CN109766128A - Generation method, device and the storage medium of project aggregated report - Google Patents
Generation method, device and the storage medium of project aggregated report Download PDFInfo
- Publication number
- CN109766128A CN109766128A CN201811638819.5A CN201811638819A CN109766128A CN 109766128 A CN109766128 A CN 109766128A CN 201811638819 A CN201811638819 A CN 201811638819A CN 109766128 A CN109766128 A CN 109766128A
- Authority
- CN
- China
- Prior art keywords
- engineering
- project
- source code
- jar packet
- polymerize
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a kind of generation methods of project aggregated report, comprising: obtains at least one project, determines at least one first engineering according at least one described project;At least one described first engineering is added to preset second engineering;Using the second engineering added at least one first engineering as purpose project, the source code of the purpose project is polymerize, obtains the project aggregated report at least one first engineering.The invention also discloses the generating means and computer readable storage medium of a kind of project aggregated report.
Description
Technical field
The present invention relates to Internet information technique more particularly to a kind of generation method, device and the meters of project aggregated report
Calculation machine readable storage medium storing program for executing.
Background technique
Under micro services framework, a technical team usually multiple projects good at managing, each project belongs to different points
The warehouse cloth version control system (Git).For generation quality report, generally continuous integrating can be done to projects on Jenkins,
A project aggregated report is finally pooled manually.The Jenkins is a continuous integrating tool, it can periodically compile,
Respective code, operation integration testing are run, operation result is illustrated as project aggregated report.The project aggregated report of acquisition refers to
During the continuous integrating of software project, reported by the code quality of the generations such as some static check tools and compilation tool;
It may include the mass numbers such as size of code, ratio of defects, test coverage, compiling packing result in the code quality report generated
According to.
Since projects fractionation granularity is thinner under micro services framework, a technical team may need to manage more than ten simultaneously and arrive
Tens projects need technical staff manually by the corresponding report of multiple projects using the generation method of above-mentioned project aggregated report
It condenses together, the formation efficiency of project aggregated report is low.
Summary of the invention
In view of this, the main purpose of the present invention is to provide generation method, device and the meters of a kind of project aggregated report
Calculation machine readable storage medium storing program for executing.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
The embodiment of the invention provides a kind of generation methods of project aggregated report, which comprises
At least one project is obtained, at least one first engineering is determined according at least one described project;By described at least
One the first engineering is added to preset second engineering;
Using the second engineering added at least one first engineering as purpose project, to the source of the purpose project
Code is polymerize, and the project aggregated report at least one first engineering is obtained.
In above scheme, it is described at least one described first engineering is added to preset second engineering before, the method
Further include:
In the configuration file of second engineering, at least one described first engineering is added to the father of second engineering
Rely on description;
It is relied on and is described according to the father, the father and son of at least one described first engineering of foundation and second engineering, which relies on, closes
System.
In above scheme, before the source code to the purpose project polymerize, which comprises
Determine at least one the first jar packet needed for first engineering;The first jar packet be first engineering without
The jar packet that method is obtained by the public packet of bottom;
Dependence description of the addition at least one the first jar packet, institute in the configuration file of second engineering
It states the first engineering and at least one described the first jar packet is obtained according to the dependence description in the configuration file.
In above scheme, before the source code to the purpose project polymerize, which comprises
It determines at least one described first engineering comprising public work and when the public work relies on the 2nd jar packet,
It modifies in the configuration file of the public work and is described for the dependence of jar packet, to cancel the public work to described second
The dependence of jar packet;The 2nd jar packet is the jar packet for including except the privately owned warehouse maven for being deployed with second engineering
Outer third party's jar packet.
In above scheme, before the source code to the purpose project polymerize, the method also includes:
It obtains the source code of second engineering and is stored in root;
The source code for successively obtaining at least one first engineering, creates at least one subdirectory under the root;
The corresponding source code for saving first engineering of one subdirectory;
Tree-like directory is obtained according to the root and at least one described subdirectory.
In above scheme, the source code to the purpose project polymerize, obtain for it is described at least one first
The project aggregated report of engineering, comprising:
Successively it is polymerize according to source code of the tree-like directory to the purpose project, is directed to according to polymerization result
The project aggregated report of at least one first engineering.
The embodiment of the invention provides a kind of generating means of project aggregated report, described device includes: the first processing mould
Block, Second processing module;Wherein,
The first processing module determines at least one according at least one described project for obtaining at least one project
A first engineering;At least one described first engineering is added to preset second engineering;
The Second processing module, for the second engineering of at least one first engineering will to be added with as target work
Journey polymerize the source code of the purpose project, obtains the project aggregated report at least one first engineering.
In above scheme, the Second processing module obtains before polymerizeing specifically for the source code to the purpose project
It takes the source code of second engineering and is stored in root;The source code for successively obtaining at least one first engineering, described
At least one subdirectory is created under root;The corresponding source code for saving first engineering of one subdirectory;According to
The root and at least one described subdirectory obtain tree-like directory;According to the tree-like directory to the source of the purpose project
Code is successively polymerize, and obtains the project aggregated report at least one first engineering according to polymerization result.
