CN109767096A - The method of data reference and computer equipment of testing record sheet or test report table - Google Patents

The method of data reference and computer equipment of testing record sheet or test report table Download PDF

Info

Publication number
CN109767096A
CN109767096A CN201811624265.3A CN201811624265A CN109767096A CN 109767096 A CN109767096 A CN 109767096A CN 201811624265 A CN201811624265 A CN 201811624265A CN 109767096 A CN109767096 A CN 109767096A
Authority
CN
China
Prior art keywords
equipment
instrument
data
testing
record sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811624265.3A
Other languages
Chinese (zh)
Inventor
杨常青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811624265.3A priority Critical patent/CN109767096A/en
Publication of CN109767096A publication Critical patent/CN109767096A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The present invention provides the method for data reference of a kind of testing record sheet or test report table, does reference differentiated control to all test apparatus equipment in systems, for a different testing inspection project binding institute instrument and equipments in need;In testing record sheet or test report table reference data, the related data of rank test instrument and equipment needed for the automatic corresponding testing inspection project of reference.The instrument automatic fitration not in reference divided rank can be fallen through the invention and only quote the corresponding instrument and equipment set and number, when report summarizes each testing record sheet data simultaneously, automatic fitration falls to be not belonging to the instrument and equipment and number of this report grade.Whole process can carry out automatically, realize and be easy.

