- CN109775915A CN109775915A CN201910173326.7A CN201910173326A CN109775915A CN 109775915 A CN109775915 A CN 109775915A CN 201910173326 A CN201910173326 A CN 201910173326A CN 109775915 A CN109775915 A CN 109775915A
- Authority
- CN
- China
- Prior art keywords
- water
- power plant
- waste water
- groups
- plant waste
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Water Treatment By Electricity Or Magnetism (AREA)
Abstract
The present invention relates to the technical fields of sewage treatment, more particularly to a kind of power plant waste water processing method, carry out sewage treatment using physical method, do not generate secondary pollution to water body, and occupied area is small, operating cost is low, while consuming little energy, save the cost;The following steps are included: (1) gradient magnetic is activated: the required power plant waste water handled being imported in gradient magnetic Activation Module and is activated;(2) adsorption treatment: the power plant waste water after being activated is imported in power plant waste water processing module, adsorption treatment is filtered to sewage by the ore building stones in power plant waste water processing module;(3) re-activation is handled: the sewage after adsorption treatment being imported and carries out re-activation processing in the Activation Module of Quadratic Pressure Gradient magnetic field;(4) detection water outlet: carrying out on-line checking to by above step treated sewage, whether qualified detects it, and the water after qualification is discharged.
Description
Technical field
The present invention relates to the technical fields of sewage treatment, more particularly to a kind of power plant waste water processing method.
Background technique
Power plant is also easy to produce the pollutants such as raw buck, chemical wastewater, oily waste water during operation, these pollutants have
Poison, and do not have processed penetration to underground, surrounding enviroment and the people using underground water can be endangered, from long-range development mesh
From the point of view of mark, carrying out processing to the waste water that power plant generates is beneficial to long-range environmental protection and economy sight, and protects water body, in conjunction with optimization
Waste water from power plant technique and equipment realize the target of zero-emission recycling.
The method of waste water from power plant increasingly updates, and the power plant of different places takes different according to the stain disease of generation
Treatment process and equipment.Biomembrane, activated sludge process etc. is commonly used in waste water treatment plant to be handled.Waste water from power plant can be with
Utilize the advanced stain disease processing equipment for the treatment of process.For example, being used for the tubular membrane of waste water from power plant, can effectively filter useless
Water waste realizes water body non-pollution discharge, has the advantages that antipollution, acid and alkali-resistance, the operating ambient temperature that can be born is up to nine
15 degrees Celsius, it can be used for extensive and quick wastewater treatment.Waste water from power plant can use relatively advanced energy saving and suitable
Close the technique that local climate uses.
Waste Water From Fire Power Plant improvement generally can be divided into two major classes: first is that property of power plant's whole waste water by its contained pollutant
Qualitative classification centralized processing, then drains into water and stops;Second is that then draining into sewer or grey field with the processing waste water mode of dispersion.
The sewage in thermal power plant specifically includes that industrial wastewater, ash flushing water and sanitary sewage, wherein industrial wastewater is work
The general name that industry always drains, including industrial colling draining, chemical water treatment system acid-alkali regeneration waste water, filter backwash waste water,
Cleaning boiler waste water, defeated coal rinses and dust waste water, oily waste water, cooling tower blowdown water etc.;Ash flushing water is primarily referred to as being used for
The water of clinker and remover ash discharge dust is rinsed, is generally discharged after the sedimentation of grey field;Sanitary sewage refers to the dirt that power plant resident is discharged
Water.
The processing method of power plant effluent common are following several:
1, evaporation
The method evaporates the moisture of waste water gradually, forms water vapour, regelation is repeatedly sharp at water after cooling for vapor
With.In waste water from power plant, soluble solid, which is trapped within, to be steamed in raffinate, as cycles of concentration raising is finally analysed with crystal form
Out, still, directly with evaporation processing waste water, energy consumption is high, at high cost.
