AD01 Patent right deemed abandoned