Description

The method of data reference and computer equipment of testing record sheet or test report table
Technical field
The present invention relates to the methods and computer equipment of a kind of testing record sheet or the data referencing of test report table.
Background technique
In Highway Construction Project Based, testing inspection is as an important link in work progress, this is to ensuring engineering matter It measures very crucial.And during testing inspection, the data management of laboratory is again extremely important, needs the detection in time to engineering Situation is recorded and is summarized, and the acquisition of detection data be unable to do without the participation of test apparatus equipment.
Therefore it currently, testing crew is recording certain testing inspection process in the detection data that is formed, needs to fill in Process record table and final account are both needed to state clearly the use of this testing inspection in process record table and final account The instrument title and number arrived.Wherein, without stating clearly all instrument title and number in process record table, this need to only be stated clearly The main instrument title and number that testing inspection uses, as long as and being stated clearly in final account important in key instrument Instrument title and number, in the software systems that current account generates, many data of final account All be to be obtained from relevant process record table, current this software systems can't intelligent recognition which be that certain primary is tested Main or important instrument in detection process, therefore cause the automatic reference of this respect data difficult, it needs artificially to judge behaviour Make.
Summary of the invention
The technical problem to be solved in the present invention is to provide the data referencing side of a kind of testing record sheet or test report table Method and computer equipment are drawn based on the data that instrument and equipment is carried out testing record sheet or test report table by grade classification result With, can carry out automatically, realize be easy.
The method of the present invention is achieved in that the method for data reference of a kind of testing record sheet or test report table, including Following step:
S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different testing inspections Project binding institute instrument and equipment in need;It is either first in need for different testing inspection project binding institutes in systems Instrument and equipment, then reference differentiated control is done to institute's test apparatus equipment in need for different testing inspection projects;
S2, in testing record sheet or test report table reference data, it is automatic to quote needed for corresponding testing inspection project etc. The related data of grade test apparatus equipment.
Further, the reference differentiated control is specifically that each test apparatus equipment is divided into three etc. by significance level Grade, first device are important equipment, and secondary equipment is secondary instrument and equipment, and three-stage apparatus is auxiliary instrument and equipment;
In testing record sheet reference data, the automatic related data for quoting first device and secondary equipment;
In test report table reference data, the automatic related data for quoting first device.
Further, the three-stage apparatus does not embody in record sheet and account, but this examination is inquired in system It can be queried to when the usage record tested.
Computer equipment of the invention is achieved in that a kind of computer equipment, including memory, processor and storage On a memory and the computer program that can run on a processor, the processor realize following mistake when executing described program Journey:
Step S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different tests Detection project binding institute instrument and equipment in need;It is either first all for different testing inspection project bindings in systems The instrument and equipment needed, then reference classification pipe is done to institute's test apparatus equipment in need for different testing inspection projects Reason;
Step S2, automatic to quote corresponding testing inspection project institute in testing record sheet or test report table reference data Need the related data of rank test instrument and equipment;
Wherein, step S1 and the unlimited sequencing of step S2.
Further, the reference differentiated control is specifically that each test apparatus equipment is divided into three etc. by significance level Grade, first device are important equipment, and secondary equipment is secondary instrument and equipment, and three-stage apparatus is auxiliary instrument and equipment;
In testing record sheet reference data, the automatic related data for quoting first device and secondary equipment;
In test report table reference data, the automatic related data for quoting first device.
Further, the three-stage apparatus does not embody in record sheet and account, but this examination is inquired in system It can be queried to when the usage record tested.
The present invention has the advantage that the present invention, in instrument & equipment management, user is independently in systems to all examinations It tests instrument and equipment and does reference differentiated control, for different testing inspection project binding institute instrument and equipments in need;It is testing When record sheet or test report table reference data, rank test instrument needed for system will quote corresponding testing inspection project automatically Instrument automatic fitration not in reference divided rank is fallen and only quotes the corresponding instrument set by the related data of equipment Device equipment and number, while when report summarizes each testing record sheet data, automatic fitration falls to be not belonging to the instrument of this report grade Device equipment and number.Whole process can carry out automatically, realize and be easy.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the flow diagram of the method for the present invention.
Fig. 2 is the status diagram when present invention does reference differentiated control to all test apparatus equipment in systems.
Fig. 3 is the status diagram when present invention does reference differentiated control to all test apparatus equipment in systems.
Status diagram when Fig. 4 is testing record sheet data referencing in systems of the invention.
Status diagram when Fig. 5 is test report table data referencing in systems of the invention.
Fig. 6 is that present device service condition inquires status diagram.
Specific embodiment
Refering to Figure 1, the method for data reference of testing record sheet or test report table of the invention, including walk as follows It is rapid:
S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different testing inspections Project binding institute instrument and equipment in need;It is either first in need for different testing inspection project binding institutes in systems Instrument and equipment, then reference differentiated control is done to institute's test apparatus equipment in need for different testing inspection projects;
S2, in testing record sheet or test report table reference data, it is automatic to quote needed for corresponding testing inspection project etc. The related data of grade test apparatus equipment;
Wherein it is possible to first do reference differentiated control to all test apparatus equipment, then it is directed to different testing inspection items Mesh binding institute instrument and equipment in need can also first be set for different testing inspection project binding institute instruments in need It is standby, reference differentiated control is done to used test apparatus equipment further according to the concrete condition of the testing inspection project;The former can To put things right once and for all, without being defined in each test, but the disadvantage is that specific aim is not strong, the advantages of the latter be it is with strong points, But it operates more cumbersome.
It please refers to shown in Fig. 2, the settable instrument & equipment management module of present system, it will by instrument & equipment management module Each test apparatus equipment is divided into three grades by significance level:
First device is important equipment, such as digital display water bath with thermostatic control equipment;
Secondary equipment is secondary instrument and equipment, such as electronic balance;
Three-stage apparatus is auxiliary instrument and equipment, such as digital display thermometer;
It please refers to shown in Fig. 3, the settable instrument relating module of present system can be by certain by the instrument relating module The corresponding instrument and equipment of one testing inspection project is associated in lists one by one, including first device, secondary equipment and three-stage apparatus. Institute's instrument and equipment in need can be bound in advance for different testing inspection projects.
It please refers to shown in Fig. 4, in testing record sheet reference data, automatic reference first device is related to secondary equipment Data, and filter out three-stage apparatus;
It please refers to shown in Fig. 5, in test report table reference data, the automatic related data for quoting first device, and mistake Filter secondary equipment and three-stage apparatus.
It please refers to shown in Fig. 6, although three-stage apparatus does not embody in record sheet and account, inquires this in system It can be queried to when the usage record of secondary test.
Method based on aforementioned present invention, computer equipment of the invention are achieved in that a kind of computer equipment, packet The computer program that includes memory, processor and storage on a memory and can run on a processor, the processor execute Following procedure is realized when described program:
Step S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different tests Detection project binding institute instrument and equipment in need;It is either first all for different testing inspection project bindings in systems The instrument and equipment needed, then reference classification pipe is done to institute's test apparatus equipment in need for different testing inspection projects Reason;
Step S2, automatic to quote corresponding testing inspection project institute in testing record sheet or test report table reference data Need the related data of rank test instrument and equipment.
Wherein, detail part can be found in the above-mentioned description in relation to the method for the present invention, and it will not go into details herein.
In conclusion the method for data reference of testing record sheet or test report table of the invention, passes through instrument and equipment The intelligence classification reference of differentiated control and detection data, reaches the instrument title and number that detection data auto-associating is used, It does not need to fill in all instrument and equipment titles, need to only be shown according to the significance level of used instrument in final record sheet Or (report need to only fill in most important instrument, such as the first device in this system on report;Record sheet need to only fill in second level And first device;Three-stage apparatus only does complementary use, can trace back in reference data, is not required for showing in list), to solve Associated instrument and equipment title and the number in traditional testing inspection data of having determined, which pass through, to be manually entered, the data of displaying In the presence of can not tracing back property, accuracy is low, typing is not convenient the problems such as.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (6)

1. the method for data reference of a kind of testing record sheet or test report table, it is characterised in that: include the following steps:
S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different testing inspection projects Binding institute instrument and equipment in need;Either first in systems for different testing inspection project binding institute instrument in need Device equipment, then reference differentiated control is done to test apparatus equipment in need for different testing inspection projects;
S2, in testing record sheet or test report table reference data, it is automatic quote corresponding testing inspection project needed for grade try Test the related data of instrument and equipment.
2. the method for data reference of testing record sheet according to claim 1 or test report table, it is characterised in that:
The reference differentiated control is specifically that each test apparatus equipment is divided into three grades by significance level, and first device is Important equipment, secondary equipment are secondary instrument and equipment, and three-stage apparatus is auxiliary instrument and equipment;
In testing record sheet reference data, the automatic related data for quoting first device and secondary equipment;
In test report table reference data, the automatic related data for quoting first device.
3. the method for data reference of testing record sheet according to claim 2 or test report table, it is characterised in that: described Three-stage apparatus does not embody in record sheet and account, but while inquiring in system the usage record of this test can be queried It arrives.
4. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, it is characterised in that: the processor realizes following procedure when executing described program:
Step S1, reference differentiated control first is done to all test apparatus equipment in systems, then is directed to different testing inspections Project binding institute instrument and equipment in need;It is either first in need for different testing inspection project binding institutes in systems Instrument and equipment, then reference differentiated control is done to institute's test apparatus equipment in need for different testing inspection projects;
Step S2, in testing record sheet or test report table reference data, needed for the automatic corresponding testing inspection project of reference etc. The related data of grade test apparatus equipment.
5. computer equipment according to claim 4, it is characterised in that:
The reference differentiated control is specifically that each test apparatus equipment is divided into three grades by significance level, and first device is Important equipment, secondary equipment are secondary instrument and equipment, and three-stage apparatus is auxiliary instrument and equipment;
In testing record sheet reference data, the automatic related data for quoting first device and secondary equipment;
In test report table reference data, the automatic related data for quoting first device.
6. computer equipment according to claim 5, it is characterised in that: the three-stage apparatus is in record sheet and account It can be queried to when not embodying, but inquiring in system the usage record of this test.
CN201811624265.3A 2018-12-28 2018-12-28 The method of data reference and computer equipment of testing record sheet or test report table Pending CN109767096A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811624265.3A CN109767096A (en) 2018-12-28 2018-12-28 The method of data reference and computer equipment of testing record sheet or test report table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811624265.3A CN109767096A (en) 2018-12-28 2018-12-28 The method of data reference and computer equipment of testing record sheet or test report table

Publications (1)

Publication Number Publication Date
CN109767096A true CN109767096A (en) 2019-05-17

Family

ID=66451687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811624265.3A Pending CN109767096A (en) 2018-12-28 2018-12-28 The method of data reference and computer equipment of testing record sheet or test report table

Country Status (1)

Country Link
CN (1) CN109767096A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639118A (en) * 2020-05-29 2020-09-08 金现代信息产业股份有限公司 Dynamic generation method and system for test report of power equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008064643A (en) * 2006-09-08 2008-03-21 Toshiba Corp Pressure transmitter inspecting system for plant
CN102368270A (en) * 2011-11-01 2012-03-07 浙江省电力试验研究院 Configuration processing method for test reports and test items
CN103996142A (en) * 2013-02-16 2014-08-20 上海思创电器设备有限公司 Electrical test measurement and control management method based on portable terminal
CN104965140A (en) * 2015-06-30 2015-10-07 国网山东省电力公司电力科学研究院 Transformer field test mobile terminal and test data processing method
CN107463974A (en) * 2017-08-18 2017-12-12 华南理工大学 A kind of test data of reliability test process and the full source tracing method of instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008064643A (en) * 2006-09-08 2008-03-21 Toshiba Corp Pressure transmitter inspecting system for plant
CN102368270A (en) * 2011-11-01 2012-03-07 浙江省电力试验研究院 Configuration processing method for test reports and test items
CN103996142A (en) * 2013-02-16 2014-08-20 上海思创电器设备有限公司 Electrical test measurement and control management method based on portable terminal
CN104965140A (en) * 2015-06-30 2015-10-07 国网山东省电力公司电力科学研究院 Transformer field test mobile terminal and test data processing method
CN107463974A (en) * 2017-08-18 2017-12-12 华南理工大学 A kind of test data of reliability test process and the full source tracing method of instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639118A (en) * 2020-05-29 2020-09-08 金现代信息产业股份有限公司 Dynamic generation method and system for test report of power equipment

Similar Documents

Publication Publication Date Title
CN111078482B (en) Communication navigation equipment test system, method, equipment and readable storage medium
JP2019032300A5 (en)
Jiang et al. Graphical representation of two mixed-Weibull distributions
CN103186456B (en) A kind of method and apparatus of system testing
CN103294594A (en) Test based static analysis misinformation eliminating method
Bano et al. Systematic reviews in requirements engineering: A tertiary study
CN102880545A (en) Method for dynamically adjusting priority sequence of test cases
CN108037444A (en) GNSS PCBA automatization test systems and its application process
CN1987820A (en) Method and system for tracing program execution in field programmable gate arrays
CN102445941B (en) Method for automatically determining and analyzing interoperability test results of on-board equipment of train control system
CN110765596B (en) Modeling method and device for auditing process simulation model and electronic equipment
CN111400505A (en) Method and system for matching fault elimination scheme of power consumption information acquisition system
CN200997633Y (en) Automatic testing system based on graphic testing platform
CN107894378A (en) A kind of method of testing of the particle size and its distribution of 5 aminotetrazole
CN109767096A (en) The method of data reference and computer equipment of testing record sheet or test report table
CN105786699B (en) A kind of test result analysis system
CN103743878A (en) Water quality monitoring data processing method and device
CN110888809B (en) Risk prediction method and device for test task
CN117608903A (en) Method, device, equipment and storage medium for automatically generating test report
CN107943635A (en) A kind of test method of storage device, device and medium
CN107328994A (en) Insulation Resistance of Transformer experimental rig and method
Favaloro et al. Harmonization of hemostasis testing across a large laboratory network: an example from Australia
CN105652182A (en) Circuit board fault positioning system and circuit board fault positioning method based on circuit network and graph search
CN206235676U (en) The detection means of the adapter based on USB PD agreements
CN108052450A (en) Avionic software integration test verification platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517