CN109778775A - It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open - Google Patents

It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open Download PDF

Info

Publication number
CN109778775A
CN109778775A CN201910080579.XA CN201910080579A CN109778775A CN 109778775 A CN109778775 A CN 109778775A CN 201910080579 A CN201910080579 A CN 201910080579A CN 109778775 A CN109778775 A CN 109778775A
Authority
CN
China
Prior art keywords
wire netting
netting group
gravity type
flood wall
torn open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910080579.XA
Other languages
Chinese (zh)
Inventor
赖伟山
刘志强
何伟杰
胡志桥
钟文深
吴瑞卿
王任杰
刘鹏
幸文敏
王斯馨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Co Ltd
Original Assignee
Guangzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Co Ltd filed Critical Guangzhou Construction Co Ltd
Priority to CN201910080579.XA priority Critical patent/CN109778775A/en
Publication of CN109778775A publication Critical patent/CN109778775A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses one kind can quickly pacify the gravity type anti-flood wall and installation method torn open, and the anti-flood wall includes wire netting group, horizontal corner steel, anti-seepage geomembrane, skewed horizontal load bar, geotextiles and sand.The horizontal corner steel is fixedly connected with the wire netting group, and is located at the back side side of the wire netting group;The laying anti-seepage geomembrane is located at the upstream face side of the wire netting group in the wire netting group;The skewed horizontal load bar is longitudinally arranged along the wire netting group, and top is fixedly connected with the horizontal corner steel, and ground is inserted into bottom end;The geotextile laying is on the ground that the wire netting group is surrounded;The sand is backfilling on ground.Gravity type flood control wall construction of the invention is simple, can flexible arrangement according to field condition, site condition is required low;At the same time, material required for anti-flood wall of the invention can be processed in the field, and material cost and cost of labor is greatly saved, and directly embody advantage from economic aspect.