2, flue facture
Carrying out spray evaporation processing to waste water in flue is a kind of wider waste water from power plant method of the scope of application.Waste water with
Droplet form evaporation gasification rapidly, suspended matter and soluble solids therein after high-temperature flue gas heats form tiny solid
Then particle enters electric precipitator under the entrainment effect of air-flow and captures removal by electrode, finally realizes waste water from power plant,
But using flue facture treating capacity small, treatment effeciency is low.
3, full film water facture
What the electric desalination process in this method used is exactly electrodialytic technique, and fortune can make ion exchange resin in this way
Regeneration be achieved.The full membrane treatment process method that waste water from power plant uses at this stage mainly have reverse osmosis, ultrafiltration and
Electric desalination, and its effect is more stable, but full film water facture power consumption is big, it is at high cost.
Summary of the invention
In order to solve the above technical problems, the present invention provide it is a kind of using physical method carry out sewage treatment, not to water body generate
Secondary pollution, and occupied area is small, and operating cost is low, while consuming little energy, the power plant waste water processing method of save the cost.
Power plant waste water processing method of the invention, comprising the following steps:
(1) gradient magnetic is activated: the required power plant waste water handled being imported in gradient magnetic Activation Module and is carried out
It is activated;
(2) adsorption treatment: the power plant waste water after being activated is imported in power plant waste water processing module, power plant waste water is passed through
Ore building stones in processing module are filtered adsorption treatment to sewage;
(3) re-activation is handled: will be carried out in the sewage importing Quadratic Pressure Gradient magnetic field Activation Module after adsorption treatment secondary
It is activated;
(4) detection water outlet: carrying out on-line checking to by above step treated sewage, whether qualified detects it, and will close
Water discharge after lattice.
Power plant waste water processing method of the invention, the ore building stones in the step (2) are the strong mine of a variety of suction-operateds
The composition of stone building stones.
Power plant waste water processing method of the invention, the step (1) to step (4) is based on a COD water treatment facilities, described
A kind of COD water treatment facilities include water inlet pipe, three groups of water treatment facilities shells, multiple groups magnetization magnetic stripe, two groups of screens, filtrate,
Multiple groups re-activation magnetic stripe, drainpipe and two groups of coupling parts, the water inlet pipe and drainpipe are respectively and at the water in left side
Reason device housings left end is connected to the water treatment facilities shell right end positioned at right side, and water outlet detection is provided on the drainpipe
Mouthful, the multiple groups magnetization is installed on the water treatment facilities outer casing inner wall in left side with magnetic stripe, the multiple groups re-activation
Magnetic stripe is installed on the water treatment facilities outer casing inner wall on right side, and two groups of screens are separately mounted to centrally located region
Water treatment facilities outer casing inner wall left area and right half area, between filtrate filling and two groups of screens, three groups of water
Processing equipment shell is stainless steel material, and three groups of water treatment facilities shells pass through two groups of coupling part connections.
Compared with prior art the invention has the benefit that
1, processing method of the invention uses pure physically activated technology, does not use any chemical agent in use, realizes
No pollution, zero-emission, water outlet COD is up to standard, and the effluent quality that the present invention is handled has reached " water environment quality standard IV
Class " (GB3838-2002) safety index, sewage standard water discharge, not to water body generate secondary pollution;
2, raw water molecule cluster is unlocked with graded composite magnetic field in gradient magnetic Activation Module, makes cluster water shape by sewage
At single hydrone state, and in regularly arranged;And various organic and inorganic complexings original being present in inside and outside hydrone cluster
Object is decomposed, and has it in a free form, is reduced the molecular action between hydrone and organic and inorganic complex compound, is convenient for
Next step adsorption treatment;
3, in waste water from power plant module, be combined using different building stones, be effectively reduced turbidity in water body, hardness,
Organic matter and suspended matter, so that water outlet be made to reach discharge standard;
4, under the action of Quadratic Pressure Gradient Activation Module, the activation memory of water is maintained the water after adsorption treatment, the water outlet of water
Water quality improves, and the setting water outlet detection mouth on drainpipe, guarantees the on-line monitoring of water outlet, realizes real-time monitoring;
5, plant area used in method of the invention is small, and operating cost is low, and it can reduce energy consumption, save at
This.
Detailed description of the invention
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is COD water treatment facilities structural schematic diagram of the invention;
It is attached marked in the figure: 1, water inlet pipe;2, water treatment facilities shell;3, magnetic stripe is used in magnetization;4, screen;5, filtrate;6, secondary work
Change magnetic stripe;7, drainpipe;8, it is discharged detection mouth;9, coupling part.
Specific embodiment
With reference to embodiment, the embodiment of the present invention is furthur described in detail.Following embodiment is used for
Illustrate the present invention, but is not intended to limit the scope of the invention.
Embodiment
As shown in Figure 1, power plant waste water processing method of the invention, comprising the following steps:
(1) gradient magnetic is activated: the required power plant waste water handled being imported in gradient magnetic Activation Module and is carried out
It is activated;
(2) adsorption treatment: the power plant waste water after being activated is imported in power plant waste water processing module, power plant waste water is passed through
The composition of the strong ore building stones of a variety of suction-operateds in processing module is filtered adsorption treatment to sewage;
(3) re-activation is handled: will be carried out in the sewage importing Quadratic Pressure Gradient magnetic field Activation Module after adsorption treatment secondary
It is activated;
(4) detection water outlet: carrying out on-line checking to by above step treated sewage, whether qualified detects it, and will close
Water discharge after lattice.
As shown in Fig. 2, the present invention is based on a COD water treatment facilities, a kind of COD water treatment facilities include water inlet pipe 1,
Three groups of water treatment facilities shells 2, multiple groups magnetization 3, two groups of screens 4 of magnetic stripe, filtrate 5, multiple groups re-activation magnetic stripe 6, drainpipe 7
With two groups of coupling parts 9, the water inlet pipe and drainpipe are respectively with the water treatment facilities shell left end for being located at left side and positioned at the right side
The water treatment facilities shell right end of side is connected to, and water outlet detection mouth 8 is provided on the drainpipe, and the multiple groups magnetization magnetic stripe is equal
It is mounted on the water treatment facilities outer casing inner wall in left side, the multiple groups re-activation magnetic stripe is installed in the water positioned at right side
On processing equipment outer casing inner wall, two groups of screens are separately mounted to the water treatment facilities outer casing inner wall left half in centrally located region
Region and right half area, between the filtrate filling and two groups of screens, three groups of water treatment facilities shells are stainless steel
Matter, three groups of water treatment facilities shells pass through two groups of coupling part connections;The water inlet pipe and discharge of wastewater go out to connect, and are used for
The power plant effluent handled required for importing into water treatment facilities shell, magnetization are used to form strong magnetic with magnetic stripe, make to conclude
Water-molecule dissociation, and two groups of screens pair can be passed through by two groups of coupling parts by three groups of water treatment facilities cage connections
Filler is supported limit.
Equipment inlet valve is opened, power plant waste water flows through gradient magnetic Activation Module by water inlet pipe 1, magnetizes in multiple groups and uses
Under the action of the high-intensity magnetic field that magnetic stripe is formed, raw water molecule cluster is unlocked, and so that cluster water is formed single hydrone state, and be in
It is regularly arranged;And the various organic and inorganic complex compounds being present in inside and outside hydrone cluster to original decompose, and make it with free
Form exists, and reduces the molecular action between hydrone and organic and inorganic complex compound.The water outlet of gradient magnetic module passes through grid
4 enter filter material layer 5, and the ore building stones of difference composition have strong suction-operated to power plant effluent, and water is purified, and is effectively reduced water
Turbidity, hardness, organic matter and suspended matter in body, so that water outlet be made to reach discharge standard, purified water is living in Quadratic Pressure Gradient
Under the action of changing module 6, the activation memory of water is maintained, and the effluent quality of water improves, and setting water outlet detection mouth guarantees water outlet
On-line monitoring, realize real-time monitoring.