The embodiment of the invention provides a kind of generating means of project aggregated report, described device includes: processor and use
In the memory for the computer program that storage can be run on a processor;Wherein,
The processor is for executing any one above-described project aggregated report when running the computer program
Generation method the step of.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, described
The step of generation method of any one above-described project aggregated report is realized when computer program is executed by processor.
The generation method of project aggregated report, device and computer readable storage medium provided by the embodiment of the present invention,
At least one project is obtained, at least one first engineering is determined according at least one described project;Will it is described at least one first
Engineering is added to preset second engineering;Will the second engineering added at least one first engineering as purpose project,
The source code of the purpose project is polymerize, the project aggregated report at least one first engineering is obtained.This hair
In bright embodiment, being established according to each first engineering and the second engineering has hierarchical relationship purpose project, to can determine each first
Relationship between engineering;It can determine the relationship between projects according to the relationship between each first engineering, allow Jenkins disposable
It checks multiple first engineerings, to generate a project aggregated report for being directed to multiple projects, improves the generation of project aggregated report
Efficiency.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the generation method of project aggregated report provided in an embodiment of the present invention;
Fig. 2 is the flow diagram of the generation method of another project aggregated report provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of the generating means of project aggregated report provided in an embodiment of the present invention;
Fig. 4 is the structural schematic diagram of the generating means of another project aggregated report provided in an embodiment of the present invention.
Specific embodiment
In various embodiments of the present invention, at least one project is obtained, is determined at least according at least one described project
One the first engineering;At least one described first engineering is added to preset second engineering;Will added with it is described at least one
Second engineering of the first engineering polymerize the source code of the purpose project as purpose project, obtains for described at least
The project aggregated report of one the first engineering.
Below with reference to embodiment, the present invention is further described in more detail.
Fig. 1 is a kind of flow diagram of the generation method of project aggregated report provided in an embodiment of the present invention;The side
Method can be applied to server;As shown in Figure 1, which comprises
Step 101 obtains at least one project, determines at least one first engineering according at least one described project;It will
At least one described first engineering is added to preset second engineering.
Here, each first engineering can be belonging respectively to different projects, and the project can be belonging respectively to the different storehouses Git
Library, i.e., each first engineering can belong to the different warehouses Git.The Git is the distributed version control system of an open source,
Can effectively, the processing of high speed is from very little to very big Item version management.
Here, for for each project, one or more first engineerings can be determined.
It is described that at least one first engineering is determined according at least one project, comprising: according at least one described project
Each project determine at least one first engineering.
Specifically, before the step 101, which comprises obtain preset second engineering.
Here, second engineering can be an empty engineering;I.e. described second engineering had both been not used in storage service number
According to also not executing business operation.
It is described to obtain preset second engineering, comprising: to create empty engineering, addition is for carrying out quality in the engineering
It detects to obtain the tool of project aggregated report;Using the engineering after addition tool as second engineering.
Here, the tool is quality examination tool needed for generation project aggregated report, specifically can be used for carrying out quiet
State inspection and coverage rate inspection etc..The quality examination tool can use existing tool, therefore which is not described herein again.Specifically
The quality examination can be written by the configuration file of the engineering (POM, Project Object Model) file
The corresponding code of tool or write-in obtain the description of the quality examination tool, and the quality examination Reporting Tools are added to
The engineering.
Here, the POM file is an extensible markup language (XML, Extensible Markup Language)
The configuration file of format;Each engineering is corresponding with its POM file.The POM file is corresponding for describing its described engineering
Essential information of maven project, such as groupId, artifactId, version etc., can also to the privately owned warehouse maven, beat
Packet form, dependence etc. are configured.
It is specifically, described that at least one described first engineering is added to preset second engineering, comprising:
In the configuration file of second engineering, i.e. POM file, add each first at least one described first engineering
Engineering relies on description to the father of second engineering;
It is relied on and is described according to the father, establish each first engineering and second engineering at least one described first engineering
Father and son's dependence.After establishing dependence, each first engineering can be added to second engineering.
Here, addition relies on description to the father of second engineering in the POM file of acceptable each first engineering, and father relies on
Description can be identical configuration description, to reduce the workload being respectively configured.
Description is relied on by addition father, by corresponding first work of projects in multiple warehouses Git under Jenkins framework
Journey is added to the father's engineering of second engineering, i.e. described second engineering as first engineering as sub- engineering.
The step 101, further includes: after each first engineering is added to second engineering, by second engineering department
Administration is into the privately owned warehouse maven, so that each first engineering can be quoted when generating project aggregated report.
It should be noted that there is no spring boot since above-mentioned second engineering sheet is as an empty engineering
The engineering (public work that services as based on) of main function may be reported when being deployed to the privately owned warehouse maven
It is wrong: Unable to find main class.Therefore, in order to by second project plan to the privately owned warehouse the maven
In, it modifies to the configuration file of second engineering.It specifically can be by increasing in the maven plug-in unit in the second engineering
Relevant configuration to modify the configuration file of second engineering, match by the correlation that increases in the maven plug-in unit in the second engineering
It sets, comprising: increase layout section in the spring-boot-maven-plugin subboard in the maven plug-in unit in the second engineering
Point:<configuration>node, and increase layout configuration in the node:<layout>nONE</layout>.
Step 102, will the second engineering added at least one first engineering as purpose project, to the target
The source code of engineering is polymerize, and the project aggregated report at least one first engineering is obtained.
Specifically, before the source code to the purpose project polymerize, which comprises
Determine at least one the first jar packet needed for each first engineering at least one described first engineering;Described first
Jar packet is the jar packet that first engineering can not be obtained by the public packet of bottom;
Addition is described for the dependence of at least one the first jar packet in the configuration file of second engineering, from
And each first engineering describes to obtain according to the dependence in the configuration file of second engineering at least one described first engineering
At least one described the first jar packet.
Here, the first jar packet is the jar packet that first engineering can not be obtained by the public packet of bottom, such as is compiled
The jar packet of phase dependence is translated, the jar packet that the compiling duration relies on may include: lombok, junit etc..It, can be in the present embodiment
Dependence description in public packet is added in the POM file of the second engineering, i.e. father's engineering, such as passes through subordinate<dependency>
Label, which increases, relies on configuration, and passes through<scope>compile</scope>the first jar packet is configured compiling duration by label
It relies on, realizes that the dependence to the jar packet that can not be obtained by the public packet of bottom is modified.
Through the above steps, realize that the dependence to the jar packet that can not be obtained by the public packet of bottom be modified, with
So that the jar packet that can not be obtained by the public packet of bottom can be compiled tool in the first engineering, i.e. sub- engineering compiling and draw
With.
The jar packet is a kind of archive file, with " .jar " for extension name, is applied not only to carry out data compression and hair
Cloth is also used to dispose encapsulation library, component and plug-in card program, and can directly be used as tools such as compilers.
In the present embodiment, it is contemplated that project is packaged (Package), also referred to as when dismissing cloth bag, it will usually the relied on
Tripartite's jar packet is introduced into the jar packet of final project jar packet, i.e. purpose project, will pass through java-jar operation.But
There are when public work in group engineering, third party's jar packet that public work can also be relied on is introduced into the jar packet of itself
In, then relied on by the final project jar packet.This packing manner will lead to public work and be packaged the jar packet obtained too
Greatly, be not easy to rely in the corresponding project of other sub- engineerings and the corresponding project of father's engineering and use, need support beat it is public
Relied on third party's jar packet is not introduced when packet.
Specifically, before the source code to the purpose project polymerize, which comprises
It determines at least one described first engineering comprising public work and when the public work relies on the 2nd jar packet,
It modifies in the configuration file of the public work and is described for the dependence of jar packet, to cancel the public work to described second
The dependence of jar packet;The 2nd jar packet is the jar packet for including except the privately owned warehouse maven for being deployed with second engineering
Outer third party's jar packet.
For example, it can be repacked by increasing in the POM file of public work in the present embodiment
(repackage) configuration description, which is realized, modifies to packing process.It specifically can be by spring-boot-maven-
Increase in plugin plug-in unit and executes<execution>node, and increase in the node<goal>repackage</goal>match
It sets, completes to increase repackage configuration in the POM file of public work.
Specifically, before the source code to the purpose project polymerize, the method also includes:
It obtains the source code of second engineering and is stored in root;
The source code for successively obtaining each first engineering at least one described first engineering, creates at least under the root
One subdirectory;The corresponding source code for saving first engineering of one subdirectory;
Tree-like directory is obtained according to the root and at least one described subdirectory.
Specifically, the source code to the purpose project polymerize, and obtains at least one described first engineering
Project aggregated report, comprising:
Successively it is polymerize according to source code of the tree-like directory to the purpose project, is directed to according to polymerization result
The project aggregated report of at least one first engineering.
Specifically, the source code (specially Git source code) of multiple first engineerings in purpose project on Jenkins is carried out
When polymerization, the source code of father's engineering, i.e. the second engineering can be first downloaded;Again by the multiple-scms plug-in unit of father's engineering same
At least one subdirectory is created under one catalogue, the source code of each sub- engineering is downloaded under newly created corresponding subdirectory, one
The source code of sub- engineering is stored in a subdirectory;To obtain tree-like directory (the concrete application process for including father and son's engineering source code
In can be shown in the workspace workspace root of Jenkins).
After obtaining the tree-like directory, is executed under the tree-like directory (i.e. workspace root) and check order, i.e.,
The order of the quality examination tool in the configuration file of second engineering is executed, successively obtains sub- engineering (i.e. in implementation procedure
First engineering) source code and successively polymerize, it is final that produce a projects comprising all sub- engineering supervision results simultaneously poly-
Close report.
It should be noted that consider exclusiveness when source code downloading, so that only allow to download a source code under same catalogue,
Even first descend the source code of carrier engineering, when father's engineering source code to be downloaded can delete sub- engineering source code, therefore, in the present embodiment first
Father's engineering is downloaded as top-level directory, then subdirectory is created under same catalogue by multiple-scms plug-in unit, and create
The title of subdirectory with and father's engineering configuration file in the title of sub- engineering node it is consistent, so that Jenkins can will be downloaded
Subdirectory checked as sub- engineering.
The above method provided in this embodiment is excessively repaired without hand-written script or to the corresponding engineering of projects
Change, project is invaded less, automation inspection is facilitated;And support father and son's engineering to check in the different warehouses Git, it is convenient
Father and son's engineering does rights management and branch management respectively.
Fig. 2 is the flow diagram of the generation method of another project aggregated report provided in an embodiment of the present invention;Such as Fig. 2
It is shown, which comprises
Step 201 obtains preset father's engineering.
Here, the second engineering described in described father's engineering, that is, Fig. 1 can be an empty engineering, i.e., father's engineering is neither
For storage service data, business operation is not also executed.
Before the step 201, comprising: addition father's engineering.It specifically includes: writing corresponding configuration text for father's engineering
Part, i.e. POM file, and the quality examination tool needed when generating project aggregated report is written to father when writing POM file
In the POM file of engineering.
It should be noted that since above-mentioned father's engineering sheet is as an empty engineering, i.e., no spring boot main
The engineering (public work that services as based on) of function may report an error when being deployed to the privately owned warehouse maven:
Unable to find main class.Therefore, in order to by father's project plan into the privately owned warehouse the maven, to institute
The POM file for stating father's engineering is modified.It specifically can be by increasing relevant configuration in the maven plug-in unit in father's engineering to repair
Change the POM file of father's engineering, it is described to increase relevant configuration in the maven plug-in unit in father's engineering, comprising: in father's engineering
Maven plug-in unit in spring-boot-maven-plugin subboard in increase arrangement nodes:<configuration>section
Point, and increase layout configuration in the node:<layout>nONE</layout>.
At least one first engineering is added to father's engineering by step 202, the sub- engineering as father's engineering.
Specifically, first engineering is the corresponding engineering of project in multiple warehouses Git under Jenkins framework, will
It is added to father's engineering as sub- engineering.And by father's project plan into the privately owned warehouse maven, so that sub- engineering can
To be quoted when generating Jenkins project aggregated report.
It is described that at least one first engineering is added to father's engineering, comprising: in the POM file of father's engineering,
It adds each first engineering at least one described first engineering and description is relied on to the father of father's engineering;It is relied on and is retouched according to the father
It states, establishes father and son's dependence of each first engineering Yu father's engineering;After establishing dependence, each first engineering can be added
Add to father's engineering.
Alternatively, the specified father to father's engineering can also be added in the POM file of multiple first engineerings relies on description, and
It is unified in each first engineering to be described using identical dependence, so as to reduce the workload being respectively configured.
Step 203 modify to the dependence for the jar packet that can not be obtained by the public packet of bottom.
Specifically, after addition father's engineering and sub- engineering, it is contemplated that some jar packets can not be obtained by the public packet of bottom
It takes, it need to be to that can not be modified by the dependence for the jar packet that the public packet of bottom obtains, so that the jar packet can be in sub- engineering
Tool reference is compiled when compiling.
Specifically, before the source code to purpose project polymerize, which comprises
Determine at least one the first jar packet needed for each first engineering;The first jar packet is that first engineering can not
The jar packet obtained by the public packet of bottom;Addition is at least one described the first jar in the POM file of father's engineering
The dependence of packet describes, at least one described first engineering is according to the dependence description acquisition in the POM file of father's engineering
At least one the first jar packet.
It for example, can be with when to that can not be modified by the public packet of bottom come the dependence of the jar packet obtained
Dependence description in public packet is added in the POM file of father's engineering, such as increases to rely on by<dependency>label and match
It sets, and passes through<scope>compile</scope>label configures compiling duration for the jar packet and relies on.
Step 204 modifies to packing process.
In view of micro services project is when being packaged, it will usually which third party's jar packet of dependence is introduced into final project jar
Bao Zhong, will pass through java-jar operation.But there are when public work in group engineering, public work can also be relied on
Third party's jar packet be introduced into the jar packet of itself, then relied on by the final project jar packet.This packing manner meeting
Cause public work to be packaged the jar Bao Tai great obtained, is not easy in the corresponding project of other sub- engineerings and the corresponding item of father's engineering
It relies on and uses in mesh, need support and do not introduce relied on third party's jar packet when playing public packet.
Specifically, before the source code to purpose project polymerize, which comprises
It determines at least one described first engineering comprising public work and when the public work relies on the 2nd jar packet,
It modifies in the POM file of the public work and is described for the dependence of jar packet, to cancel the public work to described second
The dependence of jar packet;The 2nd jar packet is the jar packet for including except the privately owned warehouse maven for being deployed with second engineering
Outer third party's jar packet.