Description

It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open
Technical field
The present invention relates to flood-proof technology fields, and in particular to a kind of gravity type anti-flood wall and installation method.
Background technique
As urban development planning tends to scale and specialization, the small plot in big plot is in construction period by periphery Building site environment is affected.If encountering the bad weathers such as heavy rain in the construction process, it is easy to cause pit water accumulation serious, influences just Often construction.
The rainwater on ground enters foundation pit in order to prevent, and the prior art, which generallys use, builds interim earth dam, armored concrete gear Three kinds of methods such as wall or aluminium alloy barricade are used to water blocking, but these three methods have following shortcoming respectively:
For building interim earth dam using rubble, clay, although construction is convenient, and plays certain water blocking effect, It is live mixed and disorderly, and it is easy to cause soil erosion under rain drop erosion, cause foundation pit hidden danger.
For building Reinforced Concrete Retaining Walls, it is necessary first to excavate groove, apply smooth ground, bed course, stock mould, reinforcing bar and tie up The processes such as bundle, casting concrete, maintenance, basis backfill, not only the construction period is long, costly, need to expend when the later period removes compared with More times.
For assembled aluminium alloy barricade, although installing and dismounting is more convenient, need to carry out in advance basis it is pre-buried or Cast in situs.And in big Excavation Process, surrounding environment change is fast, if progress hardened ground or basis pour, consuming Time and higher cost.
Therefore, it is badly in need of finding that a kind of convenient to assemble and disassemble, place is adaptable and lower-cost flood control method.
Summary of the invention
The present invention be directed in place of the deficiencies in the prior art, provide one kind can quickly pacify the gravity type anti-flood wall torn open and installation Method reduces the manpower expended when flood control and material resources while meeting flood control results, improves the adaptability to place.
The present invention is achieved by the following technical solutions:
It is a kind of quickly to pacify the gravity type anti-flood wall torn open, comprising:
Wire netting group, the wire netting group are made of multiple monomer iron wire cylinder moulds, and the monomer iron wire cylinder mould is mutual It is fixedly connected;
Horizontal corner steel, the horizontal corner steel are fixedly connected with the wire netting group, and are located at the backwater of the wire netting group Face side;
Anti-seepage geomembrane, the laying anti-seepage geomembrane are located at meeting for the wire netting group in the wire netting group Water surface side;
Skewed horizontal load bar, the skewed horizontal load bar are longitudinally arranged along the wire netting group, top and the horizontal corner steel It is fixedly connected, ground is inserted into bottom end;
Geotextiles, the geotextile laying is on the ground that the wire netting group is surrounded;
Sand, the sand are backfilling on ground.
Further, the monomer iron wire cylinder mould passes through iron wire binding and fixing between each other and connects.
Specifically, the monomer iron wire cylinder mould is by four sides wire gauze circumference at having a size of long 1m, width 1m, high 1m.
Further, be uniformly provided with bolt hole on the horizontal corner steel, the horizontal corner steel and the wire netting group it Between be fixedly connected by bolt clamping plate.
Preferably, the bolt hole it is adjacent between be spaced 1m.
Further, the anti-seepage geomembrane includes embedded part and water blocking part, and the embedded part is fixed on ground On, the water blocking is partially covered on the upstream face side of the wire netting group, on the top of the water blocking part instead with the iron Silk screen group is fixed.
Preferably, the length of the embedded part is no less than 300mm.
Preferably, the anti-seepage geomembrane with a thickness of 3mm.
Further, fixation of the embedded part on ground can be fixed using sand hill compacting.The thickness of the sand hill Degree is not less than 0.4m.
Further, the skewed horizontal load bar is adjustable in length support rod.
Further, the top of the skewed horizontal load bar is with the horizontal corner steel by being welded and fixed.
Preferably, the depth of skewed horizontal load bar bottom end insertion ground is not less than 150mm.
Preferably, the skewed horizontal load bar it is adjacent between be spaced 1m.
A kind of installation method that can quickly pacify the gravity type anti-flood wall torn open, the specific steps are as follows:
Step 1: surrounding monomer iron wire cylinder mould using the connection of four sides wire netting, multiple monomer iron wire cylinder moulds are tied up by iron wire It after pricking composition wire netting group, places to predetermined position, and is laid with geotextiles in wire netting group and fixes;
Step 2: in the back side side of wire netting group, horizontal corner steel and skewed horizontal load bar, horizontal corner steel and wire netting are set It is fixedly connected between group by bolt clamping plate, the top of skewed horizontal load bar and horizontal corner steel weld, and ground is inserted into bottom end;
Step 3: being laid with anti-seepage geomembrane, the top of the water blocking part of anti-seepage geomembrane in the upstream face side of wire netting group On instead fixed with wire netting group, embedded part is fixed with ground;
Step 4: backfill sand forms complete gravity type anti-flood wall.
Compared with prior art, the beneficial effects of the present invention are:
1, of the invention quickly to pacify the gravity type anti-flood wall torn open, wire netting group is by multiple monomer iron wire cylinder mould connection groups At there is independent molding characteristic, can arrange single single layer or multiple rows of multilayer form according to field condition.When later period removes, The constraint between solution demonomerization wire netting cage is only needed, sand is just freely scattered, is removed with excavator.
2, of the invention quickly to pacify the gravity type anti-flood wall torn open, backfill sand is formed using wire netting group and geotextiles Four sides constrains, and can effectively prevent sand side leakage;In addition, backfill sand bottom and original place face contact, without being carried out to original place Curing process, it is adaptable to place;Gravity type anti-flood wall can anti-inclining of generating of equilibrium water pressure by sand self weight and diagonal brace Cover torque and horizontal sliding;The infiltration path of anti-flood wall can be obstructed by being laid with anti-seepage geomembrane, improve anti-flood wall impermeability.
3, of the invention quickly to pacify the gravity type anti-flood wall torn open, wire netting group, anti-seepage geomembrane, horizontal corner steel and tiltedly It is light to quality of materials such as support rods, it is readily transported and installs, be not easy to be lost.In addition, steel required for building anti-flood wall are existing Field processing space can be completed the process voluntarily, and versatility is higher.
4, of the invention quickly to pacify the gravity type anti-flood wall torn open, wire netting group required for anti-flood wall, anti-seepage geomembrane, The materials overall cost such as horizontal corner steel, geotextiles is low, while cyclic utilization rate is higher, greatly reduces cost.
5, the installation method that can quickly pacify the gravity type anti-flood wall torn open of the invention has assembly rapidly, removes easy Characteristic greatly reduces the man power and material expended when flood control.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only an implementation of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of anti-flood wall skeleton of the present invention;
Fig. 2 is the integrally-built main view of the present invention;
Fig. 3 is the partial enlarged view in the portion A in Fig. 2.
Wherein, the meaning of appended drawing reference is as follows:
Wire netting group 1, monomer iron wire cylinder mould 11, anti-seepage geomembrane 2, embedded part 21, water blocking part 22, skewed horizontal load bar 3, steel pipe 31, screw rod 32, horizontal corner steel 4, clamping plate 5, sand hill 6
Specific embodiment
In order to better understand and implement, with reference to the accompanying drawings and examples, to a specific embodiment of the invention make into One step detailed description.Following embodiment is merely to illustrate the present invention, is not intended to limit the scope of the invention.
The invention discloses one kind can quickly pacify the gravity type anti-flood wall torn open, as shown in Figure 1-3, include wire netting group 1, oblique To support rod 3 and horizontal corner steel 4;The wire netting group 1 is made of multiple monomer iron wire cylinder moulds 11, the monomer iron wire cylinder mould 11 It is surrounded by the connection of four sides wire netting, the monomer iron wire cylinder mould 11 is fixedly connected between each other;It is anti-in order to reinforce entire gravity type The structure of big vast wall increases the ability that anti-flood wall resists flood, is additionally provided with horizontal angle in the back side side of the wire netting group 1 Steel 4 and skewed horizontal load bar 3, the horizontal corner steel 4 are fixedly connected with the wire netting group 1, and the skewed horizontal load bar 3 is along described Wire netting group 1 is longitudinally arranged, and top is fixedly connected with the horizontal corner steel 4, and ground is inserted into bottom end.
In the present embodiment, the monomer iron wire cylinder mould 11 is arranged along single direction, so as to form single anti-flood wall knot Structure;The size of the monomer iron wire cylinder mould 11 is long 1m, width 1m, high 1m, passes through iron wire bundled fixed between each other and connects;Institute The top and the horizontal corner steel 4 for stating skewed horizontal load bar 3 are fixedly connected by welding, and the depth of bottom end insertion ground is 150mm;1m is spaced between the skewed horizontal load bar 3 is adjacent.In other embodiments, the monomer iron wire cylinder mould 11 can also edge Multiple directions arrangement, so as to form multiple rows of flood control wall construction;The monomer iron wire cylinder mould 11 is also possible to other between each other can The connection type of disassembly, therefore can according to actual needs and field condition, the structure of flexible arrangement anti-flood wall;The skewed horizontal load Bar 3 is fixed by way of being connect other fasteners with the horizontal corner steel 4.
In addition, the monomer iron wire cylinder mould 11 is by removably connection, also have the advantage that can be larger by volume Wire netting group 1 split into the lesser part of several volumes and transported so that the transport of anti-flood wall is more convenient;Later period removes When, it is only necessary to the mutual constraint of demonomerization wire netting cage 11 is solved, sand is just freely scattered, is removed with excavator, had Assembled rapid, the easy characteristic of dismounting.
As shown in Fig. 2, further including anti-seepage geomembrane 2, the anti-seepage geomembrane 2 is laid in the wire netting group 1, and position In the upstream face side of the wire netting group;The anti-seepage geomembrane 2 includes burying part 21 and water blocking part 22, described embedded Part 21 is fixed on ground, and the water blocking part 22 is corresponding with the wire netting group 1, on the top of the water blocking part 22 It is anti-fixed with the wire netting group 1.
In the present embodiment, the embedded part 21 is fixed on ground by 6 presser feet of sand hill, the length of the embedded part Degree is 400mm;The anti-seepage geomembrane 2 selects canvas to be made, with a thickness of 3mm, the sand hill with a thickness of 0.4m.At other In embodiment, the anti-seepage geomembrane 2 can also be made of other materials, as long as its waterproof ability is met the requirements.
Compared to the scheme that anti-seepage geomembrane 2 only has water blocking part 22, after embedded part 21 is set, the embedded part 21 with Ground is fixed, so that water is more difficult by the anti-flood wall, to further improve the sealing ability of the anti-flood wall;With this Meanwhile by the effect between embedded part 21 and ground, fixing intensity of the entire anti-flood wall on ground can effectively improve, So that the structural stability of anti-flood wall further gets a promotion.
In conjunction with shown in Fig. 2, the skewed horizontal load bar 3 is the support rod of adjustable in length, sets internal thread by two Steel pipe 31 and a screw rod 32 form, and two steel pipe 31 is threadedly coupled with 32 both ends of screw rod respectively;When needing to adjust When saving the length of skewed horizontal load bar 3, it is only necessary to rotate the steel pipe 31 at both ends.
In other embodiments, the skewed horizontal load bar 3 can also be made of a plurality of steel pipe for offering multiple pin holes, It is fixed between the steel pipe and steel pipe by the plug that pin latches.When needing adjustment length, it need to only pass through different bolts Hole is attached steel pipe, that is, can reach the change of length.The skewed horizontal load bar 3 or other length are changeable Structure, herein with no restrictions.
As shown in figure 3, further including clamping plate 5, the clamping plate 5 is pasted on horizontal corner steel 4, the horizontal corner steel 4 and clamping plate 5 On offer corresponding bolt hole, the horizontal corner steel 4 is bolted to connection with the wire netting group 1.
In the present embodiment, the bolt hole it is adjacent between be spaced 1m.In other embodiments, the horizontal corner steel 4 The connection with wire netting group 1 can be realized by other dismountable modes.
In addition, the anti-flood wall further includes geotextiles and sand (being not shown in figure), the geotextile laying is in ground On, and be located in the wire netting group 1, the geotextiles can prevent soil from being destroyed by the effect of external force.The sand returns It fills out on ground, flood control wall construction is reinforced by the self weight of sand.
The installation method that one kind of the embodiment of the present invention can quickly pacify the gravity type anti-flood wall torn open is as follows:
Step 1: monomer iron wire cylinder mould 11 is surrounded using the connection of four sides wire netting, and according to field condition, by multiple monomers Iron wire cylinder mould 11 binds connection composition wire netting group 1 by iron wire, is subsequently placed with to predetermined position, and soil is laid in wire netting group Work cloth is fixed;
Step 2: in the back side side of wire netting group, horizontal corner steel 4 and skewed horizontal load bar 3, the horizontal corner steel 4 are set It being fixedly connected with the wire netting group 1 by bolt clamping plate, the skewed horizontal load bar 3 is longitudinally arranged along the wire netting group 1, Its top and the horizontal corner steel 4 weld, and ground is inserted into bottom end, and the skeleton for completing anti-flood wall is built;
Step 3: it is laid with anti-seepage geomembrane 2 in the upstream face side of wire netting group, the water blocking part 22 of anti-seepage geomembrane 2 Anti- fixed with wire netting group 1 on top, embedded part 21 is fixed with ground, and is fixed using the compacting of sand hill 6.
Step 4: backfill sand forms complete gravity type anti-flood wall.
The technical means disclosed in the embodiments of the present invention is not limited only to technological means disclosed in above embodiment, further includes Technical solution consisting of any combination of the above technical features.It should be pointed out that for those skilled in the art For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as Protection scope of the present invention.

Claims (10)

1. one kind can quickly pacify the gravity type anti-flood wall torn open characterized by comprising
Wire netting group, the wire netting group are made of multiple monomer iron wire cylinder moulds, and the monomer iron wire cylinder mould is fixed between each other Connection;
Horizontal corner steel, the horizontal corner steel are fixedly connected with the wire netting group, and are located at the back side one of the wire netting group Side;
Anti-seepage geomembrane, the laying anti-seepage geomembrane are located at the upstream face of the wire netting group in the wire netting group Side;
Skewed horizontal load bar, the skewed horizontal load bar are longitudinally arranged along the wire netting group, and top is fixed with the horizontal corner steel Ground is inserted into connection, bottom end;
Geotextiles, the geotextile laying is on the ground that the wire netting group is surrounded;
Sand, the sand are backfilling on ground.
2. according to claim 1 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the monomer iron wire cylinder mould It is connected between each other by iron wire binding and fixing.
3. according to claim 1 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that on the horizontal corner steel It is even to offer bolt hole, it is fixedly connected between the horizontal corner steel and the wire netting group by bolt clamping plate.
4. according to claim 1 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the anti-seepage geomembrane packet It includes embedded part and water blocking part, the embedded part is fixed on ground, the water blocking is partially covered on the wire netting group Upstream face side, instead fixed with the wire netting group on the top of the water blocking part.
5. according to claim 4 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the length of the embedded part Degree is no less than 300mm.
6. according to claim 1 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the skewed horizontal load bar is Adjustable in length support rod.
7. according to claim 6 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the skewed horizontal load bar Top is with the horizontal corner steel by being welded and fixed.
8. according to claim 7 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the skewed horizontal load bar The depth that ground is inserted into bottom end is not less than 150mm.
9. according to claim 1 to 8 can quickly pacify the gravity type anti-flood wall torn open, which is characterized in that the list Body iron wire cylinder mould is by four sides wire gauze circumference at having a size of long 1m, width 1m, high 1m.
10. a kind of installation method for the gravity type anti-flood wall that can quickly pacify as described in any one of claim 1-9 is torn open, It is characterized in that, the specific steps are as follows:
Step 1: surrounding monomer iron wire cylinder mould using the connection of four sides wire netting, multiple monomer iron wire cylinder moulds are bound into group by iron wire It after wire netting group, places to predetermined position, and is laid with geotextiles in wire netting group and fixes;
Step 2: in the back side side of wire netting group, horizontal corner steel and skewed horizontal load bar be set, horizontal corner steel and wire netting group it Between be fixedly connected by bolt clamping plate, the top of skewed horizontal load bar and horizontal corner steel weld, and ground is inserted into bottom end;
Step 3: anti-on the upstream face side of wire netting group laying anti-seepage geomembrane, the top of the water blocking part of anti-seepage geomembrane It is fixed with wire netting group, embedded part is fixed with ground;
Step 4: backfill sand forms complete gravity type anti-flood wall.
CN201910080579.XA 2019-01-28 2019-01-28 It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open Pending CN109778775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910080579.XA CN109778775A (en) 2019-01-28 2019-01-28 It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910080579.XA CN109778775A (en) 2019-01-28 2019-01-28 It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open

Publications (1)

Publication Number Publication Date
CN109778775A true CN109778775A (en) 2019-05-21

Family

ID=66502735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910080579.XA Pending CN109778775A (en) 2019-01-28 2019-01-28 It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open

Country Status (1)

Country Link
CN (1) CN109778775A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185313A (en) * 2019-06-10 2019-08-30 华北水利水电大学 A kind of multistage sediment trapping device for water and soil conservation
CN110822210A (en) * 2019-11-15 2020-02-21 广州市第三市政工程有限公司 Water supply and drainage pipeline assembled type blocking plate and construction method
CN113005989A (en) * 2021-03-17 2021-06-22 上海市水利工程设计研究院有限公司 Novel prefabricated assembled interim flood control wall convenient to nimble equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1473994A (en) * 2003-07-31 2004-02-11 辉 黄 Movable combined flood cut-off dam
KR20110120165A (en) * 2010-04-28 2011-11-03 (주)남영산업 A gabion of revetment protection
CN203768864U (en) * 2014-01-14 2014-08-13 于丁一 Single-layered steel sheet pile flood wall
CN107858999A (en) * 2017-12-14 2018-03-30 中国水利水电科学研究院 Flexible anti-flood wall
CN209779548U (en) * 2019-01-28 2019-12-13 广州建筑股份有限公司 gravity type flood control wall capable of being quickly installed and detached

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1473994A (en) * 2003-07-31 2004-02-11 辉 黄 Movable combined flood cut-off dam
KR20110120165A (en) * 2010-04-28 2011-11-03 (주)남영산업 A gabion of revetment protection
CN203768864U (en) * 2014-01-14 2014-08-13 于丁一 Single-layered steel sheet pile flood wall
CN107858999A (en) * 2017-12-14 2018-03-30 中国水利水电科学研究院 Flexible anti-flood wall
CN209779548U (en) * 2019-01-28 2019-12-13 广州建筑股份有限公司 gravity type flood control wall capable of being quickly installed and detached

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185313A (en) * 2019-06-10 2019-08-30 华北水利水电大学 A kind of multistage sediment trapping device for water and soil conservation
CN110822210A (en) * 2019-11-15 2020-02-21 广州市第三市政工程有限公司 Water supply and drainage pipeline assembled type blocking plate and construction method
CN113005989A (en) * 2021-03-17 2021-06-22 上海市水利工程设计研究院有限公司 Novel prefabricated assembled interim flood control wall convenient to nimble equipment

Similar Documents

Publication Publication Date Title
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN104612160B (en) A kind of next-door neighbour's existing building pit maintenance soil structure and construction method
CN109371905B (en) Dam and construction method
CN109778775A (en) It is a kind of quickly to pacify the gravity type anti-flood wall and installation method torn open
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN203429660U (en) Stereo stiffened rigid-flexible combined ecological retaining wall
CN109838240B (en) River-crossing tunnel arch cover covering and digging construction method
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN106638612B (en) Simple foundation pit support system and its construction method
CN111778994A (en) Pipe-jacking working well supporting device for municipal pipeline engineering and construction method
CN209779548U (en) gravity type flood control wall capable of being quickly installed and detached
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN1067453C (en) Foundation pit slope flat anchor spray net supporting method
CN105672450A (en) Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN112681332A (en) Construction method for supporting system by using steel sheet piles in complex environment
CN112252342A (en) Steel wire grid net protection and construction method for rock slope broken rock mass
CN113529786B (en) Garbage filling and mountain-piling supporting and retaining structure and construction method
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN117166510A (en) Deep large-diameter open caisson construction method
CN209722993U (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction a little
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN105672350B (en) Construction method for repairing lateral displacement of retaining wall
CN112144425B (en) Box culvert drainage ditch pouring method located at high water level and in sandy soil environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination