CN109768580A - 一种适用于抽水蓄能电站大规模消纳风电的调度方案 - Google Patents
一种适用于抽水蓄能电站大规模消纳风电的调度方案 Download PDFInfo
- Publication number
- CN109768580A CN109768580A CN201910246477.0A CN201910246477A CN109768580A CN 109768580 A CN109768580 A CN 109768580A CN 201910246477 A CN201910246477 A CN 201910246477A CN 109768580 A CN109768580 A CN 109768580A
- Authority
- CN
- China
- Prior art keywords
- storage station
- wind
- electricity
- power plant
- hydroenergy storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Landscapes
- Wind Motors (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及抽水蓄能电站大规模消纳新能源技术领域,尤其涉及一种适用于抽水蓄能电站大规模消纳风电的调度方案。包括以下步骤:步骤(1),通过气象技术获得风电功率预测数据,并实时采集风电场发电量P1;步骤(2),实时采集和监控电网的负荷P2和常规电厂的发电量P3;步骤(3),实时监测抽水蓄能电站上水库库容V1、下水库库容V2,地下厂房安装四台单机容量为P4的混流可逆式水泵水轮发电电动机组,预置一台单机容量为P4的备用水泵机组,同时修一条从下水库经厂房到上水库的备用输水管道;步骤(4),建立风电场‑抽水蓄能电站联合运行实时监测系统。本发明利用风电场与抽水蓄能电站联合运行的模式减小了风电波动对电网的影响,可以直接大规模消纳风电新能源,并且提高了经济效益。
Description
技术领域
本发明涉及抽水蓄能电站大规模消纳新能源技术领域,尤其涉及一种适用于抽水蓄能电站大规模消纳风电的调度方案。
背景技术
抽水蓄能电站是一种结合了抽水和发电两类设施的水电站,其具有在抽水工况和发电工况转换的优点,是一种可以消纳电能的水电站,抽水蓄能电站与传统水电站相比有如下优点:启停快速、灵活,可承担电网调频、调相、紧急事故备用和黑启动等任务,大大提高了电网的供电质量和供电可靠性,改善电网的运行条件。
由于风电、光伏发电出力具有随机波动性和间歇性的特点与电力系统用电负荷特性呈现较大差异,风电和光电的并网会给电网带来冲击,对电网调峰能力提出较高要求,因此风光能量的储存再利用是极为必要的。一种风力水力联合发电系统[208396864U]将风力发电机与水力发电机结合在一起,解决有风力随机性对电网所带来的影响,但不能解决风电场弃荷的问题,本发明利用风电场与抽水蓄能电站联合运行的模式减小了风电波动对电网的影响,可以直接大规模消纳风电新能源,并且提高了经济效益。
发明内容
一种适用于抽水蓄能电站大规模消纳风电的调度方案,包括以下步骤:
步骤(1),通过气象技术获得风电功率预测数据,并实时采集风电场发电量P1;
步骤(2),实时采集和监控电网的负荷P2和常规电厂的发电量P3;
步骤(3),实时监测抽水蓄能电站上水库库容V1、下水库库容V2,地下厂房安装四台单机容量为P4的混流可逆式水泵水轮发电电动机组,预置一台单机容量为P4的备用水泵机组,同时修一条从下水库经厂房到上水库的备用输水管道;
步骤(4),建立风电场-抽水蓄能电站联合运行实时监测系统。
低谷用电时,此时能量关系P1+P3>P2,抽水蓄能电站的常备机组投入抽水工况,优先消纳风电场输出的电量,抽水蓄能电站消纳的电量即为P1+P3-P2,若此时P2>P3则风电场上网的电量应为P2-P3;若此时P2<P3则风电场发电量P1全部供给抽水蓄能电站消纳,且抽水蓄能电站同时会消纳常规电厂的电量P3-P2。
平段用电时,若P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则启动抽水蓄能电站的机组消纳风电场输出的超过比重的电量,消纳的电量即为P1-0.1P2。
高峰用电时,P1+P3<P2,抽水蓄能电站的常备机组投入发电工况,使P1+P3+xP4=P2,并且可针对风电并网造成的波动进行调相调频;若此时P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则启动抽水蓄能电站的备用水泵机组消纳风电场输出的超过比重的电量,消纳的电量即为P1-0.1P2。
本发明的有益效果:
(1)可以大大减少区域弃风;
(2)平滑风电场的输出,避免了风电光伏对电网的直接冲击,提高新能源的供电可靠性,优化电源结构;
(3)将风电场在低谷时段所发的廉价电能转化为高峰时段的稀缺电能,带来能量转化的经济效益;
(4)使火电出力平衡,降低煤耗,能够有效地节约煤炭等非可再生能源,减少了烟尘、二氧化碳、一氧化碳、氯化氮及大量废弃物对环境的污染和破坏,具有较高的环境效益。