Processing method of the invention uses pure physically activated technology, does not use any chemical agent in use, real
Existing no pollution, zero-emission, water outlet COD is up to standard, and the effluent quality that the present invention is handled has reached " water environment quality standard
IV class " (GB3838-2002) safety index, sewage standard water discharge do not generate secondary pollution, and side of the invention to water body
Plant area used in method is small, and operating cost is low, and it can reduce energy consumption, save the cost.
The total system material of processing method of the invention is necessary for obtaining the material of drinking water related product health license, and its
Filtrate between two groups of screens can according to the filtrates of the different selection different-grain diameters of water quality, while can according to water supply and
The requirement of water quality can carry out the parallel connection and series connection of multiple groups equipment.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, several improvements and modifications, these improvements and modifications can also be made
Also it should be regarded as protection scope of the present invention.
Claims (3)
1. a kind of power plant waste water processing method, which comprises the following steps:
(1) gradient magnetic is activated: the required power plant waste water handled being imported in gradient magnetic Activation Module and is carried out
It is activated;
(2) adsorption treatment: the power plant waste water after being activated is imported in power plant waste water processing module, power plant waste water is passed through
Ore building stones in processing module are filtered adsorption treatment to sewage;
(3) re-activation is handled: will be carried out in the sewage importing Quadratic Pressure Gradient magnetic field Activation Module after adsorption treatment secondary
It is activated;
(4) detection water outlet: carrying out on-line checking to by above step treated sewage, whether qualified detects it, and will close
Water discharge after lattice.
2. power plant waste water processing method as described in claim 1, which is characterized in that the ore building stones in the step (2) are
The composition of the strong ore building stones of a variety of suction-operateds.
3. power plant waste water processing method as described in claim 1, which is characterized in that the also described step (1) to step (4) is based on
One COD water treatment facilities, a kind of COD water treatment facilities include that water inlet pipe, three groups of water treatment facilities shells, multiple groups magnetization are used
Magnetic stripe, two groups of screens, filtrate, multiple groups re-activation magnetic stripe, drainpipe and two groups of coupling parts, the water inlet pipe and drainpipe point
Water treatment facilities shell right end not with the water treatment facilities shell left end for being located at left side and positioned at right side is connected to, the drainpipe
On be provided with water outlet detection mouth, the multiple groups magnetization is installed on the water treatment facilities outer casing inner wall in left side with magnetic stripe,
The multiple groups re-activation magnetic stripe is installed on the water treatment facilities outer casing inner wall on right side, and two groups of screens are pacified respectively
Mounted in the water treatment facilities outer casing inner wall left area and right half area for being located at middle section, the filtrate filling and two groups of screens
Between, three groups of water treatment facilities shells are stainless steel material, and three groups of water treatment facilities shells pass through two groups of connections
Part connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910173326.7A CN109775915A (en) | 2019-03-07 | 2019-03-07 | Power plant waste water processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910173326.7A CN109775915A (en) | 2019-03-07 | 2019-03-07 | Power plant waste water processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109775915A true CN109775915A (en) | 2019-05-21 |
Family