For example, it can be repacked by increasing in the POM file of public work in the present embodiment
(repackage) configuration description, which is realized, modifies to packing process.It specifically can be by spring-boot-maven-
Increase in plugin plug-in unit and executes<execution>node, and increase in the node<goal>repackage</goal>match
It sets, completes to increase repackage configuration in the POM file of public work.
Step 205, will father's engineering added at least one first engineering as purpose project, to the target work
The source code of journey is polymerize, and the project aggregated report at least one first engineering is obtained.
Specifically, the step 205, comprising: the source code of downloading father's engineering;Again by multiple-scms plug-in unit same
Subdirectory is created under one catalogue, later by sub- engineering, the source code of i.e. each first engineering downloads under newly created corresponding sub directory;
It is comprehensive to generate the tree-like directory for completely including father and son's engineering source code in the workspace root of Jenkins
Inspection be ready;
After obtaining the tree-like directory, inspection order is executed in the tree-like directory, under i.e. above-mentioned workspace catalogue,
The order of quality examination tool of the configuration in the POM file of father's engineering is executed, the source of sub- engineering is successively obtained in implementation procedure
Code simultaneously successively polymerize, and final i.e. producible portion includes the project aggregated report of all sub- engineering supervision results simultaneously.
It should be noted that the exclusiveness when downloading of Git source code is considered, so that only allowing to download a source under same catalogue
Code, even first descends the source code of carrier engineering, and when father's engineering source code to be downloaded can delete sub- engineering source code, therefore, the present embodiment
Middle first downloading father's engineering creates subdirectory as top-level directory, then by multiple-scms plug-in unit under same catalogue, and creates
The title for the subdirectory built with and the POM file of father's engineering in the title of sub- engineering node it is consistent, thus Jenkins can will
The subdirectory of downloading is checked as sub- engineering.
Fig. 3 is a kind of structural schematic diagram of the generating means of project aggregated report provided in an embodiment of the present invention;Such as Fig. 3 institute
Show, described device includes: first processing module 301 and Second processing module 302.
The first processing module 301 determines at least for obtaining at least one project according at least one described project
One the first engineering;At least one described first engineering is added to preset second engineering.
The Second processing module 302, for the second engineering of at least one first engineering will to be added with as mesh
Engineering is marked, the source code of the purpose project is polymerize, the project obtained at least one first engineering polymerize report
It accuses.
Specifically, the first processing module 301, at least one described first engineering to be added to preset second
Before engineering, in the configuration file of second engineering, at least one described first engineering is added to the father of second engineering
Rely on description;It is relied on and is described according to the father, the father and son for establishing at least one described first engineering and second engineering relies on
Relationship.
Specifically, the Second processing module 302 before polymerizeing for the source code to the purpose project, determines institute
State at least one the first jar packet needed for the first engineering;The first jar packet is that first engineering can not be public by bottom
Wrap the jar packet obtained;Addition is retouched for the dependence of at least one the first jar packet in the configuration file of second engineering
It states, first engineering obtains at least one described the first jar packet according to the dependence description in the configuration file.
Specifically, the Second processing module 302 before polymerizeing for the source code to the purpose project, determines institute
It states at least one first engineering comprising public work and when the public work relies on the 2nd jar packet, the modification public work
It describes in the configuration file of journey for the dependence of jar packet, is closed with cancelling the public work to the dependence of the 2nd jar packet
System;The 2nd jar packet is the third party jar in addition to the jar packet that the privately owned warehouse maven for being deployed with second engineering includes
Packet.
Specifically, the Second processing module 302 before polymerizeing for the source code to the purpose project, obtains institute
It states the source code of the second engineering and is stored in root;The source code for successively obtaining at least one first engineering, in described mesh
At least one subdirectory is created under record;The corresponding source code for saving first engineering of one subdirectory;According to described
Root and at least one described subdirectory obtain tree-like directory.
Specifically, the Second processing module 302, for according to the tree-like directory to the source code of the purpose project into
Row successively polymerization obtains the project aggregated report at least one first engineering according to polymerization result.
It should be understood that the generating means of project aggregated report provided by the above embodiment are carrying out project aggregated report
Generation method when, only with the division progress of above-mentioned each program module for example, can according to need and incite somebody to action in practical application
Above-mentioned processing distribution is completed by different program modules, i.e., the internal structure of device is divided into different program modules, with complete
At all or part of processing described above.In addition, the generating means and item of project aggregated report provided by the above embodiment
The generation method embodiment of mesh aggregated report belongs to same design, and specific implementation process is detailed in embodiment of the method, here no longer
It repeats.
Fig. 4 is the structural schematic diagram of the generating means of another project aggregated report provided in an embodiment of the present invention.It is described
Device 40 includes: processor 401 and the memory 402 for storing the computer program that can be run on the processor;
Wherein, the processor 401 for run the computer program when, execute: obtain at least one project, according to it is described at least
One project determines at least one first engineering;At least one described first engineering is added to preset second engineering;It will add
Added at least one first engineering the second engineering as purpose project, the source code of the purpose project is polymerize,
Obtain the project aggregated report at least one first engineering.
In one embodiment, it when the processor 401 is also used to run the computer program, executes: by described at least
Before one the first engineering is added to preset second engineering, in the configuration file of second engineering, addition described at least one
A first engineering relies on description to the father of second engineering;Relied on and described according to the father, establish it is described at least one first
Father and son's dependence of engineering and second engineering.
In one embodiment, it when the processor 401 is also used to run the computer program, executes: to the target
Before the source code of engineering is polymerize, at least one the first jar packet needed for first engineering is determined;The first jar packet is
The jar packet that first engineering can not be obtained by the public packet of bottom;It adds and is directed in the configuration file of second engineering
The dependence of at least one the first jar packet describes, and first engineering describes to obtain according to the dependence in the configuration file
At least one described the first jar packet.
In one embodiment, it when the processor 401 is also used to run the computer program, executes: to the target
Before the source code of engineering is polymerize, determine at least one described first engineering comprising public work and the public work according to
When relying the 2nd jar packet, modifies in the configuration file of the public work and described for the dependence of jar packet, it is described public to cancel
Dependence of the engineering to the 2nd jar packet;The 2nd jar packet is except the maven for being deployed with second engineering is privately owned
Third party's jar packet outside the jar packet that warehouse includes.
In one embodiment, it when the processor 401 is also used to run the computer program, executes: to the target
Before the source code of engineering is polymerize, obtains the source code of second engineering and be stored in root;Successively obtain described at least one
The source code of a first engineering, creates at least one subdirectory under the root;One subdirectory is corresponding to save one
The source code of first engineering;Tree-like directory is obtained according to the root and at least one described subdirectory.
In one embodiment, it when the processor 401 is also used to run the computer program, executes: according to the tree
Shape catalogue successively polymerize the source code of the purpose project, is obtained according to polymerization result at least one described first work
The project aggregated report of journey.
It should be understood that the life of the generating means of project aggregated report provided by the above embodiment and project aggregated report
Belong to same design at embodiment of the method, specific implementation process is detailed in embodiment of the method, and which is not described herein again.
When practical application, described device 40 can also include: at least one network interface 403.The life of project aggregated report
It is coupled at the various components in device 40 by bus system 404.It is understood that bus system 404 is for realizing these
Connection communication between component.Bus system 404 further includes power bus, control bus and shape in addition to including data/address bus
State signal bus.But for the sake of clear explanation, various buses are all designated as bus system 404 in Fig. 4.Wherein, described
The number of processor 404 can be at least one.Generating means 40 of the network interface 403 for project aggregated report are set with other
The communication of wired or wireless way between standby.
Memory 402 in the embodiment of the present invention is for storing various types of data to support the life of project aggregated report
At the operation of device 40.
The method that the embodiments of the present invention disclose can be applied in processor 401, or be realized by processor 401.
Processor 401 may be a kind of IC chip, the processing capacity with signal.During realization, the above method it is each
Step can be completed by the integrated logic circuit of the hardware in processor 401 or the instruction of software form.Above-mentioned processing
Device 401 can be general processor, digital signal processor (DSP, DiGital Signal Processor) or other can
Programmed logic device, discrete gate or transistor logic, discrete hardware components etc..Processor 401 may be implemented or hold
Disclosed each method, step and logic diagram in the row embodiment of the present invention.General processor can be microprocessor or appoint
What conventional processor etc..The step of method in conjunction with disclosed in the embodiment of the present invention, can be embodied directly at hardware decoding
Reason device executes completion, or in decoding processor hardware and software module combine and execute completion.Software module can be located at
In storage medium, which is located at memory 402, and processor 401 reads the information in memory 402, in conjunction with its hardware
The step of completing preceding method.
In the exemplary embodiment, the generating means 40 of project aggregated report can be dedicated integrated by one or more application
Circuit (ASIC, Application Specific Integrated Circuit), DSP, programmable logic device (PLD,
Programmable Logic Device), Complex Programmable Logic Devices (CPLD, Complex Programmable Logic
Device), field programmable gate array (FPGA, Field-Programmable Gate Array), general processor, control
Device, microcontroller (MCU, Micro Controller Unit), microprocessor (Microprocessor) or other electronics member
Part is realized, for executing preceding method.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, described
It when computer program is run by processor, executes: obtaining at least one project, determine at least one according at least one described project
A first engineering;At least one described first engineering is added to preset second engineering;Will added with it is described at least one the
Second engineering of one engineering polymerize the source code of the purpose project as purpose project, obtains for described at least one
The project aggregated report of a first engineering.
In one embodiment, it when the computer program is run by processor, executes: will at least one described first engineering
Before being added to preset second engineering, in the configuration file of second engineering, at least one described first engineering pair is added
The father of second engineering relies on description;It is relied on and is described according to the father, establish at least one described first engineering and described the
Father and son's dependence of two engineerings.
In one embodiment, when the computer program is run by processor, execute: to the source code of the purpose project into
Before row polymerization, at least one the first jar packet needed for first engineering is determined;The first jar packet is first engineering
The jar packet that can not be obtained by the public packet of bottom;At least one described in being directed to is added in the configuration file of second engineering
The dependence of first jar packet describes, and first engineering describes at least one described in acquisition according to the dependence in the configuration file
First jar packet.
In one embodiment, when the computer program is run by processor, execute: to the source code of the purpose project into
Before row polymerization, determining at least one described first engineering includes public work and the public work relies on the 2nd jar packet
When, the dependence description in the configuration file of the public work for jar packet is modified, to cancel the public work to described the
The dependence of two jar packets;The 2nd jar packet is the jar for including except the privately owned warehouse maven for being deployed with second engineering
Third party's jar packet outside packet.
In one embodiment, when the computer program is run by processor, execute: to the source code of the purpose project into
Before row polymerization, obtains the source code of second engineering and be stored in root;Successively obtain at least one first engineering
Source code creates at least one subdirectory under the root;One subdirectory is corresponding to save first engineering
Source code;Tree-like directory is obtained according to the root and at least one described subdirectory.
In one embodiment, it when the computer program is run by processor, executes: according to the tree-like directory to described
The source code of purpose project is successively polymerize, and obtains the project polymerization at least one first engineering according to polymerization result
Report.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it
Its mode is realized.Apparatus embodiments described above are merely indicative, for example, the division of the unit, only
A kind of logical function partition, there may be another division manner in actual implementation, such as: multiple units or components can combine, or
It is desirably integrated into another system, or some features can be ignored or not executed.In addition, shown or discussed each composition portion
Mutual coupling or direct-coupling or communication connection is divided to can be through some interfaces, the INDIRECT COUPLING of equipment or unit
Or communication connection, it can be electrical, mechanical or other forms.
Above-mentioned unit as illustrated by the separation member, which can be or may not be, to be physically separated, aobvious as unit
The component shown can be or may not be physical unit, it can and it is in one place, it may be distributed over multiple network lists
In member;Some or all of units can be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
In addition, each functional unit in various embodiments of the present invention can be fully integrated in one processing unit, it can also
To be each unit individually as a unit, can also be integrated in one unit with two or more units;It is above-mentioned
Integrated unit both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program
When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned include: movable storage device, it is read-only
Memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disk or
The various media that can store program code such as person's CD.
If alternatively, the above-mentioned integrated unit of the present invention is realized in the form of software function module and as independent product
When selling or using, it also can store in a computer readable storage medium.Based on this understanding, the present invention is implemented
Substantially the part that contributes to existing technology can be embodied in the form of software products the technical solution of example in other words,
The computer software product is stored in a storage medium, including some instructions are used so that computer equipment (can be with
It is personal computer, server or network equipment etc.) execute all or part of each embodiment the method for the present invention.
And storage medium above-mentioned includes: that movable storage device, ROM, RAM, magnetic or disk etc. are various can store program code
Medium.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the scope of the present invention, it is all
Made any modifications, equivalent replacements, and improvements etc. within the spirit and principles in the present invention, should be included in protection of the invention
Within the scope of.
Claims (10)
1. a kind of generation method of project aggregated report, which is characterized in that the described method includes:
At least one project is obtained, at least one first engineering is determined according at least one described project;Will it is described at least one
First engineering is added to preset second engineering;
Will the second engineering added at least one first engineering as purpose project, to the source code of the purpose project into
Row polymerization obtains the project aggregated report at least one first engineering.
2. the method according to claim 1, wherein it is described at least one described first engineering is added to it is default
The second engineering before, the method also includes:
In the configuration file of second engineering, adds at least one described first engineering and the father of second engineering is relied on
Description;
It is relied on and is described according to the father, establish father and son's dependence of described at least one first engineering and second engineering.
3. the method according to claim 1, wherein before the source code to the purpose project polymerize,
The described method includes:
Determine at least one the first jar packet needed for first engineering;The first jar packet is that first engineering can not lead to
Cross the jar packet that the public packet of bottom obtains;
Addition is described for the dependence of at least one the first jar packet in the configuration file of second engineering, and described the
One engineering obtains at least one described the first jar packet according to the dependence description in the configuration file.
4. the method according to claim 1, wherein before the source code to the purpose project polymerize,
The described method includes:
Determine modification at least one described first engineering comprising public work and when the public work relies on the 2nd jar packet
It is described in the configuration file of the public work for the dependence of jar packet, to cancel the public work to the 2nd jar packet
Dependence;The 2nd jar packet is in addition to the jar packet that the privately owned warehouse maven for being deployed with second engineering includes
Third party's jar packet.
5. the method according to claim 1, wherein before the source code to the purpose project polymerize,
The method also includes:
It obtains the source code of second engineering and is stored in root;
The source code for successively obtaining at least one first engineering, creates at least one subdirectory under the root;One
The corresponding source code for saving first engineering of the subdirectory;
Tree-like directory is obtained according to the root and at least one described subdirectory.
6. according to the method described in claim 5, obtaining it is characterized in that, the source code to the purpose project polymerize
Obtain the project aggregated report at least one first engineering, comprising:
Successively it is polymerize according to source code of the tree-like directory to the purpose project, is obtained according to polymerization result for described
The project aggregated report of at least one the first engineering.
7. a kind of generating means of project aggregated report, which is characterized in that described device includes: first processing module, at second
Manage module;Wherein,
The first processing module, for obtaining at least one project, according at least one described project determine at least one
One engineering;At least one described first engineering is added to preset second engineering;
The Second processing module, for the second engineering of at least one first engineering will to be added with as purpose project,
The source code of the purpose project is polymerize, the project aggregated report at least one first engineering is obtained.
8. device according to claim 7, which is characterized in that the Second processing module is specifically used for the target
Before the source code of engineering is polymerize, obtains the source code of second engineering and be stored in root;Successively obtain described at least one
The source code of a first engineering, creates at least one subdirectory under the root;One subdirectory is corresponding to save one
The source code of first engineering;Tree-like directory is obtained according to the root and at least one described subdirectory;According to the tree
Shape catalogue successively polymerize the source code of the purpose project, is obtained according to polymerization result at least one described first work
The project aggregated report of journey.
9. a kind of generating means of project aggregated report, which is characterized in that described device includes: processor and can for storing
The memory of the computer program run on a processor;Wherein,
The processor is for the step of when running the computer program, perform claim requires any one of 1 to 6 the method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of any one of claim 1 to 6 the method is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811638819.5A CN109766128A (en) | 2018-12-29 | 2018-12-29 | Generation method, device and the storage medium of project aggregated report |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811638819.5A CN109766128A (en) | 2018-12-29 | 2018-12-29 | Generation method, device and the storage medium of project aggregated report |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109766128A true CN109766128A (en) | 2019-05-17 |
Family
ID=66453034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811638819.5A Pending CN109766128A (en) | 2018-12-29 | 2018-12-29 | Generation method, device and the storage medium of project aggregated report |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109766128A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111782191A (en) * | 2020-06-29 | 2020-10-16 | 京东数字科技控股有限公司 | Project engineering creating method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040255265A1 (en) * | 2003-03-26 | 2004-12-16 | Brown William M. | System and method for project management |
CN101540022A (en) * | 2008-01-22 | 2009-09-23 | 埃森哲环球服务有限公司 | Knowledge transfer in a project environment |
-
2018
- 2018-12-29 CN CN201811638819.5A patent/CN109766128A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040255265A1 (en) * | 2003-03-26 | 2004-12-16 | Brown William M. | System and method for project management |
CN101540022A (en) * | 2008-01-22 | 2009-09-23 | 埃森哲环球服务有限公司 | Knowledge transfer in a project environment |
Non-Patent Citations (1)
Title |
---|
IT_小翼: "一个多maven项目聚合的实例", 《HTTPS://MY.OSCHINA.NET/XUQIANG/BLOG/99854》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111782191A (en) * | 2020-06-29 | 2020-10-16 | 京东数字科技控股有限公司 | Project engineering creating method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20230244454A1 (en) | Software defined network controller | |
CN106227605A (en) | The dynamic micro services expansion method of a kind of multilingual cloud compiling and device | |
CN106250199A (en) | The dynamic micro services call method of a kind of multilingual cloud compiling and device | |
CN106293704A (en) | Dynamic micro services edit methods, device and the server of multilingual cloud compiling | |
FI115941B (en) | Data processing system for communication networks | |
CN106533804A (en) | Network operation support system | |
CN102866944B (en) | Pressure testing system and method | |
EP2228726A2 (en) | A method and system for task modeling of mobile phone applications | |
CN109144618A (en) | A kind of service flow execution method and relevant apparatus | |
CN103646104A (en) | Hard real-time fault diagnosis method and system | |
CN108460199B (en) | CNI modeling system | |
CN104267938B (en) | A kind of method and device of the quick development deployment of the application of streaming computing | |
CN110018829A (en) | Improve the method and device of PL/SQL language interpreter execution efficiency | |
CN102014016A (en) | System and method for testing defects of network protocol | |
CN102289774A (en) | Graphical message processing and test system and method in financial transaction processing system | |
Zhang et al. | Incremental network configuration verification | |
CN111813739A (en) | Data migration method and device, computer equipment and storage medium | |
CN107122307B (en) | Internet of things execution system | |
CN109766128A (en) | Generation method, device and the storage medium of project aggregated report | |
WO2017084388A1 (en) | Network polling method and apparatus | |
CN110109658A (en) | A kind of ROS code generator and code generating method based on formalized model | |
Lu et al. | Zen-CC: An automated and incremental conformance checking solution to support interactive product configuration | |
CN106535221A (en) | Resource management method and device, and multimode soft base station unified webmaster | |
CN107229815A (en) | Data analysing method and device | |
CN107317716A (en) | A kind of terminal management system and its application process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190517 |
|
RJ01 | Rejection of invention patent application after publication |