附图说明
图1为本发明判断过程图;
图2为本发明的A工况调度过程示意图;
图3为本发明的B工况调度过程示意图;
图4为本发明的C工况调度过程示意图;
图5为本发明的D工况与E工况调度过程示意图;
图6为本发明的F工况调度过程示意图;
图7为本发明的电站内部结构改进示意图。
具体实施方式
在下文中将结合附图对本发明的示范性实施例进行描述。可以理解的是,此处所描述的具体实施例仅仅用于解释本发明实施例,而非对本发明实施例的限定。另外还需要说明的是,为了便于描述,附图中仅示出了与本发明实施例相关的部分而非全部结构,且附图某些部件会有省略、放大或缩小,并不代表实际工程的尺寸。
如图1所示,一种适用于抽水蓄能电站大规模消纳风电的调度方案,包括以下步骤:步骤1,通过气象技术获得风电功率预测数据,并实时采集风电场发电量P1。采集到的信号中包括:风力发电机正常运行时的输出功率和发电量。
步骤2,实时采集和监控电网的负荷P2和常规电厂的发电量P3。
步骤3,实时监测抽水蓄能电站上水库库容V1、下水库库容V2,地下厂房安装四台单机容量为P4的混流可逆式水泵水轮发电电动机组,预置一台单机容量为P4的备用水泵机组,同时修一条从下水库经厂房到上水库的备用输水管道。
步骤4,建立风电场-抽水蓄能电站联合运行实时监测系统。
低谷用电时,此时能量关系P1+P3>P2,若此时P2<P3则常规机组投入抽水A工况;若此时P2>P3且P1<0.1P2则常规机组投入抽水B工况;若此时P2>P3且P1>0.1P2则常规机组投入抽水C工况。
平段用电时,若P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则启动抽水蓄能电站的机组消纳风电场输出的超过比重的电量,消纳的电量即为P1-0.1P2。
高峰用电时,P1+P3<P2,抽水蓄能电站的常备机组投入发电工况,使P1+P3+xP4=P2,并且可针对风电并网造成的波动进行调相调频,若此时P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则常规机组投入发电D工况,备用水泵机组投入抽水E工况;若此时P1<0.1P2,则常规机组投入发电F工况即可。
所述常规机组投入抽水A工况,风电场发电量P1全部供给抽水蓄能电站消纳,且抽水蓄能电站同时会消纳常规电厂的电量为P3-P2。
所述常规机组投入抽水B工况,抽水蓄能电站消纳风电场的电量应为P1+P3-P2,风电场上网的电量应为P2-P3。
所述常规机组投入抽水C工况,抽水蓄能电站直接消纳风电场的电量为P1-0.1P2,风电场上网的电量应为0.1P2,消纳电网中的电量为P3-0.9P2。
所述常规机组投入发电D工况且备用水泵投入抽水E工况,抽水蓄能电站水泵机组消纳的风电场的电量为P1-0.1P2,故风电场上网的电量为0.1P2,抽水蓄能电站常规机组发出的电量应为0.9P2-P3。
所述常规机组投入发电F工况,抽水蓄能电站常规机组发出的电量应为P2-P3-P1。
最后说明的是,尽管根据有限数量的实施例描述本发明,但是受益于上面的描述,本技术领域内的技术人员应当理解,在由此描述的本发明的范围内,可以设想其它实施例。此外,应当注意,本说明书中使用的语言主要是为了可读性和教导的目的而选择的,而不是为了解释或者限定本发明的主题而选择的。因此,在不偏离所附权利要求书的范围和宗旨的情况下,对于本技术领域的普通技术人员来说,许多修改和变更是显而易见的。对于本发明的范围,对本发明所做的公开是说明性的,而非限制性的,本发明的范围由所附权利要求书限定。
Claims (5)
1.一种适用于抽水蓄能电站大规模消纳风电的调度方案,其特征在于,包括以下步骤:
步骤(1),通过气象技术获得风电功率预测数据,并实时采集风电场发电量P1;
步骤(2),实时采集和监控电网的电能量P2和常规电厂的发电量P3;
步骤(3),实时监测抽水蓄能电站上水库库容V1、下水库库容V2,地下厂房安装四台单机容量为P4的混流可逆式水泵水轮发电电动机组,预置一台单机容量为P4的备用水泵机组,同时修一条从下水库经厂房到上水库的备用输水管道;
步骤(4),建立风电场-抽水蓄能电站联合运行实时监测系统。
2.根据权利要求1所述的一种适用于抽水蓄能电站大规模消纳风电的调度方案,其特征在于,低谷用电时,此时能量关系P1+P3>P2,抽水蓄能电站的常备机组投入抽水工况,优先消纳风电场输出的电量,抽水蓄能电站消纳的电量即为P1+P3-P2,若此时P2>P3则风电场上网的电量应为P2-P3;若此时P2<P3则风电场发电量P1全部供给抽水蓄能电站消纳,且抽水蓄能电站同时会消纳常规电厂的电量P3-P2。
3.根据权利要求2所述的一种适用于抽水蓄能电站大规模消纳风电的调度方案,其特征在于,平段用电时,若P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则启动抽水蓄能电站的机组消纳风电场输出的超过比重的电量,消纳的电量即为P1-0.1P2。
4.根据权利要求2或3所述的一种适用于抽水蓄能电站大规模消纳风电的调度方案,其特征在于,高峰用电时,P1+P3<P2,抽水蓄能电站的常备机组投入发电工况,使P1+P3+xP4=P2,并且可针对风电并网造成的波动进行调相调频;若此时P1>0.1P2(即风电场发电量占电网总电量的比重超过10%),则启动抽水蓄能电站的备用水泵机组消纳风电场输出的超过比重的电量,消纳的电量即为P1-0.1P2。
5.根据权利要求4所述的一种适用于抽水蓄能电站大规模消纳风电的调度方案,其特征在于,对抽水蓄能电站进行改造,于地下厂房预置一台单机容量为P4的备用水泵机组,同时修一条从下水库经厂房到上水库的备用输水管道,使得在电站可以同时工作在发电D工况和抽水E工况。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910246477.0A CN109768580A (zh) | 2019-03-29 | 2019-03-29 | 一种适用于抽水蓄能电站大规模消纳风电的调度方案 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910246477.0A CN109768580A (zh) | 2019-03-29 | 2019-03-29 | 一种适用于抽水蓄能电站大规模消纳风电的调度方案 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109768580A true CN109768580A (zh) | 2019-05-17 |
Family
ID=66460065
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910246477.0A Pending CN109768580A (zh) | 2019-03-29 | 2019-03-29 | 一种适用于抽水蓄能电站大规模消纳风电的调度方案 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109768580A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113824148A (zh) * | 2021-10-19 | 2021-12-21 | 阳光电源股份有限公司 | 一种发电系统及其控制方法 |
CN115759421A (zh) * | 2022-11-17 | 2023-03-07 | 国网新源控股有限公司 | 全功率变频抽蓄与风电联合供电优化配置系统及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105634023A (zh) * | 2016-02-03 | 2016-06-01 | 国家电网公司 | 一种电力系统生产运行方法 |
CN106099960A (zh) * | 2016-07-18 | 2016-11-09 | 华中科技大学 | 一种小水电机群组成分布式储能系统的方法 |
CN106447218A (zh) * | 2016-10-14 | 2017-02-22 | 重庆大学 | 基于多风电场的抽水蓄能系统的可靠性评估方法 |
-
2019
- 2019-03-29 CN CN201910246477.0A patent/CN109768580A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105634023A (zh) * | 2016-02-03 | 2016-06-01 | 国家电网公司 | 一种电力系统生产运行方法 |
CN106099960A (zh) * | 2016-07-18 | 2016-11-09 | 华中科技大学 | 一种小水电机群组成分布式储能系统的方法 |
CN106447218A (zh) * | 2016-10-14 | 2017-02-22 | 重庆大学 | 基于多风电场的抽水蓄能系统的可靠性评估方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113824148A (zh) * | 2021-10-19 | 2021-12-21 | 阳光电源股份有限公司 | 一种发电系统及其控制方法 |
CN115759421A (zh) * | 2022-11-17 | 2023-03-07 | 国网新源控股有限公司 | 全功率变频抽蓄与风电联合供电优化配置系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Patel et al. | Wind and solar power systems: design, analysis, and operation | |
Petrescu et al. | Ecosphere protection through green energy | |
Douak et al. | Estimation of hydrogen production using wind energy in Algeria | |
Qian et al. | Analysis of the environmental benefits of distributed generation | |
CN108206547B (zh) | 风氢耦合发电系统各单元容量优化的方法 | |
US20150340941A1 (en) | Regenerative energy electric motor driven generator power plant system | |
Eltamaly et al. | Impact of distributed generation (DG) on the distribution system network | |
Orhan et al. | A feasibility study on microgrid for various islands in Australia | |
CN109768580A (zh) | 一种适用于抽水蓄能电站大规模消纳风电的调度方案 | |
CN114021911A (zh) | 含碳捕捉装置的综合能源系统低碳优化调度方法 | |
Liu et al. | Optimal scheduling of multi-source microgrid considering power to gas technology and wind power uncertainty | |
Gabbar et al. | Resilient micro energy grids with gas-power and renewable technologies | |
CN205081546U (zh) | 一种太阳能供电装置 | |
Jia et al. | Research on joint dispatch of wind, solar, hydro, and thermal power based on pumped storage power stations | |
Zhang et al. | Frequency-constrained expansion planning for wind and photovoltaic power in wind-photovoltaic-hydro-thermal multi-power system | |
Li et al. | Optimal configuration for distributed generations in micro-grid system considering diesel as the main control source | |
Gajic et al. | Pumped-hydro storages are balancing electric energy production of wind and solar reducing average costs and pollution | |
Kiaee et al. | The impact on the electrical grid of hydrogen production from alkaline electrolysers | |
Li et al. | Collaborative Planning and Economic Analyses of High Renewable Penetrated Energy Systems Considering Concentrating Solar Power | |
Furukakoi et al. | Multi-objective optimal operation considering voltage stability for unit commitment | |
Azhar et al. | Feasibility study of renewable energy using levelized cost energy | |
Chen et al. | Optimal configuration for distributed generations in micro-grid system considering diesel as the main control source | |
Hussain et al. | Solar Grid Integration Issue: Overvoltage Dilemma | |
Bhalshankar et al. | Home water-tank pico-hydro power generator modeling and analysis for smart home distributed generation system | |
Wang et al. | Carbon neutral planning for high percentage of renewable power systems considering WIPP as inertia support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190517 |
|
WD01 | Invention patent application deemed withdrawn after publication |