ID=66486312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910173326.7A Pending CN109775915A (en) | 2019-03-07 | 2019-03-07 | Power plant waste water processing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109775915A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112125355A (en) * | 2020-08-26 | 2020-12-25 | 华能国际电力股份有限公司上安电厂 | Power plant water resource utilization method based on water quality classification and cascade utilization |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090045135A1 (en) * | 2007-08-18 | 2009-02-19 | Khudenko Engineering, Inc. | Method for water filtration |
CN201236171Y (en) * | 2008-04-17 | 2009-05-13 | 梁光照 | Energy water feeder capable of purifying, magnetizing and activating water quality |
CN101456642A (en) * | 2009-01-09 | 2009-06-17 | 廖怀德 | Method for producing high magnetic activated water |
CN201390663Y (en) * | 2008-12-17 | 2010-01-27 | 上海奔腾企业(集团)有限公司 | Water activation device with permanent axial gradient magnetic field |
CN107954504A (en) * | 2017-12-12 | 2018-04-24 | 山东太和洁源水务科技发展有限公司 | Remove the novel process of bisphenol-A in drinking water |
-
2019
- 2019-03-07 CN CN201910173326.7A patent/CN109775915A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090045135A1 (en) * | 2007-08-18 | 2009-02-19 | Khudenko Engineering, Inc. | Method for water filtration |
CN201236171Y (en) * | 2008-04-17 | 2009-05-13 | 梁光照 | Energy water feeder capable of purifying, magnetizing and activating water quality |
CN201390663Y (en) * | 2008-12-17 | 2010-01-27 | 上海奔腾企业(集团)有限公司 | Water activation device with permanent axial gradient magnetic field |
CN101456642A (en) * | 2009-01-09 | 2009-06-17 | 廖怀德 | Method for producing high magnetic activated water |
CN107954504A (en) * | 2017-12-12 | 2018-04-24 | 山东太和洁源水务科技发展有限公司 | Remove the novel process of bisphenol-A in drinking water |
Non-Patent Citations (1)
Title |
---|
RAFIE RUSHDY MOHAMMED等: "Combined magnetic field and adsorption process for treatment of biologically treated palm oil mill effluent (POME)", 《CHEMICAL ENGINEERING JOURNAL》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112125355A (en) * | 2020-08-26 | 2020-12-25 | 华能国际电力股份有限公司上安电厂 | Power plant water resource utilization method based on water quality classification and cascade utilization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6756934B2 (en) | Active rice husk filters, filter media, and methods | |
CN105776706A (en) | Device and method for treating desulfurized waste water through flue multi-level evaporation | |
CN103505990A (en) | UV-VOC waste gas treatment device | |
DE102016001526A1 (en) | A system solution and waste treatment facility for hospital waste (waste, waste water and waste gas) | |
CN109775915A (en) | Power plant waste water processing method | |
CN204981422U (en) | Categorised advanced treatment unit of sewage treatment plant | |
CN208869445U (en) | Integrated sewage treating apparatus | |
CN210656480U (en) | Adopt washing cigarette waste water retrieval and utilization processing apparatus of DTRO device | |
CN107261852A (en) | A kind of cleaning equipment and cleaning method of iron pollution micro-filtration/milipore filter | |
CN109970261A (en) | A kind of drinking water purification equipment configuring ultraviolet sterilizer | |
CN204661466U (en) | Mark sub-prime advanced treatment system is carried by sewage work | |
CN208742318U (en) | A kind of reverse osmosis membrane antisludging equipment | |
CN110092509B (en) | Intensive laboratory waste treatment system | |
CN105645620A (en) | Reclaimed water reuse filtering equipment and reclaimed water filtering regeneration method | |
CN207237725U (en) | A kind of cleaning equipment of iron pollution micro-filtration/ultrafiltration membrane | |
CN103241853B (en) | Field water source purifying equipment and method | |
CN205856258U (en) | A kind of nano ceramics film sewage treatment device | |
CN208493835U (en) | Ultrafiltration apparatus and ultrafiltration system | |
CN208055142U (en) | A kind of recovery system of evaporation pond haline water | |
KR100622855B1 (en) | Simplicity water purifying device | |
CN105110501A (en) | Multi-term advanced nanometer catalytic wastewater treatment device | |
CN205347083U (en) | Processing system of desulfurization waste water | |
CN108793537A (en) | A kind of processing method of laboratory waste water | |
CN205170557U (en) | A effluent treatment plant for metal cleaner production line | |
CN207958037U (en) | A kind of die casting waste liquid after-treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |